Records from 2002 to 2026. Most recent: inspection, 27 February 2026.
07 - Fire Safety › N/A - No Subsystem › Fire doors/openings in fire-resisting divisions
Issued 15 July 2025
Resolved
A pre-engineered fixed gas fire extinguishing system must: be installed in accordance with the manufacturer's instructions. Gap in port side forward machinery space boundary allows the passage of vapors. Make vapor tight to ensure quantity of extinguisher is sufficient for space. Resolve by July 18, 2025 to the satisfaction of the attending marine inspector.
46 CFR 181.420(a)(4)
Action required: 705 - Other - as specified
Resolved 18 July 2025
Resolution: Spaces made vapor tight.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 15 July 2025
Resolved
Spaces containing machinery shall be fitted with at least two ducts to furnish natural or mechanical supply and exhaust ventilation. Operator unable to identify location of the two ducts where port side main engine draws ventilation. Demonstrate adequate ventilation or install in accordance with 46 CFR 182.20-45 (OLD T Regulations).
46 CFR 182.20-45 (c)
OLD T
Action required: 16 - Rectify deficiencies w/in 14 days
Due 29 July 2025
Resolved 28 July 2025
Resolution: Appropriate ventilation identified.
10 - Safety of Navigation › N/A - No Subsystem › Lights, shapes, sound-signals
Issued 15 July 2025
Resolved
All vessels must have navigation lights that are in compliance with the applicable sections of the International and Inland Navigation Rules. Vessel mast light and stern light is not in compliance with Navigation Rule 23. Install navigation lights in accordance with 33 CFR 83.22(d) (Rule 23) for a vessel of less than 12 meters to the satisfaction of the MI.
46 CFR 183.420
Action required: 16 - Rectify deficiencies w/in 14 days
Due 29 July 2025
Resolved 28 July 2025
Resolution: Anchor light wired in.
02 - Structural Conditions › N/A - No Subsystem › Other (Structural condition)
Issued 15 July 2025
Resolved
Each vessel must be marked as required by part 67, subpart I, of this chapter. Vessel's name and hailing port markings missing on port side and stern. Replace with markings of appropriate size as described by 46 CFR 67.123(a)(d) to the satisfaction of the attending Marine Inspector.
46 CFR 185.602(a)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 29 July 2025
Resolved 28 July 2025
Resolution: Markings replaced both sides.
05 - Radio Communications › N/A - No Subsystem › VHF radio installation
Issued 15 July 2025
Resolved
A durable placard must be posted next to all radiotelephone installations with the emergency broadcast instructions an information, specific to the individual vessel. Placard not located next to radiotelephone installation. Install next to radiotelephone.
46 CFR 184.506
Action required: 16 - Rectify deficiencies w/in 14 days
Due 29 July 2025
Resolved 28 July 2025
Resolution: Emergency broadcast instructions posted next to radiotelephone.
01 - Certificates & Documentation › 012 - Crew Certificates › Medical certificate
Issued 15 July 2025
Resolved
A person may not employ or engage an individual in a position required to hold and MMC unless that individual maintains a current medical certificate. 01 employee (EMERSON HILLEN) serving as captain unable to produce proof of current medical certificate. Employee may not operate in capacity of captain until valid medical certificate is provided to the attending Marine Inspector.
46 CFR 15.401(c)
Action required: 705 - Other - as specified
Resolved 9 September 2025
Resolution: Received medical cert.
02 - Structural Conditions › N/A - No Subsystem › Electrical installations in general
Issued 15 July 2025
Resolved
Each vessel that relies on electricity to power the following loads must be arranged so that the loads can be energized from two sources of electricity: Navigation equipment and lights. Existing all-around anchor light only powered by battery. Install appropriate navigation light in accordance with this regulation to the satisfaction of attending marine inspector.
46 CFR 183.310(a)(1)(iv)
Action required: 50 - Rectify deficiencies w/in 30 days
Due 15 August 2025
Resolved 28 July 2025
Resolution: Anchor light wired in.
02 - Structural Conditions › N/A - No Subsystem › Hull - cracking
Issued 20 May 2025
Resolved
In general, compliance with the standards established by a recognized classification society will be considered satisfactory evidence of the structural adequacy of the vessel. Area of plywood separation discovered in starboard aft compartment inner hull at waterline. Uncover and present for inspection at drydock.
46 CFR 177.10-1(a)
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 22 May 2025
Resolution: Attended vessel and instructed the contractor to drill two core samples from the aft inboard port hull just above the port propeller and aft near the wing deck to hull transition to determine plywood thickness to determine repair options.
02 - Structural Conditions › N/A - No Subsystem › Hull - cracking
Issued 20 May 2025
Resolved
No major repairs or alterations affecting the safety of the vessel with regard to the hull, machinery, or equipment, shall be made without the knowledge and approval of the [name withheld] repairs present on the port side hull. Uncover and present for inspection at drydock.
46 CFR 176.20-1(a)
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 23 May 2025
Resolution: Inspected identified hull areas that had been opened up.
02 - Structural Conditions › N/A - No Subsystem › Hull damage impairing seaworthiness
Issued 25 September 2024
Resolved
Whenever damage or deterioration to hull plating or structural members that may affect the seaworthiness of a vessel is discovered or suspected, the cognizant OCMI may conduct an internal structural examination in any affected space including fuel tanks, and may require the vessel to be drydocked or taken out of service to assess the extent of the damage, and to affect permanent repairs. the OCMI may also decrease the drydock examination intervals to monitor the vessel's structural condition. Vessel has 8 foot crack on exterior of starboard hull in way of wing deck causing water intrusion into starboard hull. Vessel restricted from carrying passengers until adequate repairs are completed during drydock and are accepted by a USCG Marine Inspector.
46 CFR 176.600(d)
701 C
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 8 October 2024
Resolution: Vessel affected satisfactory repairs to damaged area.
09 - Working and Living Conditions › 091 - Living Conditions › Electrical devices
Issued 11 April 2024
Resolved
Electrical equipment on a vessel must be installed and maintained to protect passengers, crew, other persons, and the vessel from electrical hazards, including fire, caused by or originating in electrical equipment, and electrical shock. Unauthorized electrical connections identified between electrical wires.
46 CFR 183.200 (b)
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 25 April 2024
Resolution: Butt connectors properly installed onto electrical connections.
08 - Alarms › N/A - No Subsystem › Other (alarms)
Issued 11 April 2024
Resolved
A visual and audible alarm must be provided at the operating station to indicate a high water level in each of the following normally unmanned spaces. Port bilge visual indicator is not operational.
46 CFR 182.530
Action required: 16 - Rectify deficiencies w/in 14 days
Due 25 April 2024
Resolved 25 April 2024
Resolution: Fixed inop bilge alarm visual indicator.
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 11 April 2024
Resolved
The marine employer must have a sufficient number of alcohol testing devices readily accessible on board the vessel. Vessel does not have any means to test for presence of alcohol.
46 CFR 4.06-15 (a)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 25 April 2024
Resolved 25 April 2024
Resolution: Provided presence of alcohol test kits to the USCG.
02 - Structural Conditions › N/A - No Subsystem › Electrical installations in general
Issued 11 April 2024
Resolved
All fuel tanks must be electrically bonded to a common ground. Grounding wire for port fuel tank is missing.
46 CFR 182.440(b)(4)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 25 April 2024
Resolved 25 April 2024
Resolution: Installed grounding wire.
09 - Working and Living Conditions › 091 - Living Conditions › Electrical devices
Issued 11 April 2024
Resolved
Electrical equipment on a vessel must be installed and maintained to protect passengers, crew, other persons, and the vessel from electrical hazards, including fire, caused by or originating in electrical equipment, and electrical shock. Battery was found having six connections on each terminal. Reduce number of connections to a maximum of four.
46 CFR 183.200 (b)
Action required: 50 - Rectify deficiencies w/in 30 days
Due 11 May 2024
Resolved 25 April 2024
Resolution: Installed terminal board to organize and reduce number of connections on battery.
09 - Working and Living Conditions › 092 - Working Conditions › Ropes and wires
Issued 7 December 2023
Resolved
Except as otherwise allowed by this subpart, a vessel must comply with the structural design requirements of one of the standards listed below for the hull material of the vessel. Vessel reported damage to a cleat on the forward part of the starboard sponson. Damage is a potential source of water ingress. Make repairs in accordance with discussed plans.
46 CFR 177.300(c)
Condition: Damaged By Earlier Event
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 15 December 2023
Resolution: Vessel completed repairs.
02 - Structural Conditions › N/A - No Subsystem › Hull damage impairing seaworthiness
Issued 1 December 2023
Resolved
Except as otherwise allowed by this subpart, a vessel must comply with the structural design requirements of one of the standards listed below for the hull material of the vessel. Vessel reported damage to the hull where the damaged drain line was leaking. Submit repair proposal.
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 15 December 2023
Resolution: Vessel submitted repair proposals and completed the repairs to the satisfaction of the attending MI.
07 - Fire Safety › N/A - No Subsystem › Fixed fire extinguishing installation
Issued 12 July 2023
Resolved
A pre-engineered fixed gas fire extinguishing system must be installed per the manufacturer's instructions. The provided fixed extinguishing system in the port engine room is rated for 75 cuft. The rear bulkhead of the engine room was not reasonably gas tight and allowed for free communication of atmosphere to the port aft shaft space which increased the volume of the compartment in excess of 75 cuft. Provide a reasonably gas tight separation of the spaces.
Action required: 10 - Deficiency Rectified
Resolved 12 July 2023
Resolution: The aft bulkhead of the engine room was made reasonably gas tight which reduced the volume of the engine room to less than 75 cubic feet.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 9 June 2023
Resolved
A vessel must be provided with a main steering gear that is of adequate strength and capable of steering the vessel at all service speeds. Vessel's steering gear is loose and misaligned in many places. Repair to the satisfaction of the attending marine inspector.
46 CFR 182.610 (a)(1)
Action required: 705 - Other - as specified
Resolved 3 July 2023
Resolution: Vessel reps had technician [name withheld] to reinstall and realign system. Everything was replaced.
02 - Structural Conditions › N/A - No Subsystem › Hull - cracking
Issued 9 June 2023
Resolved
Except as otherwise allowed by this subpart, a vessel must comply with the structural design requirements of one of the standards listed below for the hull material of the vessel. Vessel has areas of suspected water damage of fiberglass underneath floor boards in fwd part of vessel, inside cabin area, bow starboard hull, topside aft starboard hull where railing is attached, inside engine room in port hull, and aft right bolt area on starboard side netting. Clean and submit findings with repair proposal.
46 CFR 177.300 (c)
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Resolved 3 July 2023
Resolution: Vessel reps completed all necessary repairs.
07 - Fire Safety › N/A - No Subsystem › Fixed fire extinguishing installation
Issued 12 July 2021
Resolved
A pre-engineered fix gas fire extinguishing system must have a means to reset devices used to automatically shut down ventilation systems & engines. STBD Fireboy failed to reset; prove proper operation to the attending MI.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 26 July 2021
Resolution: Purchased and installed new Fireboy control module. O/O proved proper operation to the attending MI.
11 - Life Saving Appliances › N/A - No Subsystem › Distress flares
Issued 12 July 2021
Resolved
A vessel on a limited coastwise route must carry six hand red flare distress signals and six hand orange smoke signals. Provide 06 hand red flares, and 03 hand orange flares. A red hand flare distress signal can be substituted for any of the hand orange smoke distress signals.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 26 July 2021
Resolution: O/O provided nine red flares and three orange flares.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 12 July 2021
Resolved
Flexible nonmetallic hose may be used in fuel oil systems subject to the following requirements: USCG Type A1-15. The STBD secondary fuel filter to primary filter
supply lines are not intended for fuel injected engines. Change to USCG Type A1-15 or SAE J1527 Marine Fuel Hose.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 26 July 2021
Resolved 26 July 2021
Resolution: O/O installed equvilent hose on the STBD secondary fuel filter to primary filter.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 12 July 2021
Resolved
Where a flexible vent pipe section is necessary, suitable flexible hose having high resistance to petroleum oils may be used. The STBD fuel tank vent hose is not designed for fuel. Change to USCG Type A-2 or SAE J1527 Marine Fuel Hose.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 26 July 2021
Resolved 31 July 2021
Resolution: Owner installed USCG Type A-2 hose for the STBD fuel tank. Photograph uploaded in deficiencies documents.
10 - Safety of Navigation › N/A - No Subsystem › Lights, shapes, sound-signals
Issued 12 July 2021
Resolved
All vessels must have operable navigation lights IAW the Navigation Rules. Navigation lights are not wired IAW Navigation Rules. The anchor light needs to be rewired separate from other navigation lights.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 26 July 2021
Resolved 26 July 2021
Resolution: O/O installed an anchor light that is manually turned on and off separate from the navigation lights.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 12 July 2021
Resolved
Machinery and fuel tank spaces must be separated from accommodation spaces by boundaries that prevent the passage of vapors. The following areas were identified to not meet the vapor tight criteria, to include: the starboard engine space and fuel tank space leading to the storage compartments, as well as the port engine room. Provide a proper seal to prevent the passage of vapors.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 26 July 2021
Resolved 4 October 2021
Resolution: MI attended vessel and confirmed the starboard engine space and fuel tank space leading to the storage compartments, as well as the port engine room were properly sealed to prevent the passage of vapors.
10 - Safety of Navigation › N/A - No Subsystem › Magnetic compass
Issued 12 July 2021
Resolved
Every vessel must be fitted with a suitable magnetic compass designed for marine use. Magnetic compass was not mounted; mount suitable magnetic compass in the vicinity of the operating station and illuminate or vessel is restricted to daytime operations.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 26 July 2021
Resolved 26 July 2021
Resolution: O/O mounted a suitable magnetic compass in the vicinity of the operating station.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 12 July 2021
Resolved
A vessel must be provided with a main steering gear that is of adequate strength and capable of steering the vessel at service speeds. The fasteners on the steering ram to rudder tie rod mounting block are corroded, and need to be replaced.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 26 July 2021
Resolved 31 July 2021
Resolution: Owner installed new fastners with nylon washers and 5200m. Photograph uploaded in deficiencies documents.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Manholes/flush scuttles
Issued 12 July 2021
Resolved
A hatch exposed to the weather must be watertight. Some of the weather deck hatches are not watertight, including the port aft hatch. Make all weather deck hatches watertight tight.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 26 July 2021
Resolved 9 August 2021
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Bilge pumping arrangements
Issued 12 July 2021
Resolved
A submersible electric bilge pump may be used as a power bilge pump on a vessel of not more than 65 feet in length carrying not more than 49 passengers, other than a ferry, provided that: The pump meets UL 1113. Install UL 1113 submersible electric bilge pumps.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 26 July 2021
Resolved 26 July 2021
Resolution: O/O installed correct UL 1113 electric bilge pumps and 15 amp overcurrent protection fuses.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 12 July 2021
Resolved
Shutoff valves, installed so as to close against the fuel flow, must be fitted in the fuel supply lines at the tank connection. The shutoff valve at the tank must be manually operable from outside the compartment in which the valve is located. The Port fuel tank fuel shut off valve does not close all the way. Demonstrate
that this shut off valve can close entirely.
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 9 August 2021
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 12 July 2021
Resolved
When the flexible section is a nonconductor of
electricity, the metallic sections of the fill pipe
separated thereby must be joined by a conductor for
protection against generation of a static charge when
filling with fuel. The bonding on the port and STBD fuel fill is in correct or missing; install proper bonding wire to the satisfaction of the attending MI.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 26 July 2021
Resolved 9 August 2021
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 12 July 2021
Resolved
A vessel inspected for compliance with the standards required by this subchapter. Machinery, equipment, materials, and arrangements not covered by standards covered in this subchapter may be inspected IAW standards acceptable to the cognizant OCMI as good marine practice. The both PSS shaft seal do not have an adequate vent line; provide a suitable vent line IAW the manufacturer installation procedures.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 26 July 2021
Resolved 31 July 2021
Resolution: Owner installed a 4 foot vent hose to both PPS shaft seals. Photograph uploaded in deficiencies documents.
01 - Certificates & Documentation › 011 - Ships Certificates › USCG Certificate of Documentation (COD)
Issued 12 July 2021
Resolved
A Certificate of Documentation (COD) is required for the operation of a vessel in certain trades, serves as evidence of vessel nationality, and permits a vessel to
be subject to preferred mortgages. Vessel Operator could not produce original COD. Provide original COD.
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 27 October 2021
Resolution: Operator emailed COD.
11 - Life Saving Appliances › N/A - No Subsystem › Lifejackets incl. provision and disposition
Issued 12 July 2021
Resolved
Each child size life jacket must be stowed in a location that is appropriately marked and separated from adult life jackets so the child size life jackets are not mistaken for adult life jackets. Child size life jackets were not stowed separately from adult life jackets. Stow
child size life jackets that is separated from adult
size life jackets.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 26 July 2021
Resolved 26 July 2021
Resolution: O/O stowed child size life jackets separately from adult life jackets by relocating them to the forward STBD salon area and marked as per 46 CFR 185.604(f).
02 - Structural Conditions › N/A - No Subsystem › Electrical installations in general
Issued 12 July 2021
Resolved
A cable must not be spliced in a hazardous location. STBD engine room 12V red cable is spliced. Install either a single wire or an enclosure IAW 183.340(g).
Action required: 16 - Rectify deficiencies w/in 14 days
Due 26 July 2021
Resolved 26 July 2021
Resolution: O/O installed a covered terminal block as a connection point for the two wires.
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 12 July 2021
Resolved
Each life jacket, immersion suit, and ring lifebuoy must be marked in clearly legible block capital letters with the vessel's name. 01 ring lifebuoy was not properly labeled with the ship's name. Mark with vessel name.
Action required: 10 - Deficiency Rectified
Due 12 July 2021
Resolved 12 July 2021
Resolution: Owner properly labled ring lifebuoy with a Sharpie in the presence of the attending MI.
11 - Life Saving Appliances › N/A - No Subsystem › Other (life saving)
Issued 12 July 2021
Resolved
The master of the vessel shall ensure that: the EPIRB test required by paragraph (a) shall be logged or otherwise documented, as applicable. EPIRB testing not conducted and not loggged. Test EPIRB and log.
Action required: 10 - Deficiency Rectified
Due 12 July 2021
Resolved 12 July 2021
Resolution: Owner tested EPIRB and logged in the presence of the attending MI.
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 12 July 2021
Resolved
The employer shall provide an Employee Assistance Program for all crew members that includes both education and training on the effects and consequences of drug and alcohol use. Supervisory personnel must receive at least 60 minutes of training. Vessel's O/O is establishing an Employee Assistance Program as part of the company's chemical testing program, but has not completed the program. Provide satisfactory evidence of an Employee Assistance Program.
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 20 August 2021
Resolution: Provided Company Policy that included DAPI Section, Zero Tolerance Policy, Master's EAP Training, and evidence of 60 min EAP Crew Training.
07 - Fire Safety › N/A - No Subsystem › Fixed fire extinguishing installation
Issued 16 July 2020
Resolved
A vessel on which a pre-engineered fixed gas fire extinguishing system is installed must have the following equipment at he operating station: A means to reset devices used to automatically shut down engines. Vessels two pre-engineered systems did not function properly and did not allow engines to restart.
46 CFR 176.810(b)
Action required: 17 - Rectify deficiencies prior to departure
Due 16 July 2020
Resolved 10 August 2020
Resolution: System tested sat.
05 - Radio Communications › N/A - No Subsystem › Satellite EPIRB 406MHz/1.6GHz
Issued 16 July 2020
Resolved
Vessel is required to ensure the EPIRB's battery is replaced after it is used, or before the date required by FCC regulations in 47 CFR part 80, whichever comes sooner. Vessel's EPIRB battery was past its expiration date. Replace battery to satisfaction of attending Coast Guard Marine Inspector.
46 CFR 185.728
Action required: 17 - Rectify deficiencies prior to departure
Due 16 July 2020
Resolved 10 August 2020
Resolution: Vessel replaced battery and tested sat.
05 - Radio Communications › N/A - No Subsystem › VHF radio installation
Issued 16 July 2020
Resolved
Vessels operated solely within 20 nautical miles of land must be equipped with a VHF-DSC radiotelephone installation meeting the requirements of § 80.1101(c)(2). VHF radio missing GPS signal for DSC operation.
47 CFR 80.905(1)
Action required: 50 - Rectify deficiencies w/in 30 days
Due 16 August 2020
Resolved 10 August 2020
Resolution: Vessel purchased new radio with internal GPS and input MMSI
02 - Structural Conditions › N/A - No Subsystem › Electrical installations in general
Issued 16 July 2020
Resolved
Over current protection must be provided for each ungrounded conductor. An emergency switch must be provided in the normally ungrounded main supply conductor from a battery. Vessel has 12v wire from battery that bypasses emergency switch and has no over current protection. Determine load of conductor and wire appropriately.
46 CFR 183.380
Action required: 50 - Rectify deficiencies w/in 30 days
Due 16 August 2020
Resolved 10 August 2020
Resolution: Vessel wired correctly.
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 2 May 2019
Resolved
FLEXIBLE NONMETALLIC HOSE PERMITTED FOR USE IN PIPING SYSTEMS MUST MEET SAE J-1942. HYDROLIC HOSES USED IN STEERING SYSTEM DID NOT MEET THE SAE J-1942 STANDARD. REPLACE THE HYDROLIC HOSES USED IN SYSTEM SYSTEM WITH SAE J-1942 STANDARD NONMETALLIC HOSES.
Condition: Improper Installation
Action required: 50 - Rectify deficiencies w/in 30 days
Due 1 June 2019
Resolved 5 June 2019
Resolution: Replaced with J-1942 spec hydraulic hose.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Covers (hatchway-, portable-, tarpaulins, etc.)
Issued 2 May 2019
Resolved
A HATCH EXPOSED TO THE WEATHER MUST BE WATERTIGHT. HATCH COVERS ON OPEN DECK WERE FOUND TO BE MISSING GASKETS RENDURING THEM NOT WATERTIGHT. ENSURE ALL HATCH COVERS HAVE GASKETS IN PLACE AND ENSURE THE WATERTIGHT INTEGRITY OF THE EACH HATCH COVER.
Condition: Improper Installation
Action required: 50 - Rectify deficiencies w/in 30 days
Due 1 June 2019
Resolved 5 June 2019
Resolution: Gaskets replaced to make it watertight.
08 - Alarms › N/A - No Subsystem › Other (alarms)
Issued 2 May 2019
Resolved
A VISUAL INDICATOR MUST BE PROVIDED AT THE OPERATING STATION TO INDICATE WHEN ANY AUTOMATIC BILGE PUMP IS OPERATING. THE TWO AUTOMATIC BILGE PUMPS ONBOARD THE VESSEL DID NOT HAVE A VISUAL INDICATOR AT THE OPERATING STATION. INSTALL A VISUAL INDICATOR AT THE OPERATING STATION TO INDICATE WHEN AN AUTOMATIC BILGE PUMP IS ACTIVATED.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 1 June 2019
Resolved 5 June 2019
Resolution: Visaul alarms provided.
11 - Life Saving Appliances › N/A - No Subsystem › Lifejackets incl. provision and disposition
Issued 2 May 2019
Resolved
CHILD SIZE LIFE JACKETS EQUAL TO AT LEAST 10% OF THE NUMBERS OF PERSONS PERMITTED ON BOARD MUST PROVIDED. VESSEL IS PERMITTED 42 PERSONS. PROVIDE 01 ADDITIONAL CHILD SIZED LIFE JACKET FOR A TOTAL OF 05 ONBOARD.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 1 June 2019
Resolved 5 June 2019
Resolution: Additional child lifejacket provided.
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 2 May 2019
Resolved
AFT BRACING BAR FOR STARBOARD SIDE HAMMOCK WAS FOUND TO BE IN AN UNSAFE CONDITION. BRACING BAR IS LOOSE. RESECURE THE AFT BRACING BAR FOR STARBOARD HAMMOCK.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 1 June 2019
Resolved 5 June 2019
Resolution: Reinforced bracing bar for stbd hammock.
10 - Safety of Navigation › N/A - No Subsystem › Lights, shapes, sound-signals
Issued 2 May 2019
Resolved
VESSEL MUST HAVE NAVIGATION LIGHTS THAT ARE IN COMPLIANCE WITH THE APPLICABLE SECTIONS OF INTERNATIONAL AND INLAND NAVIGATION RULES. VESSEL'S NAVIGATION LIGHTS WERE HAZED REDENURING THEM NOT VISABLE IAW NAVIGATION RULES. REMOVE HAZE FROM NAVIGATION LIGHTS.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 1 June 2019
Resolved 5 June 2019
Resolution: Navigational lights were made visible.
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 20 March 2019
Resolved
BATTERY CONNECTIONS MUST BE AMDE TO BATTERY TERMINALS WITH PERMANENT TYPE CONNECTORS. REPLACE WINGNUT CONNECTORS WITH PERMANENT HEXNUT TYPE CONNECTORS.
Condition: Improper Installation
Action required: 50 - Rectify deficiencies w/in 30 days
Due 1 June 2019
Resolved 5 June 2019
Resolution: Replaced with permanent hex nut.
Fire Fighting › Fixed Gas Fire Extinguishing System › Operating Controls
Issued 8 May 2018
Resolved
07109: A pre-engineered fixed gas fire extinguishing system must automatically shut down all power ventilation systems and all engines that draw intake air from within the protected space. Currently, fire-boy systems are interconnected so when one fire-boy is discharged, all engines are shut down. 46 CFR 181.420
Condition: Invalid
Action required: 50 - Rectify deficiencies w/in 30 days
Due 8 June 2018
Resolved 11 June 2018
Resolution: Fire-boy systems were rewired independently of each other, so one pre-engineered fixed gas fire extinguishing systems shut down engine in one space.
Lifesaving › Hand Flares › Not on Board
Issued 8 May 2018
Resolved
11116: A vessel on a limited coastwise route must carry 6 hand red flares and 6 hand orange smoke distress signals. Vessel is missing one hand red flare. 46 CFR 180.68(a)
Condition: Invalid
Action required: 16 - Rectify deficiencies w/in 14 days
Due 22 May 2018
Resolved 21 May 2018
Resolution: Received picture of 6 red hand flares and 6 orange smoke distress signals onboard vessel.
Navigation › Piloting/Steering › Marine Charts
Issued 8 May 2018
Resolved
10111: Vessel must carry adequate and up-to-date chart, U.S. Coast Pilot, and CG Light List. Vessel does not have an up-to-date chart, CG light list, and Coast Pilot on board. 46 CFR 184.420
Condition: Invalid
Action required: 16 - Rectify deficiencies w/in 14 days
Due 22 May 2018
Resolved 21 May 2018
Resolution: Received picture of up-to-date chart, Coast Pilot, and CG light List onboard vessel.
Engineering › Bilge Water Management System › Interface Detector
Issued 8 May 2018
Resolved
13104: A visual indicator must be provided at the operating station to indicate when any automatic bilge pump is operating. A visual indicator is not provided for both bilge pumps on board. 46 CFR 182.530(c)
Condition: Invalid
Action required: 50 - Rectify deficiencies w/in 30 days
Due 8 June 2018
Resolved 11 June 2018
Resolution: A visual indicator was provided for both bilge pumps on board.
Engineering › Bilge Water Management System › Interface Detector
Issued 8 May 2018
Resolved
04113: A visual and audible alarm must be provided at the operating station to indicate a high water level. Port side high water alarm visual indicator is inoperable. 46 CFR 182.530(a)
Condition: Invalid
Action required: 50 - Rectify deficiencies w/in 30 days
Due 8 June 2018
Resolved 11 June 2018
Resolution: Port side high water alarm visual indicator was operable.
Communications › Radio Communications › VHF Radiotelephone
Issued 8 May 2018
Resolved
05199: A durable placard must be posted next to all radio telephone installations with the emergency broadcast instructions and information specific to the vessel. Vessel does not have an emergency broadcast placard next to VHF radio onboard. 46 CFR 184.506
Action required: 16 - Rectify deficiencies w/in 14 days
Due 22 May 2018
Resolved 21 May 2018
Resolution: Received picture of emergency broadcast placard onboard vessel.
Operations/Management › Vessel Activity › Cleaning/Stripping
Issued 3 November 2017
Resolved
Remove sea valves for CG Inspection
Condition: Invalid
Action required: 705 - Other - as specified
Due 3 December 2017
Resolved 6 November 2017
Resolution: Sea valves were removed for CG inspection; satsifactory.
Operations/Management › Vessel Activity › Construction/Repair
Issued 3 November 2017
Resolved
Rebed starboard strut support.
Action required: 705 - Other - as specified
Due 3 December 2017
Resolved 14 November 2017
Resolution: Starboard strut support was rebedded.
Operations/Management › Vessel Activity › Construction/Repair
Issued 3 November 2017
Resolved
Reweld starboard rudder support.
Condition: Invalid
Action required: 705 - Other - as specified
Due 3 December 2017
Resolved 14 November 2017
Resolution: Starboard rudder support was rewelded; satisfactory.
Engineering › Shafting/Propeller Arrangements › Bearing
Issued 3 November 2017
Resolved
Replace cutlass bearings.
Condition: Invalid
Action required: 705 - Other - as specified
Due 3 December 2017
Resolved 14 November 2017
Resolution: Cutlass bearings were replaced.
Operations/Management › Vessel Activity › Construction/Repair
Issued 3 November 2017
Resolved
Scrape angel hair to good wood and provide repair plan for angel hair outboard of port side fuel tank.
Condition: Invalid
Action required: 705 - Other - as specified
Due 3 December 2017
Resolved 8 November 2017
Resolution: Approved repair proposal: Scrape angel hair down to good wood, sand, and fill with 404 high-density filler with 105 epoxy resin and smooth out area and paint.
Operations/Management › Vessel Activity › Construction/Repair
Issued 3 November 2017
Resolved
Scrape out rotted wood in tween deck and provide repair plan for rotted wood in port fuel tank space.
Condition: Invalid
Action required: 705 - Other - as specified
Due 3 December 2017
Resolved 8 November 2017
Resolution: Approved repair plan: Scrape out rotten wood; fill with 404 high-dens. filler with 105 west system. Sand and lay up 18 Oz fiberglass cover with 105 resin, sand, and paint.
Operations/Management › Vessel Activity › Construction/Repair
Issued 3 November 2017
Resolved
Provide repair plan for rotted frame under stbd shaft.
Action required: 705 - Other - as specified
Due 3 December 2017
Resolved 8 November 2017
Resolution: Approved repair plan: Scrape away rotten wood on frame, sand down to good wood, apply 404 high-dens. filler, sand, and lay up 18 Oz fiberglass sand and paint.
Operations/Management › Vessel Activity › Underway
Issued 3 November 2017
Resolved
Conduct underway sea trial in presence of CG MI prior to credit dry dock.
Action required: 705 - Other - as specified
Due 3 December 2017
Resolved 20 November 2017
Resolution: Post dry dock sea trial conducted; satisfactory.
Fire Fighting › Fixed Gas Fire Extinguishing System › Operating Controls
Issued 11 May 2017
Resolved
Prove proper installation of the fixed extinguishing system ventilation shutdown and manual pull cable.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 15 May 2017
Resolution: Verified proper installation.
Accommodation/Occupational Safety › Occupational Safety › Deck Rail
Issued 11 May 2017
Resolved
Install proper deck rails in all passenger areas.
Action required: 705 - Other - as specified
Due 10 June 2017
Resolved 10 June 2017
Resolution: Temporary courses installed, pax restricted from other areas. See special note.
Engineering › Fuel Oil Service System › Piping
Issued 11 May 2017
Resolved
Install proper flexible fuel line hose iaw 46 cfr 182.20-40.
Action required: 705 - Other - as specified
Due 10 June 2017
Resolved 10 June 2017
Resolution: Proper hose installed iaw MSC policy note E1-15.
Electrical › Lighting (service) › Lighting Fixture
Issued 11 May 2017
Resolved
Properly cover lighting fixture in stbd fwd compartment.
Action required: 705 - Other - as specified
Due 10 June 2017
Resolved 9 June 2017
Resolution: Proper cover provided.
Engineering › Shafting/Propeller Arrangements › Stern Tube Lubrication/Sealing
Issued 11 May 2017
Resolved
Properly install dripless packing cooling hose iaw manufacturer inst.
Action required: 705 - Other - as specified
Due 10 June 2017
Resolved 10 June 2017
Resolution: Hose properly vented.
Engineering › Diesel Engine (propulsion-reduction gear) › Exhaust Manifold
Issued 11 May 2017
Resolved
Repair or replace leaking exhaust elbow on port engine.
Action required: 705 - Other - as specified
Due 10 June 2017
Resolved 9 June 2017
Resolution: Epoxy repair patch installed.
Electrical › Electrical Distribution System (service) › Junction Box
Issued 11 May 2017
Resolved
Properly secure wire splices in junction boxes.
Action required: 705 - Other - as specified
Due 9 June 2017
Resolved 9 June 2017
Resolution: Wire splices put in enclosed boxes.
Construction/Loadline › Penetrations › Gasket
Issued 11 May 2017
Resolved
Make all deck hatches watertight.
Action required: 705 - Other - as specified
Due 10 June 2017
Resolved 9 June 2017
Resolution: All hatches provided with proper gaskets and closures.
Navigation › Collision/Grounding Avoidance › Navigation Lights
Issued 11 May 2017
Resolved
Prov e proper operation of stern light.
Action required: 705 - Other - as specified
Due 10 June 2017
Resolved 9 June 2017
Resolution: Proper operation witnessed.
Lifesaving › Lifejacket/PFD (Type I) › Retroreflective Material
Issued 3 May 2016
Resolved
Replace retroreflective tape on identified (5) adult life jackets
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 17 May 2016
Resolved 13 May 2016
Navigation › Piloting/Steering › Marine Charts
Issued 3 May 2016
Resolved
Replace chart onboard with updated chart and provide tide tables.
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 17 May 2016
Resolved 13 May 2016
Communications › Alarms/Indicators › Bilge Alarm
Issued 3 May 2016
Resolved
Repair visual alarm for starboard void. Bilge alarm was faint/inoperable.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 17 May 2016