KYODO YARROW is a 1982 tank ship. The Coast Guard has recorded 55 inspections since 1984, most recently in December 2008, along with 24 deficiencies and 6 operational controls.

Records from 1984 to 2008. Most recent: inspection, 27 December 2008.

Built
1982
Last inspected
27 December 2008
Documentation
Not in the documentation file of 10 September 2026
Controls
None recorded without a removal date

Identity

8002951 View on MarineTraffic leaves Maury; a third-party site, nothing from it is stored here
Flag
PANAMA
—
Maury page id
psix-54278

Inspections, by type

…with no type recorded28
Years with a record 19 calendar years (1984–2008)
The 55 inspections in the strip above, split by the kind of activity the US Coast Guard recorded. Years with a record are calendar years in which a record exists, not years in service. What Maury does not do.

This record may be incomplete: the most recent inspection recorded for this vessel was 18 years ago. Maury shows what the Coast Guard recorded, not whether the vessel has been inspected since, is still in service, or what condition it is in. Coast Guard record current through 13 September 2026, retrieved 18 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard. Records for the Tank Ship class in Maury's sources begin in 1980.

Documentation record

Tonnage as PSIX records it6202 - Regulatory (Subpart C or D), Gross Ton
6356 - Convention (Subpart B), Gross Ton
3369 - Regulatory (Subpart C or D), Net Ton
1907 - Convention (Subpart B), Net Ton
7500 - Dead Weight, Ton
This hull's Official Number is not in the NVDC file dated 10 September 2026 as served by NOAA Fisheries, so no documentation record is shown. Absence from that file is a fact about the file, not about the hull.

Radio station licence

No FCC ship-station licence is recorded against this Official Number in the file of 6 September 2026. That is a fact about the licence file, not about the radio.

Inspection history · 55

27 December 2008 ISPS III Exam · STCW 95 Exam · ILO-147 Exam · MARPOL Annex I Examination · MARPOL Annex V Examination · Ballast Water Examination · PII Safety Exam · Loadline Exam
Physical examination · Sector Corpus Christi · USCG Heartland District (CGD-H) · Activity 3372199
15 October 2008 PII Safety Exam · ISPS III Exam · Ballast Water Examination
Physical examination · Marine Safety Unit Lake Charles · USCG Heartland District (CGD-H) · Activity 3345649
15 October 2008 Type not recorded
No type recorded · Marine Safety Unit Lake Charles · USCG Heartland District (CGD-H) · Activity 3353969
27 August 2008 Type not recorded
No type recorded · Sector Corpus Christi · USCG Heartland District (CGD-H) · Activity 3310538
14 June 2008 ISPS II Exam
Physical examination · Sector Corpus Christi · USCG Heartland District (CGD-H) · Activity 3232014
25 April 2008 Deficiency Check
Physical examination · Sector Corpus Christi · USCG Heartland District (CGD-H) · Activity 3192331
6 April 2008 PI Safety Exam
Physical examination · Marine Safety Unit Lake Charles · USCG Heartland District (CGD-H) · Activity 3178363
10 March 2008 MARPOL Annex I Examination · Ballast Water Examination · MARPOL Annex II Examination · ISPS II Exam · COC-GAS Annual · MARPOL Annex V Examination
Physical examination · Sector Corpus Christi · USCG Heartland District (CGD-H) · Activity 3161801
15 February 2008 Damage Survey
Physical examination · Sector Corpus Christi · USCG Heartland District (CGD-H) · Activity 3148267
12 February 2008 Deficiency Check
Physical examination · Sector Corpus Christi · USCG Heartland District (CGD-H) · Activity 3073248
8 February 2008 Deficiency Check
Physical examination · Sector Corpus Christi · USCG Heartland District (CGD-H) · Activity 3040824
2 February 2008 Deficiency Check · ISPS III Exam · PI Safety Exam
Physical examination · Sector Corpus Christi · USCG Heartland District (CGD-H) · Activity 3139974
20 January 2008 PI Safety Exam · ISPS III Exam
Physical examination · Sector Corpus Christi · USCG Heartland District (CGD-H) · Activity 3132356
29 December 2007 PII Safety Exam · Ballast Water Examination · MARPOL Annex V Examination · MARPOL Annex I Examination
Physical examination · Sector Corpus Christi · USCG Heartland District (CGD-H) · Activity 3082501
29 December 2007 Type not recorded
No type recorded · Sector Corpus Christi · USCG Heartland District (CGD-H) · Activity 3124282
15 September 2007 Type not recorded
No type recorded · Sector Corpus Christi · USCG Heartland District (CGD-H) · Activity 3065008
15 September 2007 Type not recorded
No type recorded · Sector Corpus Christi · USCG Heartland District (CGD-H) · Activity 3065071
20 June 2007 Type not recorded
No type recorded · Sector Corpus Christi · USCG Heartland District (CGD-H) · Activity 2963355
8 June 2007 Type not recorded
No type recorded · Sector Corpus Christi · USCG Heartland District (CGD-H) · Activity 2955739
21 May 2007 Type not recorded
No type recorded · Sector Corpus Christi · USCG Heartland District (CGD-H) · Activity 2933132
11 April 2007 Deficiency Check
Physical examination · Sector Corpus Christi · USCG Heartland District (CGD-H) · Activity 2900865
4 March 2007 ISPS II Exam · COC-GAS Renew · Ballast Water Examination
Physical examination · Sector Corpus Christi · USCG Heartland District (CGD-H) · Activity 2876386
24 November 2005 Type not recorded
No type recorded · Vessel Traffic Service Houston-Galveston · USCG Heartland District (CGD-H) · Activity 2562452
23 August 2005 Deficiency Check
Physical examination · Sector Corpus Christi · USCG Heartland District (CGD-H) · Activity 2471830
9 August 2005 MARPOL Annex I Examination · ISPS II Exam · MARPOL Annex II Examination · MARPOL Annex V Examination · COC-GAS Annual · Ballast Water Examination
Physical examination · Sector Corpus Christi · USCG Heartland District (CGD-H) · Activity 2452590
21 April 2005 Type not recorded
No type recorded · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 2339767
5 August 2004 ISPS II Exam · COC-GAS Renew
Physical examination · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 2157143
30 November 2003 Certificate of Compliance
Administrative · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 1956360
13 May 2002 Type not recorded
No type recorded · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 1616002
17 September 1998 Type not recorded
No type recorded · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 420264
30 December 1997 Type not recorded
No type recorded · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 411201
30 December 1997 Administrative
Administrative · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 1120535
2 June 1997 Type not recorded
No type recorded · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 404295
4 April 1997 Type not recorded
No type recorded · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 402213
4 April 1997 Letter of Compliance (Initial/Renewal)
Administrative · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 1103455
30 May 1995 Type not recorded
No type recorded · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 378900
30 May 1995 Letter of Compliance (Initial/Renewal)
Administrative · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 1183774
12 April 1994 Type not recorded
No type recorded · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 479711
18 February 1994 Type not recorded
No type recorded · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 364755
24 September 1993 Deficiency Check
Physical examination · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 842616
21 September 1993 Certificate of Compliance
Administrative · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 1137776
21 October 1992 Type not recorded
No type recorded · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 353870
25 June 1992 Type not recorded
No type recorded · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 477900
10 February 1992 Type not recorded
No type recorded · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 348740
1 November 1991 Deficiency Check
Physical examination · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 934363
26 October 1991 Certificate of Compliance
Administrative · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 945583
11 June 1990 Type not recorded
No type recorded · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 525382
9 November 1989 Certificate of Compliance
Administrative · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 1231243
6 October 1988 Type not recorded
No type recorded · COTP HOUSTON · USCG Heartland District (CGD-H) · Activity 534843
6 October 1988 Type not recorded
No type recorded · MIO HOUSTON · USCG Heartland District (CGD-H) · Activity 1195102
5 January 1988 Certificate of Compliance
Administrative · MIO HOUSTON · USCG Heartland District (CGD-H) · Activity 1007929
30 December 1987 Type not recorded
No type recorded · COTP HOUSTON · USCG Heartland District (CGD-H) · Activity 439561
18 October 1987 Type not recorded
No type recorded · MIO HOUSTON · USCG Heartland District (CGD-H) · Activity 1014177
10 March 1986 Type not recorded
No type recorded · MIO HOUSTON · USCG Heartland District (CGD-H) · Activity 997865
12 October 1984 Type not recorded
No type recorded · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 501107

Deficiency record · 24

Engineering › Steering Gear System › Actuator
Issued 15 October 2008 Resolved
Make permanent repairs to steering system prior to departing port.
Action required: 705 - Other - as specified
Due 15 October 2008
Resolved 18 October 2008
Resolution: Received Class report stating repairs have been make and steering system is now fully operational.
Documentation › Safety/Response Plans/Programs › Vessel Response Plan
Issued 27 August 2008 Resolved
Owner/Operator has not received required authorization to operate on the Navigable Waters of the U. S. Nontank Vessel Response Plan is under review per compliance with 33 USC 1321 (j)(5) but does not currently have an active Interim Operating Authorization Letter.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 27 August 2008
Resolved 22 October 2008
Resolution: NTVRP on board vessel and verified on VRP website.
Fire Fighting › Emergency Fire Pumps › Power Source
Issued 10 March 2008 Resolved
Diaphram on the fresh water cooling pump leading to the emergency fire pump is inoperable.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 11 March 2008
Resolution: Received class report attesting to satisfactory repairs and operation of Emergency Fire Pump.
Fire Fighting › Structural - A Class Divisions › Doors
Issued 10 March 2008 Resolved
Class "A" fire door leading into aft steering flat is not self-closing, therefore does not provide a proper fire boundary. SOLAS 74 II-2/34(b)(iii)
Due 24 March 2008
Resolved 11 March 2008
Resolution: Received class report attesting to satisfactory replacement of hydraulic type door closer. Door tested with no defects.
Pollution Prevention/Response › Prevention Equipment › Oily Water Separator (15 ppm)
Issued 15 February 2008 Resolved
Vessel reported inoperable OWS. Issued COTP Order 017-08 requiring vessel repair and operate the Oily Water Separator to the satisfaction of the attending class surveyor. MARPOL 73/78 (2006 Consolidated Edition) I/14
Action required: 705 - Other - as specified
Due 15 March 2008
Resolved 10 March 2008
Resolution: PSCOs tested OWS during Annual COC exam. Tested satisfactory.
Engineering › Generator (propulsion-electric) › Heating Element Circuitry
Issued 8 February 2008 Resolved
Received a call from Agent stating that the vessel lost all power while mooring up at Oxychem. It was later determined that the No. 2 generator's governor was not working correctly, causing high exhaust temperature. The entire load was shifted to No. 1 generator causing it to trip and total loss of main electric power.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 9 February 2008
Resolution: Received a report from [name withheld] stating that upon completion of repairs, the engine shut down devices were tested and engine run tested on load with satisfactory results.
Lifesaving › Lifeboat › Propulsion Starting System
Issued 29 December 2007 Resolved
Vessel has only 1 operative battery to start both lifeboats. Vessel cannot start both lifeboats with independent arrangements
Condition: Unknown
Action required: 705 - Other - as specified
Resolved 1 January 2008
Resolution: Received DNV class report: Additional batteries supplied, connected and function tested in order with satisfactory results.
Fire Fighting › Emergency Fire Pumps › Capacity
Issued 29 December 2007 Resolved
During operational test of Emergency Fire Pump, vessel experience leaking of sea water discharge, mixing w/ hydro oil from fire pump motor, creating approx 5 cubic mtrs of slops. Vessel is to offload slops from ballast tank prior to departure, and clean ballast tank as required.
Condition: Unknown
Action required: 705 - Other - as specified
Resolved 1 January 2008
Resolution: DNV Class report received: Leaking section of sea water discharge pipe (elbow) has been renewed, pressure tested and found in order. Oily water at emergency fire pump removed and cleaned dry. Slops from No. 1 Wing tank - portside offload to shore.
Pollution Prevention/Response › Prevention Equipment › Oily Water Separator (15 ppm)
Issued 29 December 2007 Resolved
OWS is inoperable, and PSCOs are unable to determine cause or length. During expanded examination, oil was discovered forward of automatic stopping device, with last recorded use being 03OCT07. MARPOL 73/78 (2006 Consol. Ed.) I/14.2
Condition: Unknown
Action required: 705 - Other - as specified
Resolved 1 January 2008
Resolution: DNV Class report received: Broken rotor pin of OWS pump renewed. Oil patch at discharge pipe section forward of Auto stopping device & separator filter tanks cleaned. All filters renewed. Completed OWS function test incl. 15ppm alarm with sat. results.
Operations/Management › Bilge/Bilge System Management › Control of Oil Mixtures
Issued 29 December 2007 Resolved
Vessel has collected excessive oil throughout engine room bilges. Slops to be collected and discharged prior to sea trials.
Action required: 705 - Other - as specified
Resolved 1 January 2008
Resolution: DNV Class Report received: All oily water at engine room bilges / tank tops incl. separator room removed and cleaned dry. Slops collected and discharged to shore reception facility.
Pollution Prevention/Response › Prevention Equipment › Incinerator, Shipboard
Issued 29 December 2007 Resolved
Sludge incinerator is inoperable due to OOC flue gas blower. Incinerator cannot be used for destruction of trash. Vessel is to discharge all garbage prior to sea trials. MARPOL 73/78 (2006 Consolidated) VI/16 31Dec07: DNV class report: Temporarily repaired, all garbage discharged to shore facility. Revised Def. Resolution due date based on 2nd Class report.
Action required: 705 - Other - as specified
Due 1 April 2008
Resolved 25 April 2008
Resolution: According to the class report form Det Norske Veritas, the flue gas blower of the incenerator was replaced with a new one and tested with no defects.
Fire Fighting › Remote Fuel Shutoff › General
Issued 29 December 2007 Resolved
No remote means exist of securing daily service tank for emergency firepump. SOLAS 74 (Unamended) II-2/54(c)
Action required: 705 - Other - as specified
Due 29 January 2008
Resolved 31 January 2008
Resolution: Received Class survey report stating the the remote means of securing the daily service tank of the emergency fire pump was installed and found in order. PSCOs also physically verified this.
Engineering › Steam Boiler (auxiliary/waste heat) › Pump
Issued 29 December 2007 Resolved
Recirc pump at aux boiler excessively leaking steam, creating personel safety hazard. ILO 147 4(c)
Action required: 705 - Other - as specified
Due 29 January 2008
Resolved 31 January 2008
Resolution: Received Class survey report stating that the leaking mechanical seal of the pump was replaced and found in order.
Fire Fighting › Fire Main › Diameter
Issued 29 December 2007 Resolved
Soft patch discovered on piping just above fire plug aft of fuel purifier room door. SOLAS 74 (Unamended) II-2/15
Action required: 705 - Other - as specified
Due 29 January 2008
Resolved 31 January 2008
Resolution: Received Class survery report stating that the pipe was renewed and installed in place.
Operations/Management › Bilge/Bilge System Management › Control of Excess Water
Issued 29 December 2007 Resolved
Heat exchangers for all 3 ship service generators appear to be ruptured internally, due to constant flow of water out of overflow from the jacket water side of heat exchanger.
Action required: 705 - Other - as specified
Due 29 January 2008
Resolved 31 January 2008
Resolution: Received a Class survey report stating that the heat exchanger was renewed and found in order.
Documentation › Safety Management System › Company Responsibility/Authority Documentation
Issued 29 December 2007 Resolved
Due to above deficiencies & scattered organization of SMS files, PSCO's recommend external audit carried out to determine company & ship adherance to SMS. 01Jan08: Flag State fax received: Agree with recommended audits. Internal audit due by 08Jan08. External audit due within 40 days (11Feb08).Flag state instructed Class to withdraw the IOPP & IAPP certificates and issue short term certificates.
Action required: 705 - Other - as specified
Due 11 February 2008
Resolved 12 February 2008
Resolution: Flag Administration conducted audit on 27 & 28 January, 2008.
Pollution Prevention/Response › Prevention Equipment › Cargo Monitor/Control System
Issued 4 March 2007 Resolved
Missing warning legends on superstructure for Overflow & Hi-level alarms.
Action required: 705 - Other - as specified
Due 4 April 2007
Resolved 11 April 2007
Resolution: Warning legends were painted on superstructure.
Construction/Loadline › Markings › Summer Load Line
Issued 9 August 2005 Resolved
Permanently mark loadline on port side. Discrepancy to be resolved to the satisfaction of the Coast Guard Inspector.
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Due 9 August 2005
Resolved 23 September 2005
Resolution: Loadline is now permanently marked on port side.
Deck/Cargo › Inert Gas System › Deck Distribution System
Issued 9 August 2005 Resolved
Make permanent repairs to holed saltwater cooling pipe for inert gas system. Discrepancy to be resolved to the satisfaction of the US Coast Guard Inspector.
Action required: 15 - Rectify deficiencies by next port
Due 9 August 2005
Resolved 23 September 2005
Resolution: Repairs made to the satisfaction of the Coast Guard Inspector.
Fire Fighting › Automatic Sprinkler System
Issued 30 November 2003 Resolved
Sprinkler pipe ruptured over #1 stbd cargo dome. Repair to the satisfaction of class (DNV) LEGACY COMPONENT DESC: Piping
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 30 December 2003
Resolved 18 December 2003
Resolution: Received Class report attesting to satisfactory repairs to deck water spray system.
Construction/Loadline › Structures › Superstructure
Issued 30 November 2003 Resolved
Aft bulkhead of compressor just above maindeck on port and starboard is wasted and has several small holes due to wastage. Make permenant Repairs to the satisfaction of class (DNV) when vessel is in a gas free condition. Repairs should include cropping back to good metal and welding inserts no les
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 30 January 2004
Resolved 5 August 2004
Resolution: Temporary repairs made and condition of class imposed on vessel repairs to be made in Nov04.
Fire Fighting › Miscellaneous Items
Issued 13 May 2002 Resolved
1 deficiency issued to update emergency instruction to reflect shipboard procedures. Vessel required to conduct satisfactory fire drill prior to departure.
Condition: Unknown
Action required: 17 - Rectify deficiencies prior to departure
Due 14 May 2002
Resolved 13 May 2002
Navigation
Issued 4 April 1997 Resolved
Repair speed and distance indicator as required by SOLAS 74, as amended, Chap. V/12.
Condition: Unknown
Due 2 June 1997
Resolved 2 June 1997
Deck/Cargo
Issued 26 October 1991 Resolved
PROVE PROPER OPERATION OF INERT GAS GENERATOR ALARMS AND SHUTDOWNS PRIOR TORETURNING TO U.S. WATERS.
Condition: Unknown
Due 13 November 1991
Resolved 13 November 1991

Ownership record

The Coast Guard's documentation record for this hull -- the Abstract of Title, with its owners and liens as filed -- is not in PSIX. Ask, and Maury buys it from the National Vessel Documentation Center, files it here with its date, and every reader of this page gets it.