MAURY USCG vessel records Sign in
← All vessels

HO KU HELE

HO KU HELE is a 1981 passenger vessel (inspected). The Coast Guard has recorded 63 inspections since 1985, most recently in November 2017, along with 136 deficiencies, 1 operational control and 4 casualty investigations between 2002 and 2016.

Records from 1985 to 2017. Most recent: inspection, 21 November 2017.

Built
1981
Last inspected
21 November 2017
Documentation
Not in the documentation file of 10 September 2026
Controls
None recorded without a removal date

Identity

WDB9741
Flag
UNITED STATES
366981870, 367657030 (licence lapsed)
Maury page id
psix-53828

Inspections, by type

…with no type recorded6
Years with a record 29 calendar years (1985–2017)
The 63 inspections in the strip above, split by the kind of activity the US Coast Guard recorded. Years with a record are calendar years in which a record exists, not years in service. What Maury does not do.

This record may be incomplete: the most recent inspection recorded for this vessel was 9 years ago. Maury shows what the Coast Guard recorded, not whether the vessel has been inspected since, is still in service, or what condition it is in. Coast Guard record current through 13 September 2026, retrieved 18 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard. Records for the Passenger Ship class in Maury's sources begin in 1977.

Documentation record

Tonnage as PSIX records it13 - Simplified, Gross Ton
10 - Simplified, Net Ton
This hull's Official Number is not in the NVDC file dated 10 September 2026 as served by NOAA Fisheries, so no documentation record is shown. Absence from that file is a fact about the file, not about the hull.

Radio station licence

WDH8344MMSI 367657030 · expired · compulsorily equipped · granted 12 February 2015, cancelled 19 April 2025 · licensed under a name not among this hull’s recorded names (not shown)
WDB9741MMSI 366981870 · expired · compulsorily equipped · granted 6 October 2004, cancelled 6 December 2014 · licensed under a name not among this hull’s recorded names (not shown)
WCW8853MMSI not assigned · expired · voluntarily equipped · granted 24 September 1996, cancelled 25 November 2006
FCC Universal Licensing System ship-station file of 6 September 2026, matched to this hull on its US Official Number. Status and dates are the file’s own. The licensee is not read from the file and is not shown. A lapsed licence’s MMSI is still the number the vessel transmitted under while it was valid.

Inspection history · 63

21 November 2017 Administrative Inspection
Administrative · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 6311104
26 February 2016 Type not recorded
No type recorded · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 5822534
10 January 2016 DAPI Audit · Administrative Inspection · Annual Inspection
Physical examination · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 5800034
11 May 2014 Administrative Inspection · Hull Examination
Physical examination · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 4881461
1 May 2012 Deficiency Check · Hull Examination · Internal Structural Exam
Physical examination · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 4282938
25 January 2011 Deficiency Check
Physical examination · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 3932893
1 December 2010 Deficiency Check
Physical examination · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 3903030
25 October 2010 Annual Inspection · Deficiency Check · DAPI Audit
Physical examination · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 3865395
2 September 2008 Internal Structural Exam · Deficiency Check · Hull Examination
Physical examination · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 3316191
12 August 2008 Type not recorded
No type recorded · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 3296836
8 August 2008 COI Inspection · Deficiency Check · Administrative Inspection
Physical examination · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 3292378
27 June 2007 Type not recorded
No type recorded · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 2992973
3 May 2007 Deficiency Check · COI Inspection
Physical examination · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 2961907
12 September 2006 Deficiency Check · Hull Examination
Physical examination · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 2720565
12 June 2006 Annual Inspection
Physical examination · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 2834767
22 July 2004 Hull Examination · Deficiency Check
Physical examination · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 2195727
30 October 2003 Annual Inspection
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1939688
26 August 2002 Damage Survey · Hull Examination · Examination of Repairs
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1664123
16 August 2002 Type not recorded
No type recorded · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1679402
9 May 2002 COI Inspection
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1613738
14 August 2001 Administrative
Administrative · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1069715
15 June 2001 Deficiency Check
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1069377
7 June 2001 Re-Inspection
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1417363
2 February 2001 Hull Examination
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1426543
23 June 2000 Deficiency Check
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1052222
7 June 2000 Re-Inspection
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1376242
18 May 1999 COI Inspection · Deficiency Check · MARPOL Annex V Examination
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1378700
21 December 1998 Hull Examination
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1381433
30 November 1998 Administrative
Administrative · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 807193
3 June 1998 MARPOL Annex V Examination · Re-Inspection
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1378393
22 April 1998 Plan Review "T" Boat
Administrative · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1126741
16 May 1997 MARPOL Annex V Examination · Re-Inspection
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1450044
22 January 1997 Deficiency Check
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1433146
2 November 1996 Hull Examination
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1357775
2 July 1996 Deficiency Check
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1367864
5 June 1996 COI Inspection · MARPOL Annex V Examination
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1411308
20 June 1995 Hull Examination
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1398280
4 May 1995 MARPOL Annex V Examination · Re-Inspection
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1417778
2 September 1994 Administrative
Administrative · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1358518
1 July 1994 Re-Inspection · MARPOL Annex V Examination
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1358470
26 May 1994 Type not recorded
No type recorded · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1356674
10 May 1994 Administrative
Administrative · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1387527
4 February 1994 Deficiency Check
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1166598
7 January 1994 Deficiency Check
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1362911
3 December 1993 Hull Examination
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1354514
4 June 1993 COI Inspection
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1354475
5 November 1992 Deficiency Check
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1247254
4 August 1992 Re-Inspection
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1261249
11 June 1992 Hull Examination
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1257856
28 June 1991 Deficiency Check
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1247553
7 June 1991 Re-Inspection
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1329938
11 March 1991 Administrative
Administrative · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1215800
27 November 1990 Hull Examination
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 914946
19 June 1990 COI Inspection
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1239733
15 November 1989 Hull Examination
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1219708
19 June 1989 Re-Inspection
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1352254
21 November 1988 Hull Examination
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 898526
6 June 1988 Re-Inspection · Deficiency Check
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1199304
29 June 1987 COI Inspection · Hull Examination
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1011388
15 July 1986 Re-Inspection
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 989808
18 June 1986 Credit Drydock
Administrative · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 994049
23 July 1985 Credit Drydock
Administrative · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1295323
28 May 1985 Type not recorded
No type recorded · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 981863

Deficiency record · 136

Engineering › Shafting/Propeller Arrangements › Bearing
Issued 11 May 2012 Resolved
Replace worn starboard cutlass bearing.
Due 24 May 2012
Resolved 17 May 2012
Stability › Watertight Integrity › Coaming
Issued 11 May 2012 Resolved
Renew starboard forward hatch coming and make watertight.
Due 24 May 2012
Resolved 17 May 2012
Accommodation/Occupational Safety › Occupational Safety › Tripping/Falling Hazard
Issued 11 May 2012 Resolved
Renew delaminated/fractured inboard safety net attachment beam.
Due 24 May 2012
Resolved 18 May 2012
Stability › Watertight Integrity › General
Issued 11 May 2012 Resolved
Grind out and make available for further inspection cracked deck in way of starboard transom step. Renew to the satisfaction of an attending USCG Marine Inspector.
Due 24 May 2012
Resolved 17 May 2012
Construction/Loadline › Structures › Deck Plating
Issued 11 May 2012 Resolved
Renew wood rot cross deck beam at transom hatch.
Due 24 May 2012
Resolved 17 May 2012
Construction/Loadline › Structures › Transverse Bulkhead
Issued 11 May 2012 Resolved
Renew wood rot stbd transom aft bulkhead.
Due 24 May 2012
Resolved 17 May 2012
Accommodation/Occupational Safety › Occupational Safety › Deck Rail
Issued 11 May 2012 Resolved
Install missing bolts in forward embarkation ladder railing attachment points.
Due 24 May 2012
Resolved 17 May 2012
Accommodation/Occupational Safety › Occupational Safety › Deck Rail
Issued 11 May 2012 Resolved
Properly secure railing at port transom.
Due 24 May 2012
Resolved 17 May 2012
Construction/Loadline › Hull › Hull Plating
Issued 11 May 2012 Resolved
Make port transom watertight in way of inboard holed hull at transom steps.
Due 24 May 2012
Resolved 17 May 2012
Construction/Loadline › Hull › Hull Plating
Issued 11 May 2012 Resolved
Renew water damaged hull in way of port engine room bilge overboard thru hull penetration
Due 24 May 2012
Resolved 18 May 2012
Construction/Loadline › Hull › Hull Plating
Issued 11 May 2012 Resolved
Remove wood rot below port cabin window and make available for further inspection. Renew area to the satisfaction of an attending USCG Marine Inspector.
Due 24 May 2012
Resolved 17 May 2012
Construction/Loadline › Hull › Hull Plating
Issued 11 May 2012 Resolved
Remove temp repair in way of port forepeak and make available for further inspection. Renew to the satisfaction of an attending USCG Marine Inspector.
Due 24 May 2012
Resolved 17 May 2012
Construction/Loadline › Hull › Hull Plating
Issued 11 May 2012 Resolved
Make identified hull blisters on port interior hull available for further inspection. Renew to the satisfaction of an attending USCG Marine Inspector.
Due 24 May 2012
Resolved 17 May 2012
Construction/Loadline › Hull › Keel
Issued 11 May 2012 Resolved
Make crack in way of port keel available for further inspection. Renew to the satisfaction of an attending USCG Marine Inspector.
Due 24 May 2012
Resolved 17 May 2012
Construction/Loadline › Hull › Hull Plating
Issued 11 May 2012 Resolved
Renew water damaged hull in way of port sink drain thru hull penetration.
Due 24 May 2012
Resolved 17 May 2012
Electrical › Electrical Distribution System (service) › Wiring
Issued 11 May 2012 Resolved
Install metallic supports for electrical wiring in way of engine room IAW 46 CFR 183.340.
Due 11 June 2012
Resolved 25 October 2012
Fire Fighting › Structural - Main Vertical Zones › General
Issued 11 May 2012 Resolved
Make port/stbd engine rooms vapor tight.
Due 11 June 2012
Resolved 25 October 2012
Electrical › Electric Generation Source (service) › Panelboard
Issued 11 May 2012 Resolved
Cover all exposed electrical relay boxes in way of port/starboard engine room.
Due 11 June 2012
Resolved 25 October 2012
Engineering › Bilge Water Management System › Not Operational
Issued 25 October 2010 Resolved
Properly mount all bilge audible alarms at the operating station.
Due 25 November 2010
Resolved 1 December 2010
Resolution: All bilge audble alarms were mounted @ the operating station.
Engineering › Bilge Water Management System › Not Operational
Issued 25 October 2010 Resolved
Prove operation of port engine room visual bilge alarm at the operating station.
Due 25 November 2010
Resolved 1 December 2010
Resolution: Port engine room visual alarm was repaired & in good working order.
Electrical › Electrical Distribution System (service) › Cable
Issued 25 October 2010 Resolved
Replace existing welding cable in way of engine battery starts with UL Boat or UL Marine grade cable IAW 46 CFR 183.340. To be completed to the satisfaction of an attending USCG MI within 90 days.
Due 25 January 2011
Resolved 25 January 2011
Resolution: Battery cable was replaced with UL approved cable.
Documentation › Certificates/Documents › FCC Vessel Bridge-to-Bridge Radiotelephony Cert.
Issued 25 October 2010 Resolved
Provide onboard valid FCC Radiotelephony certificate within 60 days.
Due 25 December 2010
Resolved 23 June 2011
Fire Fighting › Fixed Halon Fire Extinguishing System › Operating Controls
Issued 25 October 2010 Resolved
Provide proof of annual servicing of port and starboard fixed fire extinguishers.
Due 25 November 2010
Resolved 1 December 2010
Resolution: A report dated 28Oct2010 was provided showing that the fire extinguishers were serviced that day.
Engineering › Fuel Oil Service System › Valve
Issued 25 October 2010 Resolved
Renew and prove positive closure of port fuel tank emergency fuel shut off valve.
Due 25 November 2010
Resolved 1 December 2010
Resolution: Closure for port fuel tank shut off valve was replaced & is in good working order.
Personnel › Certificates/Documents/Licenses › Certificate, First Aid Course Completion
Issued 25 October 2010 Resolved
Provide proof of first aid/CPR certification for 50% of crew.
Due 25 November 2010
Resolved 25 January 2011
Resolution: Proof of first aid/certification was provided.
Stability › Intact Righting Energy › General
Issued 2 September 2008 Resolved
Unstep mast and replace all associated rigging wires and attachments as recommended by rigging report from Tradewind Yachting Services dated 20SEP08.
Due 31 January 2009
Resolved 5 October 2009
Stability › Intact Righting Energy › General
Issued 2 September 2008 Resolved
COnduct sea trials in presence of USCG marine inspector after unstepping mast and tuning rig.
Due 31 January 2009
Resolved 5 October 2009
Operations/Management › Equipment Service/Testing › EPIRB
Issued 8 August 2008 Resolved
Provide a serviceable battery for EPIRB.
Action required: 705 - Other - as specified
Due 2 September 2008
Resolved 2 October 2008
Operations/Management › Equipment Service/Testing › EPIRB
Issued 8 August 2008 Resolved
Provide a serviceable hydrostatic release for EPIRB.
Action required: 705 - Other - as specified
Due 2 September 2008
Resolved 2 October 2008
Engineering › Fuel Oil Service System › Valve
Issued 8 August 2008 Resolved
Prove operation of stbd remote fuel shut-off.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 11 August 2008
Accommodation/Occupational Safety › Occupational Safety › Rubbish/Waste Materials
Issued 8 August 2008 Resolved
Remove all combustibles from engine room spaces.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 11 August 2008
Accommodation/Occupational Safety › Occupational Safety › Rubbish/Waste Materials
Issued 8 August 2008 Resolved
Remove portable diesel container from engine room.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 11 August 2008
Operations/Management › Bilge/Bilge System Management › Control of Excess Water
Issued 8 August 2008 Resolved
Install and prove operation of high level bilge alarms in old fuel tank spaces. This requirement was never addressed by past inspectors; however, due to vessels construction (wood) these are required.
Action required: 705 - Other - as specified
Due 2 September 2008
Resolved 29 September 2008
Operations/Management › Bilge/Bilge System Management › Control of Excess Water
Issued 8 August 2008 Resolved
Prove operation of high level bilge alarms in engine room spaces (disconnected). Audible alarm repaired and panel to be relocated to operating station at scheduled dry-dock 02SEP08.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 11 August 2008
Fire Fighting › Fixed Gas Fire Extinguishing System › Operating Controls
Issued 8 August 2008 Resolved
Prove operation of port side fixed fire fighting system audible alarm.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 11 August 2008
Accommodation/Occupational Safety › Occupational Safety › Deck Rail
Issued 8 August 2008 Resolved
Install rails around parememter of vessel designed to withstand 200 lbs of pressure. Vessel is currently using a "rope" like material that stretches and would not likely withstand an average persons weight.
Action required: 705 - Other - as specified
Due 2 September 2008
Resolved 29 September 2008
Fire Fighting › Fixed Gas Fire Extinguishing System › Operating Controls
Issued 8 August 2008 Resolved
Label location of fixed fire fighting system remote pulls/activation knobs.
Action required: 705 - Other - as specified
Due 2 September 2008
Resolved 2 October 2008
Lifesaving › Lifefloat › Float Free
Issued 8 August 2008 Resolved
Properly stow lifefloats in a float free arrangement.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 11 August 2008
Fire Fighting › Fire Bucket › Availability
Issued 8 August 2008 Resolved
Provide (3) 2.5 gallon fire buckets with labeling and 6' lanyards.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 11 August 2008
Lifesaving › Lifebuoys › Not on Board
Issued 8 August 2008 Resolved
Provide ring buoy with lifeline (60') and floating waterlight.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 11 August 2008
Lifesaving › Lifefloat › Float-free Link
Issued 8 August 2008 Resolved
Replace weak link on port side lifefloat. Specification tag is missing front weak link currently installed.
Action required: 705 - Other - as specified
Due 2 September 2008
Resolved 11 August 2008
Fire Fighting › Portable Dry Chemical Fire Extinguisher › Mounting Bracket
Issued 8 August 2008 Resolved
Properly mount portable fire extinguisher at operating station.
Action required: 705 - Other - as specified
Due 2 September 2008
Resolved 2 October 2008
Engineering › Diesel Engine (auxiliary) › Gear/Clutch Starter (electric)
Issued 8 August 2008 Resolved
Prove operation of electric start for stbd engine (switch at operating station inoperable). Temporary switch is located just outside engine space and immediately available to the Master/Captain.
Action required: 705 - Other - as specified
Due 2 September 2008
Resolved 2 October 2008
Lifesaving › Lifejacket/PFD (Type I) › Retroreflective Material
Issued 8 August 2008 Resolved
Replace retroreflective material on (4) adult PFD's as identified.
Action required: 705 - Other - as specified
Due 2 September 2008
Resolved 11 August 2008
Lifesaving › Lifejacket/PFD (Type I) › Quantity
Issued 8 August 2008 Resolved
Provide (4) serviceable adult PFD's.
Action required: 705 - Other - as specified
Due 2 September 2008
Resolved 11 August 2008
Navigation › Piloting/Steering › Tide/Tidal Current Tables
Issued 8 August 2008 Resolved
Provide current copy of tides and currents for operating area.
Action required: 705 - Other - as specified
Due 2 September 2008
Resolved 2 October 2008
Operations/Management › Drug and Alcohol Testing › MIS Submission
Issued 3 May 2007 Resolved
Provide copy of MIS report and proof of 50% random testing
Due 3 June 2007
Resolved 8 May 2007
Lifesaving › Lifefloat › Float Free
Issued 3 May 2007 Resolved
Properly stow lifefloats in approved float free arrangement
Due 3 June 2007
Resolved 8 May 2007
Lifesaving › Lifefloat › Painter
Issued 3 May 2007 Resolved
Replace painter line for both lifefloat lights
Due 3 June 2007
Resolved 8 May 2007
Lifesaving › Lifefloat › Floating Electric Waterlight
Issued 3 May 2007 Resolved
Prove proper operation of port lifefloat light
Due 3 June 2007
Resolved 8 May 2007
Lifesaving › Lifejacket/PFD (Type I) › Retroreflective Material
Issued 3 May 2007 Resolved
Install new retro-reflective tape on 2 child sized lifejackets
Due 3 June 2007
Resolved 8 May 2007
Engineering › Bilge Water Management System › Pump
Issued 3 May 2007 Resolved
Prove proper operation of automatic bilge pumps and high level alarms
Due 3 June 2007
Resolved 8 May 2007
Lifesaving › Buoyant Apparatus
Issued 30 October 2003 Resolved
Properly attach sea painter to weak link for port BA. LEGACY COMPONENT DESC: Sea painter
Condition: Improper/Lack of Maintenance
Due 30 October 2003
Resolved 30 October 2003
Lifesaving › Lifejacket/PFD (Type I)
Issued 30 October 2003 Resolved
Failed 4 CG approved lifejackets. Vessel still meets COI requirements. LEGACY COMPONENT DESC: Condition
Condition: Improper/Lack of Maintenance
Due 30 October 2003
Resolved 6 November 2003
Lifesaving › Lifebuoys
Issued 30 October 2003 Resolved
Vessel rep supplied (2) new lifebuoys.
Condition: Improper/Lack of Maintenance
Due 30 October 2003
Resolved 30 October 2003
Navigation › Collision/Grounding Avoidance › Navigation Lights
Issued 30 October 2003 Resolved
Stern light OOC. Master replaced bulb. Tested SAT.
Condition: Improper/Lack of Maintenance
Due 30 October 2003
Resolved 30 October 2003
Engineering › Fuel Oil Service System › Piping
Issued 30 October 2003 Resolved
Fuel leak. Tightned connection at fuel supply valve located at port fuel tank.
Condition: Improper/Lack of Maintenance
Due 30 October 2003
Resolved 30 October 2003
Engineering › Steering Gear System
Issued 3 September 2002 Resolved
Conduct underway steering tests. (Due to renewal of stbd ruddrer assembly and propeller) LEGACY COMPONENT DESC: Rudder
Condition: Damaged By Earlier Event
Action required: 701 - Prior to carriage of passengers/cargo
Due 11 September 2002
Resolved 6 September 2002
Resolution: Deficiency cleared by MST-MAUI, [name withheld].
Construction/Loadline › Hull
Issued 26 August 2002 Resolved
Repair dings at multiple locations below the waterline IAW 46 CFR 176.610. LEGACY COMPONENT DESC: Bottom Coat
Condition: Improper/Lack of Maintenance
Due 3 September 2002
Resolved 26 September 2002
Construction/Loadline
Issued 26 August 2002 Resolved
Repair the 4 cracked hatches to the lifejacket's storage area, which also serves as a sitting area, IAW 46 CFR 171.124. LEGACY COMPONENT DESC: Watertight Integrity
Condition: Unknown
Due 3 September 2002
Resolved 3 September 2002
Electrical › Electric Supply System (service)
Issued 9 May 2002 Resolved
Install metal supports for cable wiring in port/starboard engine rooms IAW 46CFR183.340. LEGACY COMPONENT DESC: Cable
Condition: Improper Installation
Due 25 May 2002
Resolved 23 May 2002
Navigation › Collision/Grounding Avoidance › Navigation Lights
Issued 9 May 2002 Resolved
Port navigation light OOC.
Condition: Unknown
Due 9 May 2002
Resolved 9 May 2002
Resolution: Port navigation light fixed and tested SAT.
Fire Fighting › Ventilation Systems › Duct Hatches
Issued 9 May 2002 Resolved
Port and starboard vents closures (4) would not close properly.
Condition: Improper/Lack of Maintenance
Due 9 May 2002
Resolved 9 May 2002
Resolution: Vents closures tested SAT.
Lifesaving › Lifejacket/PFD (Type I) › Condition
Issued 9 May 2002 Resolved
Rejected 8 adult life jackets.
Condition: Improper/Lack of Maintenance
Due 9 May 2002
Resolved 9 May 2002
Resolution: Vessel provided 8 CG approved adult lifejackets.
Lifesaving › Lifebuoys › Buoyant Lifeline
Issued 9 May 2002 Resolved
Missing corrosion resistant clip and lifeline.
Condition: Improper Installation
Due 9 May 2002
Resolved 9 May 2002
Resolution: Vessel provided corrosion resistant clip and lifeline IAW 46CFR180.70.
Engineering › Diesel Engine (propulsion-direct drive)
Issued 9 May 2002 Resolved
Replace starboard engine mounting bolts IAW 46CFR176.800. LEGACY COMPONENT DESC: Mounts
Condition: Unknown
Due 28 February 2003
Resolved 23 May 2002
Pollution Prevention/Response › Prevention Equipment › Marine Sanitation Device, Type III
Issued 9 May 2002 Resolved
Tank vent mesh screen blocked due to salt build up.
Condition: Improper/Lack of Maintenance
Due 9 May 2002
Resolved 9 May 2002
Resolution: Tank vent mesh screen cleaned and placed back into service.
Engineering › Bilge Water Management System › Interface Detector
Issued 9 May 2002 Resolved
Install bilge high level alarm's in port and starboard heads IAW 46CFR182.530.
Condition: Unknown
Due 9 May 2002
Resolved 9 May 2002
Resolution: Bilge high level alam''s in port and starboard heads installed and tested SAT.
Fire Fighting
Issued 7 June 2001 Resolved
MAKE PORT ENGINE ROOM VAPOR TIGHT BY SEALING WIRE RUN IN AFT BULKHEAD.
Condition: Unknown
Due 31 July 2001
Resolved 31 July 2001
Construction/Loadline
Issued 7 June 2001 Resolved
BILGE HIGH LEVEL ALARMS USED KIDDE FIRE DETECTION BEZEL. LABEL BILGE HIGH LEVEL ALARMS APPROPRIATELY.
Condition: Unknown
Due 31 July 2001
Resolved 31 July 2001
Lifesaving
Issued 7 June 2001 Resolved
PROVIDE APPROPRIATE APPROVED WEAK LINK FOR SURVIVAL CRAFT. VESSEL REDUCED TO 26 TOTAL PERSONS UNTIL CORRECTED.
Condition: Unknown
Due 31 July 2001
Resolved 31 July 2001
Documentation
Issued 7 June 2001 Resolved
Provide proof of Drug Program and EAP program IAW 46CFR16.
Condition: Unknown
Due 31 July 2001
Resolved 31 July 2001
Navigation
Issued 7 June 2001 Resolved
PROVIDE CG LIGHT LIST IAW 46CFR 184.420.
Condition: Unknown
Due 31 July 2001
Resolved 31 July 2001
Fire Fighting
Issued 7 June 2000 Resolved
Seal bulkhead penetrations between lazarettes (fuel tank spaces) and enginecompartments which are protected by fixed fire supression systems iaw 46CFR182.465.
Condition: Unknown
Due 5 July 2000
Resolved 5 July 2000
Documentation
Issued 7 June 2000 Resolved
Post SPV Inspected vessel decal iaw 46CFR 176.306.
Condition: Unknown
Due 5 July 2000
Resolved 5 July 2000
Documentation
Issued 7 June 2000 Resolved
Post vessel waste management plan iaw 46CFR 151.57.
Condition: Unknown
Due 5 July 2000
Resolved 5 July 2000
Lifesaving
Issued 7 June 2000 Resolved
Replace (1) child's life jacket iaw 46CFR 180.71. Vessel limited to the carriage of (4) children until corrected. Additionally, properly mark 12 lifejackets found requiring attachment of new retro-grade material or marking with vessel's name.
Condition: Unknown
Due 5 July 2000
Resolved 5 July 2000
Engineering
Issued 18 May 1999 Resolved
Provide chafe protection for fuel hose in way of aft port bulkhead.
Condition: Unknown
Due 4 June 1999
Resolved 4 June 1999
Fire Fighting
Issued 18 May 1999 Resolved
Provide formula used for fixed fire fighting system installation.
Condition: Unknown
Due 4 June 1999
Resolved 4 June 1999
Construction/Loadline
Issued 18 May 1999 Resolved
Provide visual and audible indicator at operating station for high level alarm.
Condition: Unknown
Due 4 June 1999
Resolved 4 June 1999
Electrical
Issued 18 May 1999 Resolved
Provide bonding strap between fuel tank and fuel fill deck plate for all fuel tanks.
Condition: Unknown
Due 4 June 1999
Resolved 4 June 1999
Engineering
Issued 18 May 1999 Resolved
Renew hose clamps for port aft fuel fill hose.
Condition: Unknown
Due 4 June 1999
Resolved 4 June 1999
Engineering
Issued 18 May 1999 Resolved
Starboard engine space: Renew all hose clamps in engine cooling system.
Condition: Unknown
Due 4 June 1999
Resolved 4 June 1999
Fire Fighting
Issued 18 May 1999 Resolved
Provide vent closures for engine room vents.
Condition: Unknown
Due 4 June 1999
Resolved 4 June 1999
Engineering
Issued 18 May 1999 Resolved
Provide plans for proper fuel hose installation.
Condition: Unknown
Due 4 June 1999
Resolved 4 June 1999
Electrical
Issued 18 May 1999 Resolved
Provide a 1/4 inch hole in bottom of each horizontal PVC electrical cable conduit every 5 feet for drainage IAW 46 CFR 183.340.
Condition: Unknown
Due 4 June 1999
Resolved 4 June 1999
Electrical
Issued 18 May 1999 Resolved
Replace all twist on wire connections in port and starboard engine rooms with approved splices or pressure connectors.
Condition: Unknown
Due 4 June 1999
Resolved 4 June 1999
Lifesaving
Issued 18 May 1999 Resolved
Port and starboard BA painters deteriorated. Renew both painters with 100 foot line that has a breaking strength of at least 1,500 pounds and be of adark color if synthetic.
Condition: Unknown
Due 4 June 1999
Resolved 4 June 1999
Fire Fighting
Issued 18 May 1999 Resolved
Prove proper operation of the fixed fire fighting system automatic engine shutdown for both systems.
Condition: Unknown
Due 4 June 1999
Resolved 4 June 1999
Engineering
Issued 3 June 1998 Resolved
Pull cable on starboard emergency F/O cutoff valve had parted. Required vessel to reconnect cable.
Condition: Unknown
Due 3 June 1998
Resolved 24 June 1998
Fire Fighting
Issued 3 June 1998 Resolved
Vessel could not produce proof of servicing portable fire extinguishers. Required vessel service portable fire extinguishers.
Condition: Unknown
Due 17 June 1998
Resolved 24 June 1998
Navigation
Issued 3 June 1998 Resolved
[withheld — contains personal information; the deficiency system, dates, and resolution status are shown above]
Condition: Unknown
Due 17 June 1998
Resolved 24 June 1998
Construction/Loadline
Issued 2 November 1996 Resolved
Renew the gaskets on the forward port and stbd collision bulkhead space main deck hatches. Prove hatches are watertight by conducting a 30 psi hose test.
Condition: Unknown
Due 2 November 1996
Resolved 2 November 1996
Electrical
Issued 2 November 1996 Resolved
Replace all wire nuts with UL approved pressure connectors on all wiring inthe helm console and the port engine room.
Condition: Unknown
Due 2 November 1996
Resolved 2 November 1996
Engineering
Issued 2 November 1996 Resolved
Repair leaks and double hose clamp the port and stbd main engine exhaust hose connections.
Condition: Unknown
Due 2 November 1996
Resolved 2 November 1996
Construction/Loadline
Issued 2 November 1996 Resolved
Permanently repair/renew all rotten wood in the overhead, outboard side between frames five and six in the port forward compartment.
Condition: Unknown
Due 2 November 1996
Resolved 2 November 1996
Construction/Loadline
Issued 2 November 1996 Resolved
Permanently repair/renew all rotten wood; inboard sheer clamp and upper structural members for the access ladder in the port and stbd head compartments.
Condition: Unknown
Due 2 November 1996
Resolved 2 November 1996
Construction/Loadline
Issued 2 November 1996 Resolved
Permanently repair/renew all rotten wood in the port and stbd swim gear compartments, to include the main deck sheathing and under deck stiffeners.
Condition: Unknown
Due 2 November 1996
Resolved 2 November 1996
Construction/Loadline
Issued 2 November 1996 Resolved
Longitudinal, centerline bulkhead was removed from the port and stbd swim gear compartments. Reinstall this bulkhead as original.
Condition: Unknown
Due 2 November 1996
Resolved 2 November 1996
Construction/Loadline
Issued 2 November 1996 Resolved
Permanently repair/renew all rotten wood around all port-lights and navigation lights in the port and stbd forward compartments.
Condition: Unknown
Due 2 November 1996
Resolved 2 November 1996
Construction/Loadline
Issued 2 November 1996 Resolved
Permanently repair/renew all rotten wood at the base of the collision bulkhead and overhead at the collision bulkhead-main deck connection in theport and stbd forward compartments.
Condition: Unknown
Due 2 November 1996
Resolved 2 November 1996
Electrical
Issued 2 November 1996 Resolved
Remove all unauthorized conductors from the port and stbd 12 volt storage batteries. Install distribution panel or terminal blocks with the proper _x001C_overload protection for all general power and lighting circuits in accordance with 46 CFR 183.05.
Condition: Unknown
Due 2 November 1996
Resolved 2 November 1996
Engineering
Issued 2 November 1996 Resolved
Remove excess fuel from stbd fuel tank space bilges. Determine the cause of fuel in the bilges, and permanently correct the leak.
Condition: Unknown
Due 2 November 1996
Resolved 2 November 1996
Navigation
Issued 2 November 1996 Resolved
Double nut or cotter pin all hardware in the steering gear linkages.
Condition: Unknown
Due 2 November 1996
Resolved 2 November 1996
Accommodation/Occupational Safety
Issued 2 November 1996 Resolved
Install hand rails on all weather decks accessible to passengers and crew. Properly seal and bed all fasteners penetrating the weather deck, and replace all missing backing plates.
Condition: Unknown
Due 2 November 1996
Resolved 2 November 1996
Construction/Loadline
Issued 2 November 1996 Resolved
Permanently repair/renew all rotten wood in the port and stbd engine rooms;to include the hatch coamings, overhead, inboard sheer clamps, inboard _x001C_ longitudinal side shell stiffeners, 2"x6" longitudinal overhead timber and the forward bulkheads.
Condition: Unknown
Due 2 November 1996
Resolved 2 November 1996
Construction/Loadline
Issued 2 November 1996 Resolved
Permanently repair delamination of the forward and aft ends of the cross-deck under deck stiffeners, 5 each.
Condition: Unknown
Due 2 November 1996
Resolved 2 November 1996
Accommodation/Occupational Safety
Issued 2 November 1996 Resolved
Permanently repair fractured top step welded connection on the bow accommodation ladder.
Condition: Unknown
Due 2 November 1996
Resolved 2 November 1996
Construction/Loadline
Issued 2 November 1996 Resolved
Permanently repair delaminated deck at entrance to the bow accommodation ladder, stbd side.
Condition: Unknown
Due 2 November 1996
Resolved 2 November 1996
Lifesaving
Issued 5 June 1996 Resolved
Replace weaklink for portside buoyant apparatus.
Condition: Unknown
Due 5 June 1996
Resolved 5 June 1996
Navigation
Issued 5 June 1996 Resolved
Provide anchor ball in accordance with the 1974 Colregs.
Condition: Unknown
Due 5 June 1996
Resolved 5 June 1996
Lifesaving
Issued 5 June 1996 Resolved
Repair or replace portside 12 man buoyant apparatus.
Condition: Unknown
Due 5 June 1996
Resolved 5 June 1996
Documentation
Issued 5 June 1996 Resolved
Provide proof of valid FCC station license or proof of application.
Condition: Unknown
Due 5 June 1996
Resolved 5 June 1996
Construction/Loadline
Issued 1 July 1994 Resolved
PROVIDE HANDLE FOR BILGE PUMP IN LADIES RESTROOM.
Condition: Unknown
Due 2 July 1994
Resolved 16 July 1994
Electrical
Issued 1 July 1994 Resolved
MAKE PROPER REPAIRS TO VHF DISCONNECT BREAKER. BREAKER HANDLE HAS FRACTURED AT THE PANEL FRONT.
Condition: Unknown
Due 2 July 1994
Resolved 16 July 1994
Accommodation/Occupational Safety
Issued 7 January 1994 Resolved
RENEW LACING CORD TO PORT SIDE BOW TRAMPOLINE.
Condition: Unknown
Due 7 January 1994
Resolved 7 January 1994
Construction/Loadline
Issued 7 January 1994 Resolved
PROVIDE A REPORT OF SURVEY, CONDUCTED BY A QUALIFIED EXTERMINATOR, SPECIFICALLY ADDRESSING THE EXTENT OF TERMITE INFESTATION IN ENTIRE VESSEL.
Condition: Unknown
Due 7 January 1994
Resolved 7 January 1994
Construction/Loadline
Issued 4 June 1993 Resolved
CROP AND RENEW DECK AT STARBOARD SAIL LOCKER WHERE ROTTED, FORWARD OF HATCH.
Condition: Unknown
Due 4 June 1993
Resolved 4 June 1993
Construction/Loadline
Issued 4 June 1993 Resolved
RENEW SIDE PLANKING PORT HULL OUTBOARD AT TRANSOM WHERE DAMAGED. THIS TO BE COMPLETED IN ACCORDANCE WITH GOOD MARINE PRACTICE.
Condition: Unknown
Due 4 June 1993
Resolved 4 June 1993
Construction/Loadline
Issued 4 June 1993 Resolved
RENEW UPPER INBOARD STRINGER OF PORT SAIL LOCKER, WHERE EATEN BY TERMITES.
Condition: Unknown
Due 4 June 1993
Resolved 4 June 1993
Documentation
Issued 4 June 1993 Resolved
PROVIDE A MARINE RADIO OPERATOR'S PERMIT FOR THE VESSEL MASTER.
Condition: Unknown
Due 4 June 1993
Resolved 4 June 1993
Construction/Loadline
Issued 4 June 1993 Resolved
CROP AND RENEW IN DECK AT STARBOARD TRANSOM WHERE ROTTED, IN LIKE KIND AND QUALITY AS ORIGINAL.
Condition: Unknown
Due 4 June 1993
Resolved 4 June 1993
Documentation
Issued 4 June 1993 Resolved
PROVIDE DOCUMENTATION OF COMPLIANCE WITH RANDOM DRUG TESTING REGULATIONS.
Condition: Unknown
Due 4 October 1993
Resolved 4 October 1993
Documentation
Issued 4 August 1992 Resolved
PROVIDE COPY OF VALID FCC RADIO OPERATOR'S PERMIT.
Condition: Unknown
Due 4 August 1992
Resolved 4 August 1992
Navigation
Issued 4 August 1992 Resolved
PROVE OPERATION OF STERN NAVIGATION LIGHT. VESSEL IS RESTRICTED TO _x001C_ DAYLIGHT OPERATIONS ONLY UNTIL THIS ITEM IS COMPLETED.
Condition: Unknown
Due 4 August 1992
Resolved 4 August 1992
Construction/Loadline
Issued 4 August 1992 Resolved
INSTALL SECURING HARDWARE ON PORT AND STARBOARD AFT HATCH COVERS.
Condition: Unknown
Due 4 August 1992
Resolved 4 August 1992
Construction/Loadline
Issued 7 June 1991 Resolved
RENEW THE BROKEN DOGS ON ALL FOUR PORTHOLES AS NEEDED.
Condition: Unknown
Due 7 June 1991
Resolved 7 June 1991
Fire Fighting
Issued 7 June 1991 Resolved
PROVIDE A COAST GUARD APPROVED MOUNTING FOR THE STBD SIDE B-II FIRE EXTINGUISHER.
Condition: Unknown
Due 7 June 1991
Resolved 7 June 1991
Engineering
Issued 7 June 1991 Resolved
INSTALL 30x30 MESH SCREENS ON BOTH FUEL TANK VENTS.
Condition: Unknown
Due 7 June 1991
Resolved 7 June 1991
Lifesaving
Issued 7 June 1991 Resolved
REPLACE THE RING BUOY WITH A NEW ONE, MINIMUM 24" SIZE. (CURRENT RING BUOYIS DETERIORATED)
Condition: Unknown
Due 7 June 1991
Resolved 7 June 1991
Engineering
Issued 27 November 1990 Resolved
INSTALL FUEL FILTERS OF APPROVED TYPE FOR MAIN DIESEL ENGINES.
Condition: Unknown
Due 27 November 1990
Resolved 27 November 1990
Documentation
Issued 19 June 1989 Resolved
PLACE FCC FORM 824 ON BOARD VESSEL. ROUTE RESTRICTED TO 1000 FEET FROM SHORE UNTIL COMPLETED.
Condition: Unknown
Due 19 June 1989
Resolved 19 June 1989
Fire Fighting
Issued 19 June 1989 Resolved
PLACE ON BOARD 2 BII FIRE EXTINGUISHERS PRIOR TO CARRYING PASSENGERS.
Condition: Unknown
Due 19 June 1989
Resolved 19 June 1989
Engineering
Issued 19 June 1989 Resolved
INSTALL FLAME SCREENS (30 X 30 CORROSION REASISTANT MESH) ON FUEL TANK VENTS.
Condition: Unknown
Due 19 June 1989
Resolved 19 June 1989
Unknown
Issued 29 June 1987 Resolved
OBTAIN RENEWAL STICKER AND ATTACH TO THE VESSEL'S CERTIFICATE OF DOCUMENTATION.
Condition: Unknown
Due 29 June 1987
Resolved 29 June 1987
Unknown
Issued 29 June 1987 Resolved
OBTAIN AND PLACE ON BOARD THE VESSEL FCC FORM 824.
Condition: Unknown
Due 29 June 1987
Resolved 29 June 1987

Casualty record · 4

16 August 2002Routine · role: Involved in a Marine Casualty · activity 1679402
27 June 2007Routine · role: Involved in a Marine Casualty · 1 dead · activity 2992973
21 February 2013Routine · role: Involved in a Marine Casualty · serious marine incident, as classified · 1 injured · activity 4541437
26 February 2016Routine · role: Involved in a Marine Casualty · serious marine incident, as classified · activity 5822534
Each line is an incident investigation the Coast Guard recorded with this hull among the vessels involved, with the date and the classification the Coast Guard gave it, and the bridge, lock or dam the investigation names where it names one. Involvement is not fault. The investigation narrative is not published. Source: IIR, through 2026.

Recorded names · 1

TERALANI (2002). Names as the Coast Guard recorded them in incident records, with the years they appear; some are renames and some are spelling variants.

Ownership record

The Coast Guard's documentation record for this hull -- the Abstract of Title, with its owners and liens as filed -- is not in PSIX. Ask, and Maury buys it from the National Vessel Documentation Center, files it here with its date, and every reader of this page gets it.