Records from 1983 to 2016. Most recent: inspection, 19 February 2016.
A report is not offered for this hull: Its record holds only 2 of the seven kinds of material a report is built from: inspections, deficiencies, operational controls, tow-unit appearances, casualty records, dimensions and documentation. That is a statement about the record, not about the vessel. Reports.
Inspection history · 52
19 February 2016
Deficiency Check
Physical examination · Activities Europe · Activity 5818017
23 June 2005
Administrative Inspection
Administrative · Activities Europe · Activity 2399897
29 December 2003
Security Plan Review - VSP
Administrative · Marine Safety Center (MSC) · Activity 1971388
20 February 2003
Deficiency Check · COI Inspection
Physical examination · Activities Europe · Activity 1746803
12 February 2003
Internal Structural Exam · Deficiency Check · Hull Examination
Physical examination · Activities Europe · Activity 1680425
26 January 2002
Re-Inspection
Physical examination · Activities Europe · Activity 1475044
30 April 2001
Hull Examination
Physical examination · Activities Europe · Activity 1397650
6 March 2001
COI Inspection
Physical examination · Activities Europe · Activity 1462193
21 August 2000
Deficiency Check
Physical examination · Activities Europe · Activity 1053193
7 August 2000
Deficiency Check
Physical examination · Activities Europe · Activity 1052804
14 June 2000
Deficiency Check
Physical examination · Activities Europe · Activity 1053254
3 May 2000
Re-Inspection
Physical examination · Activities Europe · Activity 1429343
21 March 1999
COI Inspection
Physical examination · Activities Europe · Activity 811368
1 May 1998
Administrative
Administrative · Activities Europe · Activity 1124369
29 March 1998
Hull Examination · Re-Inspection
Physical examination · Activities Europe · Activity 1416684
15 January 1997
COI Inspection
Physical examination · Activities Europe · Activity 1099857
24 May 1996
Deficiency Check
Physical examination · Activities Europe · Activity 1085956
9 May 1996
Deficiency Check
Physical examination · Activities Europe · Activity 1083729
29 April 1996
Re-Inspection
Physical examination · Activities Europe · Activity 1083241
27 April 1996
Hull Examination
Physical examination · Activities Europe · Activity 1355791
25 March 1996
Type not recorded
No type recorded · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 220508
27 March 1995
Administrative
Administrative · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1142052
23 January 1995
MARPOL Annex V Examination · COI Inspection
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 829549
6 June 1994
Deficiency Check
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1020970
29 April 1994
Deficiency Check
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1169737
12 April 1994
Deficiency Check
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 857046
18 March 1994
Re-Inspection
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 856047
23 December 1993
Administrative
Administrative · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1164195
27 October 1993
Administrative
Administrative · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1139992
28 July 1993
Drydock Extension
Administrative · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1151525
24 January 1993
COI Inspection · Deficiency Check
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 839795
12 February 1992
Re-Inspection
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 954768
14 September 1991
Hull Examination
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 935812
15 August 1991
Administrative
Administrative · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 936253
15 August 1991
Administrative
Administrative · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1250944
10 May 1991
Deficiency Check
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1232921
10 February 1991
COI Inspection
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 910392
2 April 1990
Re-Inspection
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1230945
7 March 1989
Hull Examination
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1195508
12 February 1989
COI Inspection
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1030741
18 February 1988
Re-Inspection
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1294044
17 February 1987
Hull Examination
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1323538
17 February 1987
Hull Examination
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1323842
6 February 1987
COI Inspection
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1016219
10 December 1986
Administrative
Administrative · MIO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1309493
27 February 1986
Re-Inspection
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1301873
4 June 1985
Type not recorded
No type recorded · MIO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1290754
29 May 1985
Type not recorded
No type recorded · MIO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1288999
21 February 1985
Type not recorded
No type recorded · MIO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1285735
1 February 1985
Type not recorded
No type recorded · MIO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1288633
13 April 1984
Type not recorded
No type recorded · MIO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 978948
11 February 1983
Type not recorded
No type recorded · MIO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 966220
Communications › Radio Communications › EPIRB
Issued 8 March 2003
Resolved
Provide NOAA registration for EPIRB and properly afix sticker to the EPIRB as required by 47CFR 80.1061(f) LEGACY COMPONENT DESC: EPIRB
Condition: Unknown
Action required: 705 - Other - as specified
Due 8 April 2003
Resolved 19 February 2016
Resolution: Vessel Reflagged Deficiencies no longer apply.
Construction/Loadline › Hull › Bottom Plating
Issued 8 March 2003
Resolved
Crop and renew wasted under deck longitudinals and side shell longitudinals in the chain locker. Vessel is restricted to operate in reasonable operating conditions until permanent repairs are completed. Repair to be completed at next repair availability but not later than February 28, 2006. LEGACY COMPONENT DESC: Longitudinal Frame
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 28 February 2006
Resolved 19 February 2016
Resolution: Vessel Reflagged Deficiencies no longer apply.
Fire Fighting › Remote Fuel Shutoff › General
Issued 8 March 2003
Resolved
Provide proper spanner for fuel oil reach rods with a positive means to secure socket to T handle vice the flwed two piece system currently in use. LEGACY COMPONENT DESC: Spanner
Condition: Design Flaw
Action required: 705 - Other - as specified
Due 8 April 2003
Resolved 19 February 2016
Resolution: Vessel Reflagged Deficiencies no longer apply.
Construction/Loadline › Structures
Issued 14 February 2003
Resolved
Repair/renew the 4th web frame, from the hatch opening, in the stbd aft void to the satisfaction of the attending USCG marine inspector or ABS class surveyor.
Due 18 March 2003
Resolved 10 March 2003
Resolution: Received ABS class survey report stating that swash bulkheads renewed. See attached ABS class survey report.
Construction/Loadline › Structures
Issued 14 February 2003
Resolved
Repair/ renew the 4th, 5th and 6th web frame, from the hatch opening, in the port aft void to the satisfaction of the attending USCG marine inspector or ABS class surveyor.
Due 18 March 2003
Resolved 10 March 2003
Resolution: Received ABS class survey report stating that swash bulkheads renewed. See attached ABS class survey report.
Construction/Loadline › Structures › Longitudinal Bulkhead
Issued 14 February 2003
Resolved
Gauge area around the hole in the side shell, near the 2nd frame in from the hatch, about 1 meter from the deck, port anchor chain locker. After gauging is completed crop and renew to the satisfaction of the attending USCG marine inspector or ABS class surveyor.
Due 18 March 2003
Resolved 27 January 2004
Resolution: 27JAN04: Received all outstanding USCG certificates (COI and Certificate Of Documentation) ). Vessels re-flagged to Vanuatu registry. Forwarded Certificate Of Documentation to NVDC
Construction/Loadline › Structures › Longitudinal Bulkhead
Issued 14 February 2003
Resolved
Gauge area by sewage pump, stbd bulkhead in passage way, near broken welds of pump frame. After gauging is completed submit finding and any repair proposals to the attending USCG marine inspector or ABS class surveyor. Repair as recommended, if necessary. Any repair work must be completed to
Due 18 March 2003
Resolved 27 January 2004
Resolution: 27JAN04: Received all outstanding USCG certificates (COI and Certificate Of Documentation) ). Vessels re-flagged to Vanuatu registry. Forwarded Certificate Of Documentation to NVDC
Construction/Loadline › Structures › Deck Plating
Issued 14 February 2003
Resolved
Original scantlings must be reviewed by USCG marine inspector or ABS class surveyor and compared to the gauging report for the centerline bulkhead in the anchor chain locker. Crop and renew and sub-standard area to the satisfaction of the attending USCG marine inspector or ABS class surveyor.
Due 18 March 2003
Resolved 27 January 2004
Resolution: 27JAN04: Received all outstanding USCG certificates (COI and Certificate Of Documentation) ). Vessels re-flagged to Vanuatu registry. Forwarded Certificate Of Documentation to NVDC
Construction/Loadline › Structures › Transverse Bulkhead
Issued 14 February 2003
Resolved
Crop/renew, close off, holes in transverse bulkhead between the port afte ballast tank and the port aft void tank to the satisfaction of the attending USCG marine inspector or ABS class surveyor.
Due 18 March 2003
Resolved 27 January 2004
Resolution: 27JAN04: Received all outstanding USCG certificates (COI and Certificate Of Documentation) ). Vessels re-flagged to Vanuatu registry. Forwarded Certificate Of Documentation to NVDC
Construction/Loadline › Hull
Issued 14 February 2003
Resolved
Provide a copy of the ABS class survey report to USCG MIO Europe no later than 01Apr03.
Due 1 April 2003
Resolved 22 May 2003
Resolution: Received ABS Survey Report with pages missing. Scanned report into case.
Construction/Loadline › Structures
Issued 14 February 2003
Resolved
Provide final gauging report for the WILLIAM TIDE, from the shipyard to USCG MIO Europe no later than 01APR03
Due 1 April 2003
Resolved 22 May 2003
Resolution: Received final gauging report from Global Spec.
Deck/Cargo
Issued 14 February 2003
Resolved
Have pressure vessels (Bulk-tanks 1-4) ready for internal inspection at the upcoming Certificate of Inspection
Action required: 705 - Other - as specified
Resolved 20 February 2003
Lifesaving › Inflatable Liferafts
Issued 24 January 2002
Resolved
Provide liferaft launching procedures at the liferaft embarkation stations which reflect vessels launching arrangements.
Condition: Design Flaw
Due 26 February 2002
Resolved 26 February 2002
Resolution: Corrected.
Lifesaving › Rescue Boat
Issued 24 January 2002
Resolved
Provide suitable rescue boat in accordance with 46 CFR 108.560.
Condition: Placed in Improper Service
Action required: 705 - Other - as specified
Due 26 February 2002
Resolved 9 January 2003
Resolution: Vessel has rescue boat as per MIO Europe Resue Boat Policy Ltr.
Construction/Loadline › Structures
Issued 24 January 2002
Resolved
Provide Guaging report for the following areas; (1) Blkhd transition between bow thruster rm and tunnel (below deck plates). (2) Port and starboard bulkheads within tunnel from deck plates to bilge. (3 ) Below WTD leading into engineroom (4) Engineroom fwd blkhd from WTD to port blkhd. lwr 6 ft.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 26 February 2002
Resolved 9 January 2003
Resolution: Gauging report provide found sat.
Construction/Loadline › Structures
Issued 24 January 2002
Resolved
Provide repair proposal for item 3 if report warrants repairs.
Condition: Unknown
Due 26 February 2002
Resolved 9 January 2003
Resolution: Vessel to be drydock on 13Feb03.
Construction/Loadline › Structures
Issued 24 January 2002
Resolved
Make suitable repairs to fractured underdeck longitudinal frames above port and starboard main engines.
Condition: Unknown
Due 26 February 2002
Resolved 26 February 2002
Resolution: Corrected
Construction/Loadline › Structures › Deck Plating
Issued 24 January 2002
Resolved
Remove soft patches on overhead above starboard main engine and make suitable repairs. Make full penetration wld on previous overhead repairs in same area.
Condition: Unknown
Due 26 February 2002
Resolved 26 February 2002
Resolution: Corrected
Fire Fighting › Fixed Fire Detection System › Smoke Detectors
Issued 24 January 2002
Resolved
Prove proper operation of all fire and smoke detection systems.
Condition: Improper/Lack of Maintenance
Due 26 February 2002
Resolved 26 February 2002
Resolution: Corrected.
Electrical › Electric Supply System (service)
Issued 24 January 2002
Resolved
Remove duct tape and install metal cover for access opening into hot water heater.
Condition: Improper/Lack of Maintenance
Due 26 February 2002
Resolved 26 February 2002
Resolution: Corrected.
Electrical › Electric Supply System (service) › Cable
Issued 24 January 2002
Resolved
Replace electrical cord with marine grade wiring for main deck lighting on both sides of towing winch.
Condition: Improper Installation
Due 26 February 2002
Resolved 26 February 2002
Resolution: Corrected.
Engineering › Compressed Air System (start air) › Receiver/Bottle
Issued 24 January 2002
Resolved
Provide testing proposal for hydrostatic testing of both main engine air receivers as internal examination is not possible. Upon approval of test, conduct hydrostatic test of both air receivers.
Condition: Unknown
Action required: 705 - Other - as specified
Due 26 February 2002
Resolved 19 February 2016
Resolution: Vessel Reflagged Deficiencies no longer apply.
Electrical › Electrical Distribution System (service)
Issued 24 January 2002
Resolved
Install closure plate to access on inboard side of main switchboard.
Condition: Unknown
Due 26 February 2002
Resolved 26 February 2002
Resolution: Corrected
Fire Fighting › Ventilation Systems
Issued 24 January 2002
Resolved
Provide 30X30 mesh flame screen on all fule oil gooseneck vents.
Condition: Improper/Lack of Maintenance
Due 24 February 2002
Resolved 24 February 2002
Engineering
Issued 6 March 2001
Resolved
Repair the reach rod to the starboard #2 fuel oil day tank suction valve.
Condition: Unknown
Due 22 May 2001
Resolved 22 May 2001
Construction/Loadline
Issued 6 March 2001
Resolved
Make repairs to hull in accordance with ABS outstanding condition of class report no. MS 14703.
Condition: Unknown
Due 22 May 2001
Resolved 22 May 2001
Construction/Loadline
Issued 6 March 2001
Resolved
Prove proper operation of the forepeak bilge valve.
Condition: Unknown
Due 22 May 2001
Resolved 22 May 2001
Construction/Loadline
Issued 6 March 2001
Resolved
Make repairs to the hull in accordance with ABS outstanding condition of class report no. MS 15124.
Condition: Unknown
Due 22 May 2001
Resolved 22 May 2001
Electrical
Issued 6 March 2001
Resolved
Test high jacket water temperature alarms.
Condition: Unknown
Due 22 May 2001
Resolved 22 May 2001
Lifesaving
Issued 6 March 2001
Resolved
Test relief valves for both S/S air recievers.
Condition: Unknown
Due 22 May 2001
Resolved 22 May 2001
Lifesaving
Issued 6 March 2001
Resolved
Label sounding tube for forward peak tank.
Condition: Unknown
Due 22 May 2001
Resolved 22 May 2001
Lifesaving
Issued 6 March 2001
Resolved
Label reach rod for forward peak tank bilge valve.
Condition: Unknown
Due 22 May 2001
Resolved 22 May 2001
Deck/Cargo
Issued 6 March 2001
Resolved
Bench test the dry bulk tank relief valves.
Condition: Unknown
Due 22 May 2001
Resolved 22 May 2001
Lifesaving
Issued 6 March 2001
Resolved
Replace life jacket chemical lights with Coast Guard approved life jacket lights approved for "OCEAN" voyages.
Condition: Unknown
Due 22 May 2001
Resolved 22 May 2001
Engineering
Issued 6 March 2001
Resolved
Test low lube oil shut down alarm.
Condition: Unknown
Due 22 May 2001
Resolved 22 May 2001
Engineering
Issued 6 March 2001
Resolved
Test high jacket water sensor alarms.
Condition: Unknown
Due 22 May 2001
Resolved 22 May 2001
Construction/Loadline
Issued 6 March 2001
Resolved
Renew bilge pump discharge piping.
Condition: Unknown
Due 22 May 2001
Resolved 22 May 2001
Fire Fighting
Issued 6 March 2001
Resolved
Make repairs to the fire pump suction pipe.
Condition: Unknown
Due 22 May 2001
Resolved 22 May 2001
Construction/Loadline
Issued 6 March 2001
Resolved
Renew bilge pump suction piping.
Condition: Unknown
Due 22 May 2001
Resolved 22 May 2001
Electrical
Issued 6 March 2001
Resolved
Test low lube oil pressure alarm on both S/S Generators.
Condition: Unknown
Due 22 May 2001
Resolved 22 May 2001
Construction/Loadline
Issued 6 March 2001
Resolved
Repair starboard engine room emergency escape hatch. Hatch does not close tight.
Condition: Unknown
Due 22 May 2001
Resolved 22 May 2001
Engineering
Issued 6 March 2001
Resolved
Repair the reach rod to the starboard #2 fuel oil tank suction valve.
Condition: Unknown
Due 22 May 2001
Resolved 22 May 2001
Fire Fighting
Issued 3 May 2000
Resolved
Provide international shore connection.
Condition: Unknown
Due 3 May 2000
Resolved 3 May 2000
Engineering
Issued 3 May 2000
Resolved
Prove proper operation of both MDE lube oil shutdowns.
Condition: Unknown
Due 3 May 2000
Resolved 3 May 2000
Construction/Loadline
Issued 3 May 2000
Resolved
Conduct proper repair of hole, located in the bulkhead between the steeringcompartment and the engineroom, IWO the bilge. Temporary repair w/cement patch has been completed. USCG or ABS to witness/test repairs.
Condition: Unknown
Due 3 May 2000
Resolved 3 May 2000
Accommodation/Occupational Safety
Issued 3 May 2000
Resolved
Hard wire galley toaster. Electrical splices are not allowed.
Condition: Unknown
Due 3 May 2000
Resolved 3 May 2000
Electrical
Issued 29 March 1998
Resolved
INSTALL SWITCHBOARD INTERLOCK MECHANISM ON THE MAIN SWITCHBOARD.
Condition: Unknown
Due 6 April 1998
Resolved 6 April 1998
Navigation
Issued 29 March 1998
Resolved
UPDATE LOCAL OPERATING CHARTS TO THE LATEST NOTICE TO MARINERS.
Condition: Unknown
Due 1 May 1998
Resolved 1 May 1998
Construction/Loadline
Issued 29 March 1998
Resolved
MAKE ADJUSTMENTS TO THE ENGINE ROOM ESCAPE SCUTTLES (PORT AND STARBOARD) MASTER WILL VERIFY WATERTIGHTNESS BY WINESSING A HOSE TEST TO SCUTTLES.
Condition: Unknown
Due 6 April 1998
Resolved 6 April 1998
Documentation
Issued 29 March 1998
Resolved
RENEW THE FOLLOWING REGULATION BOOKS: (A) 46CFR41-69, (B) 46CFR90-139 AND (C) 33CFR1-199.
Condition: Unknown
Due 1 May 1998
Resolved 1 May 1998
Engineering
Issued 29 March 1998
Resolved
PRIOR TO GETTING UNDERWAY, PROVE PROPER OPERATION OF THE MAIN DIESEL ENGINEEMERGENCY STOP FROM THE PILOT HOUSE.
Condition: Unknown
Due 6 April 1998
Resolved 6 April 1998
Fire Fighting
Issued 29 March 1998
Resolved
PRIOR TO GETTING UNDERWAY, PROVE PROPER OPERATION OF THE ENGINE ROOM HEAT DETECTORS; FIVE (5).
Condition: Unknown
Due 6 April 1998
Resolved 6 April 1998
Navigation
Issued 29 March 1998
Resolved
RENEW U.S. COAST GUARD NAVIGATION RULES.
Condition: Unknown
Due 1 May 1998
Resolved 1 May 1998
Lifesaving
Issued 29 March 1998
Resolved
PERFORM ANNUAL SERVICING OF LIFERAFTS AT A COAST GUARD APPROVED FACILITY.
Condition: Unknown
Due 1 May 1998
Resolved 1 May 1998
Fire Fighting
Issued 29 March 1998
Resolved
OBTAIN TWO (2) COAST GUARD APPROVED PORTABLE (BII) FIRE EXTINGUISHERS.
Condition: Unknown
Due 1 May 1998
Resolved 1 May 1998
Lifesaving
Issued 15 January 1997
Resolved
Provide proof that both SCBA bottles have been hydrotested.
Condition: Unknown
Due 22 January 1997
Resolved 22 January 1997
Lifesaving
Issued 29 April 1996
Resolved
THE NEW VESSEL MASTER SHALL CONDUCT FIRE & BOAT DRILLS UPON ARRIVAL ONBOARDAND FAX STATEMENT TO MIO EUROPE ATTESTING TO SUCH BY 10MAY96.
Condition: Unknown
Due 29 April 1996
Resolved 29 April 1996
Engineering
Issued 29 April 1996
Resolved
TEST ALL ALARMS ON THE AUTOMATION/ALARM PANELS IN THE PRESENCE OF THE ABS SURVEYOR. THIS REQUIREMENT CAN BE CLEARED VIA A FAXED STATEMENT FROM THE SURVEYOR ATTESTING TO SATISFACTORY OPERATION OF THE SYSTEM. ENGINE ROOM IS TO BE CONTINUOUSLY MANNED WHILE VESSEL IS OPERATING UNTIL THIS IS CLEARED.
Condition: Unknown
Due 30 May 1996
Resolved 9 May 1996
Engineering
Issued 23 January 1995
Resolved
RENEW ALARM CIRCUIT FOR STBD DAY TANK FLOAT ALARM.
Condition: Unknown
Due 23 January 1995
Resolved 23 January 1995
Engineering
Issued 23 January 1995
Resolved
RENEW/REPAIR SHAFT TACH ASSEMBLIES IN E/R BOTH P/S.
Condition: Unknown
Due 23 January 1995
Resolved 23 January 1995
Accommodation/Occupational Safety
Issued 23 January 1995
Resolved
PROVIDE GREASE SCREENS TO RANGE EXHAUST HOOD.
Condition: Unknown
Due 23 January 1995
Resolved 23 January 1995
Lifesaving
Issued 18 March 1994
Resolved
PROVIDE NEW 25 BLANK CARTRIDGES FOR THE LINE THROWING DEVICE.
Condition: Unknown
Due 18 March 1994
Resolved 18 March 1994
Navigation
Issued 18 March 1994
Resolved
PROVIDE VESSEL JWITH COPY OF 46 CFR PARTS 41/69 & 90/139.
Condition: Unknown
Due 18 March 1994
Resolved 18 March 1994
Navigation
Issued 18 March 1994
Resolved
PROVIDE REQUIRED DAY SHAPES.
Condition: Unknown
Due 18 March 1994
Resolved 18 March 1994
Navigation
Issued 18 March 1994
Resolved
PROVIDE CURRENT COPY OF LIGHT LIST.
Condition: Unknown
Due 18 March 1994
Resolved 18 March 1994
Navigation
Issued 18 March 1994
Resolved
PROVIDE CURRENT NOTICE TO MARINERS.
Condition: Unknown
Due 18 March 1994
Resolved 18 March 1994
Construction/Loadline
Issued 28 July 1993
Resolved
PRIOR TO RECEIVING CREDIT FOR DRYDOCKING PROVIDE ABS CERTIFICATION REPAIRS TO PORT SIDESHELL IN WAY OF PORT DAY FUEL TANK. BOTTOM PLATING IN PORT AND STBD VOIDS AND INSERTS JUST ABOVE PORT AND STBD PROPELLERS HAVE BEEN TESTEDAND INSPECTED AS NECESSARY.
Condition: Unknown
Due 23 September 1993
Resolved 23 September 1993
Engineering
Issued 24 January 1993
Resolved
INSTALL LAMPS IN ENGINEROOM MACHINERY ALARM PANEL.
Condition: Unknown
Due 24 January 1993
Resolved 24 January 1993
Electrical
Issued 24 January 1993
Resolved
INSTALL EMERGENCY LIGHTING ILLUMINATING ENGINEROOM EMERGENCY ESCAPES.
Condition: Unknown
Due 8 February 1993
Resolved 24 May 1993
Deck/Cargo
Issued 24 January 1993
Resolved
CONDUCT INTERNAL EXAMINATION OF THE PORT AND STBD AFT BULK TANKS IN THE PRESENCE OF COAST GUARD INSPECTOR.
Condition: Unknown
Due 24 January 1993
Resolved 24 January 1993
Fire Fighting
Issued 24 January 1993
Resolved
SERVICE THE 10# DRY CHEMICAL FIRE BOTTLE IN THE ACCOMMODATION SPACE.
Condition: Unknown
Due 24 January 1993
Resolved 24 May 1993
Navigation
Issued 24 January 1993
Resolved
PROVIDE SAILING DIRECTIONS FOR OPERATING AREA.
Condition: Unknown
Due 24 January 1993
Resolved 24 January 1993
Deck/Cargo
Issued 24 January 1993
Resolved
REPLACE ALL THREE(3) 1 1/2" BULK TANK RELIEF VALVES WITH 2" CG APPROVED RELEIF VALVES AND BENCH TEST THE SAME BEFORE INSTALLATION. FAX RESULTS TO [name withheld] FAX NUMBER [phone withheld].
Condition: Unknown
Due 24 January 1993
Resolved 24 January 1993
Engineering
Issued 24 January 1993
Resolved
INCREASE BOTH MAIN DIESEL ENGINE OVERSPEEDS AND PROVE PROPER OPERATION OF CRANKCASE HIGH PRESSURE SHUTDOWNS.
Condition: Unknown
Due 8 February 1993
Resolved 24 May 1993
Engineering
Issued 24 January 1993
Resolved
POP TEST BOTH ENGINE ROOM AIR RECEIVER RELIEF VALVES. BENCH TEST.
Condition: Unknown
Due 24 February 1993
Resolved 24 May 1993
Lifesaving
Issued 24 January 1993
Resolved
REPAIR ENGINEROOM GENERAL ALARM LIGHT.
Condition: Unknown
Due 24 February 1993
Resolved 24 May 1993
Electrical
Issued 24 January 1993
Resolved
INSTALL LAMPS IN ENGINEROOM ELECTRICAL SWITCHBOARD.
Condition: Unknown
Due 24 January 1993
Resolved 24 January 1993
Navigation
Issued 24 January 1993
Resolved
PROVE PROPER OPERATION OF ENGINE ROOM EMERGENCY STEERING CONTROL.
Condition: Unknown
Due 24 January 1993
Resolved 24 January 1993
Deck/Cargo
Issued 24 January 1993
Resolved
RETEST OPERATION OF ALL BULK TANK RELIEF VALVES. MAXIMUM OPENING PRESSURE NOT TO EXCEED 42 PSI AND MINIMUN OPENING PRESSURE NOT BELOW 38 PSI. FAX RESULTS TO [name withheld] FAX [phone withheld].
Condition: Unknown
Due 24 January 1993
Resolved 24 January 1993
Engineering
Issued 10 February 1991
Resolved
INSTALL NEW AIR PRESSURE GAUGES ON BOTH PORT AND STARBOARD AIR RECEIVERS AND PROVE PROPER OPERATION OF RELIEF VALVES.
Condition: Unknown
Due 10 February 1991
Resolved 10 February 1991
Documentation
Issued 10 February 1991
Resolved
PROVIDE CURRENT TIME TABLES AND 46 CFR'S CHAPTERS I AND F.
Condition: Unknown
Due 10 February 1991
Resolved 10 February 1991
Navigation
Issued 10 February 1991
Resolved
PROVE PROPER OPERATION OF POWER FAILURE STEERING ALARM USING NUMBER ONE STEERING PUMP.
Condition: Unknown
Due 10 February 1991
Resolved 10 February 1991
Fire Fighting
Issued 10 February 1991
Resolved
PROVIDE ONE (01) SPARE OXYGEN BOTTLE, DOT APPROVED, FOR SELF-CONTAINED BREATHING APPARATUS.
Condition: Unknown
Due 10 February 1991
Resolved 10 February 1991
Fire Fighting
Issued 10 February 1991
Resolved
PROVIDE ONE (01) COMPLETE FIREMANS OUTFIT.
Condition: Unknown
Due 10 February 1991
Resolved 10 February 1991
Fire Fighting
Issued 10 February 1991
Resolved
INSTALL FIRE PUMP PRESSURE GAUGE ON BRIDGE.
Condition: Unknown
Due 10 February 1991
Resolved 10 February 1991
Electrical
Issued 10 February 1991
Resolved
REPLACE TACHOMETER AND CABLE FOR STARBOARD GENERATOR.
Condition: Unknown
Due 10 February 1991
Resolved 10 February 1991
Lifesaving
Issued 10 February 1991
Resolved
REPLACE ONE RING BUOY WITH A 36 INCH USCG APPROVED RING LIFE BUOY.
Condition: Unknown
Due 10 February 1991
Resolved 10 February 1991
Lifesaving
Issued 10 February 1991
Resolved
PROPERLY SECURE NEW VIKING CRADLES FOR LIFERAFTS TO DECK, PORTS AND STBD AFT OF BRIDGE.
Condition: Unknown
Due 10 February 1991
Resolved 10 February 1991
Lifesaving
Issued 10 February 1991
Resolved
PROVIDE TWO (02) USCG APPROVED SMOKE SIGNALS FOR RING LIFE BUOYS.
Condition: Unknown
Due 10 February 1991
Resolved 10 February 1991
Unknown
Issued 1 February 1985
Resolved
TEST VESSEL ENGINE ROOM ALARMS.
Condition: Unknown
Due 1 February 1985
Resolved 1 February 1985
Unknown
Issued 1 February 1985
Resolved
PROVIDE 4 SAFETY VALVES ON THE LIQUID MUD TANKS PRIOR TO PLACING TANKS IN SERVICE.
Condition: Unknown
Due 1 February 1985
Resolved 1 February 1985
Unknown
Issued 1 February 1985
Resolved
THE FOLLOWING DEFICIENCIES PERTAIN TO WILLIAM TIDE, DN653834.
Condition: Unknown
Due 1 February 1985
Resolved 1 February 1985
Unknown
Issued 1 February 1985
Resolved
REPLACE 4 VENT SCREEN FOR LIQUID MUD TANKS AND AFT STBD LUBOIL VENT(1.)
Condition: Unknown
Due 1 February 1985
Resolved 1 February 1985
Unknown
Issued 1 February 1985
Resolved
REPLACE STBD. DECK LOCKER LIGHT GLOBE.
Condition: Unknown
Due 1 February 1985
Resolved 1 February 1985