Records from 1982 to 1991. Most recent: inspection, 24 December 1991.
A report is not offered for this hull: Its record holds only 2 of the seven kinds of material a report is built from: inspections, deficiencies, operational controls, tow-unit appearances, casualty records, dimensions and documentation. That is a statement about the record, not about the vessel. Reports.
Inspection history · 20
24 December 1991
Administrative
Administrative · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1269499
10 August 1990
Deficiency Check
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 917540
6 August 1990
Deficiency Check
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 914929
26 July 1990
Deficiency Check
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 924460
27 February 1990
COI Inspection
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 913865
10 December 1989
Type not recorded
No type recorded · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 915683
20 June 1989
Deficiency Check
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1207660
15 May 1989
Type not recorded
No type recorded · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 892493
21 April 1989
Deficiency Check
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1207181
15 April 1989
Hull Examination
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1206164
24 March 1989
Re-Inspection
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1202696
8 September 1988
Deficiency Check
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1350833
21 April 1988
Deficiency Check
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1195400
21 March 1988
COI Inspection
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1346294
31 October 1987
Deficiency Check
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1023165
15 October 1987
Deficiency Check
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1326235
19 June 1987
Re-Inspection
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1332399
13 May 1986
COI Inspection · Credit Drydock
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 992938
11 September 1985
Re-Inspection
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1302413
22 September 1982
Type not recorded
No type recorded · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 968473
Fire Fighting
Issued 27 February 1990
Resolved
REPAIR/REPLACE THE ELECTRICALLY OPERATED SPRINKLER PUMP AND TEST AFTER COMPLETION OF WORK. FORWARD RESULTS OF TEST TO [name withheld], HAWAII.
Condition: Unknown
Due 27 February 1990
Resolved 27 February 1990
Fire Fighting
Issued 10 December 1989
Resolved
INSTALL PLACARDS AT SPRINKLER CONTROL STATIONS SHOWING VESSEL LAYOUT, PUMP STARTING AND CONTROL PROCEDURES, LOCATION OF ISOLATION VALVES AND ALARMS, AND AN INDICATION OF WHAT TAKES PLACE WHEN ALARM SOUNDS (PER G-MSC LTR M-80203 OF 8 MARCH 1988).
Condition: Unknown
Due 10 December 1989
Resolved 10 December 1989
Fire Fighting
Issued 10 December 1989
Resolved
REVISE FIRE SAFETY PLAN TO ACCOMMODATE MODIFICATIONS COMPLETED AT THE APRIL1989 DRYDOCK.
Condition: Unknown
Due 10 December 1989
Resolved 10 December 1989
Fire Fighting
Issued 15 May 1989
Resolved
REVISE FIRE SAFETY PLAN TO ACCOMMODATE MODIFICATIONS COMPLETED AT THE APRIL 1989 DRYDOCK.
Condition: Unknown
Due 15 May 1989
Resolved 15 May 1989
Documentation
Issued 15 May 1989
Resolved
PROVIDE USCG APPROVED STABILITY REVIEW DEMONSTRATING SATISFACTORY STABILITYCHARACTERISTICS.
Condition: Unknown
Due 15 May 1989
Resolved 15 May 1989
Electrical
Issued 15 May 1989
Resolved
INSTALL AND TEST EMERGENCY LIGHTING IN THE ACCOMMODATION SPACES LOCATED UNDER THE HELICOPTER DECK.
Condition: Unknown
Due 15 May 1989
Resolved 15 May 1989
Electrical
Issued 15 May 1989
Resolved
PROVIDE USCG APPROVED DRAWINGS, AS BUILT, FOR THE ELECTRICAL INSTALLATIONS,SPRINKLER SYSTEM, SMOKE DETECTOR, AND THE GENERAL ALARM SYSTEM, PROTECTING THE ACCOMMODATION SPACES UNDER THE HELICOPTER DECK.
Condition: Unknown
Due 15 May 1989
Resolved 15 May 1989
Construction/Loadline
Issued 15 May 1989
Resolved
PROVIDE DOCUMENTATION SHOWING COAST GUARD APPROVAL OF ALL INSULATION MATER-IALS USED IN THE CONSTRUCTION OF THE NEW ACCOMMODATION SPACES UNDER THE HELIDECK AS WELL AS PROOF OF INSTALLATION IN ACCORDANCE WITH THE GUIDELINESOF USCG NVIC 6-80
Condition: Unknown
Due 15 May 1989
Resolved 15 May 1989
Construction/Loadline
Issued 15 May 1989
Resolved
UPDATE VESSEL FIRE AND SAFETY PLAN TO INCLUDE THE CURRENT NUMBER AND LOCATION OF ALL EQUIPMENT, AND INCORPORATE ANY CHANGES MADE NECESSARY BY THE HELICOPTER DECK MODIFICATIONS.
Condition: Unknown
Due 15 May 1989
Resolved 15 May 1989
Unknown
Issued 15 May 1989
Resolved
SUBMIT WEIGHT AND MOMENT CALCULATIONS TO USCG G-MSC-2 TO ACCOMMODATE MODIFICATIONS COMPLETED AT THE APRIL 1989 DRYDOCK (ADMINISTRATIVELY ISSUED PER HONMS LTR 16715 DTD 05SEP89).
Condition: Unknown
Due 15 May 1989
Resolved 15 May 1989
Construction/Loadline
Issued 15 May 1989
Resolved
PROVIDE USCG APPROVED DRAWINGS, AS BUILT, FOR THE ACCOMMODATION SPACES UNDER THE HELICOPTER DECK.
Condition: Unknown
Due 15 May 1989
Resolved 15 May 1989
Fire Fighting
Issued 24 March 1989
Resolved
PROVIDE ONE USCG APPROVED FIRE HOOD FOR THE PORT FIREMANS OUTFIT.
Condition: Unknown
Due 24 March 1989
Resolved 24 March 1989
Lifesaving
Issued 24 March 1989
Resolved
CONDUCT FIRE AND BOAT DRILL PRIOR TO PIPE LAYING OPERATIONS WITH THE INDUSTRIAL PERSONNEL ON BOARD.
Condition: Unknown
Due 24 March 1989
Resolved 24 March 1989
Electrical
Issued 24 March 1989
Resolved
PROVIDE AND INSTALL LAGGING FOR ALL EXHAUSTS ON THE VESSEL'S GENERATORS.
Condition: Unknown
Due 24 March 1989
Resolved 24 March 1989
Fire Fighting
Issued 24 March 1989
Resolved
SERVICE ALL PORTABLE SEMI-PORTABLE AND FIXED FIRE EXTINGUISHERS ON BOARD AND PROVIDE SERVICING REPORT.
Condition: Unknown
Due 24 March 1989
Resolved 24 March 1989
Unknown
Issued 24 March 1989
Resolved
MAKE TEN HORN AUXILIARY BOILER AVAILABLE FOR AUTOMATION TEST.
Condition: Unknown
Due 24 March 1989
Resolved 24 March 1989
Unknown
Issued 24 March 1989
Resolved
REPAINT ALL HULL MARKINGS, CONTRASTING TO BACKGROUND OF HULL.
Condition: Unknown
Due 24 March 1989
Resolved 24 March 1989
Unknown
Issued 24 March 1989
Resolved
MAKE JOHNSON AUXILIARY BOILER AVAILABLE FOR 1.25 MAWP HYDROSTATIC TESTING; ALSO CONDUCT AUTOMATION TEST.
Condition: Unknown
Due 24 March 1989
Resolved 24 March 1989
Unknown
Issued 24 March 1989
Resolved
RENEW FLAME SCREENS ON ALL VENTS ON MAIN DECK.
Condition: Unknown
Due 24 March 1989
Resolved 24 March 1989
Fire Fighting
Issued 24 March 1989
Resolved
SUBMIT FIRE FIGHTING SAFETY PLAN TO MARINE SAFETY OFFICE HONOLULU, HI, FOR APPROVAL.
Condition: Unknown
Due 24 March 1989
Resolved 24 March 1989
Documentation
Issued 24 March 1989
Resolved
PROVIDE THE ORIGINAL CERTIFICATE OF DOCUMENTATION BEFORE LEAVING SINGAPORE.
Condition: Unknown
Due 24 March 1989
Resolved 24 March 1989
Unknown
Issued 8 September 1988
Resolved
SUBMIT PIPING DETAILS FOR THE FUEL OIL, LUBE OIL, SALT WATER COOLING, AND EXHAUST PIPING SYSTEM ASSOCIATED WITH THE DIESEL ENGINE INSTALLATION TO COAST GUARD MARINE SAFETY CENTER FOR REVIEW (REF: G-MSC-2 LTR SERIAL NO. M-80203 OF 7 MAR 88, COMMENT 8).
Condition: Unknown
Due 8 September 1988
Resolved 8 September 1988
Fire Fighting
Issued 21 April 1988
Resolved
SUBMIT DETAILS PERTAINING TO THE DRAINAGE OF THE SPACES PROTECTED BY THE SPRINKLERS TO [name withheld], HI
Condition: Unknown
Due 21 April 1988
Resolved 21 April 1988
Fire Fighting
Issued 21 April 1988
Resolved
SUBMIT DETAILS OF THE FIRE DETECTION ALARM SYSTEM (COMMON TO THE GENERAL ALARM) TO THE USCG MARINE SAFETY CENTER FOR REVIEW AND APPROVAL.
Condition: Unknown
Due 21 April 1988
Resolved 21 April 1988
Fire Fighting
Issued 21 April 1988
Resolved
PROVIDE EVIDENCE OF USCG APPROVAL OF THE RUBBER EXPANSION JOINTS AT THE SPRINKLER PUMPS.
Condition: Unknown
Due 21 April 1988
Resolved 21 April 1988
Fire Fighting
Issued 21 April 1988
Resolved
PROVIDE EVIDENCE OF USCG APPROVAL OF THE SPRINKLER/FIRE MAIN CONNECTION.
Condition: Unknown
Due 21 April 1988
Resolved 21 April 1988
Fire Fighting
Issued 21 March 1988
Resolved
CONDUCT ANNUAL SERVICING OF THE PORTABLE AND SEMI-PORTABLE FIRE EXTINGUISHERS.
Condition: Unknown
Due 21 March 1988
Resolved 21 March 1988
Fire Fighting
Issued 21 March 1988
Resolved
PROVIDE COAST GUARD APPROVED PLANS FOR THE RECENTLY INSTALLED SPRINKLER SYSTEM.
Condition: Unknown
Due 21 March 1988
Resolved 21 March 1988
Fire Fighting
Issued 21 March 1988
Resolved
DEMONSTRATE THE FIRE DETECTION SYSTEM TO A COAST GUARD INSPECTOR.
Condition: Unknown
Due 21 March 1988
Resolved 21 March 1988
Fire Fighting
Issued 21 March 1988
Resolved
PROVIDE PROPER HELMET FOR THE FIREMANS OUTFIT STORED ON THE PORT SIDE.
Condition: Unknown
Due 21 March 1988
Resolved 21 March 1988
Fire Fighting
Issued 15 October 1987
Resolved
PRIOR TO FIRING THE JOHNSTON FIRETUBE BOILER INSTALL CLASS "A" ENCLOSURES TO THE PORT AND STARBOARD SIDE OF THE BOILER ROOM ON THE MAIN DECK AFT OF THE CRANE TUB.
Condition: Unknown
Due 15 October 1987
Resolved 15 October 1987
Accommodation/Occupational Safety
Issued 15 October 1987
Resolved
PRIOR TO USE ON BOARD, PROVIDE USCG/ASME PRESSURE VESSEL FOR HUMAN OCCUPANCY APPROVAL FOR ALL COMMERCIAL DIVING EQUIPMENT IN ACCORDANCE WITH 46 CFR 197.
Condition: Unknown
Due 15 October 1987
Resolved 15 October 1987
Unknown
Issued 19 June 1987
Resolved
HYDROSTATICALLY TEST ALL FIXED CO2 CYLINDERS PRIOR TO PLACING THE VESSEL INSERVICE.
Condition: Unknown
Due 19 June 1987
Resolved 19 June 1987
Unknown
Issued 19 June 1987
Resolved
PRIOR TO RETURNING THE VESSEL TO SERVICE, CONDUCT THE ANNUAL SERVICING OF ALL INFLATABLE LIFERAFTS AND HYDROSTATIC RELEASES.
Condition: Unknown
Due 19 June 1987
Resolved 19 June 1987
Unknown
Issued 19 June 1987
Resolved
PRIOR TO RETURNING THE VESSEL TO SERVICE, MAKE BOTH PILE DRIVING BOILERS AVAILABLE FOR COAST GUARD INSPECTION.
Condition: Unknown
Due 19 June 1987
Resolved 19 June 1987
Unknown
Issued 19 June 1987
Resolved
PROVIDE A CURRENT FOAM ANALYSIS REPORT TO [name withheld] PRIOR TO RETURNING THE VESSEL TO SERVICE.
Condition: Unknown
Due 19 June 1987
Resolved 19 June 1987
Unknown
Issued 19 June 1987
Resolved
CONDUCT THE ANNUAL TESTING OF THE MATERIAL HANDLING CRANES PRIOR TO RETURNING THE VESSEL TO SERVICE.
Condition: Unknown
Due 19 June 1987
Resolved 19 June 1987
Unknown
Issued 13 May 1986
Resolved
CONDUCT HYDROSTATIC TEST, SET/SEAL SAFETIES, TEST ALARMS AND SHUTDOWNS ON JOHNSTON BROS. BOILER IN THE PRESENCE OF A USCG INSPECTOR.
Condition: Unknown
Due 13 May 1986
Resolved 13 May 1986
Unknown
Issued 13 May 1986
Resolved
SET/SEAL SAFETIES AND TEST ALARMS AND SHUTDOWNS ON THE TEN HORN BOILER IN THE PRESENCE OF A USCG INSPECTOR.
Condition: Unknown
Due 13 May 1986
Resolved 13 May 1986
Unknown
Issued 11 September 1985
Resolved
PROVE ANNUAL INSPECTION OF ALL PORTABLE, SEMI-PORTABLE, AND FIXED FIRE EXTINGUISHERS AND DRY CHEMICAL EXTINGUISHERS.
Condition: Unknown
Due 11 September 1985
Resolved 11 September 1985
Unknown
Issued 11 September 1985
Resolved
PROVE PROPER OPERATION ON ALL UNFIRED PRESSURE VESSELS RELIEF VALVES.
Condition: Unknown
Due 11 September 1985
Resolved 11 September 1985
Unknown
Issued 11 September 1985
Resolved
PROVE UP TO DATE HYDRO OF SELF CONTAINED BREATHING APPARATUS BOTTLES, T130694, T126750, T184362, T53663, 59164 AND O70202 OR REPLACE BOTTLES WITHUP TO DATE BOTTLES.
Condition: Unknown
Due 11 September 1985
Resolved 11 September 1985
Unknown
Issued 11 September 1985
Resolved
SET AND SEAL ALL BOILER SAFETIES ON #1 AND #2 AUXILIARY BOILERS.
Condition: Unknown
Due 11 September 1985
Resolved 11 September 1985
Unknown
Issued 11 September 1985
Resolved
PROVE PROPER OPERATION OF OVERSPEED TRIPS, LOW L/O SHUTDOWNS AND ALARMS ON ALL AC AND DC GENERATORS 4 EA. 500 KW AC GEN.; 4 EA. 500 KW DC GEN; 1 EA 350 KW AC GEN; AND 1 EA 400 KW DC GEN.
Condition: Unknown
Due 11 September 1985
Resolved 11 September 1985
Unknown
Issued 11 September 1985
Resolved
PROVIDE A COPY OF THE ANALYSIS OF THE FOAM FOR THE HELO DECK FOAM SYSTEM.
Condition: Unknown
Due 11 September 1985
Resolved 11 September 1985
Unknown
Issued 11 September 1985
Resolved
REPAIR AND PROVE PROPER OPERATION OF REMOTE FWD OIL VALVE FOR DAY TANK.
Condition: Unknown
Due 11 September 1985
Resolved 11 September 1985
Unknown
Issued 11 September 1985
Resolved
REPAIR AND PROVE OPERATION OF CO2 SHUTDOWN FOR VENTILATION SYSTEM FOR AC & DC GENERATOR SPACES AND BOILER ROOM.
Condition: Unknown
Due 11 September 1985
Resolved 11 September 1985
Unknown
Issued 11 September 1985
Resolved
REPAIR AND PROVE PROPER OPERATION OF CO2 ACTIVATOR FOR PAINT LOCKER CO2 SYSTEM.
Condition: Unknown
Due 11 September 1985
Resolved 11 September 1985
Unknown
Issued 11 September 1985
Resolved
REPAIR OR REPLACE VARIOUS DAMAGED SAFETY NETS ON HELO DECK.
Condition: Unknown
Due 11 September 1985
Resolved 11 September 1985
Unknown
Issued 11 September 1985
Resolved
REPLACE RELIEF VALVES ON PRESSURE VESSELS 75-01, 75-02, 75-03 AND 75-04 ANDPROVE PROPER OPERATION.
Condition: Unknown
Due 11 September 1985
Resolved 11 September 1985
Unknown
Issued 11 September 1985
Resolved
REPLACE 1 EA 75 FT LENGTH OF FIRE HOSE, TEST SAME.
Condition: Unknown
Due 11 September 1985
Resolved 11 September 1985
Unknown
Issued 11 September 1985
Resolved
REPAIR OR REPLACE 3 EA 2.5" ALL PURPOSE NOZZELS.
Condition: Unknown
Due 11 September 1985
Resolved 11 September 1985
Unknown
Issued 11 September 1985
Resolved
REPAIR CO2 PIPING TO SIREN WARNING SYSTEM FOR INSTALLED CO2 SYSTEM.
Condition: Unknown
Due 11 September 1985
Resolved 11 September 1985
Unknown
Issued 11 September 1985
Resolved
REPLACE EXISTING 10 LIFERAFTS WITH 10 EA 25 MAN LIFERAFTS WITH UP TO DATE SERVICING OR HAVE PRESENT RAFTS SERVICED AT AUTHORIZED SERVICING FACILITY AND PROVE SERVICING.
Condition: Unknown
Due 11 September 1985
Resolved 11 September 1985
Unknown
Issued 11 September 1985
Resolved
SHOW PROPER OPERATION OF FIRE PUMPS AND FIRE PUMP RELIEF VALVES.
Condition: Unknown
Due 11 September 1985
Resolved 11 September 1985
Unknown
Issued 11 September 1985
Resolved
PROVE PROPER OPERATION OF VENTILATION REMOTE AND EMERGENCY SHUTDOWN FOR ALLSPACES.
Condition: Unknown
Due 11 September 1985
Resolved 11 September 1985