MAURY USCG vessel records
← All vessels

STUYVESANT

Built
1982
Last inspected
17 March 2026
Documentation
Valid · NVDC file of 10 August 2026
Controls
None recorded without a removal date

Coast Guard record current through 23 August 2026, retrieved 5 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard. Records for the Miscellaneous Vessel class in Maury's sources begin in 2016.

Inspection record

Last inspected 17 March 2026
…with no type recorded7
Operational controls None recorded without a removal date
Years with a record 11 calendar years (2016–2026)
Every line above is a count of records the US Coast Guard wrote, or a date it recorded. A blank resolution means none was recorded in this data; it does not establish that a deficiency is outstanding. Years with a record are calendar years in which a record exists, not years in service. What Maury does not do.

Identity

7915838
Flag
UNITED STATES
Maury page id
psix-53843

Documentation record

Registered dimensions (L × B × D)340.1 ft × 72.1 ft × 34.0 ft
Registered tonnagegross 7,110 / net 3,853
ITC dimensions (L × B × D)342.7 ft × 72.0 ft × 34.0 ft
ITC tonnagegross 8,432 / net 2,771
BuilderAVONDALE SHIPYARDS INC · AVONDALE, LA, UNITED STATES · built 1982
Hull materialSteel
PropulsionDiesel Reduction
Hull shapeUNSPECIFIED
Hull configurationUNSPECIFIED
Hailing portMOBILE, AL
Endorsements, as the file codes themcw_un, reg
DocumentationValid · issued 19 December 2025 · expires 31 January 2027
Service, as the file records itIndustrial Vessel
Hull formpowered (Maury's inference from propulsion, hull shape, material and length, rule hf-1; not a recorded fact)
Tonnage as PSIX records it7110 - Regulatory (Subpart C or D), Gross Ton
8432 - Convention (Subpart B), Gross Ton
3853 - Regulatory (Subpart C or D), Net Ton
2771 - Convention (Subpart B), Net Ton
Every line above is a field of the National Vessel Documentation Center's file as served by NOAA Fisheries, dated 10 August 2026, matched to this hull on its Official Number. Registered and ITC measurements are two systems and are never combined. One snapshot is held so far; documentation history begins with the next.
Professional
The full record for this vessel

Behind this panel: 54 inspections, each with its date, unit and type; 73 deficiencies with the resolution recorded against each; operational controls, none recorded without a removal date; no tow-unit appearances recorded; no other recorded names; the documentation record: dimensions, tonnage, builder, hailing port and endorsements. Every line is a record the Coast Guard wrote; the counts above are the same counts as in the summary, and they are free.

Professional is $39 a month or $299 a year, or $19.99 a month locked for life at the founding rate, for the first 200 subscribers. It unlocks every detail section on every vessel page, fleet watch tied to your account, and ownership records on request. Already a subscriber? Sign in.

Maury does not score, rate or grade vessels, at any price.

Vessel history report
Every record for this hull, in one document — $299

Every recorded inspection, 1972 to 2026, in one chronology · every deficiency, with system, dates and resolution · operational controls imposed and removed · every name this hull has been recorded under · the vessels it was inspected alongside, and when · how its record compares with hulls of similar age and size, as a fact about the population and never a judgement about this vessel.

Read one first, in full: a forty-year chronology · a hull that changed operators four times · the sparse case, shown as an example, not for sale.

This report is in development and is not for sale yet. There is no date, and nothing is charged. Leave an email and we will tell you when it exists, once.

Inspection history · 54

17 March 2026 Examination of Repairs · MTSA/ISPS Verification · Deficiency Check · Vessel Attendance · COI Inspection
Physical examination · Sector Jacksonville · USCG Southeast District (CGD-SE) · Activity 8333896
10 February 2026 Administrative Inspection
Administrative · Marine Safety Unit Port Canaveral · USCG Southeast District (CGD-SE) · Activity 8314559
14 December 2025 Administrative Inspection
Administrative · Sector Virginia · USCG East District (CGD-E) · Activity 8283022
26 November 2025 Deficiency Check · Damage Survey · Administrative Inspection
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 8274468
9 September 2025 Deficiency Check
Physical examination · Sector Jacksonville · USCG Southeast District (CGD-SE) · Activity 8230399
3 September 2025 Deficiency Check
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 8226685
25 July 2025 Deficiency Check
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 8194385
18 July 2025 Deficiency Check
Physical examination · Sector Jacksonville · USCG Southeast District (CGD-SE) · Activity 8188635
13 March 2025 Deficiency Check
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 8093009
4 November 2024 Type not recorded
No type recorded · Sector Jacksonville · USCG Southeast District (CGD-SE) · Activity 8029427
2 November 2024 In-Service Inspection · Examination of Repairs · Deficiency Check · Damage Survey · Construction Oversight · Annual Inspection
Physical examination · Sector Jacksonville · USCG Southeast District (CGD-SE) · Activity 8028586
4 September 2024 Internal Structural Exam · Drydock Exam
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 7995823
3 June 2024 Periodic Inspection · MARPOL Annex VI Survey · MARPOL Annex I Examination · Deficiency Check · Annual Survey
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 7924736
11 February 2024 In-Service Inspection · Administrative Inspection · Deficiency Check
Physical examination · Marine Safety Unit Port Canaveral · USCG Southeast District (CGD-SE) · Activity 7863927
10 February 2024 Type not recorded
No type recorded · Marine Safety Unit Port Canaveral · USCG Southeast District (CGD-SE) · Activity 7865089
7 February 2024 Administrative Inspection
Administrative · Marine Safety Unit Port Canaveral · USCG Southeast District (CGD-SE) · Activity 7862013
30 November 2023 Administrative Inspection
Administrative · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 7831882
21 August 2023 Administrative Inspection
Administrative · Sector Virginia · USCG East District (CGD-E) · Activity 7773718
29 June 2023 Administrative Inspection
Administrative · Sector Mobile · USCG Heartland District (CGD-H) · Activity 7726504
13 June 2023 Administrative Inspection
Administrative · Sector Mobile · USCG Heartland District (CGD-H) · Activity 7714192
5 May 2023 Annual Inspection · MARPOL Annex I Examination · MARPOL Annex VI Survey · MTSA/ISPS Verification · Deficiency Check
Physical examination · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 7680931
8 March 2023 Administrative Inspection · Deficiency Check
Physical examination · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 7647435
29 December 2022 Administrative Inspection
Administrative · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 7615278
26 September 2022 Administrative Inspection
Administrative · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 7568223
12 September 2022 In-Service Inspection · Annual Inspection · Administrative Inspection
Physical examination · Sector Mobile · USCG Heartland District (CGD-H) · Activity 7559274
11 April 2022 Examination of Repairs · Drydock Exam · Administrative Inspection · Internal Structural Exam
Physical examination · Sector Mobile · USCG Heartland District (CGD-H) · Activity 7465812
14 August 2021 Damage Survey · Administrative Inspection
Physical examination · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 7286217
14 August 2021 Type not recorded
No type recorded · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 7382469
11 March 2021 MTSA/ISPS Verification · MARPOL Annex V Examination · MARPOL Annex I Examination · MARPOL Annex IV Survey · MARPOL Annex VI Survey · COI Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 7154461
5 March 2021 Administrative Inspection
Administrative · Marine Safety Unit Port Canaveral · USCG Southeast District (CGD-SE) · Activity 7150764
13 February 2021 Damage Survey
Physical examination · Marine Safety Unit Port Canaveral · USCG Southeast District (CGD-SE) · Activity 7141220
12 February 2021 Type not recorded
No type recorded · Marine Safety Unit Port Canaveral · USCG Southeast District (CGD-SE) · Activity 7142259
13 November 2020 In-Service Inspection · Administrative Inspection
Physical examination · Sector Mobile · USCG Heartland District (CGD-H) · Activity 7096673
12 August 2020 In-Service Inspection
Physical examination · Marine Safety Unit Portland OR · USCG Northwest District (CGD-NW) · Activity 7032182
19 June 2020 Annual Inspection · MTSA Verification
Physical examination · Marine Safety Unit Texas City · USCG Heartland District (CGD-H) · Activity 6977763
18 September 2019 Drydock Exam · Internal Structural Exam · Administrative Inspection · In-Service Inspection · Hull Examination · Examination of Repairs
Physical examination · Sector Mobile · USCG Heartland District (CGD-H) · Activity 6821249
21 June 2019 MTSA/ISPS Verification · Periodic Inspection · Deficiency Check · MARPOL Annex I Examination · MARPOL Annex VI Survey
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 6721519
1 April 2019 Administrative Inspection · Deficiency Check
Physical examination · Sector Jacksonville · USCG Southeast District (CGD-SE) · Activity 6653623
27 February 2019 Administrative Inspection · Deficiency Check
Physical examination · Sector Jacksonville · USCG Southeast District (CGD-SE) · Activity 6633411
4 January 2019 MARPOL Annex I Examination · Administrative Inspection
Physical examination · Sector Jacksonville · USCG Southeast District (CGD-SE) · Activity 6605734
29 October 2018 Bulk Liquid Transfer Monitor
Physical examination · Marine Safety Detachment Humboldt Bay · USCG Southwest District (CGD-SW) · Activity 6570497
27 April 2018 MTSA/ISPS Verification · Annual Inspection · MARPOL Annex I Examination · Deficiency Check · MARPOL Annex VI Survey · Administrative Inspection
Physical examination · Marine Safety Unit Lake Charles · USCG Heartland District (CGD-H) · Activity 6400432
28 June 2017 Drydock Exam · Internal Structural Exam
Physical examination · Sector Mobile · USCG Heartland District (CGD-H) · Activity 6201407
28 June 2017 Administrative Inspection · Ballast Water Examination · Annual Inspection · MTSA/ISPS Verification
Physical examination · Sector Mobile · USCG Heartland District (CGD-H) · Activity 6241126
4 April 2017 Examination of Repairs · Administrative Inspection
Physical examination · Sector Mobile · USCG Heartland District (CGD-H) · Activity 6117445
7 February 2017 Type not recorded
No type recorded · Marine Safety Unit Savannah · USCG Southeast District (CGD-SE) · Activity 6144120
12 December 2016 Type not recorded
No type recorded · Marine Safety Unit Savannah · USCG Southeast District (CGD-SE) · Activity 6056566
3 November 2016 Deficiency Check · Administrative Inspection
Physical examination · Sector Mobile · USCG Heartland District (CGD-H) · Activity 6034432
2 September 2016 Administrative Inspection
Administrative · Sector Mobile · USCG Heartland District (CGD-H) · Activity 5999451
13 July 2016 Damage Survey
Physical examination · Sector Mobile · USCG Heartland District (CGD-H) · Activity 5939634
8 July 2016 Type not recorded
No type recorded · Sector Mobile · USCG Heartland District (CGD-H) · Activity 5952440
29 March 2016 MTSA/ISPS Verification · COI Inspection · Deficiency Check
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 5843163
9 February 2016 Administrative Inspection
Administrative · Sector New York · USCG Northeast District (CGD-NE) · Activity 5812041
15 January 2016 Deficiency Check
Physical examination · Sector Mobile · USCG Heartland District (CGD-H) · Activity 5798100

Deficiency record · 73

13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 1 December 2025 Resolved
A survey, either general or partial, according to the circumstances, shall be made every time an accident occurs or a defect is discovered which affects the safety of the vessel or the efficacy or completeness of its lifesaving appliances, fire-fighting or other equipment, or whenever any important repairs or renewals are made. Vessel reported port controllable pitch propeller is not operating as designed due to possible blocked valve. 46 CFR 91.30-1(a)
Action required: 50 - Rectify deficiencies w/in 30 days
Due 30 December 2025
Resolved 29 May 2026
Resolution: Port CPP was observed underway and tested sat.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 26 November 2025 Resolved
A survey, either general or partial, according to the circumstances, shall be made every time an accident occurs or a defect is discovered which affects the safety of the vessel or the efficacy or completeness of its lifesaving appliances, fire-fighting or other equipment, or whenever any important repairs or renewals are made. Vessel reported the controls between the operating station and the port controllable pitch propeller is inoperable and not responding to commands. 46 CFR 91.30-1(a)
Action required: 17 - Rectify deficiencies prior to departure
Resolved 1 December 2025
Resolution: Tech report received for interim fix of CPP.
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 26 November 2025 Resolved
The vessel is required a tug escort throughout its transit within the Port of Virginia or until the port controllable pitch propeller is repaired to the satisfaction of the attending Coast Guard Marine Inspector. The number of tugs, horsepower, and bollard pull shall be determined adequate by the [name withheld] the vessel experiences any propulsion or steering issues while underway you are to follow Coast Guard casualty reporting requirements. 33 CFR 160.111(c)
Action required: 705 - Other - as specified
Resolved 4 March 2026
08 - Alarms › N/A - No Subsystem › Machinery controls alarm
Issued 21 June 2025 Resolved
All automatically or remotely controlled or monitored vital systems addressed by part 62 of this subchapter must be subjected to tests and inspections to evaluate the operation and reliability of controls, alarms, safety features, and interlocks. Test procedures must be submitted to the Coast Guard for approval. PSTPs were amended to reflect system upgrades after fire in engine room. Provide approved PSTPs.
Condition: Invalid
Action required: 50 - Rectify deficiencies w/in 30 days
Due 22 July 2025
Resolved 9 September 2025
Resolution: Approved PSTPs provided.
08 - Alarms › N/A - No Subsystem › Machinery controls alarm
Issued 21 June 2025 Resolved
Tests must be conducted at periodic intervals specified by the Coast Guard to confirm that vital systems and safety features continue to operate in a safe, reliable manner. Dirty oil tank PSTPs could not be completed due to tank level indicator not installed.
Condition: Invalid
Action required: 50 - Rectify deficiencies w/in 30 days
Due 22 July 2025
Resolved 18 July 2025
Resolution: PSTPs ccompleted.
08 - Alarms › N/A - No Subsystem › Machinery controls alarm
Issued 21 June 2025 Resolved
Tests must be conducted at periodic intervals specified by the Coast Guard to confirm that vital systems and safety features continue to operate in a safe, reliable manner. Incinerator PSTPs could not be completed. Complete PSTPs prior to operating incinerator.
Condition: Invalid
Action required: 705 - Other - as specified
Resolved 25 July 2025
Resolution: Witnessed Satisfactory test of PSTPs for Incinerator.
07 - Fire Safety › N/A - No Subsystem › Fixed fire extinguishing installation
Issued 21 June 2025 Resolved
A lockout valve must be provided on any carbon dioxide extinguishing system protecting a space over 6,000 cubic feet in volume and installed or altered after July 9, 2013. “Altered” means modified or refurbished beyond the maintenance required by the manufacturer's design, installation, operation and maintenance manual. Lock out valve was not provided due to supply chain issues. Vessel scheduled to return to BAE in September to install valve. Valve shall be installed by 30Sept2025.
Condition: Invalid
Action required: 705 - Other - as specified
Resolved 3 September 2025
Resolution: Witnessed installation of lockout valve and installation pressure test on manifold to stop valve.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 13 June 2025 Resolved
A survey, either general or partial, according to the circumstances, shall be made every time an accident occurs or a defect is discovered which affects the safety of the vessel or the efficacy or completeness of its lifesaving appliances, fire-fighting or other equipment, or whenever any important repairs or renewals are made. The survey shall be such as to insure that the necessary repairs or renewals have been effectively made, that the material and the workmanship of such repairs or renewals are in all respects satisfactory, and that the vessel complies in all respects with the regulations in this subchapter. Conduct repairs to the satisfaction of the vessel's Classification Society and attending CG Marine Inspector.
Condition: Damaged By Earlier Event
Action required: 17 - Rectify deficiencies prior to departure
Resolved 21 June 2025
Resolution: Damage survey and repair oversight complete.
02 - Structural Conditions › N/A - No Subsystem › Hull damage impairing seaworthiness
Issued 2 November 2024 Resolved
A survey, either general or partial, according to the circumstances, shall be made every time an accident occurs or a defect is discovered which affects the safety of the vessel or the efficacy or completeness of its lifesaving appliances, fire-fighting or other equipment, or whenever any important repairs or renewals are made. The survey shall be such as to insure that the necessary repairs or renewals have been effectively made, that the material and the workmanship of such repairs or renewals are in all respects satisfactory, and that the vessel complies in all respects with the regulations in this subchapter. Due to vessel casualty in engine room, prior to movement vessel will be required: 1) maintain a fire safety watch of the effected space and communicate vessel status every 2 hours to Sector Jacksonville via VHF channel 16 or [phone withheld]. 2) Submit an approved tow plan by USCG SECJAX prior movement or towing evolution. 3) Complete and submit a damage survey prior to repairs.
Action required: 60 - Rectify deficiencies prior to movement
Due 4 November 2024
Resolved 5 November 2024
Resolution: COTP issued
07 - Fire Safety › N/A - No Subsystem › Fire doors/openings in fire-resisting divisions
Issued 2 November 2024 Resolved
Boundary bulkheads separating control stations and machinery spaces shall be of "A" class construction. ECR port door closes but does not latch.
Condition: Improper Installation
Action required: 16 - Rectify deficiencies w/in 14 days
Due 7 July 2025
Resolved 1 July 2025
Resolution: Door latches.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 4 September 2024 Resolved
In the event of alterations involving the safety of the vessel, the applicable plans shall be submitted for approval covering the proposed work. Vessel installed surveillance system to comply with Safer seas act with out approval. Plans were submitted to Marine Safety Center but have yet to be approved and verified by a OCMI. 46 CFR 91.55-10
Action required: 50 - Rectify deficiencies w/in 30 days
Due 24 October 2024
Resolved 13 March 2025
Resolution: MSC letter received. Plan approval not applicable for this system. All sat.
11 - Life Saving Appliances › N/A - No Subsystem › Immersion suits
Issued 3 June 2024 Resolved
Each cargo vessel must carry an immersion suit approved under approval series 160.171 of an appropriate size for each person on board. Vessel had 08 immersion suits that were not SOLAS approved. Vessel restricted to domestic voyages. 46CFR199.273(a)
Action required: 50 - Rectify deficiencies w/in 30 days
Due 3 July 2024
Resolved 26 June 2024
Resolution: New immersion suits onboard
11 - Life Saving Appliances › N/A - No Subsystem › Lifejackets incl. provision and disposition
Issued 3 June 2024 Resolved
Each vessel must carry life jackets approved under approval series 160.155. Vessels life jackets were not SOLAS approved. Vessel restricted to domestic voyages. 46CFR199.70(b)
Action required: 50 - Rectify deficiencies w/in 30 days
Due 3 July 2024
Resolved 26 June 2024
Resolution: New life jackets on board.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 3 June 2024 Resolved
Multiple cables should be supported in metal hangers or trays. Metallic band strapping used for cable support should be steel and corrosion treated in not a corrosion resistant material. Vessels navigation light cable runs were supported with zip-ties. 46CFR111.60-5(a) IEEE 45-2002, Section 25
Action required: 50 - Rectify deficiencies w/in 30 days
Due 3 July 2024
Resolved 17 June 2024
Resolution: Vessel installed metallic supports for cables. All Sat.
11 - Life Saving Appliances › N/A - No Subsystem › Evaluation, testing and approval
Issued 3 June 2024 Resolved
Lifeboat and rescue boat release gear must be operationally tested under a load of 1.1 times the total mass of the lifeboat when loaded with its full complement of persons and equipment whenever overhauled or at least once every 5 years. Vessel completed weight test without a USCG MI present. 46CFR199.190(i)(5)
Action required: 50 - Rectify deficiencies w/in 30 days
Due 3 July 2024
Resolved 17 June 2024
Resolution: Witnessed test of both port and stbd lifeboats. All Sat.
11 - Life Saving Appliances › N/A - No Subsystem › Maintenance and inspections
Issued 3 June 2024 Resolved
Annual inspections must include each survival craft to be stripped, cleaned and thoroughly inspected. Maintenance third party servicing report for vessels lifeboats was unclear to what was completed and what was recommended. 46CFR199.190(a)
Action required: 50 - Rectify deficiencies w/in 30 days
Due 3 July 2024
Resolved 17 June 2024
Resolution: Reviewed servicing report with rep, all sat.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Doors
Issued 3 June 2024 Resolved
Water tight doors shall be designed, constructed, tested and marked with ASTM F1196. Door was unable to be opened manually. 46CFR170.270(a)(1)
Action required: 50 - Rectify deficiencies w/in 30 days
Due 3 July 2024
Resolved 17 June 2024
Resolution: Witnessed satisfactory open and closure of WTD, all Sat.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 3 June 2024 Resolved
Non-metallic hose must be in accordance with J1942. Fuel hoses on emergency generator could not be verified that they are designed for use for fuel oil. 46CFR56.60-25(b)
Action required: 50 - Rectify deficiencies w/in 30 days
Due 3 July 2024
Resolved 17 June 2024
Resolution: Inspected EDG with proper fuel lines, all sat.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 3 June 2024 Resolved
Valves must be designed for the maximum pressure to which they may be subjected, but in no case shall the design pressure be less than 50 lbs per square inch. Evaporator line valve leaking onto cables in overhead above port MDE. 46CFR56.20-9(c)
Action required: 50 - Rectify deficiencies w/in 30 days
Due 3 July 2024
Resolved 17 June 2024
Resolution: Inspected area above MDE and found the leak was secured, all sat.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 3 June 2024 Resolved
Wire must be in an enclosure. Dead end wire not terminated in a junction box or removed port side 2nd level in Pump Room. 46CFR111.60-11(a)
Action required: 50 - Rectify deficiencies w/in 30 days
Due 3 July 2024
Resolved 17 June 2024
Resolution: Deadend wire was removed, all sat.
07 - Fire Safety › N/A - No Subsystem › Fire pumps and its pipes
Issued 3 June 2024 Resolved
Fire mains must be tested to not less than 150psi. Fire main in engine room had pinhole leak. 46CFR56.97-40(a)(7)
Action required: 50 - Rectify deficiencies w/in 30 days
Due 3 July 2024
Resolved 17 June 2024
Resolution: Witnessed Fire main run for several minutes, all sat.
14 - Pollution Prevention › 146 - MARPOL Annex VI › Incinerator incl. operations and operating manual
Issued 3 June 2024 Resolved
Periodic Safety tests must demonstrate the proper operation of the primary and alternate controls. Vessel could not demonstrate PSTPs for Incinerator. Door on incinerator could not be fully closed & engage interlock. 46CFR61.40-6(a)
Action required: 50 - Rectify deficiencies w/in 30 days
Due 3 July 2024
Resolved 17 June 2024
Resolution: Witnessed incinerator reach required temperature with complete closure, showing proper operation, all sat.
14 - Pollution Prevention › 146 - MARPOL Annex VI › Bunker delivery notes
Issued 3 June 2024 Resolved
The Bunker delivery note shall be accompanied by a representative sample of fuel delivered taking into account guidelines developed by the organization. The sample is to be sealed and signed by the supplier’s representative and the master or officer in charge of the bunker operation on completion of the bunkering operations and retained under the ship’s control until fuel is substantially consumed, but in any case for a period of not less than 12 months from the time of delivery. Fuel Samples onboard were only from the last 6 months.
Action required: 10 - Deficiency Rectified
Resolved 3 June 2024
04 - Emergency Systems › N/A - No Subsystem › Emergency, lighting, batteries and switches
Issued 3 June 2024 Resolved
On vessels required to have a final emergency power source by 112.05-5(a) of this chapter, the following emergency lighting must be arranged so they can be energized from the final emergency power source. E-Lights for emergency escape were burnt out. 46CFR112.15-5
Action required: 10 - Deficiency Rectified
Resolved 3 June 2024
Resolution: Lights replaced
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 11 February 2024 Resolved
The material, workmanship, and arrangement of main propulsion machinery must be at least equivalent to the standards established by ABS Steel Vessel Rules. The vessel secured its port main engine after the turbo was found to be overheating. Metal shavings were subsequently found in the engine's oil. Upon receiving written permission by Sector Jacksonville COTP/[name withheld], vessel is to proceed to berth in Port Canaveral, FL, and effect repairs to the port M/E to the satisfaction of a Marine Inspector. 46 CFR 58.05-1(a)
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 11 February 2024
Resolved 1 March 2024
Resolution: Received tech report, attended vessel to verify proper operation of M/E and port turbo.
07 - Fire Safety › N/A - No Subsystem › Oil accumulation in engine room
Issued 11 February 2024 Resolved
The general construction of the vessel shall be such as to minimize fire hazards. Oil soaked lagging was found on the M/E exhaust leading to the turbo on the port M/E.
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 15 March 2024
Resolved 19 March 2024
Resolution: Vessel replaced oil soaked lagging. Uploaded photos in docs tab.
07 - Fire Safety › N/A - No Subsystem › Fire doors/openings in fire-resisting divisions
Issued 5 May 2023 Resolved
The integrity of a stairtower shall be maintained by "A" Class doors at every level. The doors shall be of self-closing type. Door at Nav Deck does not latch closed and door leading up to the bridge is taped opened due to a broken door knob.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 5 June 2023
Resolved 30 May 2023
11 - Life Saving Appliances › N/A - No Subsystem › Operation of Life Saving Appliances
Issued 5 May 2023 Resolved
Each lifeboat must be provided with a launching appliance. The launching appliance must be capable of launching and recovering the lifeboat with its crew. Each launching appliance arrangement must be designed to ensure persons can safely disembark from the survival craft prior to its stowage. During Lifeboat drill, noted both Chief Engineer and Second Mate were leading the winch remote control wire with their hands to ensure wire rope stayed on pulleys and unreeled/wound on drum correctly. Vessel to provide third party report from an approved servicing company stating the launching appliances for the lifeboats are operating as intended.
Condition: Design Flaw
Action required: 50 - Rectify deficiencies w/in 30 days
Due 5 June 2023
Resolved 2 June 2023
Resolution: Uploaded report from Palfinger into system.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 5 May 2023 Resolved
Connections and terminations in all conductors must retain the original electrical, mechanical, flame-retarding properties of the cable. Noted various dead end wires on deck.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 5 June 2023
Resolved 30 May 2023
09 - Working and Living Conditions › 092 - Working Conditions › Machinery
Issued 5 May 2023 Resolved
The material, design, construction, workmanship, and arrangement of main propulsion machinery and of each auxiliary, directly connected to the engine and supplied as such, must be at least equivalent to the standards established by the ABS Steel Vessel Rules (incorporated by reference, see 46 CFR 58.03–1), except as otherwise provided by this subchapter. ABS; Hot surfaces likely to come into contact with the crew during operation are to be suitably guarded or insulated. Where the temperature of hot surfaces are likely to exceed 220°C (428°F), and where any leakage, under pressure or otherwise, of fuel oil, lubricating oil or other flammable liquid is likely to come into contact with such surfaces, they are to be suitably insulated with non-combustible materials that are impervious to such liquid. Insulation material not impervious to oil is to be encased in sheet metal or an equivalent impervious sheath. Inspector observed oil-soaked lagging on Port MDE Turbo/exhaust piping.
Action required: 10 - Deficiency Rectified
Resolved 5 May 2023
09 - Working and Living Conditions › 092 - Working Conditions › Protection machinery
Issued 5 May 2023 Resolved
The material, design, construction, workmanship, and arrangement of main propulsion machinery and of each auxiliary, directly connected to the engine and supplied as such, must be at least equivalent to the standards established by the ABS Steel Vessel Rules (incorporated by reference, see 46 CFR 58.03–1), except as otherwise provided by this subchapter. ABS; Hot surfaces likely to come into contact with the crew during operation are tobe suitably guarded or insulated. Where the temperature of hot surfaces are likely to exceed 220°C (428°F), and where any leakage, under pressure or otherwise, of fuel oil, lubricating oil or other flammable liquid is likely to come into contact with such surfaces, they are to be suitably insulated with non-combustible materials that are impervious to such liquid. Insulation material not impervious to oil is to be encased in sheet metal or an equivalent impervious sheath. Emergency Generator fuel injector connections not properly insulated/shielded in way of exhaust manifold/turbo piping.
Action required: 10 - Deficiency Rectified
Resolved 5 May 2023
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 15 September 2022 Resolved
All automatically or remotely controlled or monitored vital systems addressed by part 62 of this subchapter must be subjected to tests and inspections to evaluate the operation and reliability of controls, alarms, safety features, and interlocks. Test procedures must be submitted to the Coast Guard for approval. In accordance with 46 CFR 61.40, design verification and periodic safety testing of automated vital systems verifies system design, construction and operation according to applicable Part 62 requirements. Please note these vessel specific test procedures are not for the purpose of replacing specific personnel or to reduce overall crew requirements.*This is for submittal of the amended test procedures, will amend as necessary once submitted to MSC.
Condition: Improper Installation
Action required: 50 - Rectify deficiencies w/in 30 days
Due 15 October 2022
Resolved 8 March 2023
Resolution: Verified PSTP revision K for auxiliary generators.
07 - Fire Safety › N/A - No Subsystem › Fixed fire extinguishing installation
Issued 15 September 2022 Resolved
Where a carbon dioxide extinguishing system is installed, the provisions of this subpart, with the exception of § 95.15-90, shall apply. CO2 system to paint locker is in-op and requires repair. Stowage of flammable/combustible products in the Forward paint locker prohibited and space shall be marked as such.
Condition: Damaged By Earlier Event
Action required: 50 - Rectify deficiencies w/in 30 days
Due 15 October 2022
Resolved 7 December 2022
04 - Emergency Systems › N/A - No Subsystem › Emergency source of power - Emergency generator
Issued 15 September 2022 Resolved
The installation of all systems of an electrical engineering or interior communication nature, together with the details of design, construction, and installation, shall be in accordance with the requirements of Subchapter J (Electrical Engineering) of this chapter. Emergency generator starter has hydraulic leak and combination jacket water/lube oil pressure switch needs replacement (current arrangement has been tested but is not meant for a permanent arrangement), permanent repair required (parts on order).
Condition: Damaged By Earlier Event
Action required: 50 - Rectify deficiencies w/in 30 days
Due 15 October 2022
Resolved 7 December 2022
Resolution: New switch installed but awaiting new starter due to deliver late Nov
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 15 September 2022 Resolved
A nonmetallic expansion joint must be replaced 10 years after it has been placed into service if it is located in a system which penetrates the side of the vessel and both the penetration and the nonmetallic expansion joint are located below the deepest load waterline. MI's unable to verify when the two expansion joints in the pump room were replaced. Provide objective evidence when those were put into service.
Condition: Improper Installation
Action required: 16 - Rectify deficiencies w/in 14 days
Due 29 September 2022
Resolved 29 September 2022
Resolution: Received spreadsheet detailing expansion joint install dates
10 - Safety of Navigation › N/A - No Subsystem › Other (navigation)
Issued 15 September 2022 Resolved
Each self-propelled vessel must have a navigation light indicator panel in the navigating bridge to control side, masthead, and stern lights. The panel must visually and audibly signal the failure of each of these navigation lights. Nav light panel audible signal was found inoperable. Repair and prove proper operation.
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 29 September 2022
Resolved 29 September 2022
Resolution: Signal was found to have a lose wire and was repaired.
10 - Safety of Navigation › N/A - No Subsystem › Magnetic compass
Issued 15 September 2022 Resolved
All ships of 150 GT and upwards shall carry a spare magnetic compass interchangeable with the compass referred to in paragraph 2.1.1. Crew could not locate the spare compass. Provide spare compass. 74SOLAS(20) V/19.2.2.2.1
Condition: Improper Installation
Action required: 16 - Rectify deficiencies w/in 14 days
Due 29 September 2022
Resolved 29 September 2022
Resolution: Spare receieved
14 - Pollution Prevention › 148 - Ballast Water › Ballast Water Management Plan (BWMP)
Issued 15 September 2022 Resolved
The master, owner, operator, agent, or person in charge of any vessel equipped with ballast water tanks that operates in the waters of the United States must follow these practices: Maintain a ballast water management (BWM) plan that has been developed specifically for the vessel and that will allow those responsible for the plan's implementation to understand and follow the vessel's BWM strategy and comply with the requirements of this subpart. Vessel's BWM Plan reflects ballast water exchange as a method of BWM. Ballast exchange is no longer an approved method past the vessels compliance date. Amend plan to reflect approved management methods.
Condition: Placed in Improper Service
Action required: 50 - Rectify deficiencies w/in 30 days
Due 15 October 2022
Resolved 29 September 2022
Resolution: Plan amended
10 - Safety of Navigation › N/A - No Subsystem › Communication-SOLAS chap. 5
Issued 15 September 2022 Resolved
Simple operating instructions with block diagram showing the change-over procedures for remote steering control systems and steering gear power units shall be permanently displayed on the navigation bridge and in the steering compartment. Noted that instructions and block diagram were not available at the bridge steering station. Provide instructions and diagram as required. 74SOLAS(20) V/26.3.1
Condition: Placed in Improper Service
Action required: 50 - Rectify deficiencies w/in 30 days
Due 15 October 2022
Resolved 29 September 2022
Resolution: Block diagram and instructions posted on the bridge
07 - Fire Safety › N/A - No Subsystem › Fixed fire extinguishing installation
Issued 15 August 2021 Resolved
A fixed CO2 system shall be installed in all spaces containing internal combustion main propulsion machinery. CO2 cylinders have been removed for re-placement after accidental discharge. Provide service report for system inspection after installation. 46 CFR 95.05-10(e)
Action required: 17 - Rectify deficiencies prior to departure
Resolved 16 August 2021
Resolution: Received class survey confirming repairs and function test. see activity documents.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 29 March 2021 Resolved
Fuel oil pneumatic shut off valve for the service tank was inoperable. Repair to the satisfaction of the attending USCG Marine Inspector.
Action required: 60 - Rectify deficiencies prior to movement
Resolved 29 March 2021
Resolution: MI's observed the proper testing of the fuel oil pneumatic shut off valve for the generator service tank.
07 - Fire Safety › N/A - No Subsystem › Fire-dampers
Issued 29 March 2021 Resolved
During testing, stack fire dampers did not close all the way. Repair and adjust to the satisfaction of the attending USCG Marine Inspector.
Action required: 60 - Rectify deficiencies prior to movement
Resolved 1 April 2021
Resolution: Received video attesting to the proper operation of the dampers.
11 - Life Saving Appliances › N/A - No Subsystem › Other (life saving)
Issued 29 March 2021 Resolved
Emergency escape hatches throughout the vessel are not functioning as intended and the assist spring needs replaced or serviced. Repair/Replace to the satisfaction of the attending USCG Marine Inspector within 7 days.
Action required: 705 - Other - as specified
Resolved 8 April 2021
Resolution: Crew adjusted and proved emergency escape hatch assist springs functioning.
07 - Fire Safety › N/A - No Subsystem › Fire fighting equipment and appliances
Issued 29 March 2021 Resolved
During the fire drill, crew did not have required communication devices (radios) or a lifeline for fire team. Crew struggled with testing the low air alarm after the drill. Ensure approved radio communications and a lifeline are put into service on board the vessel and conduct sufficient training with crew to the satisfaction of the attending USCG Marine Inspector within 7 days.
Action required: 705 - Other - as specified
Resolved 9 April 2021
Resolution: Recieved, reviewed and accepted video evidenace showing sat fire drill with crew utilizing radios and life line.
07 - Fire Safety › N/A - No Subsystem › Maintenance of Fire protection systems
Issued 29 March 2021 Resolved
Vessel's CO2 system, MI's observed 2 slices in one of the flexible loops. Dust was found on bottles questioning if they were weighed correctly by 3rd party. Provide a 3rd party servicing report attesting to the maintenance and operation of system within 7 days.
Action required: 705 - Other - as specified
Resolved 2 April 2021
Resolution: Harris Fire tech has replaced the cracked hoses. Servicing report attesting to proper weighing of the bottles will be attained by vessel operator for inspection.
07 - Fire Safety › N/A - No Subsystem › Fire doors/openings in fire-resisting divisions
Issued 29 March 2021 Resolved
Several fire doors were found to be held back with either rope or a hold back device. In addition, during testing, some fire doors would not close completely. Remove hold back devices and adjust fire doors to ensure the vessel is maintaining fire boundaries to the satisfaction of the attending USCG Marine Inspector within 7 days.
Action required: 705 - Other - as specified
Resolved 2 April 2021
Resolution: The hold backs for fire doors have been removed and officers deck door closer adjusted to ensure correct closing.
07 - Fire Safety › N/A - No Subsystem › Division - decks, bulkheads and penetrations
Issued 29 March 2021 Resolved
Vessel was missing A60 insulation in the engine room. In addition, insulation was missing in the galley above the air conditioning unit. Replace and ensure all structural fire boundaries are maintained to the satisfaction of the attending USCG Marine Inspector within 7 days.
Action required: 705 - Other - as specified
Resolved 8 April 2021
Resolution: Received and accepted photographic evidence of repair to the engine room's A60 insulation.
07 - Fire Safety › N/A - No Subsystem › Fire doors/openings in fire-resisting divisions
Issued 29 March 2021 Resolved
Galley waiter door has not been tested per manufacturer's recommendation from a 3rd party. Provide a written report attesting to the proper maintenance and testing of the galley waiter door to the satisfaction of the attending USCG Marine Inspector within 7 days.
Action required: 705 - Other - as specified
Resolved 9 April 2021
Resolution: Received copy of third party attesting to testing of the galley waiter door.
07 - Fire Safety › N/A - No Subsystem › Other (fire safety)
Issued 29 March 2021 Resolved
Excessive grease was found near the deep fat fryer and galley hoods. All electrical components were covered with grease. Clean to the satisfaction of the attending USCG Marine Inspector within 7 days.
Action required: 705 - Other - as specified
Resolved 8 April 2021
Resolution: Deep Fat Fryer cleaned of excessive grease build up.
07 - Fire Safety › N/A - No Subsystem › Other (fire safety)
Issued 29 March 2021 Resolved
Oil found inside a light fixture housing in the engine room and one cracked light housing in the engine room. Identify/secure the leak, clean housing, and replace cracked light cover to the satisfaction of the attending USCG Marine Inspector within 7 days.
Action required: 705 - Other - as specified
Resolved 8 April 2021
Resolution: Engine room light fixture repaired and or cleaned.
02 - Structural Conditions › N/A - No Subsystem › Other (Structural condition)
Issued 29 March 2021 Resolved
CAPAC monitoring and control panel located in engineering control room is showing a fault. Provide servicing report addressing fault and repairs.
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 22 April 2021
Resolution: Faults removed from CAPAC and properly tested.
02 - Structural Conditions › N/A - No Subsystem › Electrical installations in general
Issued 29 March 2021 Resolved
Each panelboard switching unit must be numbered and have a circuit directory cardholder; and a circuit directory. Multiple distribution panels throughout, were found with missing breaker numbers and confusing labeling of old and new equipment. Make corrections to breaker numbers and card holders as necessary.
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 22 April 2021
Resolution: Circuit directory card updated to reflect current systems serviced.
02 - Structural Conditions › N/A - No Subsystem › Electrical installations in general
Issued 29 March 2021 Resolved
The status of automatically or remotely controlled vital auxiliaries, power sources, switches, and valves must be visually indicated in the machinery spaces or the cognizant remote control location, as applicable. Multiple lights were found extinguished on the ventilation panel. Replace bulbs and necessary.
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 22 April 2021
Resolution: Light bulbs replaced on ventilation control panel.
02 - Structural Conditions › N/A - No Subsystem › Electrical installations in general
Issued 29 March 2021 Resolved
Electric installations on vessels must ensure Protection of passengers, crew, other persons, and the vessel from electrical hazards. Emergency switchboard and previously installed air compressor control switch were found with missing covers. Install covers as required.
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 22 April 2021
Resolution: Missing covers on emergency switchboard and air compressor control switch replaced.
02 - Structural Conditions › N/A - No Subsystem › Electrical installations in general
Issued 29 March 2021 Resolved
Dead end wires were found for the old compressor push button starting panel. Cap wires to the satisfaction of the attending USCG Marine Inspector.
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 22 April 2021
Resolution: Dead end wires properly secured.
11 - Life Saving Appliances › N/A - No Subsystem › Lifeboats
Issued 29 March 2021 Resolved
Lifeboats retro-reflective tape on the upper hemisphere of the lifeboat is wasted and needs to be replaced.
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 22 April 2021
Resolution: Both lifeboat's retro-reflective tape on the upper hemisphere of the lifeboat has been satisfactorily replaced.
01 - Certificates & Documentation › 013 - Documents › Garbage record book
Issued 29 March 2021 Resolved
During the examination of the vessel's Garbage Record Book, MI's found that no garbage receipts had been kept since 2011. Conducted detailed training with mate and Captain on the requirements of MARPOL Annex V. In addition, the vessel had an outdated Garbage Management Record Book. Provide proof of an updated record book to the satisfaction of the attending USCG Marine Inspector.
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 27 April 2021
Resolution: Garbage recorded book updated and receipts attained.
11 - Life Saving Appliances › N/A - No Subsystem › Other (life saving)
Issued 29 March 2021 Resolved
Vessel had outdated life jacket donning placards on board the vessel. Ensure updated lifesaving donning placards are placed on board the vessel and remove the old ones.
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 27 April 2021
Resolution: Proper life jacket donning placard has been posted.
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 29 March 2021 Resolved
Marine Inspectors found several ring buoys (5) that had wasted line, punctured bung holes, and wasted retro tape. Crew had extras and replaced them on the spot.
Action required: 10 - Deficiency Rectified
Resolved 29 March 2021
Resolution: All items replaced or re marked. All clear
09 - Working and Living Conditions › 091 - Living Conditions › Other (crew and accommodation)
Issued 29 March 2021 Resolved
MI's observed the hospital space being used as berthing for the ship's steward. The hospital space is not authorized for continuous occupancy for any of the crew and needs to remain empty in case of emergency. Clear out the hospital space and ensure each crew member has appropriate berthing.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 8 April 2021
Resolution: Hospital space has been vacated by crew and returned to ready unoccupied status.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 12 August 2020 Resolved
Observed soft patch on the starboard sea water cooling overboard piping for the starboard main engine.
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Due 31 December 2020
Resolved 24 November 2020
15 - Safety Management Systems (ISM) › N/A - No Subsystem › Safety and environment policy
Issued 25 June 2019 Resolved
Quarterly lifeboat launches were not being done as required by subchapter "W". Lifeboats were instead only being brought to the water's edge as per the electronic SMS checklist which was based only on old subchapter "I".
Action required: 50 - Rectify deficiencies w/in 30 days
Due 25 July 2019
Resolved 5 July 2019
Resolution: A CAR was issued and acted upon to update the SMS checklist with the requirements for quarterly lifeboat launches and operation.
09 - Working and Living Conditions › 091 - Living Conditions › Other (crew and accommodation)
Issued 25 June 2019 Resolved
Hospital space was occupied by a crewmember as a regular berth. Space needs to be cleared out & not used as berthing.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 5 July 2019
Resolution: Hospital space was cleared out.
11 - Life Saving Appliances › N/A - No Subsystem › Embarkation arrangement survival craft
Issued 25 June 2019 Resolved
No embarkation station ladder or emergency lights were found for the forward 6-man liferaft. Vessel to install adequate embarkation ladder and emergency lighting.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 25 July 2019
Resolved 17 September 2019
Resolution: Embarkation ladder and e-lighting installed.
01 - Certificates & Documentation › 011 - Ships Certificates › Other (certificates)
Issued 25 June 2019 Resolved
Vessel carries nuclear material onboard as part of a sensor system for dredging ops. Vessel required to have a federal license issued by the Nuclear Regulatory Commission (NRC) or by a State's equivalent agency that also has a reciprocity agreement with FedGov. Only Louisiana license found onboard w/no proof of reciprocity agreement.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 25 July 2019
Resolved 2 August 2019
Resolution: Vessel provided copy of State-Federal reciprocity agreement.
Lifesaving › Lifeboat › Hull
Issued 27 April 2018 Resolved
THE PORT LIFEBOAT/RESCUE BOAT HAS TWO AREAS OF DAMAGE IN WAY OF THE PORT GUNWALE. FIRST, THERE IS A FORWARD SECTION APPROXIMATELY A FOOT AFT OF THE FRONT BREAST PLATE THAT HAS A 2.5" CRACK. SECOND, UNDER THE AFT GRIPE PLATE, DELAMINATION HAS BEGUN TO TAKE PLACE.
Condition: Damaged By Earlier Event
Action required: 50 - Rectify deficiencies w/in 30 days
Due 9 June 2018
Resolved 29 May 2018
Resolution: Proper repairs were made and tested.
Engineering › Shafting/Propeller Arrangements › Propeller Shaft
Issued 31 July 2016 Resolved
The temporary repair to the starboard shaft is approved, and the vessel must make permanent repairs at the next scheduled dry dock in July 2017. However, should the temporary repair fail in anyway, the vessel is to make report of it to the local OCMI and proceed immediately to dry dock and effect permanent repairs.
Action required: 705 - Other - as specified
Due 27 December 2017
Resolved 13 April 2017
Resolution: Temporary repair was approved by ABS as satisfying a permanent repair according to ABS Class Rules.
Engineering › Fuel Oil Service System › Piping
Issued 21 July 2016 Resolved
Provide approved plans for the newly installed fuel cooler and its piping where it was altered from the existing fuekl piping and the raw water piping.
Action required: 705 - Other - as specified
Due 23 September 2016
Resolved 3 November 2016
Resolution: Vessel rep provided approval MSC Approval Letter; E1-1603389 dated 29 SEP 2016, for the installed heat exchanger for the fuel system.
Engineering › Shafting/Propeller Arrangements › Propeller Shaft
Issued 13 July 2016 Resolved
Prior to Coast Guard review/approval for the shaft repair proposal, DUTRA must provide verification from Wartsilla and the OEM, of their acceptance for the temporary repair. Once reviewed and approved by the OCMI, all NDT testing, installation, and additional tests must be witnessed/accepted to the satisfaction of the attending marine inspector.
Condition: Damaged By Earlier Event
Action required: 17 - Rectify deficiencies prior to departure
Due 2 August 2016
Resolved 2 August 2016
Resolution: Repair proposal has been reviewed, approved, and completed to the satisfaction of the attending marine inspector.
Electrical › Electric Generation Source (emergency) › Generator
Issued 30 March 2016 Resolved
Emergency gen would not start when performing Periodic Safety Test Procedures.
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Due 21 April 2016
Resolved 31 March 2016
Resolution: Vessel discovered hydraulic pump for starting the gen was broken. vessel fixed pump.
Engineering › Pressure Vessel › Relief Valve
Issued 30 March 2016 Resolved
Vessel did not want to test thier relief valves.
Condition: Invalid
Action required: 705 - Other - as specified
Due 29 April 2016
Resolved 11 April 2016
Resolution: recieved report
Engineering › Steam Boiler (auxiliary/waste heat) › Valve, Relief
Issued 29 March 2016 Resolved
vessel was unable to get the relief valve to pop off at the marked setting on the valve.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 7 April 2016
Resolved 31 March 2016
Resolution: Vessel replaced relief valve
Documentation › Logs/Records › Operational Procedures for Engines or Equipment
Issued 29 March 2016 Resolved
Vessel is required to submit amendments for PSTP to MSC.
Condition: Invalid
Action required: 705 - Other - as specified
Due 30 May 2016
Resolved 2 August 2016
Resolution: Vessel provided approval letter for PSTP from MSC and a test o fhte under voltage trips was conducted using the approved PSTP. All were SAT.

Ownership record