Records from 1985 to 1986. Most recent: inspection, 30 December 1986.
A report is not offered for this hull: Its record holds only 1 of the seven kinds of material a report is built from: inspections, deficiencies, operational controls, tow-unit appearances, casualty records, dimensions and documentation. That is a statement about the record, not about the vessel. Reports.
Unknown
Issued 20 March 1985
Resolved
REPAIR REFRACTORY IN STBD BOILER: (A) MISSING FLOOR & OVHD REFRACTORY IN VESTIBULE BTWN SUPHTR & GEN. TUBES, (B) REPAIR FLOOR IN SUPERHEATER VESTI- BULE (C) OUTBOARD WALL & MISC. HOLES IN VESTIBULE OUTBOARD OF GEN. TUBES, (D) HOLE IN FWD WALL OUTBOARD CORNER OF FURNACE.
Condition: Unknown
Due 31 August 1985
Resolved 18 May 2002
Resolution: MISLE Maintenance - Resolved all open deficiencies issued prior to 6/1/1997 where activity was closed and deficiency due date was past
Unknown
Issued 20 March 1985
Resolved
FREE UP AND PROVE OPERATION OF FAINTAIL MUSHROOM VENTILATION CLOSURE PORT- SIDE.
Condition: Unknown
Due 31 August 1985
Resolved 18 May 2002
Resolution: MISLE Maintenance - Resolved all open deficiencies issued prior to 6/1/1997 where activity was closed and deficiency due date was past
Unknown
Issued 20 March 1985
Resolved
SUPERHEATER TUBE REPAIRS SUBMITTED PRIOR TO 25FEB85 TO [name withheld], HI MUST BE APPROVED OR THESE TUBES REPLACED. THIS ITEM WAS ORIGINALLY ISSUED BY [name withheld], HI ON 25FEB83 AT THE VESSELS PREVIOUS BIENNIAL INSPECTIONAND IS TO BE CLEARED OR RECINDED BY [name withheld], HI ONLY.
Condition: Unknown
Due 21 May 1985
Resolved 18 May 2002
Resolution: MISLE Maintenance - Resolved all open deficiencies issued prior to 6/1/1997 where activity was closed and deficiency due date was past
Unknown
Issued 20 March 1985
Resolved
CONDUCT NON-DISTRUCTIVE TESTING ON THREE NOTCHES IN SHEER STRAKE IN WAY OF PORT AND STBD LIFE BOATS WHICH ARE USED TO DRAIN STANDING DECK WATER. IF CRACK INDICATIONS ARE FOUND MAKE PERMANENT REPAIRS TO THE SATISFACTION OF THE ATTENDING INSPECTOR.
Condition: Unknown
Due 31 August 1985
Resolved 18 May 2002
Resolution: MISLE Maintenance - Resolved all open deficiencies issued prior to 6/1/1997 where activity was closed and deficiency due date was past
Unknown
Issued 20 March 1985
Resolved
INSTALL AN APPROVED STEAM DUMP SYSTEM FOR BOTH BOILERS. IF SAFETY VALVES LIFT IN COAL BURNING OPERATIONS THE MASTER OR CH. ENG. SHALL NOTIFY [name withheld] THIS ITEM WAS ISSUED BY [name withheld] OF 25FEB83 AND IS TO BE CLEARED OR RECINDED BY [name withheld] ADVISE OF STATUS.
Condition: Unknown
Due 21 May 1985
Resolved 18 May 2002
Resolution: MISLE Maintenance - Resolved all open deficiencies issued prior to 6/1/1997 where activity was closed and deficiency due date was past
Unknown
Issued 20 March 1985
Resolved
RENEW SOOT BLOWER IN STBD BOILER VESTIBULE BETWEEN THE GENERATING TUBES ANDTHE SUPER HEATER TUBES.
Condition: Unknown
Due 21 May 1985
Resolved 18 May 2002
Resolution: MISLE Maintenance - Resolved all open deficiencies issued prior to 6/1/1997 where activity was closed and deficiency due date was past
Unknown
Issued 20 March 1985
Resolved
CROP AND INSERT APPROX. 1 FT X 2 FT PORTION OF BUCKLED FRAME IN PORT PIPE TUNNEL FWD OF #3 WING TANK AT SHEER STRAKE. ALL WELDING TO BE IN ACCORDANCEWITH REQUIRED PROCEEDURES FOR HIGH TENSILE STRENGTH STEEL USED ON THE VESSELS SIDE SHELL.
Condition: Unknown
Due 31 August 1985
Resolved 18 May 2002
Resolution: MISLE Maintenance - Resolved all open deficiencies issued prior to 6/1/1997 where activity was closed and deficiency due date was past
Unknown
Issued 20 March 1985
Resolved
LIFT RELIEF VALVES AND OPEN D.C. HEATER AND CONTROL AIR RECEIVER FOR INSPECTION.
Condition: Unknown
Due 31 August 1985
Resolved 18 May 2002
Resolution: MISLE Maintenance - Resolved all open deficiencies issued prior to 6/1/1997 where activity was closed and deficiency due date was past
Unknown
Issued 20 March 1985
Resolved
MODIFY OR RENEW ESCAPE HATCH TO AFTER STEERING COMPARTMENT SO THAT IT CAN BE OPENED FROM THE INSIDE AND REMAIN WATERTIGHT WHEN CLOSED. IN THE INTERIM THIS HATCH IS TO BE SECURED FROM THE INSIDE ONLY.
Condition: Unknown
Due 31 August 1985
Resolved 18 May 2002
Resolution: MISLE Maintenance - Resolved all open deficiencies issued prior to 6/1/1997 where activity was closed and deficiency due date was past
Unknown
Issued 20 March 1985
Resolved
MAKE PERMANENT REPAIRS TO INBOARD SHIP SERVICE GENERATOR SALT WATER COOLINGVALVE.
Condition: Unknown
Due 31 August 1985
Resolved 18 May 2002
Resolution: MISLE Maintenance - Resolved all open deficiencies issued prior to 6/1/1997 where activity was closed and deficiency due date was past
Unknown
Issued 20 March 1985
Resolved
REPAIR AND SERVICE BURNER ROOM FIXED DRY CHEMICAL FIRE EXTINGUISHING SYSTEM.
Condition: Unknown
Due 21 May 1985
Resolved 18 May 2002
Resolution: MISLE Maintenance - Resolved all open deficiencies issued prior to 6/1/1997 where activity was closed and deficiency due date was past
Unknown
Issued 20 March 1985
Resolved
REPAIR OR REPLACE PUMP ROOM FIXED CO2 SYSTEM ACTUATOR.
Condition: Unknown
Due 21 May 1985
Resolved 18 May 2002
Resolution: MISLE Maintenance - Resolved all open deficiencies issued prior to 6/1/1997 where activity was closed and deficiency due date was past
Unknown
Issued 20 March 1985
Resolved
REPAIR AND PROVE OPERATION OF EMERGENCY FIRE PUMP.
Condition: Unknown
Due 21 May 1985
Resolved 18 May 2002
Resolution: MISLE Maintenance - Resolved all open deficiencies issued prior to 6/1/1997 where activity was closed and deficiency due date was past
Unknown
Issued 20 March 1985
Resolved
REPAIR ELECTRICAL JUNCTION BOX CONNECTION IN WAY OF PORT ENTRANCE TO THE PUMP ROOM TO RESTORE ITS EXPLOSION PROOF DESIGN.
Condition: Unknown
Due 21 May 1985
Resolved 18 May 2002
Resolution: MISLE Maintenance - Resolved all open deficiencies issued prior to 6/1/1997 where activity was closed and deficiency due date was past
Unknown
Issued 20 March 1985
Resolved
PROVE OPERATION OF STEERING GEAR VENTILATION.
Condition: Unknown
Due 20 March 1985
Resolved 20 March 1985
Unknown
Issued 20 March 1985
Resolved
REPAIR STORM DAMAGE FORWARD INCLUDING: REPAIR TO STBD PIPE TUNNEL VENTI- LATOR, REPAIRS TO INDENTED ACCESS TO STBD PIPE TUNNEL AND SPRUNG CENTER RAILING FWD STBD SIDE.
Condition: Unknown
Due 31 August 1985
Resolved 18 May 2002
Resolution: MISLE Maintenance - Resolved all open deficiencies issued prior to 6/1/1997 where activity was closed and deficiency due date was past
Unknown
Issued 20 March 1985
Resolved
REPAIR AND PROVE OPERATION OF PORT FIRE MAIN TRUNK ISOLATION VALVES.
Condition: Unknown
Due 21 May 1985
Resolved 18 May 2002
Resolution: MISLE Maintenance - Resolved all open deficiencies issued prior to 6/1/1997 where activity was closed and deficiency due date was past