Records from 1982 to 1997. Most recent: inspection, 10 September 1997.
Documentation record
Registered dimensions (L × B × D)60.0 ft × 18.6 ft × 8.3 ft
Registered tonnagegross 76 / net 51
ITC dimensions (L × B × D)Not recorded
ITC tonnageNot recorded
BuilderA-1 MARINE, INC · PANAMA CITY FL, UNITED STATES · built 1982
Hull materialFRP (Fiberglass)
PropulsionDiesel Reduction
Hull shapeNot recorded
Hull configurationNot recorded
Hailing portMIAMI, FL
Trade endorsementsRegistry
DocumentationExpired · issued 30 June 2004
Service, as the file records itPassenger (Inspected)
Hull formpowered (Maury's inference from propulsion, hull shape, material and length, rule hf-1; not a recorded fact)
Tonnage as PSIX records it76 - Regulatory (Subpart C or D), Gross Ton
51 - Regulatory (Subpart C or D), Net Ton
Every line above is a field of the National Vessel Documentation Center's file as served by NOAA Fisheries, dated 10 September 2026, matched to this hull on its Official Number. Registered and ITC measurements are two systems and are never combined. One snapshot is held so far; documentation history begins with the next.
A report is not offered for this hull: Its record holds only 2 of the seven kinds of material a report is built from: inspections, deficiencies, operational controls, tow-unit appearances, casualty records, dimensions and documentation. That is a statement about the record, not about the vessel. Reports.
Inspection history · 21
10 September 1997
Administrative
Administrative · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 1122076
20 November 1995
Inclining Experiment · COI Inspection · Hull Examination
Physical examination · MSO Mobile · USCG Heartland District (CGD-H) · Activity 1424181
23 December 1993
Administrative
Administrative · MSO JACKSONVILLE · USCG Southeast District (CGD-SE) · Activity 1160868
1 April 1993
COI Inspection
Physical examination · MSO JACKSONVILLE · USCG Southeast District (CGD-SE) · Activity 1142181
4 March 1993
Administrative
Administrative · MSO JACKSONVILLE · USCG Southeast District (CGD-SE) · Activity 1151217
18 December 1991
COI Inspection
Physical examination · MSO JACKSONVILLE · USCG Southeast District (CGD-SE) · Activity 950865
4 November 1991
Hull Examination
Physical examination · MSO JACKSONVILLE · USCG Southeast District (CGD-SE) · Activity 1250947
7 November 1990
Re-Inspection
Physical examination · MSO JACKSONVILLE · USCG Southeast District (CGD-SE) · Activity 914616
30 March 1990
Hull Examination
Physical examination · MSO JACKSONVILLE · USCG Southeast District (CGD-SE) · Activity 1241969
7 December 1989
Re-Inspection · Deficiency Check
Physical examination · MSO JACKSONVILLE · USCG Southeast District (CGD-SE) · Activity 1227712
23 June 1989
Type not recorded
No type recorded · MSO JACKSONVILLE · USCG Southeast District (CGD-SE) · Activity 1197435
20 December 1988
COI Inspection · Deficiency Check
Physical examination · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 1038394
14 November 1988
Type not recorded
No type recorded · MSO TAMPA · USCG Southeast District (CGD-SE) · Activity 1205544
2 November 1988
Hull Examination · COI Inspection
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 889981
25 June 1987
Administrative
Administrative · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1316110
10 April 1986
Type not recorded
No type recorded · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 999004
3 October 1985
Deficiency Check
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1300464
27 August 1985
Damage Survey
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1293278
23 May 1985
Type not recorded
No type recorded · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1291233
28 June 1984
Type not recorded
No type recorded · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 977313
26 May 1982
Type not recorded
No type recorded · MSO Mobile · USCG Heartland District (CGD-H) · Activity 1274669
Engineering
Issued 7 December 1989
Resolved
PROVIDE A WORKING EMERGENCY BILGE PUMP AND DISCHARGE HOSE.
Condition: Unknown
Due 7 December 1989
Resolved 7 December 1989
Lifesaving
Issued 7 December 1989
Resolved
PROVIDE (02) TWO ORANGE DISTRESS FLARES, (DAY).
Condition: Unknown
Due 7 December 1989
Resolved 7 December 1989
Engineering
Issued 7 December 1989
Resolved
REPAIR DIESEL FUEL OIL LEAKAGE FROM BOTH THE PORT & STBD MAIN DIESEL RACOR FUEL OIL FILTER MANIFOLD PIPING AND CROSS CONNECTION PIPING.
Condition: Unknown
Due 7 December 1989
Resolved 7 December 1989
Engineering
Issued 7 December 1989
Resolved
REPAIR THE DIESEL ENGINE EXHAUST LEAK FROM THE INBOARD TURBO CHARGER ON THEPORT MAIN DIESEL ENGINE.
Condition: Unknown
Due 7 December 1989
Resolved 7 December 1989
Engineering
Issued 7 December 1989
Resolved
REMOVE DIESEL/LUBE OIL FROM THE ENGINE COMPARTMENT BILGES AND BUCKET BELOW THE RACOR FUEL OIL SYSTEM MANIFOLD.
Condition: Unknown
Due 7 December 1989
Resolved 7 December 1989
Electrical
Issued 7 December 1989
Resolved
REMOVE/REPAIR 12V WIRING, SWITCHES, AND CONNECTIONS FOR BOTH THE PORT AND STBD TOILET ELECTRICAL MOTORS/PUMPS. REINSTALL WITH APPROVED PROCEDURES ANDMATERIALS.
Condition: Unknown
Due 7 December 1989
Resolved 7 December 1989
Electrical
Issued 7 December 1989
Resolved
REPAIR/REWIRE OR REMOVE 12V WIRING-SWITCHES AND CONNECTIONS FOR ALL 12V BILGE PUMPS. LOCATIONS-FORWARD COMPARTMENT, PASSENGER ACCOMMODATIONS, BILGEENGINE COMPARTMENT, AND STEERING COMPARTMENT.
Condition: Unknown
Due 7 December 1989
Resolved 7 December 1989
Accommodation/Occupational Safety
Issued 7 December 1989
Resolved
INSTALL DOUBLE HOSE CLAMPS ON ALL MSD/TOILET PIPING AND HOSE CONNECTIONS. REPAIR 4" PVC MSD HOLDING TANK OVERBOARD DISCHARGE LINE.
Condition: Unknown
Due 7 December 1989
Resolved 7 December 1989
Electrical
Issued 7 December 1989
Resolved
REPAIR SEAWATER (S/S DIESEL GENERATOR COOLING WATER) LEAKAGE FROM THE S/S DIESEL GENERATOR, MUFFLER AND EXHAUST PIPING, PORT SIDE OF ENG COMPARTMENT.
Condition: Unknown
Due 7 December 1989
Resolved 7 December 1989
Electrical
Issued 7 December 1989
Resolved
PROVIDE A BATTERY BOX COVER FOR THE S/S DIESEL GENERATOR STARTING BATTERY.
Condition: Unknown
Due 7 December 1989
Resolved 7 December 1989
Fire Fighting
Issued 7 December 1989
Resolved
REPAIR 1' COPPER PIPING FIREMAIN IN WAY OA A RUBBER PATCH, LOCATED ABOVE THE STBD MAIN DIESEL ENGINE.
Condition: Unknown
Due 7 December 1989
Resolved 7 December 1989
Construction/Loadline
Issued 14 November 1988
Resolved
PROVIDE SECURING CHAINS FOR FORWARD AND AFT ACCESS HATCHES.
Condition: Unknown
Due 14 November 1988
Resolved 14 November 1988
Construction/Loadline
Issued 14 November 1988
Resolved
PROVIDE ADDITIONAL ENGINE ROOM ACCESS COAMING TO INCREASE HEIGTH TO MINIMUMOF 6".
Condition: Unknown
Due 14 November 1988
Resolved 14 November 1988
Accommodation/Occupational Safety
Issued 14 November 1988
Resolved
PROVIDE SECURING BOLTS AND NUTS WHERE MISSING ON ALL HAND RAILS.
Condition: Unknown
Due 14 November 1988
Resolved 14 November 1988
Documentation
Issued 2 November 1988
Resolved
PRIOR TO PLACING VESSEL IN COMMERCIAL SERVICE NOTIFY [name withheld], FL OF CHANGE OF EMPLOYMENT AND REQUEST FOR INCREASE IN PASSENGER CARRIAGE, IF SO DESIRED (VESSEL PRESENTLY CERTIFICATED FOR 20 PASSENGERS ONLY).
Condition: Unknown
Due 2 November 1988
Resolved 2 November 1988
Documentation
Issued 2 November 1988
Resolved
PRIOR TO PLACING VESSEL IN COMMERCIAL SERVICE OBTAIN A NEW VESSEL DOCUMENT AND PLACE ONBOARD.
Condition: Unknown
Due 2 November 1988
Resolved 2 November 1988
Unknown
Issued 27 August 1985
Resolved
VESSEL MAY NOT CARRY PASSENGERS UNTIL ALL REPAIRS ARE MADE TO THE SATIS- FACTION OF THE COGNIZANT OCMI.
Condition: Unknown
Due 27 August 1985
Resolved 27 August 1985
Unknown
Issued 27 August 1985
Resolved
REPAIR OR REMOVE BOW PULPIT AND MAKE PERMANENT REPAIRS WHERE PULPIT ATTACHES TO HULL.
Condition: Unknown
Due 27 August 1985
Resolved 27 August 1985
Unknown
Issued 27 August 1985
Resolved
REPAIR OR REPLACE 32V DC DISTRIBUTION PANEL IN STAIR WELL LEADING TO ACCOMMODATION SPACES.
Condition: Unknown
Due 27 August 1985
Resolved 27 August 1985
Unknown
Issued 27 August 1985
Resolved
REPLACE DECK BEAM, FOURTH FROM AFTER MACHINERY SPACE BULKHEAD.
Condition: Unknown
Due 27 August 1985
Resolved 27 August 1985
Unknown
Issued 27 August 1985
Resolved
REPAIR HYDRAULIC STEERING SYSTEM.
Condition: Unknown
Due 27 August 1985
Resolved 27 August 1985
Unknown
Issued 27 August 1985
Resolved
REPLACE 32V DC WIRING SYSTEM AND ANY DAMAGED PORTIONS OF 110V DC SYSTEM.
Condition: Unknown
Due 27 August 1985
Resolved 27 August 1985
Accommodation/Occupational Safety
Issued 23 May 1985
Resolved
REMOVE THE MSD OVERBOARD DISCHARGE PIPING SYSTEM PRIOR TO THE DISCHARGING OF SEWAGE.
Condition: Unknown
Due 23 May 1985
Resolved 23 May 1985
Unknown
Issued 28 June 1984
Resolved
THE FOLLOWING DEFICIENCIES ARE FOR THE THEDMAE, DN648148.
Condition: Unknown
Due 28 June 1984
Resolved 28 June 1984
Lifesaving
Issued 28 June 1984
Resolved
PROCURE AND INSTALL A WEAK LINK ON THE PAINTERS FOR THE LIFE FLOATS.
Condition: Unknown
Due 28 June 1984
Resolved 28 June 1984
Engineering
Issued 28 June 1984
Resolved
INSTALL OVERSPEED TRIP DEVICES ON BOTH MAIN ENGINES.
Condition: Unknown
Due 28 June 1984
Resolved 28 June 1984