Records from 1982 to 1995. Most recent: inspection, 14 September 1995.
A report is not offered for this hull: Its record holds only 2 of the seven kinds of material a report is built from: inspections, deficiencies, operational controls, tow-unit appearances, casualty records, dimensions and documentation. That is a statement about the record, not about the vessel. Reports.
Inspection history · 30
14 September 1995
Administrative
Administrative · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1193512
14 September 1994
MARPOL Annex V Examination · COI Inspection
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 865990
26 May 1994
Administrative
Administrative · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1172936
15 April 1994
Hull Examination
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1460718
5 April 1994
Administrative
Administrative · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 855838
29 March 1994
Administrative
Administrative · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1166753
21 March 1994
Type not recorded
No type recorded · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 39967
15 December 1993
Administrative
Administrative · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 849802
30 November 1993
Administrative
Administrative · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1159153
23 October 1993
MARPOL Annex V Examination · Re-Inspection
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 846484
17 February 1993
Administrative
Administrative · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1143637
14 September 1992
COI Inspection
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 954086
11 August 1992
Deficiency Check
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1265136
19 May 1992
Administrative
Administrative · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 946224
18 March 1992
Administrative
Administrative · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 958598
25 November 1991
Administrative
Administrative · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1248790
20 November 1991
Administrative
Administrative · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 935692
27 September 1991
Re-Inspection · Hull Examination
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 936205
4 September 1990
Drydock Extension
Administrative · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 927978
4 September 1990
COI Inspection
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1234781
9 May 1990
Type not recorded
No type recorded · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1236999
7 November 1989
Re-Inspection
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 931210
4 October 1989
Administrative
Administrative · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1017256
6 September 1988
COI Inspection · Hull Examination
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1044660
16 December 1986
Drydock Extension
Administrative · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1334069
13 November 1986
Deficiency Check
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1023246
20 June 1986
COI Inspection
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1309109
13 November 1985
Type not recorded
No type recorded · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 994937
28 March 1985
Type not recorded
No type recorded · MSO Mobile · USCG Heartland District (CGD-H) · Activity 978321
20 September 1982
Type not recorded
No type recorded · MSO Mobile · USCG Heartland District (CGD-H) · Activity 1276496
Fire Fighting
Issued 14 September 1994
Resolved
RE-FILL OR REPLACE 100LB CO2 CYLINDER, SERIAL NO. NY03800, IN MUD PUMP ROOMFIXED CO2 SYSTEM. LOSS OF CO2 GREATER THAN 10%.
Condition: Unknown
Due 14 September 1994
Resolved 14 September 1994
Construction/Loadline
Issued 15 April 1994
Resolved
COMPLETE THE PLANNED STEEL REPAIRS AS OUTLINED FOR PRE-LOAD TANKS 2 STARBOARD AND 1 CENTER.
Condition: Unknown
Due 15 April 1994
Resolved 15 April 1994
Lifesaving
Issued 15 April 1994
Resolved
SERVICE LIFERAFT THAT WAS DUE 15JUN94 AT AN APPROVED LIFERAFT FACILITY AND FORWARD A COPY OF THE SERVICING REPORT TO [name withheld].
Condition: Unknown
Due 30 July 1994
Resolved 21 June 1994
Documentation
Issued 15 April 1994
Resolved
PROVIDE A COPY OF THE CERTIFIED STATEMENT FROM THE SENIOR DIVER CONCERNING THE CONDITIONS OF THE SPUD CANS AND A COPY OF THE UNDERWATER VIDEO.
Condition: Unknown
Due 13 June 1994
Resolved 13 June 1994
Accommodation/Occupational Safety
Issued 15 April 1994
Resolved
REMOVE MUD LOGGING UNIT OR MAKE PROPER REPAIR'S FOR A CLASS I DIV I LOCATION. PROVIDE CLASS I DIV I APPROVED AC UNIT, PROPERLY INSTALL CABLE RUNS, REPAIR DECK AND BULKHEADS TO MINIMIZE LOSS OF POSITIVE AIR PRESSURE, RENEW BROKEN WINDOW AND FIX WINDOW DEAD COVERS TO ENABLE THEM TO CLOSE.
Condition: Unknown
Due 15 April 1994
Resolved 15 April 1994
Construction/Loadline
Issued 15 April 1994
Resolved
COMPLETE ADDITIONAL STEEL REPAIRS AS REQUIRED IN PRE-LOAD TANKS, 6 PORT, 6 STARBOARD, 1 CENTER, 2 PORT, AND 2 STARBOARD.
Condition: Unknown
Due 15 April 1994
Resolved 15 April 1994
Construction/Loadline
Issued 15 April 1994
Resolved
OPEN UP AND PREPARE THE DUMP VALVES FOR PRE-LOAD TANKS 2 PORT, 7 CENTER AND7 STARBOARD TO ALLOW EXAMINATION BY A COAST GUARD INSPECTOR.
Condition: Unknown
Due 15 April 1994
Resolved 15 April 1994
Construction/Loadline
Issued 15 April 1994
Resolved
MAKE BOTTOM HULL AVAILABLE FOR EXTERNAL INSPECTION.
Condition: Unknown
Due 15 April 1994
Resolved 15 April 1994
Deck/Cargo
Issued 15 April 1994
Resolved
OPEN UP THE MUD PIT DUMP VALVES FOR INTERNAL EXAMINATION.
Condition: Unknown
Due 15 April 1994
Resolved 15 April 1994
Lifesaving
Issued 15 April 1994
Resolved
REPLACE THE NEW 25 MAN ELLIOT LIFERAFT WITH ONE THAT CAN BE LAUNCHED FROM AHEIGHT EQUAL TO OR GREATER THAN THE NORMAL DRILLING AIR GAP.
Condition: Unknown
Due 20 June 1994
Resolved 20 June 1994
Construction/Loadline
Issued 15 April 1994
Resolved
COMPLETE REPAIRS TO THE 15' DECK LEVEL IN 2 STARBOARD PRE-LOAD TANK AND MAKE AVAILABLE FOR ANOTHER FINAL INSPECTION.
Condition: Unknown
Due 15 April 1994
Resolved 15 April 1994
Fire Fighting
Issued 23 October 1993
Resolved
HYDROSTATICALLY TEST AT A DOT APPROVED FACILITY THE FOLLOWING CYLINDERS: (7) SCBA; (8) LIFEBOAT BREATHING AIR SYSTEM; ALL PORTABLE CO2 FIRE EXTINGUISHERS; (2) SEMI PORTABLE CO2 FIRE EXTINGUISHERS; AND ALL FIXED CO2 FIRE EXTINGUISHERS FOR ENG ROOM. TO BE COMPLETED NLT NEXT HULL EXAMINATION.
Condition: Unknown
Due 23 October 1993
Resolved 23 October 1993
Lifesaving
Issued 23 October 1993
Resolved
PROVIDE RETRO-REFLECTIVE TAPE FOR PORT AND STBD LIFE CAPSULES AND ALL RING BUOYS.
Condition: Unknown
Due 23 October 1993
Resolved 23 October 1993
Fire Fighting
Issued 23 October 1993
Resolved
PROVIDE HYDROSTATIC SERVICE REPORT FOR PIT ROOM'S FIXED CO2 FIRE EXTINGUISHING SYSTEM CYLINDERS AND NOTIFY [name withheld] ARE REINSTALLED ON VESSEL AND SYSTEM IS OPERATIONAL.
Condition: Unknown
Due 23 October 1993
Resolved 23 October 1993
Lifesaving
Issued 23 October 1993
Resolved
MAKE FRP REPAIRS (OSMOSIS BLISTERS) TO PORT AND STBD WHITTAKER LIFE CAPSULES IN ACCORDANCE WITH MANUFACTURER'S SPECIFICATIONS. REPAIRS TO BE COMPLETED NO LATER THAN NEXT HULL EXAMINATION.
Condition: Unknown
Due 23 October 1993
Resolved 23 October 1993
Construction/Loadline
Issued 23 October 1993
Resolved
RENEW BOTTOM PLATE IN WAY OF NO. 7 SW BALLAST TANK AND MID STBD VOID TANK, IAW ABS SPECIAL SURVEY REPORT DATED 24 AUG 93, AT NEXT HULL EXAMINATION ANDNO LATER THAN 31 MAR 94. PRIOR TO ON SITE REPAIRS, SUBMIT REPAIR PROPOSAL FOR A.B.S. AND COAST GUARD APPROVAL.
Condition: Unknown
Due 23 October 1993
Resolved 23 October 1993
Construction/Loadline
Issued 23 October 1993
Resolved
RENEW SEA SUCTION VALVE LOCATED IN MID STBD VOID TANK PRIOR TO PLACING MODUIN THE FLOATING MODE.
Condition: Unknown
Due 23 October 1993
Resolved 23 October 1993
Fire Fighting
Issued 27 September 1991
Resolved
PROVIDE ACCEPTABLE HYDROSTATIC TEST DATE FOR PORTABLE FIRE EXTINGUISHER UNITS 3,15,16,17,25,32, AND 45. TESTING TO BE DONE BY A U.S. D.O.T. APPROVED FACILITY.
Condition: Unknown
Due 27 September 1991
Resolved 27 September 1991
Lifesaving
Issued 27 September 1991
Resolved
PROVIDE CHAIN SUSPENSION LADDER AT PORT DAVIT LAUNCHED LIFERAFT STATION.
Condition: Unknown
Due 27 September 1991
Resolved 27 September 1991
Electrical
Issued 27 September 1991
Resolved
PROVE SATISFACTORY OPERATION OF ALARMS AND TRIPS FOR THE #1 DIESEL GENERATOR.
Condition: Unknown
Due 27 September 1991
Resolved 27 September 1991
Fire Fighting
Issued 27 September 1991
Resolved
RENEW FIRST 15 FT OF LINE ON THE DISCHARGE SIDE OF FIRE PUMP ALONG WITH_x001C_ ITS NON-METALLIC EXPANSION JOINTS (2).
Condition: Unknown
Due 27 September 1991
Resolved 27 September 1991
Lifesaving
Issued 27 September 1991
Resolved
PROVIDE ACCEPTABLE DATE FOR END FOR ENDING OF BOTH DAVIT LAUNCHED LIFERAFT FALLS.
Condition: Unknown
Due 27 September 1991
Resolved 27 September 1991
Lifesaving
Issued 27 September 1991
Resolved
PROVIDE ACCEPTABLE FIRE EXTINGUISHERS,IN SERVICE, OARS, AND ROWLOCKS FOR BOTH LIFEBOATS.
Condition: Unknown
Due 27 September 1991
Resolved 27 September 1991
Engineering
Issued 27 September 1991
Resolved
RENEW FIRST 2 FT OF LINE ON THE DISCHARGE SIDE AND THE ELBOW FROM THE SEA CHEST SUCTION OF THE GENERAL SERVICE PUMP ALONG WITH ITS NON-METALLIC JOINTS (2).
Condition: Unknown
Due 27 September 1991
Resolved 27 September 1991
Engineering
Issued 27 September 1991
Resolved
RENEW, AS ORIGINAL, WASTED SECTION OF RAW WATER TOWER AND PROVE PROPER OPERATION OF JACKING MECHANISM.
Condition: Unknown
Due 27 September 1991
Resolved 27 September 1991
Fire Fighting
Issued 27 September 1991
Resolved
PROVIDE [name withheld] FROM MANUFACTURER OF GALLEY FIXED DRY CHEM SYSTEM (ANSUL) THAT PRESENT SET UP IS ACCEPTABLE OR REINSTALL PRESSURE SWITCHES FOR DEEP FAT FRYER AND VENTILATION SHUT DOWNS.
Condition: Unknown
Due 27 September 1991
Resolved 27 September 1991
Fire Fighting
Issued 4 September 1990
Resolved
PROVIDE COPY OF ANNUAL FOAM ANALYSIS WHEN COMPLETED.
Condition: Unknown
Due 4 September 1990
Resolved 4 September 1990
Unknown
Issued 4 September 1990
Resolved
CONDUCT FIRE AND ABANDON SHIP DRILL, LOG RESULTS OF SAME AND SUBMIT COPY OF LOG TO [name withheld], HI.
Condition: Unknown
Due 4 September 1990
Resolved 4 September 1990
Fire Fighting
Issued 4 September 1990
Resolved
REPLACE DEFECTIVE GLOBE VALVE AT FS#19, REPLACE CLASS B BALL VALVES AT FS#1, FS#3 AND FS#4 WITH METALLIC SEAT/DISK GLOBE TYPE SUITABLE FOR PRESSURE AND MEDIUM.
Condition: Unknown
Due 4 September 1990
Resolved 4 September 1990
Lifesaving
Issued 4 September 1990
Resolved
PROVIDE ON BOARD HYDROSTATIC RELEASE DEVICE THAT HAVE CURRENT/VALID TEST DATES FOR EACH FLOAT FREE LIFERAFT (4) TOTAL.
Condition: Unknown
Due 4 September 1990
Resolved 4 September 1990
Lifesaving
Issued 4 September 1990
Resolved
PROVIDE THE FOLLOWING ITEMS FOR PORT LIFEBOAT: 1-JACKNIFE, 1-FISHING KIT, 42-QUARTS OF WATER.
Condition: Unknown
Due 4 September 1990
Resolved 4 September 1990
Lifesaving
Issued 4 September 1990
Resolved
PROVIDE THE FOLLOWING ITEMS FOR STBD LIFEBOAT: 1-FISHING KIT, 8-QUARTS OF WATER.
Condition: Unknown
Due 4 September 1990
Resolved 4 September 1990
Fire Fighting
Issued 4 September 1990
Resolved
CONDUCT ANNUAL SERVICING OF FIXED CO2 SYSTEMS FOR THE PAINT LOCKER, MACHINERY SPACE AND MUD PIT ROOM. PROVIDE COPY OF SERVICING REPORT TO OCMIHONOLULU, HI UPON COMPLETION OF SERVICING ABOVE MENTIONED SYSTEMS.
Condition: Unknown
Due 4 September 1990
Resolved 4 September 1990
Accommodation/Occupational Safety
Issued 4 September 1990
Resolved
MAKE AVAILABLE FOR INTERNAL EXAM NOT LATER THAN NEXT DRYDOCK EXTENSION EXAMOR CREDIT DRYDOCK EXAM THE FOLLOWING BULK TANKS: NO.2, NO.4, NO.5 AND NO.6
Condition: Unknown
Due 4 September 1990
Resolved 4 September 1990
Unknown
Issued 4 September 1990
Resolved
PROVIDE ON BOARD ALCOHOL BREATH TESTING DEVICE PER 46 CFR 4.06-20(A) AND URINE SPECIMEN COLLECTION/SHIPPING KIT DESCRIBED IN 46 CFR 16.330.
Condition: Unknown
Due 4 September 1990
Resolved 4 September 1990
Lifesaving
Issued 4 September 1990
Resolved
AT NEXT AVAILABLE GOOD WEATHER, LOWER PORT & STBD LIFEBOATS INTO WATER AND CONDUCT OPERATIONAL TEST RUN OF SAME. LOG RESULTS AND PROVIDE COPY OF LOG ENTRY TO [name withheld], HI.
Condition: Unknown
Due 4 September 1990
Resolved 4 September 1990
Unknown
Issued 4 September 1990
Resolved
PROVIDE 1500 FEET OF 3 INCH DIAMETER MANILA OR EQUIVALENT AUXILIARY LINE FOR VESSEL'S LINE THROWING APPLIANCE.
Condition: Unknown
Due 4 September 1990
Resolved 4 September 1990
Unknown
Issued 4 September 1990
Resolved
MAKE OPERABLE VESSEL'S OIL/WATER SEPERATOR UNIT, UNTIL UNIT IS OPERABLE ALL OILY WASTE SHALL BE RETAINED ON BOARD THE VESSEL.
Condition: Unknown
Due 4 September 1990
Resolved 4 September 1990
Fire Fighting
Issued 4 September 1990
Resolved
RENEW WASTED HOSE REEL FOR PORT SIDE HELO DECK FOAM HOSE.
Condition: Unknown
Due 4 September 1990
Resolved 4 September 1990
Deck/Cargo
Issued 4 September 1990
Resolved
TEST MUD PUMP RELIEF VALVE.
Condition: Unknown
Due 4 September 1990
Resolved 4 September 1990
Electrical
Issued 7 November 1989
Resolved
PROVIDE BATTERIES/REPAIR AS NEEDED BOTH ENGINE ROOM EMERGENCY LIGHTS.
Condition: Unknown
Due 7 November 1989
Resolved 7 November 1989
Lifesaving
Issued 7 November 1989
Resolved
PROPERLY SERVICE THE TWO COAST GUARD APPROVED 25 PERSON DAVIT LAUNCHED LIFE RAFTS (BFG 25 MMUS1 & MMUS4) WHICH ARE NOT ONBOARD, OR REPLACE WITH TWO COAST GUARD APPROVED 25 PERSON DAVIT LAUNCHED LIFERAFTS WHICH ARE IN DATE.
Condition: Unknown
Due 7 November 1989
Resolved 7 November 1989
Lifesaving
Issued 7 November 1989
Resolved
PRIOR TO COMMENCING DRILLING OPERATIONS, PROVIDE AND INSTALL TWO ADDITIONAL(FOR A TOTAL OF 4) COAST GUARD APPROVED 25 PERSON DAVIT LAUNCHED LIFERAFTS WHICH ARE IN DATE; OR REDUCE THE TOTAL PERSONS ONBAORD TO NOT MORE THAN 50 PERSONS.
Condition: Unknown
Due 7 November 1989
Resolved 7 November 1989
Fire Fighting
Issued 7 November 1989
Resolved
REPAIR AND PROVE OPERATION, IN ACCORDANCE WITH MFG SPECS, OF PYROTECHNICS SMOKE DETECTION AND FIRE ALARM PULL BOX SYSTEM.
Condition: Unknown
Due 7 November 1989
Resolved 7 November 1989
Accommodation/Occupational Safety
Issued 7 November 1989
Resolved
REPAIR REMOTE VENTILATION SHUTDOWN FOR QUARTERS.
Condition: Unknown
Due 7 November 1989
Resolved 7 November 1989
Construction/Loadline
Issued 6 September 1988
Resolved
COMPLETE CREDIT DRYDOCKING BY MAKING SPUD CANS AVAILABLE FOR INTERNAL INSPECTION AND UNDERWATER SURVEY OR EXTERNAL INSPECTION ON DRYDOCK OR LIFTSHIP. TO BE COMPLETED PRIOR TO DEPARTING SINGAPORE.
Condition: Unknown
Due 6 September 1988
Resolved 6 September 1988
Construction/Loadline
Issued 6 September 1988
Resolved
MAKE PERMANENT REPAIRS TO FRACTURES IN HIGH STRESS LEG TO CAN JOINTS AND MAKE SAME AVAILABLE FOR NDT INSPECTION.
Condition: Unknown
Due 6 September 1988
Resolved 6 September 1988
Unknown
Issued 20 June 1986
Resolved
REPAIR OILY WATER SEPARATOR AND DEMONSTRATE OPERATION OF ALARM AND SHUTDOWN.
Condition: Unknown
Due 20 June 1986
Resolved 20 June 1986
Unknown
Issued 20 June 1986
Resolved
MAKE PERMANENT REPAIRS TO PORT LIFERAFT DAVIT AND CONDUCT WEIGHT TEST IN PRESENCE OF USCG INSPECTOR.
Condition: Unknown
Due 20 June 1986
Resolved 20 June 1986
Unknown
Issued 20 June 1986
Resolved
REPLACE BROKEN WINDOW IN STERN OF #2 LIFEBOAT.
Condition: Unknown
Due 20 June 1986
Resolved 20 June 1986
Unknown
Issued 13 November 1985
Resolved
SERVICE THE ONE OUT OF DATE DAVIT LAUNCHED LIFERAFT.
Condition: Unknown
Due 13 November 1985
Resolved 13 November 1985
Unknown
Issued 13 November 1985
Resolved
SUBMIT FOAM SAMPLE FOR ANALYSIS, AND PROVIDE A COPY OF THE REPORT TO THIS OFFICE.
Condition: Unknown
Due 13 November 1985
Resolved 13 November 1985
Unknown
Issued 13 November 1985
Resolved
REPAIR OVERSPEED INDICATOR LIGHTS ON ALARM PANEL.
Condition: Unknown
Due 13 November 1985
Resolved 13 November 1985
Unknown
Issued 13 November 1985
Resolved
PROVE THE PROPER OPERATION OF THE GENERAL ALARM INDICATOR LIGHTS WHILE CONNECTED TO THE GENERAL ALARM BATTERIES.
Condition: Unknown
Due 13 November 1985
Resolved 13 November 1985
Unknown
Issued 13 November 1985
Resolved
ALL CRANES SHALL BE TESTED BY A CG RECOGNIZED CLASSIFICATION SOCIETY.
Condition: Unknown
Due 13 November 1985
Resolved 13 November 1985