Records from 1985 to 2006. Most recent: inspection, 9 February 2006.
A report is not offered for this hull: Its record holds only 2 of the seven kinds of material a report is built from: inspections, deficiencies, operational controls, tow-unit appearances, casualty records, dimensions and documentation. That is a statement about the record, not about the vessel. Reports.
Inspection history · 37
9 February 2006
Administrative Inspection
Administrative · Sector Miami · USCG Southeast District (CGD-SE) · Activity 2582399
12 February 2004
Periodic Inspection
Physical examination · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 2003968
20 November 2002
COI Inspection
Physical examination · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 1707135
25 February 2002
Hull Examination
Physical examination · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 1490174
28 June 1999
Administrative
Administrative · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 1078860
28 August 1998
Deficiency Check
Physical examination · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 1132122
11 August 1998
Re-Inspection · MARPOL Annex V Examination
Physical examination · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 1470182
24 April 1997
Deficiency Check
Physical examination · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 1104473
17 April 1997
Deficiency Check · MARPOL Annex V Examination · Re-Inspection
Physical examination · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 1095939
10 April 1997
Type not recorded
No type recorded · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 1091325
3 March 1997
COI Inspection
Physical examination · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 1107401
28 February 1997
Hull Examination
Physical examination · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 1467500
5 June 1996
Administrative
Administrative · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 1104303
5 June 1996
COI Inspection
Physical examination · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 1355831
15 May 1995
Re-Inspection · Hull Examination
Physical examination · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 1427062
16 March 1995
COI Inspection · Hull Examination
Physical examination · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 1176502
24 June 1994
Re-Inspection
Physical examination · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 1428365
24 June 1993
COI Inspection
Physical examination · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 844067
21 May 1993
Hull Examination
Physical examination · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 844205
1 November 1991
Type not recorded
No type recorded · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 1255563
19 September 1990
Re-Inspection
Physical examination · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 917023
15 December 1989
Type not recorded
No type recorded · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 1233863
1 December 1989
Administrative
Administrative · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 1240713
2 November 1989
Hull Examination
Physical examination · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 1312606
4 October 1989
COI Inspection
Physical examination · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 1017886
14 September 1989
Re-Inspection
Physical examination · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 895381
26 August 1988
Deficiency Check · COI Inspection · Hull Examination
Physical examination · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 1346654
29 March 1988
Re-Inspection
Physical examination · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 994142
1 May 1987
Deficiency Check
Physical examination · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 1327314
11 March 1987
Hull Examination
Physical examination · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 1015730
7 November 1986
Deficiency Check
Physical examination · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 1323823
4 November 1986
Type not recorded
No type recorded · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 1320104
6 October 1986
Re-Inspection
Physical examination · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 1315351
27 March 1986
Credit Drydock
Administrative · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 1293921
26 September 1985
Examination of Repairs · COI Inspection
Physical examination · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 1299391
7 March 1985
Type not recorded
No type recorded · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 1286500
10 January 1985
Type not recorded
No type recorded · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 1284091
Lifesaving › Buoyant Apparatus › Floating Electric Waterlight
Issued 12 February 2004
Resolved
Cleared due to COI deactivation. Prior to carrying passengers, replace unservicable 16 person Buoyant Apparatus with approved Life Float. LEGACY COMPONENT DESC: Unserviceable
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 12 August 2004
Lifesaving › Buoyant Apparatus › Approval
Issued 12 February 2004
Resolved
Cleared due to COI deactivation. Prior to carrying passengers, replace all frayed grablines and life lines on all Life Floats. LEGACY COMPONENT DESC: Grab & Life Lines
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 12 August 2004
Lifesaving › Buoyant Apparatus › Approval
Issued 12 February 2004
Resolved
Cleared due to COI deactivation. Prior to carrying passengers, re-stencil vessel name and number of persons allowed on each Life Float. LEGACY COMPONENT DESC: Markings
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 12 August 2004
Fire Fighting › Fixed Halon Fire Extinguishing System › Tanks
Issued 12 February 2004
Resolved
Cleared due to COI deactivation. Prior to carrying passengers, provide servicing for all portable fire extinguishers and for fixed fire fighting system.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 12 August 2004
Construction/Loadline › Structures › Superstructure
Issued 12 February 2004
Resolved
Cleared due to COI deactivation. Prior to carrying passengers, renew the inner ceiling and outter shell of the railings on the upper deck.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 12 August 2004
Construction/Loadline › Structures › Deck Plating
Issued 12 February 2004
Resolved
Cleared due to COI deactivation. Prior to carrying passengers, crop and renew all rotten deck frames and planking in the overhead of compartment #2 from the bow.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 12 August 2004
Construction/Loadline › Structures › Ventilators
Issued 12 February 2004
Resolved
Cleared due to COI deactivation. Prior to carrying passengers, provide adequate ventialtion for the #2 compartment from the bow to prevent the condensation and rot problem from recurring.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 12 August 2004
Construction/Loadline › Hull › Side Shell
Issued 12 February 2004
Resolved
Cleared due to COI deactivation. Prior to carrying passengers, renew hull planking in 3 places between frames on the starboard side of the #3 compartment form the bow.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 12 August 2004
Construction/Loadline › Hull › Bottom Plating
Issued 12 February 2004
Resolved
Cleared due to COI deactivation. Prior to carrying passengers, provide proper caulking and closure on either side of top of stem. Duct tape is not acceptable. LEGACY COMPONENT DESC: Stem
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 12 August 2004
Construction/Loadline › Structures › Superstructure
Issued 12 February 2004
Resolved
Cleared due to COI deactivation. Prior to carrying passengers, renew rotten bench, starboard side next to door, 2nd deck.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 12 August 2004
Communications › Internal Communications System › Portable Radios
Issued 12 February 2004
Resolved
Cleared due to COI deactivation. Prior to carrying passengers, provide means for crew and master to communicate.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 12 August 2004
Documentation › Certificates/Documents › FCC SSL
Issued 12 February 2004
Resolved
Cleared due to COI deactivation. Provide current FCC Station License and FCC Safety Certificate.
Due 12 March 2004
Resolved 12 August 2004
Operations/Management › Navigation Safety › Carriage of Charts and Publications
Issued 12 February 2004
Resolved
Cleared due to COI deactivation. Prior to carrying passengers, provide current charts for operational area and C.G. Navigational Rules.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 12 August 2004
Accommodation/Occupational Safety › Other Accommodation Spaces › Open Deck Space
Issued 12 February 2004
Resolved
Cleared due to COI deactivation. Prior to carrying passengers, stencil stairway to upper deck with number of passengers allowed on the upper deck by the stability letter.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 12 February 2004
Engineering › Shafting/Propeller Arrangements › Bearing
Issued 12 February 2004
Resolved
Cleared due to COI deactivation. Prior to carrying passengers, determine cause of apparent wobble in both shafts. Pull each shaft and test with non-destructive testing. Retighten packing when complete to decrease large amount of water coming in though the shaft packing. LEGACY COMPONENT DESC: Propeller Shaft
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 12 February 2004
Electrical › Electric Generation Source (service) › Generator Cable
Issued 12 February 2004
Resolved
Cleared due to COI deactivation. Prior to carrying passengers, remove unsued wiring harness to old (removed) generator.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 12 August 2004
Electrical › Electric Generation Source (service) › Conductor
Issued 12 February 2004
Resolved
Cleared due to COI deactivation. Prior to carrying passengers, provide machinery guard over moving parts on starboard generator. LEGACY COMPONENT DESC: Machinery Guard
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 12 February 2004
Engineering › Bilge Water Management System › Hose
Issued 12 February 2004
Resolved
Cleared due to COI deactivation. Prior to carrying passengers, properly label all high water alarms and bilge pump indicators lights to the satisfaction of the attending Coast Guard inspector. LEGACY COMPONENT DESC: Labels
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 12 August 2004
Lifesaving › Buoyant Apparatus
Issued 20 November 2002
Resolved
Swap weak links to correct locations as per the size of the Life Floats. LEGACY COMPONENT DESC: Float Free Links
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 4 March 2003
Fire Fighting › Structural Fire Protection - General
Issued 20 November 2002
Resolved
Determine the fire rating of the insulation between the Main Deck and the Engine Room. LEGACY COMPONENT DESC: Accommodation Space Protection
Due 26 December 2002
Resolved 27 February 2003
Fire Fighting › Fixed Halon Fire Extinguishing System
Issued 20 November 2002
Resolved
Determine means of testing auto engine shut-down by fixed fire fightinig system. LEGACY COMPONENT DESC: Auto Engine Shut-Down
Due 26 December 2002
Resolved 19 March 2003
Engineering › Freshwater Generation System
Issued 20 November 2002
Resolved
Renew fresh water pipe in galley hold. LEGACY COMPONENT DESC: Piping
Due 26 December 2002
Resolved 4 March 2003
Lifesaving › Buoyant Apparatus
Issued 20 November 2002
Resolved
Provide float free link and sea painter for each or each set of life floats. LEGACY COMPONENT DESC: Weak Links & Sea Painters
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 26 November 2002
Lifesaving › Buoyant Apparatus
Issued 20 November 2002
Resolved
Replace Grabline for 2 life float. LEGACY COMPONENT DESC: Grabline
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 26 November 2002
Lifesaving › Buoyant Apparatus
Issued 20 November 2002
Resolved
Label all Life Floats for maximum number of passengers. LEGACY COMPONENT DESC: Labeling
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 26 November 2002
Lifesaving › Buoyant Apparatus
Issued 20 November 2002
Resolved
Provide 01 bracket for Life Float Waterlight. LEGACY COMPONENT DESC: Waterlight Bracket
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 26 November 2002
Navigation › Collision/Grounding Avoidance › Navigation Lights
Issued 20 November 2002
Resolved
Prove proper operation of all Navigation Lights.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 26 November 2002
Accommodation/Occupational Safety › Occupational Safety › Guards for Exposed Hazards
Issued 20 November 2002
Resolved
Replace Machinery Guard on Port Engine.
Action required: 705 - Other - as specified
Resolved 26 November 2002
Lifesaving › Embarkation Appliances/Stations
Issued 20 November 2002
Resolved
Provide camera system for man-overboard retrieval and a more stable platform. LEGACY COMPONENT DESC: Rescue Platform w/ Camera
Action required: 705 - Other - as specified
Resolved 26 November 2002
Construction/Loadline › Hull
Issued 25 February 2002
Resolved
Replace/repair rotted one foot (1') section of port side garboard strake, 32 feet aft of stem on port side. LEGACY COMPONENT DESC: Stringer
Due 25 March 2002
Resolved 20 March 2002
Construction/Loadline › Hull
Issued 25 February 2002
Resolved
Replace/repair rotted section of port side garboard strake, 36 feet aft of stem.
Due 25 March 2002
Resolved 20 March 2002
Construction/Loadline › Hull
Issued 25 February 2002
Resolved
Replace/repair rotted section of chine, 50 feet aft of stem.
Due 25 March 2002
Resolved 18 March 2002
Construction/Loadline › Hull
Issued 25 February 2002
Resolved
Replace/repair rotted section of garboard strake located 24 feet aft of stem on the starboard side.
Due 25 March 2002
Resolved 20 March 2002
Construction/Loadline › Hull
Issued 25 February 2002
Resolved
Replace/repair rotted section of located 22 feet aft of stem on starboard side.
Due 25 March 2002
Resolved 20 March 2002
Construction/Loadline › Hull
Issued 25 February 2002
Resolved
Replace/repair seven foot (7') section of chine located 19 feet aft of stem on starboard side.
Due 25 March 2002
Resolved 18 March 2002
Construction/Loadline › Hull
Issued 25 February 2002
Resolved
Replace all gate valves with new/serviceable valves. Cap or install mechanical plug dead end valve in engine room along center line near aft engine room bulkhead.
Due 25 March 2002
Resolved 18 March 2002
Engineering › Diesel Engine (propulsion-direct drive)
Issued 25 February 2002
Resolved
Replace exhaust lagging on port engine.
Due 25 March 2002
Resolved 26 November 2002
Construction/Loadline › Hull
Issued 25 February 2002
Resolved
Replace starboard side planks #1 and #2 between frames #2 and #3 in the compartment aft of the forepeake.
Due 25 March 2002
Resolved 20 March 2002
Construction/Loadline › Hull
Issued 25 February 2002
Resolved
Replace 2' 6" section of frame #6 frame chine toward keel.
Due 25 March 2002
Resolved 18 March 2002
Construction/Loadline › Hull
Issued 25 February 2002
Resolved
Replace #5 side frame from chine upward 2 feet. Replace gusset on #5 frame. All in compartment aft of forepeake.
Due 25 March 2002
Resolved 18 March 2002
Construction/Loadline › Hull
Issued 25 February 2002
Resolved
Replace butt block between #3 and #4 frames on port side in compartment aft of forepeake.
Due 25 March 2002
Resolved 20 March 2002
Construction/Loadline › Hull
Issued 25 February 2002
Resolved
Replace #4 gusset (bracket) on port side in compartment aft of forepeake.
Due 25 March 2002
Resolved 18 March 2002
Construction/Loadline › Hull
Issued 25 February 2002
Resolved
Replace #7 side frame from chine upward 2'6" on port side in compartment aft of forepeake.
Due 25 March 2002
Resolved 18 March 2002
Construction/Loadline › Hull
Issued 25 February 2002
Resolved
Replace #3 side frame from chine upward to 4th plank above chine on portside of compartment aft of forepeake.
Due 25 March 2002
Resolved 18 March 2002
Construction/Loadline › Hull
Issued 25 February 2002
Resolved
Replace #4 plank from frame #2 to frame #5 on port side of compartment aft of forepeake.
Due 25 March 2002
Resolved 20 March 2002
Construction/Loadline › Hull
Issued 25 February 2002
Resolved
Replace #2 frame from chine upward on port side in compartment aft of forepeake. Also renew to good wood upper 6 inches of side frame below chine.
Due 25 March 2002
Resolved 18 March 2002
Construction/Loadline › Hull
Issued 25 February 2002
Resolved
Replace plank in way of frame #2 port side in compartment aft of forepeake.
Due 25 March 2002
Resolved 20 March 2002
Construction/Loadline › Hull
Issued 25 February 2002
Resolved
Replace chine log inside compartment aft of forepeake on port side between frame #3 and #6
Due 25 March 2002
Resolved 18 March 2002
Construction/Loadline › Hull
Issued 25 February 2002
Resolved
Replace 3rd plank from chine up on port side between frames #2 and #7 in compartment aft of forepeake.
Due 25 March 2002
Resolved 18 March 2002
Construction/Loadline › Hull
Issued 25 February 2002
Resolved
Replace #1 frame on starboard side in forepeake.
Due 25 March 2002
Resolved 18 March 2002
Construction/Loadline › Hull
Issued 25 February 2002
Resolved
Replace rotted section of 2nd deck beam forward of the transolm at both outboard ends in lazarette.
Due 25 March 2002
Resolved 18 March 2002
Construction/Loadline › Hull
Issued 25 February 2002
Resolved
Replace rotted section of deck on port side above 2nd deck beam approximately 18 inches from side shell.
Due 25 March 2002
Resolved 18 March 2002
Construction/Loadline › Hull
Issued 25 February 2002
Resolved
Replace 1 foot section of deck planks #5 and #6 in way of second deck beam from transolm on port side.
Due 25 March 2002
Resolved 18 March 2002
Electrical
Issued 11 August 1998
Resolved
Repair/renew exposed wires/lighting in port & starboard outboard passageways.
Condition: Unknown
Due 21 August 1998
Resolved 31 August 1998
Accommodation/Occupational Safety
Issued 11 August 1998
Resolved
Make the MSD Holding Tank available for inspection. Lock heads (toilets) doors shut & do not use system until verified operational.
Condition: Unknown
Due 30 September 1998
Resolved 26 November 2002
Fire Fighting
Issued 11 August 1998
Resolved
Replace the handle for the fire valve on the fixed system manifold.
Condition: Unknown
Due 21 August 1998
Resolved 31 August 1998
Accommodation/Occupational Safety
Issued 11 August 1998
Resolved
Pump out black water & sanitize aft lazarette to allow completion of RIN. Complete by 24AUG98.
Condition: Unknown
Due 24 August 1998
Resolved 31 August 1998
Lifesaving
Issued 17 April 1997
Resolved
Stencil name of vessel on paddles for lifefloats.
Condition: Unknown
Due 24 April 1997
Resolved 28 April 1997
Lifesaving
Issued 17 April 1997
Resolved
Stencil name of vessel on buoyant apparatus.
Condition: Unknown
Due 24 April 1997
Resolved 28 April 1997
Lifesaving
Issued 17 April 1997
Resolved
Install retro-reflective tape on lifefloats and buoyant apparatus.
Condition: Unknown
Due 24 April 1997
Resolved 28 April 1997
Lifesaving
Issued 17 April 1997
Resolved
Renew 2 ring buoys.
Condition: Unknown
Due 24 April 1997
Resolved 28 April 1997
Navigation
Issued 17 April 1997
Resolved
Remove paint from sidelight lenses.
Condition: Unknown
Due 24 April 1997
Resolved 28 April 1997
Engineering
Issued 17 April 1997
Resolved
Install heat shield on Raycor fuel filter for port generator.
Condition: Unknown
Due 24 April 1997
Resolved 28 April 1997
Navigation
Issued 17 April 1997
Resolved
Provide copy of Navigation Rules.
Condition: Unknown
Due 24 April 1997
Resolved 28 April 1997
Lifesaving
Issued 10 April 1997
Resolved
Provide proof of valid drug testing program.
Condition: Unknown
Due 10 April 1997
Resolved 10 April 1997
Fire Fighting
Issued 10 April 1997
Resolved
Provide 3 fire buckets with lanyards.
Condition: Unknown
Due 10 April 1997
Resolved 10 April 1997
Lifesaving
Issued 10 April 1997
Resolved
Conduct man overboard drill and fire drill in presence of Marine Inspector prior to operating in MSO Miami zone.
Condition: Unknown
Due 10 April 1997
Resolved 10 April 1997
Lifesaving
Issued 10 April 1997
Resolved
Provide 406 mhz category 1 EPIRB.
Condition: Unknown
Due 10 April 1997
Resolved 10 April 1997
Construction/Loadline
Issued 28 February 1997
Resolved
REPAIR FOREPEAK AND AFTPEAK ACCESS SCUTTLES LOCATED ON MAIN DECK.
Condition: Unknown
Due 28 February 1997
Resolved 28 February 1997
Electrical
Issued 28 February 1997
Resolved
REMOVE DEAD END WIRES FROM OVER HEAD ENGINE ROOM ABOVE PORT MAIN ENGINE ANDTHROUGH OUT VESSEL.
Condition: Unknown
Due 28 February 1997
Resolved 28 February 1997
Unknown
Issued 28 February 1997
Resolved
UPON ARRIVAL IN KEYWEST FLORIDA CONTACT MIAMI, FLORIDA OCMI FOR ENDORSEMENTON COI TO OPERATE IN AREA.
Condition: Unknown
Due 28 February 1997
Resolved 28 February 1997
Unknown
Issued 28 February 1997
Resolved
DUE TO REMODELING OF VESSEL, THE PASSENGERS PERMITTED IS TO BE DETERMINED PRIOR TO OPERATION OF THE VESSEL.
Condition: Unknown
Due 28 February 1997
Resolved 28 February 1997
Engineering
Issued 5 June 1996
Resolved
PROVIDE FLAME IMPINGEMENT BOWL FOR RACOR FILTER TO VESSELS GENERATOR. _x001C_ _x001C_
Condition: Unknown
Due 2 September 1996
Resolved 27 August 1996
Accommodation/Occupational Safety
Issued 4 October 1989
Resolved
PLACE OUT TYPE III MSD HOLDING TANK WITH A USCG CERTIFIED TYPE MSD FOR INSPECTED VESSELS I.A.W. 33 CFR 159.
Condition: Unknown
Due 4 October 1989
Resolved 4 October 1989
Electrical
Issued 26 August 1988
Resolved
MAKE LIGHTS OPERABLE FOR THE AMP MOTORS ON THE BRIDGE, FOR THE MAIN ENGINES.
Condition: Unknown
Due 26 August 1988
Resolved 26 August 1988
Lifesaving
Issued 26 August 1988
Resolved
PROVIDE 34 APPROVED ADULT AND ONE CHILD LIFEJACKET.
Condition: Unknown
Due 26 August 1988
Resolved 26 August 1988
Electrical
Issued 26 August 1988
Resolved
REPLACE BULB IN LIGHTING (12 VOLTS) ON PORT SIDE STAIRS.
Condition: Unknown
Due 26 August 1988
Resolved 26 August 1988
Electrical
Issued 6 October 1986
Resolved
PROVIDE AN AMP METER FOR SHOP SERVICE GENERATOR.
Condition: Unknown
Due 6 October 1986
Resolved 6 October 1986
Navigation
Issued 6 October 1986
Resolved
PROVIDE PROOF OF 80% LIGHT TRANSMITTANCE OF PILOT HOUSE TINTED WINDOWS OR REPLACE.
Condition: Unknown
Due 6 October 1986
Resolved 6 October 1986
Accommodation/Occupational Safety
Issued 6 October 1986
Resolved
PROVIDE WIRE MESH OR ITS EQUIVALENT FOR RAILS IN AREAS ACCESSIBLE TO PASSENGER.
Condition: Unknown
Due 6 October 1986
Resolved 6 October 1986