Records from 1982 to 1987. Most recent: inspection, 10 July 1987.
Documentation record
Registered dimensions (L × B × D)166.0 ft × 38.0 ft × 13.5 ft
Registered tonnagegross 174 / net 118
ITC dimensions (L × B × D)Not recorded
ITC tonnageNot recorded
BuilderHALTER MARINE · LOCKPORT, LA, UNITED STATES · built 1977
Hull materialSteel
PropulsionDiesel Reduction
Hull shapeNot recorded
Hull configurationNot recorded
Hailing portNot recorded
Trade endorsementsCoastwise, unrestricted, Registry
DocumentationInvalid
Service, as the file records itOffshore Supply Vessel
Hull formpowered (Maury's inference from propulsion, hull shape, material and length, rule hf-1; not a recorded fact)
Tonnage as PSIX records it174 - Regulatory (Subpart C or D), Gross Ton
118 - Regulatory (Subpart C or D), Net Ton
Every line above is a field of the National Vessel Documentation Center's file as served by NOAA Fisheries, dated 10 September 2026, matched to this hull on its Official Number. Registered and ITC measurements are two systems and are never combined. One snapshot is held so far; documentation history begins with the next.
A report is not offered for this hull: Its record holds only 1 of the seven kinds of material a report is built from: inspections, deficiencies, operational controls, tow-unit appearances, casualty records, dimensions and documentation. That is a statement about the record, not about the vessel. Reports.
Unknown
Issued 18 November 1982
Resolved
BRIDGE LIFERINGS, B) TWO FIREMANS OUTFITS, C) ONE FOUR FOOT LOW VELOCITY WATER SPRAY APPLICATOR WITH SUITABLE MOUNTING IN ENGINE ROOM.
Condition: Unknown
Due 18 November 1982
Resolved 18 November 1982
Unknown
Issued 18 November 1982
Resolved
A) TWO (2) TEN MAN LIFERAFTS B) TWO (2) HYDROSTATIC RELEASES
Condition: Unknown
Due 18 November 1982
Resolved 18 November 1982
Lifesaving
Issued 18 November 1982
Resolved
PROVIDE THE FOLLOWING EQUIPMENT NECESSARY FOR AN INTERNATIONAL VOYAGE: A) TWO USCG APPROVED SELF ACTIVATING SMOKE SIGNALS WITH BRACKETS FOR
Condition: Unknown
Due 18 November 1982
Resolved 18 November 1982
Construction/Loadline
Issued 18 November 1982
Resolved
DRYDOCK THE VESSEL AND COMPLETE DRYDOCKING INSPECTION.
Condition: Unknown
Due 18 November 1982
Resolved 18 November 1982
Lifesaving
Issued 18 November 1982
Resolved
SERVICE LIFESAVING EQUIPMENT AT AN APPROVED USCG SERVICING FACILITY WITNESSED BY A USCG INSPECTIOR AS FOLLOWS:
Condition: Unknown
Due 18 November 1982
Resolved 18 November 1982
Navigation
Issued 18 November 1982
Resolved
A) REPLACE MISSING STERN LIGHT, B) REPAIR INOPERATIVE TOP BREAKDOWN LIGHT, C) PROVIDE VESSEL COPY OF RULES OF THE ROAD.
Condition: Unknown
Due 18 November 1982
Resolved 18 November 1982
Engineering
Issued 18 November 1982
Resolved
MAKE BOTH FUEL OIL REMOTE SHUTDOWNS OPERATIONAL.
Condition: Unknown
Due 18 November 1982
Resolved 18 November 1982
Unknown
Issued 18 November 1982
Resolved
REPAIR BROKEN SEALING LIP FOR FORWARD PORT ENGINEROOM VENT COVER.
Condition: Unknown
Due 18 November 1982
Resolved 18 November 1982
Lifesaving
Issued 18 November 1982
Resolved
PROVIDE COMPLETE FIRST AID KIT.
Condition: Unknown
Due 18 November 1982
Resolved 18 November 1982
Fire Fighting
Issued 18 November 1982
Resolved
PROVIDE UL APPROVED B-II PORTABLE FIRE EXTINGUISHER FOR OUTSIDE PAINT LOCKER, OR REMOVE ALL PAINTS FROM VESSEL.
Condition: Unknown
Due 18 November 1982
Resolved 18 November 1982
Electrical
Issued 18 November 1982
Resolved
A) PROVIDE ISOLATING BAR BETWEEN GENERATOR CIRCUIT BREAKERS, B) REPAIR GROUND DETECTION LIGHTS, C) REPAIR WIRING TO LOWER AIR COMPRESSOR.
Condition: Unknown
Due 18 November 1982
Resolved 18 November 1982
Unknown
Issued 18 November 1982
Resolved
PROVIDE OIL TRANSFER PROCEEDURES AS REQUIRED BY 33 CFR 155.
Condition: Unknown
Due 18 November 1982
Resolved 18 November 1982
Unknown
Issued 18 November 1982
Resolved
PROVIDE CURRENT FMC CERTIFICATE.
Condition: Unknown
Due 18 November 1982
Resolved 18 November 1982