MAURY USCG vessel records
← All vessels

HIKINO

HIKINO is a 1982 commercial fishing vessel. The Coast Guard has recorded 12 inspections since 2016, most recently in June 2023, along with 37 deficiencies and 1 casualty investigation in 2011.

Records from 2011 to 2023. Most recent: inspection, 22 June 2023.

Built
1982
Last inspected
22 June 2023
Documentation
Valid · documentation file of 10 August 2026
Controls
None recorded without a removal date

Identity

WRB2963
Flag
UNITED STATES
Maury page id
psix-54438

Inspections, by type

Years with a record 8 calendar years (2016–2023)
The 12 inspections in the strip above, split by the kind of activity the US Coast Guard recorded. Years with a record are calendar years in which a record exists, not years in service. What Maury does not do.

This record may be incomplete: the most recent inspection recorded for this vessel was 3 years ago. Maury shows what the Coast Guard recorded, not whether the vessel has been inspected since, is still in service, or what condition it is in. Coast Guard record current through 23 August 2026, retrieved 5 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard. Records for the Fishing Vessel class in Maury's sources begin in 2016.

Documentation record

Registered dimensions (L × B × D)51.0 ft × 16.0 ft × 6.2 ft
Registered tonnagegross 35 / net 28
ITC dimensions (L × B × D)Not recorded
ITC tonnageNot recorded
BuilderDONALD STODDARD · HONOLULU, HI, UNITED STATES · built 1982
Hull materialSteel
PropulsionDiesel Reduction
Hull shapeShip
Hull configurationMonohull
Hailing portHONOLULU, HI
Trade endorsementsFishery
DocumentationValid · issued 10 June 2026 · expires 30 June 2027
Service, as the file records itCommercial Fishing Vessel
Hull formpowered (Maury's inference from propulsion, hull shape, material and length, rule hf-1; not a recorded fact)
Tonnage as PSIX records it28 - Simplified, Net Ton
35 - Simplified, Gross Ton
Every line above is a field of the National Vessel Documentation Center's file as served by NOAA Fisheries, dated 10 August 2026, matched to this hull on its Official Number. Registered and ITC measurements are two systems and are never combined. One snapshot is held so far; documentation history begins with the next.

One vessel history report for this hull — every record on this page in one dated, citable document — $300, on request.

Inspection history · 12

22 June 2023 Drydock Exam · Administrative Inspection
Physical examination · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 7716097
30 May 2023 Annual Inspection · Deficiency Check
Physical examination · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 7681901
4 August 2022 Deficiency Check · Annual Inspection
Physical examination · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 7524908
23 June 2021 Drydock Exam
Physical examination · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 7234208
5 May 2021 Annual Inspection · Deficiency Check
Physical examination · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 7193626
8 May 2020 Administrative Inspection · COI Inspection
Physical examination · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 6950586
27 June 2019 Deficiency Check · Administrative Inspection · Internal Structural Exam · Hull Examination · Annual Inspection
Physical examination · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 6727801
14 June 2018 Annual Inspection · Administrative Inspection
Physical examination · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 6443644
15 June 2017 Internal Structural Exam · Administrative Inspection · Drydock Exam · Examination of Repairs
Physical examination · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 6178184
8 June 2017 Deficiency Check · Administrative Inspection · Annual Inspection
Physical examination · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 6169636
25 October 2016 Administrative Inspection · Deficiency Check
Physical examination · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 6068722
16 June 2016 Deficiency Check · Annual Inspection · Administrative Inspection
Physical examination · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 5903554

Deficiency record · 37

13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 30 May 2023 Resolved
Approval of bowls other than steel construction on fuel filters will specify if a flame shield is required. Additionally, valves for removing impurities or water from the water trap shall be provided with caps or plugs. The RACOR style fuel filters provided require a flame shield and the a means to plug or cap the drain valve provided. 46 CFR 482.455(b)(6&9)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 13 June 2023
Resolved 6 June 2023
Resolution: Required flame shields and pipe plugs for the drain valve were installed on the fuel filters.
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 4 August 2022 Resolved
A person may not employ or engaged an individual in a position required to hold an MMS unless that individual maintains a current medical certificate. Master on duty did not have a medical certificate. Provide medical certificate prior to being employed or engaged in a position that requires a merchant mariner credential by law or regulation or by an employer as a condition of employment. 46CFR15.401(c)
Action required: 705 - Other - as specified
Due 4 August 2022
Resolved 30 August 2022
Resolution: Medical certificate provided.
05 - Radio Communications › N/A - No Subsystem › Satellite EPIRB 406MHz/1.6GHz
Issued 4 August 2022 Resolved
Each vessel that operates on the high seas, or that operates beyond three miles from the coastline of the Great Lakes, must have on board a FCC Type Accepted Category 1, 406 MHz EPIRB, installed to automatically float free and activate. The vessel’s EPIRB registration is expired and rated for 12 persons. Provide proper EPIRB registration, and an EPIRB rated for 24 persons. Vessel restricted to stay within 3nm from shore. 46CFR180.64
Action required: 705 - Other - as specified
Due 4 August 2022
Resolved 30 August 2022
Resolution: EPIRB registration renewed, and properly rated.
11 - Life Saving Appliances › N/A - No Subsystem › Distress flares
Issued 4 August 2022 Resolved
A vessel on a limited coastwise route must carry six hand red flare distress signals and six hand orange smoke signals. A red hand flare distress signal may be substituted for any of the hand orange smoke distress signals. Two of vessel's orange smoke distress signals are expired. Vessel restricted to a Lakes/Bays/Sounds route. 46 CFR 180.68
Action required: 705 - Other - as specified
Due 5 September 2022
Resolved 15 August 2022
Resolution: Attending MI visually examined expiration date on new orange smoke distress signals.
11 - Life Saving Appliances › N/A - No Subsystem › Other (life saving)
Issued 4 August 2022 Resolved
Each survival craft must be secured to the vessel by a painter with a float-free link permanently attached to the vessel except that a float-free link is not required if the vessel operates only on waters not as deep as the length of the painter. Life float is secured to vessel using an HRU, HRU was expired. Provide new HRU for life float. Vessel restricted to a Lakes/Bays/Sounds route. 46CFR180.130(a)(1)
Action required: 705 - Other - as specified
Due 4 August 2022
Resolved 4 August 2022
Resolution: Vessel rep provided photograph of new HRU on life float.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 4 August 2022 Resolved
Machinery, equipment, materials, and arrangements not covered by standards in this subchapter may be inspected in accordance with standards acceptable to the cognizant OCMI as good marine practice. Three penetrations on forward bulkhead in engine room, starboard side, are not vapor tight. As a good marine practice, provide a proper seal to each penetration to prevent passage of vapors. 46 CFR 176.25-1(a)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 19 August 2022
Resolved 2 September 2022
Resolution: Vessel rep. properly sealed each penetration to prevent passage of vapors.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 4 August 2022 Resolved
Where flexibility is necessary a section of flexible metallic hose may be used. Non-metallic hose may be used provided it is especially adapted to resist the action of oil, acid and heat, and has a wall thickness sufficient to prevent collapsing or panting. The nonmetallic hose used for the generator’s wet exhaust is dry rotted and cracked, exposing rusting metal jacket. Replace hose for generator exhaust. 46 CFR 182.15-20 (c)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 19 August 2022
Resolved 15 August 2022
Resolution: Attending MI verified the nonmetallic hose used for the generator’s wet exhaust was renewed.
11 - Life Saving Appliances › N/A - No Subsystem › Other (life saving)
Issued 4 August 2022 Resolved
Pendants must be fitted approximately 18 inches apart around the outside of each buoyant apparatus. Each pendant must be at least 1/4in diameter, at least 12 feet long, secured in the middle, and have a breaking strength of at least 540lbs. Each pendant must be made up in a hank, and the hank secured by not more than two turns of light twine. The life float pendants are less than 12 feet long. Provide 12 feet long pendants for the life float. 46CFR160.010-4(g)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 19 August 2022
Resolved 15 August 2022
Resolution: Attending MI verified the life float pendants were at least 12 feet long (14 ft.)
11 - Life Saving Appliances › N/A - No Subsystem › Other (life saving)
Issued 4 August 2022 Resolved
The number of persons capacity must be marked or painted in clearly legible letters and numbers on each life float. This number must be the number of persons the device is equipped for and not be greater than the number of persons the device is approved for as shown on its nameplate. The number or persons capacity markings was worn on one side of life float. Mark or paint in clearly legible letters and numbers the number of persons capacity on life float. 46CFR185.604(e)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 19 August 2022
Resolved 15 August 2022
Resolution: Vessel operator provided photograph of lif float persons capacity renewed and clearly legible.
11 - Life Saving Appliances › N/A - No Subsystem › Other (life saving)
Issued 4 August 2022 Resolved
Each buoyant apparatus must have Type II retro-reflective material meeting subpart 164.018 of this chapter on each side and end. The retro-reflective tape on life float no longer adhered to one side. Renew retro-reflective tape. 46CFR160.010-4 (p)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 19 August 2022
Resolved 15 August 2022
Resolution: Vessel operator provided a photograph of the life floats renewed retro-reflective tape.
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 4 August 2022 Resolved
The employer shall provide an Employee Assistance Program for all crew members that includes both education and training on the effects and consequences of drug and alcohol use. Supervisory personnel must receive at least 60 minutes of training. There are no records indicating crew members received education and training on the effects and consequences of drug and alcohol use. Provide a roster of crew member and the details of the education and training on the effects and consequences of drug and alcohol use they received. 46 CFR 16.401(b)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 19 August 2022
Resolved 2 September 2022
Resolution: Vessel rep. provided a roster of crew members and the details of the education and training on the effects and consequences of drug and alcohol use they received.
09 - Working and Living Conditions › 091 - Living Conditions › Medical Equipment
Issued 4 August 2022 Resolved
A vessel must carry either a first aid kit approved under approval series 160.041 or a kit with equivalent contents and instructions. Vessel first aid kit aspirin was expired. Provide in-date aspirin for first aid kit. 46 CFR 184.710
Action required: 16 - Rectify deficiencies w/in 14 days
Due 19 August 2022
Resolved 15 August 2022
Resolution: Vessel operator provided photograph of new aspirin for first aid kit.
10 - Safety of Navigation › N/A - No Subsystem › Nautical publications
Issued 4 August 2022 Resolved
[withheld — contains personal information; the deficiency system, dates, and resolution status are shown above]
Action required: 16 - Rectify deficiencies w/in 14 days
Due 19 August 2022
Resolved 15 August 2022
Resolution: Vessel opeator purchased current required publications to the satisfaction of the attending MI.
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 4 August 2022 Resolved
An inspection for renewal of a Certificate of Inspection is conducted to determine if the vessel is in satisfactory condition, fit for the service intended, and complies with all applicable regulations. It normally includes inspection and testing of the structure, machinery, equipment, and on a sailing vessel, rigging and sails. The owner or operator must conduct all tests as required by the OCMI, and make the vessel available for all specific inspections and drills required by subpart H of this part. In addition, the OCMI may require the vessel to get underway. Prior to carrying passengers conduct man overboard and fire drills. 46 CFR 176.404(a)
Action required: 701 - Prior to carriage of passengers/cargo
Due 19 August 2022
Resolved 30 August 2022
Resolution: Man overboard and fire drills conducted. All satisfactory.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 18 August 2021 Resolved
A suitable hull strainer must be installed in the circulating raw water intake line of an engine cooling water system. Vessel was missing strainers on both engines. Install strainers on both engines. 46 CFR 182.420
Action required: 50 - Rectify deficiencies w/in 30 days
Due 18 September 2021
Resolved 10 September 2021
Resolution: Attended vessel moored at Pier 36. Verified installation of sea strainers on both main engines. Had operator start and run both engines to verify no leaks and that cooling water was circulating.
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 23 June 2021 Resolved
When required by the marine inspector, a portion of the inspection must be conducted while the vessel is underway. Conduct sea trial prior to credit drydock. 46 CFR 176.802 (c)
Action required: 17 - Rectify deficiencies prior to departure
Resolved 11 August 2021
Resolution: Sea trial conducted.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 12 May 2021 Resolved
At each initial and subsequent inspection inspection for certification of a vessel, the owner or managing operator shall be prepared to conduct tests and have the vessel ready for inspections of machinery, fuel, and piping systems. Vessel's port exhaust pipe was leaking due to fractured fiberglass section. Repair damaged section to the satisfaction of attending marine inspector.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 9 June 2021
Resolution: Damaged section of fiberglass repaired. No leaks.
05 - Radio Communications › N/A - No Subsystem › Other (radio communication)
Issued 12 May 2021 Resolved
A vessel must comply with the applicable requirements for any radio, including the requirements for a station license and installation certificates to be issued by the Federal Communications Commission, as set forth in 47 CFR part 80. Vessel could not produce current FCC station license during annual inspection. Provide valid FCC license.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 26 May 2021
Resolved 9 June 2021
Resolution: Vessel produced FCC documentation
14 - Pollution Prevention › 144 - MARPOL Annex IV (Not Applicable to PSC Exams conducted in the U.S.) › Sewage discharge connection
Issued 12 May 2021 Resolved
When operating a vessel on a body of water where the discharge of treated or untreated sewage is prohibited by the Environmental Protection Agency under 40 CFR 140.3 or 140.4, the operator must secure each Type I or Type II device in a manner which prevents discharge of treated or untreated sewage. Install means to secure overboard discharge.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 26 May 2021
Resolved 9 June 2021
Resolution: Securing device installed
03 - Water/Weathertight Conditions › N/A - No Subsystem › Covers (hatchway-, portable-, tarpaulins, etc.)
Issued 12 May 2021 Resolved
Each hatch cover must have securing devices. Forward deck hatch lacks securing devices. Install securing devices on hatch cover in accordance with 46 CFR 171.124.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 26 May 2021
Resolved 9 June 2021
Resolution: Securing device installed.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 12 May 2021 Resolved
This part is intended to provide a minimum standard of regulations for electrical installations and equipment that will result in a vessel that is reasonably safe from electrical shock of personnel. Fuses on stbd side engine room bulkhead are exposed, presenting an electrical hazard. Properly cover to prevent potential shock or electrical hazard. 46 CFR 183.01-5
Action required: 16 - Rectify deficiencies w/in 14 days
Due 26 May 2021
Resolved 9 June 2021
Resolution: cover installed for fuses
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 12 May 2021 Resolved
This part is intended to provide a minimum standard of regulations for electrical installations and equipment that will result in a vessel that is reasonably safe from electrical shock of personnel. Alternators on port and stbd engine are exposed presenting an electrical hazard. Properly cover or install boot to prevent potential shock or electrical hazard. 46 CFR 183.01-5
Action required: 16 - Rectify deficiencies w/in 14 days
Due 26 May 2021
Resolved 9 June 2021
Resolution: Covers installed preventing electrical hazard.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 12 May 2021 Resolved
This part is intended to provide a minimum standard of regulations for electrical installations and equipment that will result in a vessel that is reasonably safe from electrical shock of personnel. Electrical wiring over port and stbd engine has several exposed and dead end wires, notably the stbd gear oil pressure sensor wire. Properly renew or cover wires to prevent potential shock or fire hazards. 46 CFR 185.01-5
Action required: 16 - Rectify deficiencies w/in 14 days
Due 26 May 2021
Resolved 9 June 2021
Resolution: Exposed and dead end wires removed.
07 - Fire Safety › N/A - No Subsystem › Other (fire safety)
Issued 12 May 2021 Resolved
The discharge ends of vent pipes shall be fitted with removable flame screens or flame arrestors. Mesh on stbd fuel vent flame screen is corroded and creates a gap between the pipe and the flame screen. Replace flame screen to eradicate gap. 46 CFR 182.20-35(d)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 26 May 2021
Resolved 9 June 2021
Resolution: New pipe and flame screens installed.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 12 May 2021 Resolved
Each generator, motor, and other major items of power equipment shall be provided with a name plate indicating the maker’s name, its rating in volts and amperes or in volts and watts and when intended for connection to a normally grounded supply, the grounding polarity. Install name plate. 46 CFR 180.25-25(a)
Action required: 50 - Rectify deficiencies w/in 30 days
Due 11 June 2021
Resolved 9 June 2021
Resolution: Information regarding the maker’s name, its rating in volts and amperes or in volts and watts and when intended for connection to a normally grounded supply, the grounding polarity installed.
11 - Life Saving Appliances › N/A - No Subsystem › Lifejackets incl. provision and disposition
Issued 18 July 2019 Resolved
(a) Each life jacket carried on a vessel on oceans, coastwise, or Great Lakes route, must have a life jacket light approved in accordance with § 161.012 in subchapter Q of this chapter, or other standard specified by the Commandant, including, but not limited to, approval series 160.112. Each life jacket light must be securely attached to the front shoulder area of the life jacket; Vessel is on a Coastwise route and lifejackets do not have lights. Add lifejacket lights. 46 CFR 180.75(a)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 1 August 2019
Resolved 22 July 2019
Resolution: Route changed to limited coastwise. Lights no longer needed.
02 - Structural Conditions › N/A - No Subsystem › Bulkhead -corrosion
Issued 18 July 2019 Resolved
Repairs or alterations to the hull, machinery, or equipment that affect the safety of the vessel must not be made without the approval of the cognizant OCMI, except during an emergency. When repairs are made during an emergency, the owner, managing operator, or master shall notify the OCMI as soon as practicable after such repairs or alternations are made. Repairs or alterations that affect the safety of the vessel include, but are not limited to: replacement, repair, or refastening of deck or hull planking, plating, and structural members; repair of plate or frame cracks; damage repair or replacement, other than replacement in kind, of electrical wiring, fuel lines, tanks, boilers and other pressure vessels, and steering, propulsion and power supply systems; alterations affecting stability; and repair or alteration of lifesaving, fire detecting, or fire extinguishing equipment. Hole found on forward port side at rub rail attachment point. Complete repair to hole. Submit repair proposal prior to conducting repair.
Action required: 705 - Other - as specified
Due 25 July 2019
Resolved 22 July 2019
Resolution: Plans approved and photo of completed repair was submitted/accepted.
Fire Fighting › Portable Dry Chemical Fire Extinguisher › Approval
Issued 8 June 2017 Resolved
Provide 01 approved B-II fire extinguisher approved for marine use.
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 7 July 2017
Resolved 8 June 2017
Resolution: Vessel installed USCG approved B-II fire extinguisher approved for marine use.
Lifesaving › Lifebuoys › Self-igniting Lights
Issued 16 June 2016 Resolved
Replace broken retaining clip on float light holder.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 15 July 2016
Resolved 8 July 2016
Resolution: Owner installed a new float light and holder.
Operations/Management › Navigation Safety › Carriage of Charts and Publications
Issued 16 June 2016 Resolved
Provide updated navigation charts for area of operations.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 15 July 2016
Resolved 8 July 2016
Resolution: Verified vessel had updated charts on board.
Fire Fighting › Portable Dry Chemical Fire Extinguisher › Approval
Issued 16 June 2016 Resolved
Replace two non-USCG approved fire extinguishers with USCG approved ones.
Condition: Invalid
Action required: 705 - Other - as specified
Due 15 July 2016
Resolved 8 July 2016
Resolution: Verified all extinguishers onboard were USCG approved and mounted in their approved brackets.
Communications › Public Address System › Broadcast Location
Issued 16 June 2016 Resolved
Install public address system to communicate with passenger cabin from operating station.
Action required: 705 - Other - as specified
Due 15 July 2016
Resolved 8 July 2016
Resolution: Vessel installed new public address system, witnessed operation, all sat.
Electrical › Electrical Distribution System (service) › Overcurrent Device
Issued 16 June 2016 Resolved
Replace AC circuit breakers with circuit breakers designed to protect the conductors (UL 489 Listed)
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 30 September 2016
Resolved 25 October 2016
Resolution: Verified UL 1077 circuit breakers in AC panel were replaced with UL 489 breakers reviewed by MSC. All sat.
Stability › Watertight Integrity › General
Issued 16 June 2016 Resolved
Replace gasket on engineroom watertight hatch
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 15 July 2016
Resolved 8 July 2016
Resolution: Witnessed hose test of engine room hatch and inspected new hatch gasket. All sat.
Engineering › Bilge Water Management System › Hose
Issued 16 June 2016 Resolved
Replace collapsed hose on engine attached bilge pump.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 15 July 2016
Resolved 8 July 2016
Resolution: Verified collapse hose was replaced & witnessed proper operation of engine attached pump.
Electrical › Electrical Distribution System (service) › Wiring
Issued 16 June 2016 Resolved
replace damaged wire on PORT engine shutdown solenoid
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 15 July 2016
Resolved 8 July 2016
Resolution: Verified damaged wire has been replaced.
Fire Fighting › Fixed Fire Detection System › Approval
Issued 16 June 2016 Resolved
Submit plans for fire alarm system to MSC for review/approval.
Condition: Invalid
Action required: 705 - Other - as specified
Due 15 July 2016
Resolved 16 August 2016
Resolution: Reviewed install of current fire alarm system with CID. CID is good with the vessel keeping the current fire alarm system.

Casualty record · 1

4 February 2011Routine · role: Involved in a Marine Casualty · activity 3941729
Each line is an incident investigation the Coast Guard recorded with this hull among the vessels involved, with the date and the classification the Coast Guard gave it. Involvement is not fault. The investigation narrative is not published. Source: IIR, through 2026.

Ownership record

The Coast Guard's documentation record for this hull -- the Abstract of Title, with its owners and liens as filed -- is not in PSIX. Ask, and Maury buys it from the National Vessel Documentation Center, files it here with its date, and every reader of this page gets it.