MAURY USCG vessel records Sign in
← All vessels

MONARCH

MONARCH is a 1970 offshore supply vessel. The Coast Guard has recorded 97 inspections since 1985, most recently in January 2009, along with 155 deficiencies and 2 casualty investigations between 2005 and 2009.

Records from 1985 to 2009. Most recent: inspection, 15 January 2009.

Built
1970
Last inspected
15 January 2009
Documentation
No Operation - PM · documentation file of 10 September 2026
Controls
None recorded without a removal date

Identity

7048403 View on MarineTraffic leaves Maury; a third-party site, nothing from it is stored here
WBA9872
Flag
UNITED STATES
367048050 (licence lapsed)
Maury page id
psix-53972

Inspections, by type

…with no type recorded36
Years with a record 25 calendar years (1985–2009)
The 97 inspections in the strip above, split by the kind of activity the US Coast Guard recorded. Years with a record are calendar years in which a record exists, not years in service. What Maury does not do.

This record may be incomplete: the most recent inspection recorded for this vessel was 17 years ago. Maury shows what the Coast Guard recorded, not whether the vessel has been inspected since, is still in service, or what condition it is in. Coast Guard record current through 13 September 2026, retrieved 18 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard. Records for the Offshore class in Maury's sources begin in 1978.

Documentation record

Registered dimensions (L × B × D)166.5 ft × 38.0 ft × 14.4 ft
Registered tonnagegross 297 / net 202
ITC dimensions (L × B × D)Not recorded
ITC tonnageNot recorded
BuilderHALTER MARINE FABRICATORS INC · MOSS POINT, MS, UNITED STATES · built 1970
Hull materialSteel
PropulsionDiesel Reduction
Hull shapeNot recorded
Hull configurationNot recorded
Hailing portDUTCH HARBOR, AK
Trade endorsementsCoastwise, unrestricted, Registry
DocumentationNo Operation - PM · issued 30 June 2004
Service, as the file records itOffshore Supply Vessel
Hull formpowered (Maury's inference from propulsion, hull shape, material and length, rule hf-1; not a recorded fact)
Tonnage as PSIX records it297 - Regulatory (Subpart C or D), Gross Ton
202 - Regulatory (Subpart C or D), Net Ton
Every line above is a field of the National Vessel Documentation Center's file as served by NOAA Fisheries, dated 10 September 2026, matched to this hull on its Official Number. Registered and ITC measurements are two systems and are never combined. One snapshot is held so far; documentation history begins with the next.

Radio station licence

WBA9872MMSI 367048050 · expired · compulsorily equipped · granted 15 May 2007, cancelled 30 September 2017 · licensed under a name not among this hull’s recorded names (not shown)
FCC Universal Licensing System ship-station file of 6 September 2026, matched to this hull on its US Official Number. Status and dates are the file’s own. The licensee is not read from the file and is not shown. A lapsed licence’s MMSI is still the number the vessel transmitted under while it was valid.

Inspection history · 97

15 January 2009 Type not recorded
No type recorded · Marine Safety Detachment Kenai · USCG Arctic District (CGD-A) · Activity 3394734
10 November 2008 Hull Examination · Internal Structural Exam · Annual Inspection
Physical examination · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 3361557
6 May 2008 Drydock Exam
Physical examination · Marine Safety Detachment Kenai · USCG Arctic District (CGD-A) · Activity 3204863
20 July 2007 Annual Inspection
Physical examination · Marine Safety Detachment Kenai · USCG Arctic District (CGD-A) · Activity 3001789
2 February 2007 Administrative Inspection
Administrative · Marine Safety Detachment Kenai · USCG Arctic District (CGD-A) · Activity 2866203
8 May 2006 Hull Examination · Annual Inspection
Physical examination · Marine Safety Detachment Kenai · USCG Arctic District (CGD-A) · Activity 2783356
16 June 2005 Security Plan Amendment Review - VSP
Administrative · Marine Safety Center (MSC) · Activity 2392848
15 May 2005 Type not recorded
No type recorded · Marine Safety Detachment Kenai · USCG Arctic District (CGD-A) · Activity 2374467
13 May 2005 MTSA Verification · COI Inspection
Physical examination · Marine Safety Detachment Kenai · USCG Arctic District (CGD-A) · Activity 2357266
14 April 2005 Administrative Inspection
Administrative · Marine Safety Detachment Kenai · USCG Arctic District (CGD-A) · Activity 2339921
24 March 2005 Security Plan Amendment Review - VSP
Administrative · Marine Safety Center (MSC) · Activity 2318572
30 November 2004 Security Plan Amendment Review - VSP
Administrative · Marine Safety Center (MSC) · Activity 2250396
15 November 2004 Security Plan Amendment Review - VSP
Administrative · Marine Safety Center (MSC) · Activity 2241499
25 November 2003 Security Plan Review - VSP
Administrative · Marine Safety Center (MSC) · Activity 1954303
11 September 2003 Re-Inspection
Physical examination · Marine Safety Detachment Kenai · USCG Arctic District (CGD-A) · Activity 1902929
10 April 2003 Hull Examination · Deficiency Check
Physical examination · Marine Safety Detachment Kenai · USCG Arctic District (CGD-A) · Activity 1772093
14 March 2003 Damage Survey
Physical examination · Marine Safety Detachment Kenai · USCG Arctic District (CGD-A) · Activity 1758408
10 September 2002 Re-Inspection
Physical examination · Marine Safety Detachment Kenai · USCG Arctic District (CGD-A) · Activity 1687566
9 August 2002 Hull Examination
Physical examination · Marine Safety Detachment Kenai · USCG Arctic District (CGD-A) · Activity 1659170
30 January 2002 Examination of Repairs
Physical examination · Marine Safety Detachment Kenai · USCG Arctic District (CGD-A) · Activity 1482870
25 August 2001 Type not recorded
No type recorded · Marine Safety Detachment Kenai · USCG Arctic District (CGD-A) · Activity 42810
23 August 2001 Re-Inspection
Physical examination · MSO ANCHORAGE · USCG Arctic District (CGD-A) · Activity 1449507
22 July 2001 Type not recorded
No type recorded · Marine Safety Detachment Kenai · USCG Arctic District (CGD-A) · Activity 150325
19 June 2001 Examination of Repairs
Physical examination · MSO ANCHORAGE · USCG Arctic District (CGD-A) · Activity 1067112
15 June 2000 COI Inspection
Physical examination · MSO ANCHORAGE · USCG Arctic District (CGD-A) · Activity 1441686
30 August 1999 Deficiency Check
Physical examination · MSO ANCHORAGE · USCG Arctic District (CGD-A) · Activity 1116779
18 August 1999 Re-Inspection
Physical examination · MSO ANCHORAGE · USCG Arctic District (CGD-A) · Activity 1421718
29 June 1999 Hull Examination
Physical examination · MSO ANCHORAGE · USCG Arctic District (CGD-A) · Activity 1452525
19 March 1999 Damage Survey
Physical examination · MSO ANCHORAGE · USCG Arctic District (CGD-A) · Activity 1112673
24 June 1998 Deficiency Check
Physical examination · MSO ANCHORAGE · USCG Arctic District (CGD-A) · Activity 792541
19 June 1998 COI Inspection · Hull Examination
Physical examination · MSO ANCHORAGE · USCG Arctic District (CGD-A) · Activity 1378391
27 October 1997 Type not recorded
No type recorded · MSO ANCHORAGE · USCG Arctic District (CGD-A) · Activity 1119477
9 June 1997 Re-Inspection
Physical examination · MSO ANCHORAGE · USCG Arctic District (CGD-A) · Activity 774099
9 August 1996 Type not recorded
No type recorded · MSO ANCHORAGE · USCG Arctic District (CGD-A) · Activity 827071
15 July 1996 Deficiency Check
Physical examination · MSO ANCHORAGE · USCG Arctic District (CGD-A) · Activity 1095423
5 June 1996 Hull Examination · COI Inspection
Physical examination · MSO ANCHORAGE · USCG Arctic District (CGD-A) · Activity 1385752
9 May 1996 Type not recorded
No type recorded · MSO ANCHORAGE · USCG Arctic District (CGD-A) · Activity 1084227
23 April 1996 Type not recorded
No type recorded · MSO ANCHORAGE · USCG Arctic District (CGD-A) · Activity 1081299
15 December 1995 Type not recorded
No type recorded · Marine Safety Detachment Kenai · USCG Arctic District (CGD-A) · Activity 53942
13 October 1995 Examination of Repairs
Physical examination · MSO ANCHORAGE · USCG Arctic District (CGD-A) · Activity 874398
17 August 1995 Deficiency Check
Physical examination · MSO ANCHORAGE · USCG Arctic District (CGD-A) · Activity 873111
21 July 1995 Re-Inspection
Physical examination · MSO ANCHORAGE · USCG Arctic District (CGD-A) · Activity 878781
6 January 1995 Damage Survey · Examination of Repairs
Physical examination · MSO ANCHORAGE · USCG Arctic District (CGD-A) · Activity 1387687
3 January 1995 Type not recorded
No type recorded · Marine Safety Detachment Kenai · USCG Arctic District (CGD-A) · Activity 663050
14 December 1994 Type not recorded
No type recorded · MSO ANCHORAGE · USCG Arctic District (CGD-A) · Activity 838346
27 November 1994 Type not recorded
No type recorded · Marine Safety Detachment Kenai · USCG Arctic District (CGD-A) · Activity 116554
21 September 1994 Type not recorded
No type recorded · MSO ANCHORAGE · USCG Arctic District (CGD-A) · Activity 870820
24 June 1994 MARPOL Annex V Examination · COI Inspection
Physical examination · MSO ANCHORAGE · USCG Arctic District (CGD-A) · Activity 1023953
24 June 1994 Type not recorded
No type recorded · MSO ANCHORAGE · USCG Arctic District (CGD-A) · Activity 1173772
21 April 1994 Type not recorded
No type recorded · Marine Safety Detachment Kenai · USCG Arctic District (CGD-A) · Activity 72629
7 June 1993 Re-Inspection · MARPOL Annex V Examination
Physical examination · MSO ANCHORAGE · USCG Arctic District (CGD-A) · Activity 1382594
7 May 1993 Hull Examination · Deficiency Check
Physical examination · MSO PUGET SOUND · USCG Northwest District (CGD-NW) · Activity 1143651
6 August 1992 Plan Review "T" Boat
Administrative · MSO ANCHORAGE · USCG Arctic District (CGD-A) · Activity 1264457
11 July 1992 Type not recorded
No type recorded · Marine Safety Detachment Kenai · USCG Arctic District (CGD-A) · Activity 663052
26 June 1992 COI Inspection
Physical examination · MSO ANCHORAGE · USCG Arctic District (CGD-A) · Activity 958513
29 April 1992 Hull Examination
Physical examination · MSO ANCHORAGE · USCG Arctic District (CGD-A) · Activity 1270013
23 March 1992 Type not recorded
No type recorded · Marine Safety Detachment Kenai · USCG Arctic District (CGD-A) · Activity 676674
11 March 1992 Type not recorded
No type recorded · Marine Safety Detachment Kenai · USCG Arctic District (CGD-A) · Activity 118280
18 November 1991 Type not recorded
No type recorded · Marine Safety Detachment Kenai · USCG Arctic District (CGD-A) · Activity 82899
18 November 1991 Type not recorded
No type recorded · MSO ANCHORAGE · USCG Arctic District (CGD-A) · Activity 218016
18 November 1991 Type not recorded
No type recorded · MSO ANCHORAGE · USCG Arctic District (CGD-A) · Activity 221332
17 November 1991 Type not recorded
No type recorded · MSO ANCHORAGE · USCG Arctic District (CGD-A) · Activity 159278
14 November 1991 Deficiency Check
Physical examination · MSO ANCHORAGE · USCG Arctic District (CGD-A) · Activity 1311527
20 September 1991 Type not recorded
No type recorded · Marine Safety Detachment Kenai · USCG Arctic District (CGD-A) · Activity 676673
12 September 1991 Type not recorded
No type recorded · MSO ANCHORAGE · USCG Arctic District (CGD-A) · Activity 935949
28 August 1991 Re-Inspection
Physical examination · MSO ANCHORAGE · USCG Arctic District (CGD-A) · Activity 937683
14 August 1991 Type not recorded
No type recorded · MSO ANCHORAGE · USCG Arctic District (CGD-A) · Activity 676672
29 July 1991 Deficiency Check
Physical examination · MSO ANCHORAGE · USCG Arctic District (CGD-A) · Activity 941280
1 July 1991 Type not recorded
No type recorded · MSO ANCHORAGE · USCG Arctic District (CGD-A) · Activity 1252805
30 May 1991 Type not recorded
No type recorded · MSO PUGET SOUND · USCG Northwest District (CGD-NW) · Activity 1216261
15 March 1991 Hull Examination
Physical examination · MSO PUGET SOUND · USCG Northwest District (CGD-NW) · Activity 906244
30 July 1990 Type not recorded
No type recorded · MSO ANCHORAGE · USCG Arctic District (CGD-A) · Activity 903531
26 June 1990 COI Inspection
Physical examination · MSO ANCHORAGE · USCG Arctic District (CGD-A) · Activity 1215142
20 February 1990 Type not recorded
No type recorded · MSO ANCHORAGE · USCG Arctic District (CGD-A) · Activity 925005
8 September 1989 Type not recorded
No type recorded · MSO ANCHORAGE · USCG Arctic District (CGD-A) · Activity 892487
27 July 1989 Re-Inspection
Physical examination · MSO ANCHORAGE · USCG Arctic District (CGD-A) · Activity 888548
9 May 1989 Hull Examination
Physical examination · MSO PUGET SOUND · USCG Northwest District (CGD-NW) · Activity 1204172
9 February 1989 Administrative
Administrative · MSO ANCHORAGE · USCG Arctic District (CGD-A) · Activity 1037979
22 December 1988 Type not recorded
No type recorded · MSO ANCHORAGE · USCG Arctic District (CGD-A) · Activity 1342732
25 October 1988 Type not recorded
No type recorded · MSO ANCHORAGE · USCG Arctic District (CGD-A) · Activity 1200627
9 August 1988 Type not recorded
No type recorded · MSO ANCHORAGE · USCG Arctic District (CGD-A) · Activity 1035966
26 July 1988 Deficiency Check
Physical examination · MSO ANCHORAGE · USCG Arctic District (CGD-A) · Activity 1341873
11 July 1988 COI Inspection
Physical examination · MSO ANCHORAGE · USCG Arctic District (CGD-A) · Activity 898256
26 January 1988 Deficiency Check
Physical examination · MSO ANCHORAGE · USCG Arctic District (CGD-A) · Activity 1326559
6 January 1988 Administrative
Administrative · MSO ANCHORAGE · USCG Arctic District (CGD-A) · Activity 1010131
3 November 1987 Deficiency Check
Physical examination · MSO ANCHORAGE · USCG Arctic District (CGD-A) · Activity 1330000
15 September 1987 Re-Inspection
Physical examination · MSO ANCHORAGE · USCG Arctic District (CGD-A) · Activity 1330204
15 August 1987 Hull Examination
Physical examination · MSO ANCHORAGE · USCG Arctic District (CGD-A) · Activity 1326565
31 July 1987 Type not recorded
No type recorded · MSO ANCHORAGE · USCG Arctic District (CGD-A) · Activity 1340872
9 July 1987 Administrative
Administrative · MIO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1014512
30 September 1986 Examination of Repairs
Physical examination · MSO ANCHORAGE · USCG Arctic District (CGD-A) · Activity 1315611
11 August 1986 Deficiency Check
Physical examination · MSO ANCHORAGE · USCG Arctic District (CGD-A) · Activity 1306969
11 July 1986 COI Inspection
Physical examination · MSO ANCHORAGE · USCG Arctic District (CGD-A) · Activity 1303972
4 October 1985 Type not recorded
No type recorded · MSO ANCHORAGE · USCG Arctic District (CGD-A) · Activity 1304068
23 August 1985 Examination of Repairs · Credit Drydock
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 987498
30 July 1985 Deficiency Check
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1290706
26 June 1985 Type not recorded
No type recorded · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 980404

Deficiency record · 155

Construction/Loadline › Hull
Issued 14 March 2003 Resolved
Make permanent repairs to fwd bulkhead of #7 stbd potable water tank not later than 28MAR03.
Due 28 March 2003
Resolved 10 April 2003
Stability › Incline Test
Issued 9 August 2002 Resolved
Complete necessary stability analysis and/or tests to provide approved stability information based on removal of stern roller.
Due 12 August 2002
Resolved 10 September 2002
Resolution: New stability letter on board.
Construction/Loadline › Structures
Issued 9 August 2002 Resolved
Complete repairs to forward bulkhead of #2 port void. Repairs must be to the satisfaction of the attending Marine Inspector. LEGACY COMPONENT DESC: Transverse Bulkhead
Due 9 August 2002
Resolved 9 August 2002
Construction/Loadline › Hull
Issued 30 January 2002 Resolved
Complete permanent repairs to satisfaction of attending marine inspector at next drydock (NLT 29JUN02) LEGACY COMPONENT DESC: Bottom Plating
Condition: Unknown
Action required: 705 - Other - as specified
Due 29 June 2002
Resolved 10 April 2003
Electrical
Issued 23 August 2001 Resolved
Replace broken voltmeter switch on main switchboard.
Condition: Unknown
Due 10 September 2001
Resolved 18 September 2001
Deck/Cargo
Issued 23 August 2001 Resolved
Install relief valve in piping between compressors and ships service air receivers.
Condition: Unknown
Due 10 September 2001
Resolved 18 September 2001
Lifesaving
Issued 23 August 2001 Resolved
Show proper operation of engine room general alarm.
Condition: Unknown
Due 10 September 2001
Resolved 18 September 2001
Deck/Cargo
Issued 23 August 2001 Resolved
Replace port air receiver relief vale.
Condition: Unknown
Due 10 September 2001
Resolved 18 September 2001
Fire Fighting
Issued 23 August 2001 Resolved
Replace hose and discharge nozzle for paint locker CO2 system.
Condition: Unknown
Due 10 September 2001
Resolved 18 September 2001
Fire Fighting
Issued 23 August 2001 Resolved
Provide servicing paperwork for all firefighting equipment.
Condition: Unknown
Due 10 September 2001
Resolved 18 September 2001
Lifesaving
Issued 18 August 1999 Resolved
Repair or replace EPIRB. Current unit does not test in the "test" mode. Unit did activate in the "on" mode.
Condition: Unknown
Due 18 August 1999
Resolved 18 August 1999
Construction/Loadline
Issued 19 March 1999 Resolved
Make permanent repairs to hole in bottom plate under forward engine room bilge suction.
Condition: Unknown
Due 19 March 1999
Resolved 19 March 1999
Engineering
Issued 19 June 1998 Resolved
PROVE PROPER OPERATION OF RELIEF VALVES ON ALL AIR RECEIVERS.
Condition: Unknown
Due 26 June 1998
Resolved 26 June 1998
Navigation
Issued 19 June 1998 Resolved
PROVE PROPER OPERATION OF VESSEL FATHOMETER.
Condition: Unknown
Due 26 June 1998
Resolved 26 June 1998
Lifesaving
Issued 19 June 1998 Resolved
COMPLETE ABANDON SHIP DRILL.
Condition: Unknown
Due 26 June 1998
Resolved 26 June 1998
Fire Fighting
Issued 19 June 1998 Resolved
CONDUCT SATISFACTORY FIRE DRILL.
Condition: Unknown
Due 26 June 1998
Resolved 26 June 1998
Electrical
Issued 19 June 1998 Resolved
PROVE PROPER OPERATION OF OVERSPEED TRIPS AND LUBE OIL ALARMS ON PORT AND STBD SSG'S.
Condition: Unknown
Due 26 June 1998
Resolved 26 June 1998
Construction/Loadline
Issued 19 June 1998 Resolved
PROVE PROPER OPERATION OF WATERTIGHT DOOR FROM ENGINEROOM TO STBD ACCESS TOMAIN DECK.
Condition: Unknown
Due 26 June 1998
Resolved 26 June 1998
Construction/Loadline
Issued 19 June 1998 Resolved
PROVE PROPER OPERATION OF WATERTIGHT DOOR FROM ENGINEROOM TO PORT ACCESS TOMAIN DECK.
Condition: Unknown
Due 26 June 1998
Resolved 26 June 1998
Fire Fighting
Issued 19 June 1998 Resolved
PROVE PROPER OPERATION OF FIRE PUMP.
Condition: Unknown
Due 26 June 1998
Resolved 26 June 1998
Fire Fighting
Issued 19 June 1998 Resolved
HYDROTEST ALL VESSEL FIRE HOSES.
Condition: Unknown
Due 26 June 1998
Resolved 26 June 1998
Fire Fighting
Issued 19 June 1998 Resolved
PROVE PROPER OPERATION OF FIRE MONITOR.
Condition: Unknown
Due 26 June 1998
Resolved 26 June 1998
Engineering
Issued 19 June 1998 Resolved
PROVE PROPER OPERATION OF BOTH MAIN ENGINE LOW LUBE OIL ALARMS AND OVERSPEED TRIPS.
Condition: Unknown
Due 26 June 1998
Resolved 26 June 1998
Navigation
Issued 19 June 1998 Resolved
PROVE PROPER OPERATION OF STEERING SYSTEM FROM ALL STEERING STATIONS.
Condition: Unknown
Due 26 June 1998
Resolved 26 June 1998
Engineering
Issued 19 June 1998 Resolved
PROVE PROPER OPERATION OF STBD MDE HIGH LUBE OIL ALARM.
Condition: Unknown
Due 26 June 1998
Resolved 26 June 1998
Construction/Loadline
Issued 19 June 1998 Resolved
PROVE PROPER OPERATION OF VESSEL OILY WATER SEPARATOR.
Condition: Unknown
Due 26 June 1998
Resolved 26 June 1998
Lifesaving
Issued 9 June 1997 Resolved
PROVE PROPER OPERATION OF 406 EPIRB.
Condition: Unknown
Due 13 June 1997
Resolved 13 June 1997
Construction/Loadline
Issued 9 June 1997 Resolved
PLUG TWO 1/4 INCH HOLES IN WATERTIGHT BULKHEAD BETWEEN STEERING ROOM PASSAGE AND ENGINE ROOM.
Condition: Unknown
Due 13 June 1997
Resolved 13 June 1997
Engineering
Issued 9 June 1997 Resolved
LABEL STARBOARD FUEL OIL DAY TANK REMOTE VALVE SHUTDOWN.
Condition: Unknown
Due 13 June 1997
Resolved 13 June 1997
Construction/Loadline
Issued 9 June 1997 Resolved
PLUG 1/4 INCH HOLE AND ALL WIRE PENETRATIONS IN WATERTIGHT BULKHEAD BETWEENFORWARD PASSAGE AND ENGINE ROOM.
Condition: Unknown
Due 13 June 1997
Resolved 13 June 1997
Electrical
Issued 9 June 1997 Resolved
REMOVE EXPOSED WIRES FROM PORT SIDE OF STEERING ROOM OVERHEAD.
Condition: Unknown
Due 13 June 1997
Resolved 13 June 1997
Lifesaving
Issued 9 June 1997 Resolved
[withheld — contains personal information; the deficiency system, dates, and resolution status are shown above]
Condition: Unknown
Due 13 June 1997
Resolved 13 June 1997
Navigation
Issued 5 June 1996 Resolved
Prove proper operation of the navigation lights
Condition: Unknown
Due 2 July 1996
Resolved 2 July 1996
Deck/Cargo
Issued 5 June 1996 Resolved
Prove proper operation of the anchor windlass
Condition: Unknown
Due 2 July 1996
Resolved 2 July 1996
Fire Fighting
Issued 5 June 1996 Resolved
Prove proper operation of the fire pump andd fire stations
Condition: Unknown
Due 2 July 1996
Resolved 2 July 1996
Engineering
Issued 5 June 1996 Resolved
Prove proper operation of the main propulsion machinery and finish automation testing
Condition: Unknown
Due 2 July 1996
Resolved 2 July 1996
Electrical
Issued 5 June 1996 Resolved
Prove proper operation of the ship service generators
Condition: Unknown
Due 2 July 1996
Resolved 2 July 1996
Engineering
Issued 5 June 1996 Resolved
Prove proper operation of the remote ventilation shut downs
Condition: Unknown
Due 2 July 1996
Resolved 2 July 1996
Fire Fighting
Issued 5 June 1996 Resolved
Conduct a fire drill, man overboard, and abandon ship drill in the presenceof a Coast Guard Inspector
Condition: Unknown
Due 2 July 1996
Resolved 2 July 1996
Documentation
Issued 5 June 1996 Resolved
Provide for review the proper officer's licenses
Condition: Unknown
Due 2 July 1996
Resolved 2 July 1996
Engineering
Issued 5 June 1996 Resolved
Prove proper operation of the relief valves on all air receivers of providea copy of the servicing certificate
Condition: Unknown
Due 2 July 1996
Resolved 2 July 1996
Engineering
Issued 5 June 1996 Resolved
Provide a copy of the servicing certificate for repairs to the main shafts
Condition: Unknown
Due 27 June 1996
Resolved 27 June 1996
Construction/Loadline
Issued 5 June 1996 Resolved
Provide a copy of the material used and spaces installed during the yard period to the [name withheld] (MSO Anchorage)
Condition: Unknown
Due 27 June 1996
Resolved 27 June 1996
Lifesaving
Issued 5 June 1996 Resolved
Prove proper operation of the outboard motor for the rescue boat
Condition: Unknown
Due 5 June 1996
Resolved 5 June 1996
Engineering
Issued 5 June 1996 Resolved
Provide the clearance readings for the rudder bearings and shaft bearings to the [name withheld](MSO Anchorage)
Condition: Unknown
Due 27 June 1996
Resolved 27 June 1996
Navigation
Issued 5 June 1996 Resolved
Prove proper operation of the steering system in all modes of operation
Condition: Unknown
Due 2 July 1996
Resolved 2 July 1996
Navigation
Issued 5 June 1996 Resolved
Prove proper operation of all electronic and navigational equipment
Condition: Unknown
Due 2 July 1996
Resolved 2 July 1996
Engineering
Issued 17 August 1995 Resolved
Prove satisfactory operation of port reduction gear lube oil pressure alarm.
Condition: Unknown
Due 14 September 1995
Resolved 5 October 1995
Electrical
Issued 17 August 1995 Resolved
Replace/Repair broken reading lights in crews quarters.
Condition: Unknown
Due 14 September 1995
Resolved 5 October 1995
Electrical
Issued 17 August 1995 Resolved
Repair/Replace loose wiring in fwd blkhd of officer's toilet.
Condition: Unknown
Due 14 September 1995
Resolved 5 October 1995
Deck/Cargo
Issued 17 August 1995 Resolved
Conduct NDT of port/stbd cement tanks of no-less than 3 girth belts & 1 enddome belt to each tank to prove plate thickness and make permanent repair proposal acceptable to the cognizant OCMI.
Condition: Unknown
Due 15 September 1995
Resolved 5 October 1995
Construction/Loadline
Issued 14 December 1994 Resolved
AS A RESULT OF THE RECENT GROUNDING ON 27 NOVEMBER, THE VESSEL IS TO BE HAULED OUT AND PRESENTED FOR A HULL EXAMINATION, WITH NECESSARY REPAIRS BEING COMPLETED TO THE SATISFACTION OF THE COGNIZANT OCMI.
Condition: Unknown
Due 14 December 1994
Resolved 14 December 1994
Deck/Cargo
Issued 21 September 1994 Resolved
CONDUCT HYDROSTATIC TEST OF ALL P-TANKS (CEMENT TANKS), THIS ITEM IS TO BECOMPLETED AT NEXT VESSEL DRYDOCK/REPAIR PERIOD BUT NOT LATER THAN THE NOTEDDATE OF COMPLIANCE.
Condition: Unknown
Due 21 September 1994
Resolved 21 September 1994
Engineering
Issued 24 June 1994 Resolved
CONDUCT HYDROTEST ON #1 AND #2 STARTING AIR RECEIVERS.
Condition: Unknown
Due 3 August 1994
Resolved 3 August 1994
Fire Fighting
Issued 24 June 1994 Resolved
HYDROSTATICALLY TEST ON BOARD FIRE EXTINGUISHERS AS NECESSARY TO BRING CURRENT.
Condition: Unknown
Due 3 August 1994
Resolved 3 August 1994
Electrical
Issued 24 June 1994 Resolved
REPAIR DECK LIGHT ON BOW.
Condition: Unknown
Due 3 August 1994
Resolved 3 August 1994
Electrical
Issued 24 June 1994 Resolved
REPAIR AND TEST PORT GENERATOR HIGH TEMPERATURE ALARM.
Condition: Unknown
Due 3 August 1994
Resolved 3 August 1994
Lifesaving
Issued 24 June 1994 Resolved
PROVIDE ONE ADULT PFD._x001C_ VESSEL RESTRICTED TO NOT MORE THAN 15 PERSONS IN ADDITION TO THE CREW UNTILCORRECTED.
Condition: Unknown
Due 3 August 1994
Resolved 3 August 1994
Engineering
Issued 24 June 1994 Resolved
REPAIR AND OPERATIONALLY TEST OWS.
Condition: Unknown
Due 3 August 1994
Resolved 3 August 1994
Construction/Loadline
Issued 24 June 1994 Resolved
CROP AND RENEW WASTED BULKHEAD SECTION TO #7 BALLAST TANK (STBD)
Condition: Unknown
Due 3 August 1994
Resolved 3 August 1994
Documentation
Issued 24 June 1994 Resolved
PROVIDE CURRENT LOADLINE CERTIFICATE._x001C_ VESSEL RESTRICTED TO COOK INLET UNTIL CORRECTED.
Condition: Unknown
Due 3 August 1994
Resolved 3 August 1994
Construction/Loadline
Issued 29 April 1992 Resolved
MAKE PERMANENT REPAIRS TO PORT AND STBD POTABLE WATER TANKS INCLUDING AFT TANK BULKHEADS AND DAMAGED STIFFENERS AND LONGITUDINALS.
Condition: Unknown
Due 29 April 1992
Resolved 29 April 1992
Construction/Loadline
Issued 29 April 1992 Resolved
CROP AND RENEW WASTED GUSSETS IN #7 PORT BALLAST TANK.
Condition: Unknown
Due 29 April 1992
Resolved 29 April 1992
Electrical
Issued 29 April 1992 Resolved
Secure or remove wiring in chain locker.
Condition: Unknown
Due 29 April 1992
Resolved 29 April 1992
Construction/Loadline
Issued 29 April 1992 Resolved
CROP AND RENEW TOP LONGITUDINAL WASTED IN WAY OF FILL PIPE IN #5 PORT BALLAST TANK.
Condition: Unknown
Due 29 April 1992
Resolved 29 April 1992
Construction/Loadline
Issued 29 April 1992 Resolved
CROP AND RENEW STBD DAY TANK BULKHEAD DAMAGED IN WAY OF ENGINEROOM STBD ENTRYWAY WHERE BULKHEAD MEETS HULL. _x001C_ FUEL WILL NOT BE CARRIED IN THE STBD DAY TANK UNTIL PERMANENT REPAIRS ARE COMPLETED.
Condition: Unknown
Due 29 April 1992
Resolved 29 April 1992
Construction/Loadline
Issued 29 April 1992 Resolved
MAKE PERMANENT REPAIRS TO FRACTURED WELD (MARKED) IN OVERHEAD DECK STIFFENER IN CHAIN LOCKER.
Condition: Unknown
Due 29 April 1992
Resolved 29 April 1992
Accommodation/Occupational Safety
Issued 29 April 1992 Resolved
PROPERLY SECURE HUMPHREY SWITCH IN #1 BALLAST TANK.
Condition: Unknown
Due 29 April 1992
Resolved 29 April 1992
Construction/Loadline
Issued 29 April 1992 Resolved
make permanent repairs to fractured welds in forepeak (4-marked) along stiffeners.
Condition: Unknown
Due 29 April 1992
Resolved 29 April 1992
Construction/Loadline
Issued 29 April 1992 Resolved
REMOVE OR PROPERLY SECURE BROKEN PIPE IN #2 STBD BALLAST TANK.
Condition: Unknown
Due 29 April 1992
Resolved 29 April 1992
Electrical
Issued 28 August 1991 Resolved
PROVE PROPER OPERATION OF THE3 PORT GENERATOR OVERSPEED SWITCH
Condition: Unknown
Due 28 August 1991
Resolved 28 August 1991
Construction/Loadline
Issued 28 August 1991 Resolved
REMOVE EXCESSIVE OIL FROM E/R BILGE.
Condition: Unknown
Due 28 August 1991
Resolved 28 August 1991
Electrical
Issued 28 August 1991 Resolved
INSTALL BLANK TO OPEN CIRCUITS IN E/R PANEL BOX.
Condition: Unknown
Due 28 August 1991
Resolved 28 August 1991
Engineering
Issued 28 August 1991 Resolved
PROVE PROPER OPERATION OF THE LOW LUBE OIL ALARM TO THE STBD MAIN ENGINE.
Condition: Unknown
Due 28 August 1991
Resolved 28 August 1991
Fire Fighting
Issued 28 August 1991 Resolved
PROVIDE FIRE EXTINQUISHER SERVICE REPORT
Condition: Unknown
Due 28 August 1991
Resolved 28 August 1991
Engineering
Issued 28 August 1991 Resolved
INSTALL ADEQUATE GUAGE TO PRT S/S AIR RECEIVER.
Condition: Unknown
Due 28 August 1991
Resolved 28 August 1991
Engineering
Issued 28 August 1991 Resolved
AMEND ALARM TEST PROCEDURES TO REFLECT PROCEDURES USED TO DEMONSTRATE ALARMS.
Condition: Unknown
Due 28 August 1991
Resolved 28 August 1991
Deck/Cargo
Issued 29 July 1991 Resolved
PROVE INSTALLATION OF CRANE IS IN ACCORDANCE WITH MSC-1 LTR 16710/GSC 51 SER H1-10498, DTD 24APR91 AND APPROVED PLANS.
Condition: Unknown
Due 29 July 1991
Resolved 29 July 1991
Deck/Cargo
Issued 30 May 1991 Resolved
PROVE INSTALLATION OF CRANE IS IN ACCORDANCE WITH MSC-1 LTR 16710/GSC 51, SER H1-10498, DTD 24APR91 AND APPROVED PLANS._x001C_ _x001C_ _x001C_
Condition: Unknown
Due 30 May 1991
Resolved 30 May 1991
Deck/Cargo
Issued 26 June 1990 Resolved
REPLACE FLAME SCREEN ON FUEL TANK VENT WITH 30X30 MESH SCREEN. VENT FIRSTVENT AFT OF STBD STACK.
Condition: Unknown
Due 26 June 1990
Resolved 26 June 1990
Navigation
Issued 26 June 1990 Resolved
REPAIR/REPLACE BRACKET WHERE WORN, ON STBD RUDDER POST WHERE RUDDER ANGLE INDICATOR ATTACHED.
Condition: Unknown
Due 26 June 1990
Resolved 26 June 1990
Fire Fighting
Issued 26 June 1990 Resolved
PROVE OPERATION OF FIRE MONITOR PRIMING VALVE TO MAKE SYSTEM INDEPENDENT FROM FIRE AND BALLAST SYSTEM. REPAIR OR REPLACE PRIMING VALVE.
Condition: Unknown
Due 26 June 1990
Resolved 26 June 1990
Electrical
Issued 26 June 1990 Resolved
INSTALL COVERS ON MAIN GENERATOR SWITCHBOARD WHERE OPEN.
Condition: Unknown
Due 26 June 1990
Resolved 26 June 1990
Electrical
Issued 26 June 1990 Resolved
PROVE OPERATION OF PORT S/S GEN OVERSPEED.
Condition: Unknown
Due 26 June 1990
Resolved 26 June 1990
Engineering
Issued 27 July 1989 Resolved
PROVE THE PROPER OPERATION OF THE STBD GEN & THE AIR COMPRESSOR ENGINE OVERSPEED TRIPS.
Condition: Unknown
Due 27 July 1989
Resolved 27 July 1989
Engineering
Issued 27 July 1989 Resolved
PROVIDE PROPER BOWL FOR ALL RACOR FILTERS.
Condition: Unknown
Due 27 July 1989
Resolved 27 July 1989
Electrical
Issued 27 July 1989 Resolved
PROVIDE A TACHOMETER FOR THE AIR COMPRESSOR ENGINE.
Condition: Unknown
Due 27 July 1989
Resolved 27 July 1989
Engineering
Issued 27 July 1989 Resolved
PROVE THE HIGH TEMP. ALARMS ON ALL DIESEL ENGINES.
Condition: Unknown
Due 27 July 1989
Resolved 27 July 1989
Electrical
Issued 27 July 1989 Resolved
REPLACE DETIORIATED ELECTRICAL WIRING IN BOTH STACK HOUSES.
Condition: Unknown
Due 27 July 1989
Resolved 27 July 1989
Lifesaving
Issued 27 July 1989 Resolved
PROVIDE NEEDED AUXILIARY LINE IN ACCORDANCE WITH APPLICABLE VSL REGS.
Condition: Unknown
Due 27 July 1989
Resolved 27 July 1989
Engineering
Issued 9 August 1988 Resolved
PROVIDE A PROPER RELIEF VALVE (ASME STAMPED & PROPERLY RATED) FOR BOTH THE PORT AND STBD CLUTCH AIR RECEIVERS.
Condition: Unknown
Due 9 August 1988
Resolved 9 August 1988
Fire Fighting
Issued 9 August 1988 Resolved
PROVIDE A PROPERLY RATED RELIEF VALVE FOR THE VESSEL'S MAIN FIRE PUMP.
Condition: Unknown
Due 9 August 1988
Resolved 9 August 1988
Fire Fighting
Issued 9 August 1988 Resolved
PROVIDE MARINE BRACKETS ON ALL ON BOARD PORTABLE FIRE EXTINGUISHERS.
Condition: Unknown
Due 9 August 1988
Resolved 9 August 1988
Electrical
Issued 9 August 1988 Resolved
CONDUCT MAINTENANCE AS NECESSARY ON THE PORT GENERATOR TO PREVENT EXCESSIVECRANKCASE PRESSURE.
Condition: Unknown
Due 9 August 1988
Resolved 9 August 1988
Unknown
Issued 9 August 1988 Resolved
PROVIDE GLASS TUBES ON THE LUBE OIL AND FUEL OIL TANK LEVEL INDICATORS IN ENGINE ROOM TO REPLACE PLEXIGLASS TUBES.
Condition: Unknown
Due 9 August 1988
Resolved 9 August 1988
Unknown
Issued 11 July 1988 Resolved
PROVIDE NECESSARY NAME PLATE DATA FOR THE "P" TANKS, SHOWING DATE, PLACE OFMANUFACTURE AND MAXIMUM ALLOWABLE WORKING PRESSURE, THIS INFORMATION MUST BE PROVIDED FROM COAST GUARD APPROVED DRAWINGS OR COPIES THEREOF.
Condition: Unknown
Due 11 July 1988
Resolved 11 July 1988
Deck/Cargo
Issued 11 July 1988 Resolved
PROVIDE EVIDENCE THAT POTABLE WATER TANK WAS ON VESSEL WHEN ORIGINALLY BUILT; OTHERWISE PROVIDE AN ASME APPROVED TANK. RELIEF VALVE IS TO TESTED AFTER OWNER PROVIDES INFORMATION ON MAXIMUM ALLOWABLE WORKING PRESSURE OF TANK.
Condition: Unknown
Due 11 July 1988
Resolved 11 July 1988
Deck/Cargo
Issued 11 July 1988 Resolved
PROVIDE NEW ASME APPROVED RELIEF VALVES WITH HAND RELIEVING GEAR FOR TWO (2) SHIP'S SERVICE AIR RECEIVERS.
Condition: Unknown
Due 11 July 1988
Resolved 11 July 1988
Deck/Cargo
Issued 11 July 1988 Resolved
PROVIDE NEW PRESSURE GAUGE FOR PORT SHIP'S SERVICE AIR RECEIVER.
Condition: Unknown
Due 11 July 1988
Resolved 11 July 1988
Electrical
Issued 11 July 1988 Resolved
REMOVE ALL SPLICED WIRING FROM GENERATORS AND DIESEL ENGINES. JUNCTION BOXES SHALL BE INSTALLED.
Condition: Unknown
Due 11 July 1988
Resolved 11 July 1988
Deck/Cargo
Issued 11 July 1988 Resolved
PROVIDE FIXED PERMANENT PIPING FROM HYDRAULIC TANK TO BOW THRUSTER FILL TANK AND REMOVE RUBBER HOSE.
Condition: Unknown
Due 11 July 1988
Resolved 11 July 1988
Deck/Cargo
Issued 11 July 1988 Resolved
MAKE AVAILABLE FOR INTERNAL INSPECTION THE FOLLOWING: PRESSURE TANKS, PORT AND STBD SHIPS SERVICE AIR RECEIVERS, PORT AND STBD CLUTCH AIR RECEIVERS, POTABLE WATER TANK AND FOUR "P" TANKS.
Condition: Unknown
Due 11 July 1988
Resolved 11 July 1988
Lifesaving
Issued 11 July 1988 Resolved
PROVIDE LIGHTS FOR ALL LIFEPRESERVERS AND EXPOSURE SUITS.
Condition: Unknown
Due 11 July 1988
Resolved 11 July 1988
Unknown
Issued 11 July 1988 Resolved
REMOVE ALL OIL FROM ENGINE ROOM BILGES.
Condition: Unknown
Due 11 July 1988
Resolved 11 July 1988
Navigation
Issued 11 July 1988 Resolved
PROPERLY SUPPORT STEERING BAR CONNECTION IN STEERING ROOM COMPARTMENT. ALSOTIGHTEN BOLT CONNECTIONS TO PORT RUDDER STEERING MECHANISM AND PROVIDE COT-TER PENS TO PORT AND STBD STEERING CONNECTIONS.
Condition: Unknown
Due 11 July 1988
Resolved 11 July 1988
Deck/Cargo
Issued 11 July 1988 Resolved
IN WAY OF FIRE MONITOR DIESEL TANK PROVIDE: (A) EXHAUST LOGGING ON STACK, (B) GLASS SITE GLASS, (C) GUARD FOR SITE GLASS, (D) OIL CONTAINMENT, (E) NEW VALVE HANDLE, AND (F) FLAME SCREEN FOR FUEL OIL VENT.
Condition: Unknown
Due 11 July 1988
Resolved 11 July 1988
Electrical
Issued 11 July 1988 Resolved
REMOVE ALL DEAD END WIRING FROM BRIDGE CONSOLE, ENGINEER'S ROOM AND STBD ENGINE ROOM ENTRANCE.
Condition: Unknown
Due 11 July 1988
Resolved 11 July 1988
Electrical
Issued 11 July 1988 Resolved
PROVIDE BLANKS FOR BREAKER BOX ON BRIDGE.
Condition: Unknown
Due 11 July 1988
Resolved 11 July 1988
Lifesaving
Issued 11 July 1988 Resolved
PROVIDE LIFERAFT INSTRUCTIONS FOR ALL LIFERAFT STATIONS.
Condition: Unknown
Due 11 July 1988
Resolved 11 July 1988
Deck/Cargo
Issued 11 July 1988 Resolved
REMOVE DIESEL FILL OUTLET AT BASE OF PORT ENGINE ROOM STAIRWELL.
Condition: Unknown
Due 11 July 1988
Resolved 11 July 1988
Construction/Loadline
Issued 11 July 1988 Resolved
LABEL ALL FUEL, BALLAST AND BILGE VALVES IN ENGINE ROOM.
Condition: Unknown
Due 11 July 1988
Resolved 11 July 1988
Electrical
Issued 11 July 1988 Resolved
ALL DIESEL ENGINES (2 ENGINES AND 1 FIRE IGNITION DIESELS) AND GENERATOR OVERSPEEDS LOW LUBE OIL AND HIGH TEMPERATURE ALARMS TO BE TESTED IN THE PRESENCE OF A USCG INSPECTOR.
Condition: Unknown
Due 11 July 1988
Resolved 11 July 1988
Electrical
Issued 11 July 1988 Resolved
MAKE OPERATIVE STBD BLOWER SHUTDOWN AT ENTRANCE TO STBD ENGINE ROOM.
Condition: Unknown
Due 11 July 1988
Resolved 11 July 1988
Unknown
Issued 11 July 1988 Resolved
PROVIDE EVIDENCE THAT THE RELIEF VALVES ON THE "P" TANKS ARE OF THE PROPER ASME STANDARD AND PROPERLY RATED FOR USE ON THESE "P" TANKS. THIS ITEM IS TO BE COMPLETED PRIOR TO PRESSURIZING THE AIR TANKS BUT NOT LATER THAN THE DATE OF COMPLIANCE
Condition: Unknown
Due 11 July 1988
Resolved 11 July 1988
Construction/Loadline
Issued 15 September 1987 Resolved
CROP AND RENEW AFT BULKHEAD STIFFNER IN WAY OF #2 STBD BALLAST TANK.
Condition: Unknown
Due 15 September 1987
Resolved 15 September 1987
Construction/Loadline
Issued 15 September 1987 Resolved
CROP AND RENEW APPROXIMATELY 5' X 15" OF MAIN DECK PLATING AND ASSOCIATED INTERNALS IN WAY OF AFT BULKHEAD OUTBOARD PORT SIDE IN #3 PORT BALLAST TANK
Condition: Unknown
Due 15 September 1987
Resolved 15 September 1987
Construction/Loadline
Issued 15 September 1987 Resolved
CROP AND RENEW GUSSET IN WAY OF INBOARD AFT BULKHEAD AND INBOARD BOTTOM LONGITUDINAL CONNECTION IN #4 PORT BALLAST TANK.
Condition: Unknown
Due 15 September 1987
Resolved 15 September 1987
Construction/Loadline
Issued 15 September 1987 Resolved
CROP AND RENEW 2 INNNERMOST BOTTOM LONGS IN WAY OF #8 AFT PEAK TANK.
Condition: Unknown
Due 15 September 1987
Resolved 15 September 1987
Construction/Loadline
Issued 15 September 1987 Resolved
CROP AND RENEW BOTTOM LONGS AS MARKED IN #6 PORT AND STARBOARD BALLAST TANKS.
Condition: Unknown
Due 15 September 1987
Resolved 15 September 1987
Construction/Loadline
Issued 15 September 1987 Resolved
CROP AND RENEW BOTTOM LONGS AS MARKED IN #7 PORT AND STARBOARD BALLAST TANKS.
Condition: Unknown
Due 15 September 1987
Resolved 15 September 1987
Construction/Loadline
Issued 15 September 1987 Resolved
TRIM WASTAGE TO GOOD METAL SURROUNDING LIGHTNING HOLES AS MARKED ON SWASH BULKHEADS IN WAY OF #8 AFT PEAK TANK.
Condition: Unknown
Due 15 September 1987
Resolved 15 September 1987
Construction/Loadline
Issued 15 September 1987 Resolved
CROP AND RENEW AFTER MID BULKHEAD STIFFNER IN WAY OF #8 AFT PEAK TANK.
Condition: Unknown
Due 15 September 1987
Resolved 15 September 1987
Accommodation/Occupational Safety
Issued 15 September 1987 Resolved
PRIOR TO 15 NOVEMBER 1987, PROVIDE FOR TESTING THE CLUTCH AIR RECEIVERS' RELIEF VALVES.
Condition: Unknown
Due 15 September 1987
Resolved 15 September 1987
Construction/Loadline
Issued 30 September 1986 Resolved
PRIOR TO 26 SEPT 86 MAKE TEMPORARY REPAIRS TO FRACTURED KEEL IN WAY OF FWD.ENGINE ROOM BULKHEAD.
Condition: Unknown
Due 30 September 1986
Resolved 30 September 1986
Construction/Loadline
Issued 30 September 1986 Resolved
PRIOR TO 19 OCT 86 THE VESSEL MUST BE DRY DOCKED TO MAKE PERMANENT REPAIRS TO KEEL IN WAY OF FORWARD ENGINE ROOM BULKHEAD AND TO WASTED FLOORS BETWEENFRAMES 18 AND 24.
Condition: Unknown
Due 30 September 1986
Resolved 30 September 1986
Unknown
Issued 11 July 1986 Resolved
PRIOR TO 11 AUG 86 PROVIDE THREE ADDITIONAL SURVIVAL SUITS (APPROVAL #'S 160.071) MARKED WITH VSL NAME AND EQUIPPED WITH PFD LIGHTS. THE VSL IS RESTRICTED TO LAKES, BAYS, AND SOUNDS, AND COOK INLET UNTIL THEY ARE ONBOARD.
Condition: Unknown
Due 11 July 1986
Resolved 11 July 1986
Unknown
Issued 11 July 1986 Resolved
PRIOR TO 11 AUG 86 REPLACE THE EXISTING WORK / RESCUE BOAT WITH ONE THAT IS ACCEPTABLE TO THE LOCAL [name withheld].
Condition: Unknown
Due 11 July 1986
Resolved 11 July 1986
Unknown
Issued 11 July 1986 Resolved
PRIOR TO 11 AUG 86 PROVIDE CHECK FLOAT FOR #7 STRBD BALLAST TANK VENT.
Condition: Unknown
Due 11 July 1986
Resolved 11 July 1986
Unknown
Issued 11 July 1986 Resolved
PRIOR TO 11 AUG 86 RECONSTRUCT PAINT LOCKER TO CONFORM WITH 46 CFR 92.05-10AS BEING ALL STEEL AND PROVIDE PROPER VENTILATION WITH SCREEN AND CLOSURE.
Condition: Unknown
Due 11 July 1986
Resolved 11 July 1986
Unknown
Issued 11 July 1986 Resolved
PRIOR TO 11 AUG 86 PROVIDE GOOSE NECK VENT AND SCREEN FOR PORT FUEL OIL DISCHARGE CLOSED CONTAINMENT.
Condition: Unknown
Due 11 July 1986
Resolved 11 July 1986
Unknown
Issued 11 July 1986 Resolved
PRIOR TO 11 AUG 86 PROVIDE CURRENT COPY OF REGULATIONS FOR CLASS VESSELS SUBCHAPTER I - 46 CFR 90-139.
Condition: Unknown
Due 11 July 1986
Resolved 11 July 1986
Unknown
Issued 11 July 1986 Resolved
PRIOR TO 11 AUG 86 PROVIDE RAILINGS AROUND VALVES IN WAY OF ENGINEROOM ALARM PANEL ON STBD SIDE.
Condition: Unknown
Due 11 July 1986
Resolved 11 July 1986
Unknown
Issued 11 July 1986 Resolved
PRIOR TO 11 AUG 86 PROVIDE ADDITIONAL EMERGENCY LIGHTING IN FWD ENGINEROOM COMPANIONWAY IN WAY OF LADDERS.
Condition: Unknown
Due 11 July 1986
Resolved 11 July 1986
Unknown
Issued 11 July 1986 Resolved
PRIOR TO 11 AUG 86 CONNECT THE EMERGENCY LIGHT ON THE STBD ENGINEROOM BLKHDTO THE EMERGENCY LIGHT CIRCUIT.
Condition: Unknown
Due 11 July 1986
Resolved 11 July 1986
Unknown
Issued 11 July 1986 Resolved
PRIOR TO 11 AUG 86 PROVIDE SUITABLE GUARDS OVER TAILSHAFT COUPLINGS IN WAY OF REDUCTION GEAR ON BOTH MAIN ENGINES.
Condition: Unknown
Due 11 July 1986
Resolved 11 July 1986
Unknown
Issued 11 July 1986 Resolved
PRIOR TO 11 AUG 86 PROVIDE THE OCMI (AT THE ABOVE ADDRESS) PLANS FOR APPROVAL SHOWING INSTALLATIONS OF NEW FIRE PUMPS, BILGE PUMPS AND ASSOC'D PIPING AND INSTALLATION OF ENGINEROOM ALARM SYSTEM.
Condition: Unknown
Due 11 July 1986
Resolved 11 July 1986
Unknown
Issued 11 July 1986 Resolved
PRIOR TO 11 AUG 86 REPAINT LOAD LINE MARKINGS AND DRAFT MARKS.
Condition: Unknown
Due 11 July 1986
Resolved 11 July 1986
Unknown
Issued 11 July 1986 Resolved
CROP AND RENEW WEB FRAME AND OVERHEAD DECK PLATING IN PORT FIDLEY WHERE UPSET. TO BE COMPLETED BY 23 AUG 87 WITH SAME RESTRICTIONS AS D1.
Condition: Unknown
Due 11 July 1986
Resolved 11 July 1986
Unknown
Issued 11 July 1986 Resolved
PRIOR TO 11 AUG 86 PROVIDE GLOBES AND GUARDS ON LIGHTING FIXTURES MISSING SAME AS POINTED TO THE CHIEF ENGINEER.
Condition: Unknown
Due 11 July 1986
Resolved 11 July 1986
Unknown
Issued 11 July 1986 Resolved
PRIOR TO 11 AUG 86 REPAIR / REPLACE EXHAUST PIPING AND LAGGING IN PORT FIDLEY.
Condition: Unknown
Due 11 July 1986
Resolved 11 July 1986
Unknown
Issued 11 July 1986 Resolved
PRIOR TO 11 AUG 86 REMOVE PLASTIC SIGHT GLASSES ON LUBE OIL STORAGE TANKS AND REPLACE WITH PROPER GLASS OR OTHER SUITABLE LIQUID LEVEL GAUGES WITH PROTECTIVE COVERS.
Condition: Unknown
Due 11 July 1986
Resolved 11 July 1986
Unknown
Issued 11 July 1986 Resolved
PRIOR TO 11 AUG 86 PROVIDE COTTER PINS OR OTHER SUITABLE RETAINERS FOR PINSON HYDRAULIC RAM TO RUDDER PORT CONNECTIONS.
Condition: Unknown
Due 11 July 1986
Resolved 11 July 1986
Unknown
Issued 11 July 1986 Resolved
PRIOR TO 11 AUG 86 PROVIDE RUBBER MAT OR WOOD GRATING IN FRONT OF MAIN GENERATOR SWITCH BOARD.
Condition: Unknown
Due 11 July 1986
Resolved 11 July 1986
Unknown
Issued 11 July 1986 Resolved
PRIOR TO 11 AUG 86 PROVIDE SUITABLE COVERS OR PROTECTION ON FLORESCENT LIGHT FIXTURES IN FWD ENGINE ROOM COMPANIONWAY.
Condition: Unknown
Due 11 July 1986
Resolved 11 July 1986
Unknown
Issued 11 July 1986 Resolved
CROP AND RENEW WASTED TRANSVERSE FRAME AND ASSOCIATED BULKHEADS IN WAY OF BILGE PMP., FWD PORT SIDE ENG RM. THE VESSEL IS RESTRICTED TO LAKES, BAYS, AND SOUNDS, COOK INLET UNTIL COMPLETED BUT NO LATER THAN THE NEXT DRY DOCK-ING OR 23 AUGUST 1987, WHICHEVER OCCURS FIRST.
Condition: Unknown
Due 11 July 1986
Resolved 11 July 1986
Unknown
Issued 11 July 1986 Resolved
CROP AND RENEW WASTED PORTION OF TRANSVERSE FRAME AND ASSOC'D BLKHD. IN WAYOF FUEL OIL MANIFOLD IN STBD. FOWARD ENGINE ROOM. THE VSL. IS RESTRICTED TOLAKES BAYS AND SOUNDS UNTIL COMPLETED AS IN D1 ABOVE.
Condition: Unknown
Due 11 July 1986
Resolved 11 July 1986
Unknown
Issued 11 July 1986 Resolved
CROP AND RENEW WASTED LONGITUDINAL IN WAY OF STBD. MAIN TAIL SHAFT. VSL IS RESTRICTED AS IN D1 ABOVE UNTIL COMPLETED.
Condition: Unknown
Due 11 July 1986
Resolved 11 July 1986
Unknown
Issued 11 July 1986 Resolved
CROP AND RENEW 2ND LONGITUDINAL AND 1ST TRANSVERSE FRAME FROM AFT IN PORT SIDE AFTERSTEERING COMPARTMENT. VSL IS RESTRICTED AS IN D1 ABOVE UNTIL COMPLETED.
Condition: Unknown
Due 11 July 1986
Resolved 11 July 1986
Unknown
Issued 11 July 1986 Resolved
CROP AND RENEW THE FIRST FWD 7 TRANSVERSE FRAMES IN FWD ENGINE ROOM COMPANIONWAY IN WAY OF FWD LADDER. THE VSL IS RESTRICTED AS IN D1 ABOVE UNTIL COMPLETED.
Condition: Unknown
Due 11 July 1986
Resolved 11 July 1986
Unknown
Issued 11 July 1986 Resolved
CROP AND RENEW INBRD LONGITUDINAL BLKHD STRINGERS AND GUSSETS (APPROX 4) AND ASSOC'D BLKHD IN PORT P-TANK VIOD / BALLAST TANK ON BOTH FWD AND AFT BLKHD'S. VSL IS RESTRICTED AS IN D1.
Condition: Unknown
Due 11 July 1986
Resolved 11 July 1986
Unknown
Issued 11 July 1986 Resolved
CROP AND RENEW AFT VERTICAL BLKHD STRINGERS (2) IN WAY OF 2ND STRINGER FROMINBRD IN PORT P-TANK VOID / BALLAST TANK. VSL RESTRICTED AS IN D1.
Condition: Unknown
Due 11 July 1986
Resolved 11 July 1986
Unknown
Issued 11 July 1986 Resolved
AT NEXT SCHEDULED DRYDOCKING FOR CREDIT BUT NOT LATER THAN 23 AUG 87, ALL FUEL TANKS AND WATER TANKS MUST BE OPENED, GAS FREED AND MADE SAFE FOR ENTRY FOR INTERNAL INSPECTION.
Condition: Unknown
Due 11 July 1986
Resolved 11 July 1986
Fire Fighting
Issued 26 June 1985 Resolved
PROVIDE AN APPROVED SAFETY LIFELINE FOR SELF CONTAINED BREATHING APPARATUS.
Condition: Unknown
Due 26 June 1985
Resolved 26 June 1985
Deck/Cargo
Issued 26 June 1985 Resolved
CALIBRATE ALL GAUGES TO BULK TANK SYSTEM, 8 TOTAL.
Condition: Unknown
Due 26 June 1985
Resolved 26 June 1985
Deck/Cargo
Issued 26 June 1985 Resolved
HAVE BULK TANK RELIEF VALVES (4 TOTAL) BENCH TESTED AND CERTIFIED BY AN INDEPENDENT COMPANY, OR TEST IN PLACE FOLLOWING CALIBRATION OF SYSTEM GAUGES.
Condition: Unknown
Due 26 June 1985
Resolved 26 June 1985

Casualty record · 2

15 May 2005Routine · role: Involved in a Marine Casualty · serious marine incident, as classified · 1 injured · activity 2374467
15 January 2009Major Marine Casualty · role: Involved in a Marine Casualty · serious marine incident, as classified · activity 3394734
Each line is an incident investigation the Coast Guard recorded with this hull among the vessels involved, with the date and the classification the Coast Guard gave it, and the bridge, lock or dam the investigation names where it names one. Involvement is not fault. The investigation narrative is not published. Source: IIR, through 2026.

Ownership record

The Coast Guard's documentation record for this hull -- the Abstract of Title, with its owners and liens as filed -- is not in PSIX. Ask, and Maury buys it from the National Vessel Documentation Center, files it here with its date, and every reader of this page gets it.