Records from 1986 to 2024. Most recent: inspection, 15 March 2024.
Inspection history · 87
15 March 2024
Administrative Inspection
Administrative · Sector Miami · USCG Southeast District (CGD-SE) · Activity 7879726
20 February 2020
In-Service Inspection · Administrative Inspection
Physical examination · Sector Miami · USCG Southeast District (CGD-SE) · Activity 6912472
18 February 2020
Damage Survey · Administrative Inspection · Deficiency Check
Physical examination · Sector Miami · USCG Southeast District (CGD-SE) · Activity 6911648
18 February 2020
Type not recorded
No type recorded · Sector Miami · USCG Southeast District (CGD-SE) · Activity 6912908
21 January 2020
COI Inspection · Administrative Inspection
Physical examination · Sector Miami · USCG Southeast District (CGD-SE) · Activity 6893145
2 May 2019
Annual Inspection · DAPI Audit
Physical examination · Sector Miami · USCG Southeast District (CGD-SE) · Activity 6674541
7 August 2018
Internal Structural Exam · Deficiency Check · Drydock Exam
Physical examination · Sector Miami · USCG Southeast District (CGD-SE) · Activity 6550610
23 May 2018
Deficiency Check
Physical examination · Sector Miami · USCG Southeast District (CGD-SE) · Activity 6421916
25 April 2018
Annual Inspection
Physical examination · Sector Miami · USCG Southeast District (CGD-SE) · Activity 6399025
20 March 2018
Damage Survey
Physical examination · Sector Miami · USCG Southeast District (CGD-SE) · Activity 6375002
5 April 2017
Annual Inspection
Physical examination · Sector Miami · USCG Southeast District (CGD-SE) · Activity 6118105
13 July 2016
Internal Structural Exam · Drydock Exam
Physical examination · Sector Miami · USCG Southeast District (CGD-SE) · Activity 5939065
4 February 2016
Annual Inspection
Physical examination · Sector Miami · USCG Southeast District (CGD-SE) · Activity 5809386
19 August 2014
Drydock Exam · Internal Structural Exam · Deficiency Check
Physical examination · Sector Miami · USCG Southeast District (CGD-SE) · Activity 4959241
7 May 2014
Annual Inspection
Physical examination · Sector Miami · USCG Southeast District (CGD-SE) · Activity 4851966
9 May 2012
Annual Inspection · DAPI Audit
Physical examination · Sector Miami · USCG Southeast District (CGD-SE) · Activity 4306405
10 February 2010
COI Inspection
Physical examination · Sector Miami · USCG Southeast District (CGD-SE) · Activity 3675946
15 April 2009
Annual Inspection
Physical examination · Sector Miami · USCG Southeast District (CGD-SE) · Activity 3453002
12 January 2009
Type not recorded
No type recorded · Sector Miami · USCG Southeast District (CGD-SE) · Activity 3424953
6 May 2008
Annual Inspection
Physical examination · Sector Miami · USCG Southeast District (CGD-SE) · Activity 3199846
27 September 2007
Hull Examination
Physical examination · Sector Miami · USCG Southeast District (CGD-SE) · Activity 3067202
20 February 2007
Annual Inspection
Physical examination · Sector Miami · USCG Southeast District (CGD-SE) · Activity 2874328
12 February 2006
Annual Inspection
Physical examination · Sector Miami · USCG Southeast District (CGD-SE) · Activity 2583753
4 November 2005
Drydock Extension
Administrative · Sector Miami · USCG Southeast District (CGD-SE) · Activity 2528526
8 September 2005
Hull Examination
Physical examination · Sector Miami · USCG Southeast District (CGD-SE) · Activity 2498849
23 April 2005
Damage Survey · Examination of Repairs
Physical examination · Sector Miami · USCG Southeast District (CGD-SE) · Activity 2341216
22 April 2005
Type not recorded
No type recorded · Sector Miami · USCG Southeast District (CGD-SE) · Activity 2342114
11 February 2005
COI Inspection
Physical examination · Sector Miami · USCG Southeast District (CGD-SE) · Activity 2290672
21 April 2004
Annual Inspection
Physical examination · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 2049417
19 August 2003
Hull Examination
Physical examination · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 1880560
12 March 2003
Re-Inspection
Physical examination · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 1756138
23 June 2002
Type not recorded
No type recorded · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 1640605
27 April 2002
Type not recorded
No type recorded · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 1615668
9 April 2002
Deficiency Check
Physical examination · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 1602774
27 March 2002
Re-Inspection
Physical examination · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 1597983
22 January 2002
Type not recorded
No type recorded · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 1608851
2 October 2001
Damage Survey
Physical examination · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 1074880
1 October 2001
Type not recorded
No type recorded · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 107612
31 August 2001
Hull Examination
Physical examination · MSO JACKSONVILLE · USCG Southeast District (CGD-SE) · Activity 1366515
14 July 2001
Type not recorded
No type recorded · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 101372
12 July 2001
Type not recorded
No type recorded · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 182403
18 May 2001
Damage Survey
Physical examination · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 1362217
17 May 2001
Type not recorded
No type recorded · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 160778
1 May 2001
Damage Survey
Physical examination · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 1063869
28 April 2001
Type not recorded
No type recorded · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 33555
27 March 2001
Deficiency Check
Physical examination · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 1060894
26 March 2001
Type not recorded
No type recorded · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 91966
15 March 2001
Re-Inspection · MARPOL Annex V Examination
Physical examination · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 1373381
2 March 2000
MARPOL Annex V Examination · COI Inspection
Physical examination · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 1460378
16 February 2000
Type not recorded
No type recorded · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 717090
12 February 2000
Type not recorded
No type recorded · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 119562
21 January 2000
Examination of Repairs
Physical examination · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 1452616
20 January 2000
Type not recorded
No type recorded · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 31399
26 November 1999
Type not recorded
No type recorded · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 116113
13 September 1999
Hull Examination
Physical examination · MSO JACKSONVILLE · USCG Southeast District (CGD-SE) · Activity 1372756
26 May 1999
Type not recorded
No type recorded · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 799478
10 March 1999
Type not recorded
No type recorded · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 177987
11 February 1999
Re-Inspection · MARPOL Annex V Examination
Physical examination · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 1378569
11 February 1998
Re-Inspection · MARPOL Annex V Examination
Physical examination · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 1110668
23 June 1997
Hull Examination
Physical examination · MSO JACKSONVILLE · USCG Southeast District (CGD-SE) · Activity 1107880
19 February 1997
MARPOL Annex V Examination · COI Inspection
Physical examination · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 1107166
3 August 1996
Type not recorded
No type recorded · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 45874
22 February 1996
Deficiency Check · COI Inspection
Physical examination · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 1193270
30 June 1995
Hull Examination
Physical examination · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 883739
27 February 1995
COI Inspection
Physical examination · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 1167576
28 February 1994
COI Inspection · Deficiency Check
Physical examination · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 1166551
17 November 1993
Type not recorded
No type recorded · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 142028
30 June 1993
Hull Examination
Physical examination · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 845297
1 March 1993
COI Inspection
Physical examination · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 839166
20 October 1992
Administrative
Administrative · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 934374
5 March 1992
COI Inspection
Physical examination · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 944910
14 June 1991
Hull Examination
Physical examination · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 1233041
17 April 1991
Deficiency Check
Physical examination · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 915657
14 March 1991
COI Inspection
Physical examination · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 1219782
17 January 1991
Type not recorded
No type recorded · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 1218295
19 March 1990
COI Inspection
Physical examination · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 1237653
9 June 1989
Hull Examination · Deficiency Check
Physical examination · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 887425
22 March 1989
Deficiency Check · COI Inspection
Physical examination · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 1207361
14 October 1988
Deficiency Check
Physical examination · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 887444
5 August 1988
Deficiency Check
Physical examination · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 1037728
28 March 1988
COI Inspection
Physical examination · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 993853
23 October 1987
Hull Examination
Physical examination · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 1018013
8 October 1987
Type not recorded
No type recorded · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 1321370
17 August 1987
Type not recorded
No type recorded · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 1031952
3 April 1987
COI Inspection
Physical examination · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 1322704
17 March 1986
COI Inspection
Physical examination · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 991848
5 February 1986
Credit Drydock
Administrative · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 1304871
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 19 February 2020
Resolved
Excessive oil was found on the #2 main engine, bilge, and deck plating IWO the engine.
46 CFR 176.25-10(b)
Action required: 701 - Prior to carriage of passengers/cargo
Due 4 March 2020
Resolved 21 February 2020
Resolution: Mechanics changed all shaft seals on the forward end of the #2 Main Diesel Engine.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 7 August 2018
Resolved
Repsir or replace propeller. Propeller has large crack IWO the hub.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 3 October 2018
Resolution: Owner installed new propeller, in kind.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Bilge pumping arrangements
Issued 7 August 2018
Resolved
Replace holed bilge piping as discussed with CGMI.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 3 October 2018
Resolution: Owner replaced all holed bilge piping.
02 - Structural Conditions › N/A - No Subsystem › Electrical installations in general
Issued 7 August 2018
Resolved
Remove dead end wire in the engine room as discussed with CGMI.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 3 October 2018
Resolution: Owner has removed the dead end wire.
Construction/Loadline › Hull › Side Shell
Issued 20 March 2018
Resolved
Vessel was involved in collision on starboard quarter. Vessel issued CG 835 to be attended by CG inspector prior to operation.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 20 March 2018
Resolution: CG inspectors attended vessel and observed no significant damage to vessel's hull.
Engineering › Bilge Water Management System › Strainer
Issued 13 July 2016
Resolved
Renew bilge strainer in #1 crossever void.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Resolved 14 September 2016
Resolution: Bilge strainer rewnewed.
Construction/Loadline › Hull › Bottom Plating
Issued 19 August 2014
Resolved
Provide gauging report and original hull scantling for the following areas: #1 wheelhouse compartment, lower portion of aft bulkhead; deck side crossover void; #1&2 walk around spaces on the outboard shell.
Action required: 705 - Other - as specified
Resolved 12 September 2014
Resolution: Gauging report provided, no wastage exceeds 25% of original plate thickness.
Electrical › Lighting (service) › Outlet Box
Issued 19 August 2014
Resolved
Reattach the box fitting on lighting fixture in the #1 rudder room.
Action required: 705 - Other - as specified
Resolved 12 September 2014
Resolution: Box fitting reattached.
Construction/Loadline › Structures › Scuttle
Issued 19 August 2014
Resolved
Renew shackle on the #1 wheel house void hatch.
Action required: 705 - Other - as specified
Resolved 12 September 2014
Resolution: Shackle renewed.
Electrical › Electric Supply System (service) › Cable
Issued 19 August 2014
Resolved
Remove all unsued electrical wiring and swtiches in the shaft alleys.
Action required: 705 - Other - as specified
Resolved 12 September 2014
Resolution: Unsused wiring and switches removed.
Engineering › Shafting/Propeller Arrangements › Stern Tube
Issued 19 August 2014
Resolved
Make all stuffing tubes watertight.
Action required: 705 - Other - as specified
Resolved 12 September 2014
Resolution: All suffing tubes adjusted.
Construction/Loadline › Structures › Scuttle
Issued 19 August 2014
Resolved
Install retainers on lanyards for all watertight hatches.
Action required: 705 - Other - as specified
Resolved 12 September 2014
Resolution: Lanyards installed on all hatches.
Engineering › Steering Gear System › Hydraulic Hose
Issued 19 August 2014
Resolved
Renew hydraulic fitting on the fwd end of the steering ram #1 rudder room.
Action required: 705 - Other - as specified
Resolved 12 September 2014
Resolution: Hydraulic fitting renewed.
Engineering › Bilge Water Management System › Valve
Issued 19 August 2014
Resolved
Renew bilge suction handle #1 rudder room.
Action required: 705 - Other - as specified
Resolved 12 September 2014
Resolution: Bilge suction handle renewed.
Engineering › Bilge Water Management System › Piping
Issued 27 September 2007
Resolved
#1 shaft alley: crop and renew sub-pump discharge piping and bilge suction to coupling union.
Action required: 705 - Other - as specified
Resolved 8 November 2007
Construction/Loadline › Hull › Bottom Plating
Issued 27 September 2007
Resolved
#1 Shaft alley: descale first two bilge pockets.
Action required: 705 - Other - as specified
Resolved 8 November 2007
Accommodation/Occupational Safety › Occupational Safety › Hand Grab
Issued 27 September 2007
Resolved
renew ladder support to #1 shaft alley.
Action required: 705 - Other - as specified
Resolved 8 November 2007
Construction/Loadline › Structures › Deck Plating
Issued 27 September 2007
Resolved
#1 Cross-over wheel house side: Crop & renew overhead in way of 4th frame IAW NVIC 7-68. Also, crop and renew vertical frame at bottom of ladder 20-24 inches.
Action required: 705 - Other - as specified
Resolved 8 November 2007
Construction/Loadline › Hull › Transverse Frame
Issued 27 September 2007
Resolved
#1 Cross-over deck side: Crop & renew approx. 4 feet of frame at hatch.
Action required: 705 - Other - as specified
Resolved 8 November 2007
Construction/Loadline › Hull › Transverse Frame
Issued 27 September 2007
Resolved
#2 Cross-over deck side Crop & renew wasted areas of frame by hatch.
Action required: 705 - Other - as specified
Resolved 8 November 2007
Operations/Management › Bilge/Bilge System Management › Control of Excess Water
Issued 14 October 2005
Resolved
Renew Bilge pipe nipple, located in #1 rudder compartment.
Condition: Unknown
Due 18 November 2005
Resolved 23 November 2005
Construction/Loadline › Hull › Bracket
Issued 14 October 2005
Resolved
Renew support bracket for rudder control box, located in #2 rudder compartment.
Condition: Unknown
Action required: 705 - Other - as specified
Due 14 November 2005
Resolved 23 November 2005
Construction/Loadline › Hull › Longitudinal Frame
Issued 14 October 2005
Resolved
Renew wasted flange, located in #2 rudder compartment.
Condition: Unknown
Action required: 705 - Other - as specified
Due 14 November 2005
Resolved 23 November 2005
Construction/Loadline › Hull › Transverse Frame
Issued 14 October 2005
Resolved
Provide repair proposal plan for wasted floor frame supports, located in #1 shaft alley.
Condition: Unknown
Action required: 705 - Other - as specified
Due 14 November 2005
Resolved 23 November 2005
Operations/Management › Bilge/Bilge System Management › Control of Excess Water
Issued 14 October 2005
Resolved
Prove proper operation of bilge dewatering sytem for all compartments.
Condition: Unknown
Action required: 705 - Other - as specified
Due 14 November 2005
Resolved 23 November 2005
Operations/Management › Ballast Water Managment › Ballast Exchange
Issued 14 October 2005
Resolved
Dewater Ballast Tanks and make available for inspection.
Condition: Unknown
Action required: 705 - Other - as specified
Due 14 November 2005
Resolved 23 November 2005
Operations/Management › Drills/Instruction › Not Conducted
Issued 23 April 2005
Resolved
Conduct drills to train crews in procedures to be taken in the event of a loss of steering situation. Drills should be done on all boats and with all crews in the fleet
Action required: 705 - Other - as specified
Due 9 June 2005
Resolved 23 November 2005
Communications › Alarms/Indicators › Bilge Alarm
Issued 11 February 2005
Resolved
Provide an Audible/visual alarm at the Operating Station for the Engine Room Bilge.
Condition: Unknown
Due 28 February 2005
Resolved 23 November 2005
Fire Fighting › Fire Pumps › Power Source
Issued 11 February 2005
Resolved
Air leak at operating station fire pump control switch not allowing for proper pressure at the fire hose.
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 16 February 2005
Fire Fighting › Fixed CO2 Fire Extinguishing System
Issued 21 April 2004
Resolved
Make permanent and proper repairs to the CO2 system. LEGACY COMPONENT DESC: Operating Controls
Condition: Unknown
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 21 April 2004
Resolution: Tech was on board and changed out rubber seal.
Engineering › Steering Gear System › Rudder Angle Indicator
Issued 21 April 2004
Resolved
Properly repair rudder angle indicator gauges.
Condition: Unknown
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 21 April 2004
Engineering › Bilge Water Management System
Issued 21 April 2004
Resolved
Repair visual indicators in the control station.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 21 April 2004
Fire Fighting › Emergency Fire Pumps › Power Source
Issued 21 April 2004
Resolved
Replace clutch for emergency fire pump.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 21 April 2004
Engineering › Bilge Water Management System › Piping
Issued 19 August 2003
Resolved
Provide a fixed means to dewater the void tanks under the wheel house no later than next drydock.
Due 30 September 2005
Resolved 23 November 2005
Construction/Loadline › Structures
Issued 27 March 2002
Resolved
Crop and renew manhole ring on #1 wrap around ballast tank.l LEGACY COMPONENT DESC: Manhole
Due 14 April 2002
Resolved 9 April 2002
Construction/Loadline › Structures
Issued 27 March 2002
Resolved
Crop and renew catwalk support frame on fwd shaft alley where broken. LEGACY COMPONENT DESC: Deck Plating
Due 14 April 2002
Resolved 9 April 2002
Engineering › Steering Gear System
Issued 27 March 2002
Resolved
Install guard on hydraulic tank sight glass near # 1 MDE.
Due 14 April 2002
Resolved 9 April 2002
Engineering › Shafting/Propeller Arrangements
Issued 27 March 2002
Resolved
Adjust packing gland on # 1 shaft to reduce water leakage. LEGACY COMPONENT DESC: Thrust Shaft
Due 14 April 2002
Resolved 9 April 2002
Electrical › Electrical Distribution System (service)
Issued 27 March 2002
Resolved
Install cover over breakers inside electric power panel in engine room near stbd side amidship. LEGACY COMPONENT DESC: Circuit Breaker
Due 14 April 2002
Resolved 9 April 2002
Electrical › Electric Generation Source (service)
Issued 27 March 2002
Resolved
Repair # 1 generator hertz gauge. LEGACY COMPONENT DESC: Panelboard
Due 14 April 2002
Resolved 9 April 2002
Engineering › Bilge Water Management System
Issued 27 March 2002
Resolved
Repair/replace bilge alarm LED light for # 2 shaft alley.
Due 14 April 2002
Resolved 9 April 2002
Electrical › Electrical Distribution System (service)
Issued 27 March 2002
Resolved
Replace all wire ties holding electrical cables in both shaft alleys with metallic holders. LEGACY COMPONENT DESC: Wiring
Due 14 April 2002
Resolved 9 April 2002
Electrical
Issued 31 August 2001
Resolved
REMOVE THE INSTALLED "SO" CABLE RUN TO THE BILGE PUMP CONNECTION BOX TO THEENGINEROOM FOR #1 AND #2 SHAFT ALLEYS.
Condition: Unknown
Due 15 October 2001
Resolved 27 March 2002
Construction/Loadline
Issued 31 August 2001
Resolved
CROP AND RENEW THE DECKHOUSE SIDE WRAPAROUND VOID MANHOLE RING.
Condition: Unknown
Due 15 October 2001
Resolved 27 March 2002
Engineering
Issued 18 May 2001
Resolved
Prior to the carriage of passengers, submit report detailing the cause and repair of shaft coupling failure; and prove proper operation of No. 1 shaftin the presence of CG inspectors._x001C_
Condition: Unknown
Due 18 May 2001
Resolved 20 May 2001
Engineering
Issued 1 May 2001
Resolved
Prior to the carriage of passengers conduct sea trials in prescence of USCGMarine Inspector.
Condition: Unknown
Due 9 May 2001
Resolved 9 May 2001
Lifesaving
Issued 15 March 2001
Resolved
Prior to 22MAR01, label emergency exits on bridge as discussed. (Label two windows that open to cat walk "Emergency Exit" and label ladder going to sealed roof hatxh "Not an exit")
Condition: Unknown
Due 15 March 2001
Resolved 15 March 2001
Engineering
Issued 15 March 2001
Resolved
Prior to 22MAR01, repair engine water temp gauge for #2 MDE.
Condition: Unknown
Due 15 March 2001
Resolved 15 March 2001
Lifesaving
Issued 15 March 2001
Resolved
Prior to 22MAR01, replace retro-reflective tape for all rejected life preservers. (19 adult and 09 children)
Condition: Unknown
Due 15 March 2001
Resolved 15 March 2001
Lifesaving
Issued 15 March 2001
Resolved
Prior to 22MAR01, relabel ring life buoys with the proper retro-reflective tape as discussed. (90*, no name over tape)
Condition: Unknown
Due 15 March 2001
Resolved 15 March 2001
Lifesaving
Issued 15 March 2001
Resolved
Prior to 22MAR01, instal PA system in passengers spaces.
Condition: Unknown
Due 15 March 2001
Resolved 15 March 2001
Construction/Loadline
Issued 15 March 2001
Resolved
Prior to 22MAR01, repair both reach-rods for bilge suction system.
Condition: Unknown
Due 22 March 2001
Resolved 15 March 2001
Navigation
Issued 2 March 2000
Resolved
Replace # 1 end rudder prior to operating vessel with passengers and prove operation to USCG inspectors.
Condition: Unknown
Due 18 April 2000
Resolved 18 April 2000
Construction/Loadline
Issued 22 February 1996
Resolved
REPAIR/REPLACE BOTH BILGE PUMPS TO PROVIDE 50GPM.
Condition: Unknown
Due 29 February 1996
Resolved 5 March 1996
Unknown
Issued 22 February 1996
Resolved
COMPLY WITH 46 CFR PART 16, DRUG TESTING PROGRAM.
Condition: Unknown
Due 29 February 1996
Resolved 5 March 1996
Construction/Loadline
Issued 28 February 1994
Resolved
CLEAN BILOGES BENEATH BOTH M.D.E.'S TO SATISFACTION OF ATTENDING MARINE INSPECTOR.
Condition: Unknown
Due 8 April 1994
Resolved 8 April 1994
Navigation
Issued 28 February 1994
Resolved
MAKE PROPER REPAIRS TO #2 RADAR. DEMONSTRATE PROPER OPERATION TO ATTENDINGMARINE INSPECTOR.
Condition: Unknown
Due 28 March 1994
Resolved 4 April 1994
Construction/Loadline
Issued 30 June 1993
Resolved
RE-WORK ALL MANHOLE COVERS AS NEEDED ON CAR DECK. WORK MUST BE CHECKED BY A USCG MARINE INSPECTOR PRIOR TO VESSEL BEING PUT BACK INTO SERVICE._x001C_ _x001C_ _x001C_
Condition: Unknown
Due 30 June 1993
Resolved 6 July 1993
Engineering
Issued 14 March 1991
Resolved
PROVIDE A ASME RELIEF VALVE FOR EACH EMERGENCY AIR RECEIVER NOT TO EXCEED THE MAWP AS INDICATED ON THE NAME PLATE OF THE AIR RECEIVER.
Condition: Unknown
Due 14 March 1991
Resolved 14 March 1991
Fire Fighting
Issued 14 March 1991
Resolved
PROVIDE A SPANNER WRENCH FOR EACH FIRE HYDRANT.
Condition: Unknown
Due 14 March 1991
Resolved 14 March 1991
Engineering
Issued 14 March 1991
Resolved
CONDUCT INTERNAL EXAM ON THE TWO STARTING AIR RECEIVERS.
Condition: Unknown
Due 14 March 1991
Resolved 14 March 1991
Engineering
Issued 14 March 1991
Resolved
PROVE PROPER OPERATION OF THE ENGINE ROOM VENTILLATION DAMPERS.
Condition: Unknown
Due 14 March 1991
Resolved 14 March 1991
Engineering
Issued 14 March 1991
Resolved
PROVIDE A METALLIC PLUG AND KEEPER CHAIN FOR THE FUEL OIL VENT OVERFLOW CONTAINMENT.
Condition: Unknown
Due 14 March 1991
Resolved 14 March 1991
Engineering
Issued 14 March 1991
Resolved
PROVIDE EMERGENCY AIR RECEIVERS TO BE HYDROSTATICLY TESTED IN THE PRESENCE_x001C_OF A CG MARINE INSPECTOR TO 1.5 TIMES THE MAXIMUM ALLOWABLE WORKING PRESSURE.
Condition: Unknown
Due 14 March 1991
Resolved 14 March 1991
Construction/Loadline
Issued 17 January 1991
Resolved
CONDUCT CREDIT DRYDOCK EXAMINATION IN PRESENCE OF USCG INSPECTORS PRIOR TO 30 JUNE 1991.
Condition: Unknown
Due 17 January 1991
Resolved 17 January 1991
Engineering
Issued 17 January 1991
Resolved
PROVE PROPER OPERATION OF STERN BILGE PICK-UP REACH ROD.
Condition: Unknown
Due 17 January 1991
Resolved 17 January 1991
Engineering
Issued 19 March 1990
Resolved
REPLACE AIR RECEIVER PRESSURE RELIEF VALVES WITH A MINIMUM 1 INCH VALVE.
Condition: Unknown
Due 19 March 1990
Resolved 19 March 1990
Engineering
Issued 19 March 1990
Resolved
PROVE OPERATION OF COLLISION COMPARTMENT BILGE CUT-OFF VALVE.
Condition: Unknown
Due 19 March 1990
Resolved 19 March 1990
Engineering
Issued 22 March 1989
Resolved
INSTALL METALLIC DRIP PANS UNDER ALL FUEL FILTERS IN ENGINE ROOM.
Condition: Unknown
Due 22 March 1989
Resolved 22 March 1989
Navigation
Issued 22 March 1989
Resolved
CLEAN SOOT FROM NAVIGATION LIGHT LENSES.
Condition: Unknown
Due 22 March 1989
Resolved 22 March 1989
Lifesaving
Issued 22 March 1989
Resolved
PROVIDE ONE ADDITIONAL RING BUOY.
Condition: Unknown
Due 22 March 1989
Resolved 22 March 1989
Navigation
Issued 22 March 1989
Resolved
INSTALL LOCKING NUT OR PIN ON FOLLOW-UP LINKAGE AT RUDDER POSTS.
Condition: Unknown
Due 22 March 1989
Resolved 22 March 1989
Fire Fighting
Issued 22 March 1989
Resolved
SECURE BRACKET FOR ONE B-I FIRE EXTINGUISHER IN ENGINE ROOM.
Condition: Unknown
Due 22 March 1989
Resolved 22 March 1989
Construction/Loadline
Issued 22 March 1989
Resolved
RE-NEW MAIN DECK HATCH GASKETS WHERE NECESSARY.
Condition: Unknown
Due 22 March 1989
Resolved 22 March 1989
Documentation
Issued 22 March 1989
Resolved
PROVIDE CERTIFICATE OF DOCUMENTATION SHOWING OWNER'S NEW ADDRESS.
Condition: Unknown
Due 22 March 1989
Resolved 22 March 1989
Fire Fighting
Issued 28 March 1988
Resolved
DEMONSTRATE PROPER OPERATION OF ENGINE ROOM FIRE ALARM PANEL.
Condition: Unknown
Due 28 March 1988
Resolved 28 March 1988
Electrical
Issued 28 March 1988
Resolved
DEMONSTRATE PROPER OPERATION OF ENGINE ROOM EMERGENCY LIGHTING.
Condition: Unknown
Due 28 March 1988
Resolved 28 March 1988
Engineering
Issued 28 March 1988
Resolved
DEMONSTRATE PROPER OPERATION OF TWO MAIN-ENGINE, STARTING-AIR, PRESSURE VESSEL RELIEF VALVES.
Condition: Unknown
Due 28 March 1988
Resolved 28 March 1988
Engineering
Issued 28 March 1988
Resolved
ALLOW INTERNAL EXAMINATION OF TWO ENGINE ROOM PRESSURE VESSELS.
Condition: Unknown
Due 28 March 1988
Resolved 28 March 1988
Lifesaving
Issued 28 March 1988
Resolved
PROVIDE ONE ADDITIONAL ADULT PFD.
Condition: Unknown
Due 28 March 1988
Resolved 28 March 1988
Lifesaving
Issued 28 March 1988
Resolved
PROVIDE TWO ADDITIONAL RING LIFE BUOYS.
Condition: Unknown
Due 28 March 1988
Resolved 28 March 1988
Fire Fighting
Issued 28 March 1988
Resolved
PROVIDE UPDATED SERVICE TAGS OR OTHER PROOF OF SERVICING DATE FOR ALL PORTABLE FIRE EXTINGUISHERS.
Condition: Unknown
Due 28 March 1988
Resolved 28 March 1988
Fire Fighting
Issued 28 March 1988
Resolved
DEMONSTRATE PROPER OPERATION OF FIRE MAIN SYSTEM.
Condition: Unknown
Due 28 March 1988
Resolved 28 March 1988
Accommodation/Occupational Safety
Issued 3 April 1987
Resolved
AIR RECEIVERS TO BE OPENED FOR INTERNAL EXAMINATION AT NEXT DRYDOCK.
Condition: Unknown
Due 3 April 1987
Resolved 3 April 1987