DOLPHIN 106
DOLPHIN 106 is a 1982 mobile offshore drilling unit. The Coast Guard has recorded 101 inspections since 1982, most recently in August 2015, along with 148 deficiencies and 1 casualty investigation in 1992.
Records from 1982 to 2015. Most recent: inspection, 4 August 2015.
- Built
- 1982
- Last inspected
- 4 August 2015
- Documentation
- Not in the documentation file of 10 September 2026
- Inspections
- 101
- Deficiencies
- 148 recorded · 0 without a recorded resolution
- Controls
- None recorded without a removal date
- Casualties
- 1 investigation · 1992
Identity
653833
WCJ7760
54716
Flag
UNITED STATES
—
Maury page id
psix-54716
Inspections, by type
…with no type recorded25
Years with a record
29 calendar years (1982–2015)
The 101 inspections in the strip above, split by the kind of activity the US
Coast Guard recorded. Years with a record are calendar years in which a record exists, not
years in service. What Maury does not do.
This record may be incomplete: the most recent inspection recorded for this vessel was 11 years ago. Maury shows what the Coast Guard recorded, not whether the vessel has been inspected since, is still in service, or what condition it is in. Coast Guard record current through 13 September 2026, retrieved 18 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard. Records for the Offshore class in Maury's sources begin in 1978.
Documentation record
Tonnage as PSIX records it943 - Regulatory (Subpart C or D), Gross Ton
943 - Regulatory (Subpart C or D), Net Ton
943 - Regulatory (Subpart C or D), Net Ton
This hull's Official Number is not in the NVDC file dated 10 September 2026 as served by NOAA Fisheries, so no documentation record is shown. Absence from that file is a fact about the file, not about the hull.
Radio station licence
WCJ7760MMSI not assigned · cancelled · voluntarily equipped · granted 15 July 1994, cancelled 14 June 2002
FCC Universal Licensing System ship-station file of 6 September 2026, matched to this hull on its
US Official Number. Status and dates are the file’s own. The licensee is not read from the file and is not shown.
A lapsed licence’s MMSI is still the number the vessel transmitted under while it was valid.
Inspection history · 101
4 August 2015
Load Line/Change of Employment
Administrative · USCG Heartland District · USCG Heartland District (CGD-H) · Activity 5209070
8 November 2010
Damage Survey
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 3887025
14 October 2010
Administrative Inspection
Administrative · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 3869806
7 April 2009
Administrative Inspection
Administrative · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 3452980
18 March 2009
Re-Inspection
Physical examination · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 3447840
23 November 2008
Administrative Inspection
Administrative · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 3367897
9 October 2008
Administrative Inspection
Administrative · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 3341395
27 March 2008
Re-Inspection
Physical examination · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 3172482
22 March 2007
Type not recorded
No type recorded · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 2892777
5 July 2006
Hull Examination
Physical examination · Marine Safety Unit Galveston · USCG Heartland District (CGD-H) · Activity 2740646
6 April 2006
Examination of Repairs · Damage Survey
Physical examination · Sector Mobile · USCG Heartland District (CGD-H) · Activity 2620918
5 October 2005
Type not recorded
No type recorded · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 2516404
5 April 2005
Re-Inspection
Physical examination · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 2327143
27 January 2005
Deficiency Check · Hull Examination
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 2280053
14 April 2004
Re-Inspection
Physical examination · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 2043918
22 September 2002
Administrative Inspection
Administrative · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1678650
15 July 2002
Administrative Inspection
Administrative · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1646730
15 July 2002
Administrative Inspection
Administrative · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1646737
13 March 2002
Annual Inspection
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1493067
7 February 2002
Hull Examination
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1484889
25 August 2001
Administrative
Administrative · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1073144
25 August 2001
Administrative
Administrative · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1073150
31 May 2001
Administrative
Administrative · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1066352
20 May 2001
Administrative
Administrative · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1063812
13 May 2001
Administrative
Administrative · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1064119
15 March 2001
Administrative
Administrative · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1060129
13 February 2001
Administrative
Administrative · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1058040
9 January 2001
COI Inspection
Physical examination · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1061038
9 May 2000
Deficiency Check
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1049381
24 April 2000
Administrative
Administrative · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 816980
10 March 2000
Deficiency Check
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1046195
7 February 2000
Deficiency Check
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 815317
12 January 2000
Re-Inspection · Hull Examination
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1466092
22 January 1999
Deficiency Check · COI Inspection
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1404690
15 January 1999
COI Inspection
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1117340
15 January 1999
Deficiency Check · COI Inspection
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1360760
9 July 1998
Administrative
Administrative · MSO Mobile · USCG Heartland District (CGD-H) · Activity 793712
24 March 1998
Deficiency Check
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1122662
11 March 1998
Administrative
Administrative · MSO Mobile · USCG Heartland District (CGD-H) · Activity 786592
15 January 1998
Re-Inspection
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1426015
3 November 1997
Damage Survey
Physical examination · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1458473
22 September 1997
Administrative
Administrative · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1111559
10 June 1997
Damage Survey
Physical examination · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1425911
13 March 1997
Damage Survey
Physical examination · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1398629
18 January 1997
COI Inspection · Hull Examination
Physical examination · MSO TAMPA · USCG Southeast District (CGD-SE) · Activity 1388196
19 November 1996
Hull Examination
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1102344
6 May 1996
Deficiency Check
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1082339
21 March 1996
Administrative
Administrative · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1078304
21 February 1996
Re-Inspection
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1424195
3 January 1996
Administrative
Administrative · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1188314
14 September 1995
Administrative
Administrative · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1185173
4 August 1995
Type not recorded
No type recorded · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1187228
26 July 1995
Type not recorded
No type recorded · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 883489
9 February 1995
COI Inspection
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1434217
2 February 1994
Re-Inspection
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1431339
22 January 1994
Type not recorded
No type recorded · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 37376
18 November 1993
Hull Examination
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 853793
7 April 1993
Deficiency Check
Physical examination · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 838496
10 February 1993
COI Inspection
Physical examination · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1366795
1 October 1992
Type not recorded
No type recorded · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 832180
2 September 1992
Permit to Proceed
Administrative · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 957357
26 August 1992
Type not recorded
No type recorded · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 167669
20 July 1992
Type not recorded
No type recorded · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 946335
13 May 1992
Administrative
Administrative · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 1268231
7 March 1992
Deficiency Check
Physical examination · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 1262047
3 March 1992
Type not recorded
No type recorded · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 963028
10 February 1992
Re-Inspection
Physical examination · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 943579
21 November 1991
Hull Examination
Physical examination · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 1263087
11 February 1991
COI Inspection
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1218215
21 January 1991
Type not recorded
No type recorded · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 953035
17 April 1990
Type not recorded
No type recorded · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1238758
27 February 1990
Re-Inspection
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1234547
7 February 1990
Administrative
Administrative · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 900060
13 June 1989
Deficiency Check
Physical examination · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1201195
5 May 1989
Deficiency Check
Physical examination · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1348188
28 April 1989
Type not recorded
No type recorded · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1034429
21 February 1989
Deficiency Check
Physical examination · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1348232
10 February 1989
COI Inspection
Physical examination · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1348351
22 November 1988
Hull Examination
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 936720
22 November 1988
Hull Examination
Physical examination · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 1208330
21 September 1988
Type not recorded
No type recorded · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 886907
23 May 1988
Type not recorded
No type recorded · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1044891
6 April 1988
Type not recorded
No type recorded · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1342140
18 March 1988
Administrative
Administrative · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1295637
12 February 1988
Re-Inspection
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1297534
15 October 1987
Hull Examination
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1024623
24 September 1987
Administrative
Administrative · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1321392
28 May 1987
Type not recorded
No type recorded · MIO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1028866
5 February 1987
COI Inspection
Physical examination · MIO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1006622
5 February 1987
Hull Examination
Physical examination · MIO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1333928
28 January 1987
Type not recorded
No type recorded · MIO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1316543
17 June 1986
Deficiency Check
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1300316
28 April 1986
Type not recorded
No type recorded · MIO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 992504
19 February 1986
Type not recorded
No type recorded · MIO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 996793
23 January 1986
Re-Inspection
Physical examination · MIO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1293457
14 March 1985
Type not recorded
No type recorded · MIO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1291576
13 December 1984
Type not recorded
No type recorded · MIO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1286272
13 December 1984
Type not recorded
No type recorded · MIO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1316644
6 May 1983
Type not recorded
No type recorded · MIO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 968478
31 December 1982
Type not recorded
No type recorded · MIO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1274855
31 December 1982
Type not recorded
No type recorded · MIO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1282447
Deficiency record · 148
Deck/Cargo › Mooring/Anchoring › Winch
Issued 8 November 2010
Resolved
Evaluate and repair #2 leg jacking gear system. Provide the Marine Inspector with a tech. report showing the cause of the failure and the repairs made.
Deck/Cargo › Mooring/Anchoring › Winch
Issued 8 November 2010
Resolved
Evaluate #1, #3, & #4 legs jacking gear systems to ensure proper operation.
Engineering › Compressed Air System (control) › Receiver/Bottle
Issued 27 March 2008
Resolved
Air Receiver needs UlA and exam conducted, or replace.
Lifesaving › Lifeboat › Propulsion Engine
Issued 27 March 2008
Resolved
Repair Exhust leak on lifeboat engine.
Construction/Loadline › Hull › Hull Plating
Issued 8 April 2006
Resolved
No. 3 Port Inboard Wet Tank (repair of cracked longitudinal bulkhead plating and flotation recess (moon pool): -Crop out fractured plating at connection to 10"structural piping connection and reinsert with new plate. -27"(h)X25"(w) X 3/8"(t). Correct as per NVIC 7/68.
Construction/Loadline › Structures › Deck Plating
Issued 6 April 2006
Resolved
No. 3 Port Outboard Wet Tank: -Crop out and reinsert (w/new) one access opening in side shell at bottom plate intersect. -31"(h) X 36"(w) X 3/8"(t). Replace as per NVIC 7/68
Construction/Loadline › Hull › Hull Plating
Issued 6 April 2006
Resolved
No. 5 Port Outboard Wet Tank: -Crop out and renew one access opening in side shell at bottom plate intersect approximately 24" (h) X 18" (w) X 3/8" (t) to the satisfaction of the attending marine inspector.
Construction/Loadline › Hull › Hull Plating
Issued 6 April 2006
Resolved
No. 6 Port Centerline Wet Tank: -Crop out and renew one access opening in side shell (stern) at bottom plate intersect. 24" (h) X 18" (w) X 3/4" (t). Repair as per NVIC 7/68.
Construction/Loadline › Hull › Hull Plating
Issued 6 April 2006
Resolved
No. 7 Port Outboard Wet Tank: -Made proper repairs to previously made insert at Mat Deck to stern plating intersect. Welded out insert to structural member connections and fillet welds that had previously been left incomplete. Repair as required by NVIC 7/68.
Construction/Loadline › Hull › Hull Plating
Issued 6 April 2006
Resolved
No. 3 Starboard Outboard Wet Tank: -Crop out and reinsert (w/ new) one access opening in side shell at bottom plate intersect. 24" (h) X 18" (w) X 3/8" (t). Repair as per NVIC 7/68.
Construction/Loadline › Hull › Hull Plating
Issued 6 April 2006
Resolved
No. 5 Stbd Outboard Wet Tank: -Crop out and reinsert (w/ new) one access opening in side shell at bottom plate intersect. 24" (h) X 18" (w) X 3/8" (t). Repair as per NVIC 7/68.
Construction/Loadline › Hull › Hull Plating
Issued 6 April 2006
Resolved
No. 6 Stbd Centerline Wet Tank. Crop out and reinsert (w/ new) one access opening in side shell (stern) at bottom plate intersect. 24" (h) X 18" (w) X 3/4" (t). Repair as per NVIC 7/68.
Construction/Loadline › Hull › Hull Plating
Issued 6 April 2006
Resolved
No. 7 Stbd Outboard Wet Tank. Crop out and reinsert (w/ new) one access opening in side shell (stern) at bottom plate intersect. 24" (h) X 18" (w) X 3/8" (t). Repair as per NVIC 7/68.
Construction/Loadline › Hull › Hull Plating
Issued 6 April 2006
Resolved
No. 7 Stbd Outboard Wet Tank (repair of inset damage): Cropped out and inserted one section of side shell (stern) plating at insect with top of mat deck. 18" (h) X 18" (w) X 1/2" (t). Cropped out and inserted one section of mat deck plating corresponding to insect with above side shell (stern) plating. 24" (h) X 30" (w) X 3/8" (t).
Construction/Loadline › Hull › Hull Plating
Issued 27 January 2005
Resolved
Complete Phase II of SEILOD before conducting any OCS operation or activities. Vessel is overdue for drydock inspection.
Construction/Loadline
Issued 9 January 2001
Resolved
ARREST CORROSION ON ITEM S FORWARD SECTION OF RIG TO INCLUDE BUT NOT LIMITED TO HELO DECK SUPPORTS, LIFERAFT EMBARKATION DECK SUPPORTS, ETC.
Unknown
Issued 9 January 2001
Resolved
PROVIDE 100 PSI OR LESS SAFETY RELIEF VALVES FOR ALL THREE DOMESTIC HOT WATER HEATERS.
Fire Fighting
Issued 9 January 2001
Resolved
PROVIDE CLOSURE DEVICE FOR VENT ON PAINT LOCKER. MODIFY OPERATING INSTRUCTIONS FOR PAINT LOCKER CO2 TO INCLUDE THE CLOSING OF VENT PRIOR TO DISCHARGE OF CO2.
Engineering
Issued 9 January 2001
Resolved
CONDUCT HYDROSTATIC TEST OF FUEL OIL TRANSFER HOSE TO 1.5 X MAWP.
Lifesaving
Issued 9 January 2001
Resolved
PROVIDE SAFER ACCESS TO SHALE SHAKER AREA.
Construction/Loadline
Issued 10 March 2000
Resolved
Crop and renew wasted bulkhead and/or sideshell plating and stiffeners in No 1 Stbd O/B ballast tank, No 6 port and stbd wing ballast tanks and No 2 stbd wing ballast tank as recommended by ABS UWILD survey report no. MC11948, dated 07FEB00.
Unknown
Issued 12 January 2000
Resolved
Submit copy of ABS hull/UWILD survey report o MSO New Orleans and provide copy of associated hull/structural gaugings for those suspect areas noted in ABS UWILD survey.
Electrical
Issued 12 January 2000
Resolved
Make bilge pump operational from emergency generator circuit.
Electrical
Issued 12 January 2000
Resolved
Make deepwell saltwater pump operational from the emergency generator circuit.
Lifesaving
Issued 12 January 2000
Resolved
Refurbish the port side lifeboat (capsule) including repair/replacement of following: inoperative emergency breathing air regulating valve; wasted steering rudder stock upper support; expired emergency drinking water; wasted fire sprinkler distribution fittings; broken throttle/clutch control
Unknown
Issued 12 January 2000
Resolved
Complete Phase II (underwater swim-by and leg-to-mat critical weld inspection) of SEILODD upon leaving current drilling site (WD 24) and priorto commencing drilling operations at next site.
Fire Fighting
Issued 22 January 1999
Resolved
PROVE PROPER OPERATION OF SMOKE DETECTOR IN ROOM #6.
Electrical
Issued 22 January 1999
Resolved
MARK "E" ON LIGHTING TO MUSTER AREA IN WAY OF LIFE BOAT.
Electrical
Issued 22 January 1999
Resolved
REPLACE BULB IN YELLOW FLASHING LIGHT IN ENGINE ROOM.
Electrical
Issued 22 January 1999
Resolved
REPLACE PLASTIC WIRE TIES IN MUD PITS WITH APPROVED METALIC TIES IAW IEEE STD 45.
Electrical
Issued 22 January 1999
Resolved
REPLACE LOOSE EYS PACKING NUT FOR EXPLOSION PROOF LIGHT IN PAINT LOCKER.
Electrical
Issued 22 January 1999
Resolved
REPAIR SPRUNG SELF CLOSING OUTLET COVERS ON DRILL FLOOR.
Deck/Cargo
Issued 22 January 1999
Resolved
PROVIDE COPY OF ANNUAL/QUADRIENNEL CRANE INSPECTION TEST REPORTS FROM ABS.
Electrical
Issued 22 January 1999
Resolved
PROVIDE WIRE DIAGRAMS FOR ALL MOTOR CONTROLLERS IN SCR ROOM.
Engineering
Issued 22 January 1999
Resolved
MARK WORKING PRESSURE ON FUEL OIL TRANSFER HOSE AS WELL AS "OIL SERVICE" ONHOSE ENDS.
Lifesaving
Issued 22 January 1999
Resolved
IN THE PRESENCE OF A CG MARINE INSPECTOR CONDUCT FULL WEIGHT TEST ON DAVIT LAUNCHED LIFERAFT STATION.
Lifesaving
Issued 22 January 1999
Resolved
REPLACE WORN/HOLED RING BUOYS ON PORT AND STBD SIDE OF RIG (BOTH RING BUOYSW/SMOKES).
Lifesaving
Issued 22 January 1999
Resolved
REPLACE FADED (NOW YELLOW) RING BUOYS ON PORT SIDE HELO DECK, AFTER STERN HOUSE.
Fire Fighting
Issued 22 January 1999
Resolved
PROVIDE INSTRUCTIONS FOR HALON ROOM FIXED FIRE FIGHTING DISCHARGE STATION.
Deck/Cargo
Issued 22 January 1999
Resolved
PROVIDE COPY OF CRANE INSPECTORS DESIGNATED IN WRITING.
Lifesaving
Issued 22 January 1999
Resolved
REPLACE 5 PFD'S FOR ONES IDENTIFIED AS NO LONGER FIT FOR SERVICE.
Fire Fighting
Issued 22 January 1999
Resolved
REPLACE DRILL FLOOR HOSE STATION #15
Electrical
Issued 22 January 1999
Resolved
LABEL SWITCHES ON DRILL FLOOR.
Construction/Loadline
Issued 15 January 1998
Resolved
Provide CG approved fire stop cable penetrations in boundary bulkhead penetrations in the emergency generator space and in the engine room aft bulkhead multi-cable thru-penetration over watertight door.
Accommodation/Occupational Safety
Issued 15 January 1998
Resolved
Replace the existing 150 psi/210 degree pressure/temperature relief valves on both galley water heaters and on the laundry room water heater with relief valves rated at no more than 100 psi/210 degrees F.
Fire Fighting
Issued 15 January 1998
Resolved
Develop and install instruction to be placed by the SCR room Halon system activation stations (remote location and cylinder stowage station) that instructs user to close all fire associated fire dampers prior to activating system. Also properly label fire damper pull cables.
Lifesaving
Issued 15 January 1998
Resolved
Demonstrate compliance with all of the requirements of the 1996 edition of 46CFR109; specifically 109.213. All new requirements for developing a training manual and/or audiovisual training aid program as well as the conducting and loggig of said drills shall be iaw D8 guidance, enclosure(1)
Documentation
Issued 3 November 1997
Resolved
SUBMIT ABS, NDT AND OTHER PERTINENT REPORTS ON LEG REPAIRS TO [name withheld].
Construction/Loadline
Issued 13 March 1997
Resolved
CROP AND RENEW INTERNAL LEG BRACES ON PORT/STBD BOW LEGS. REPLACE LEG RACK TEETH. NDT ALL REPAIRS, BENT BRACES AND LEG WALL THICKNESS. REPAIRS TO BE COMPLETED IN ACCORDANCE WITH APPROVED CONSTRUCTION PORTFOLIO AND TO THE SATISFACTION OF ATTENDING ABS SURVEYOR AND CG INSPECTOR.
Construction/Loadline
Issued 13 March 1997
Resolved
SUBMIT REPAIR PROCEDURES FOR FWD PORT AND STBD LEGS. SUBMIT WELD PROCEDURESAND NDT REPORTS. PROVIDE COPY OF ABS SURVEYOR'S REPORT.
Construction/Loadline
Issued 19 November 1996
Resolved
Open and make ready for inspection the leg jacking mechanism of each leg.
Construction/Loadline
Issued 19 November 1996
Resolved
In the #1 port wing tank: crop and renew all verticle stiffeners full length, corp and renw the 2 transverse underdeck stiffener brackets at sideshell.
Construction/Loadline
Issued 19 November 1996
Resolved
In the #3 port outboard tank: crop and renew the holed and distorted transverse under deck bracket.
Construction/Loadline
Issued 19 November 1996
Resolved
In the #4 port wing tank: make proper repair by welding the piping at dresser coupling.
Construction/Loadline
Issued 19 November 1996
Resolved
In the #6 port wing tank: crop and renew aft most underdeck stiffener and bracket. Scale and clean tank bottom to allow for examination of stiffeners and bottom shell.
Construction/Loadline
Issued 19 November 1996
Resolved
In the #7 port outboard tank: crop and renew transverse bulkhead stringer,scale and clean tank for examination of bottomsiffners and shell, crop and renew the two forward most bottom stiffner together with bottom plating as needed.
Fire Fighting
Issued 19 November 1996
Resolved
Crop and renew wasted piping at fire stations #12 and #15.
Fire Fighting
Issued 19 November 1996
Resolved
Repair/replace leaking valve at fire station #7.
Construction/Loadline
Issued 19 November 1996
Resolved
Provide gauging report on condition of bulkhead at port companion way to laundry room. Above main deck at ladder enclosure and below main deck adjcent to #5 port wing tank.
Construction/Loadline
Issued 19 November 1996
Resolved
In the #5 starboard wing tank: crop and renew all lower brackets at stiffners, crop and renew vertical stiffeners in way of brackets, crop and renew bottom aft trasverse stiffeners, provide gauging report on bottom hull plate.
Construction/Loadline
Issued 19 November 1996
Resolved
In the #6 starboard wing tank: crop and renew under deck stiffners and brackets in first bay, near access hatch.
Construction/Loadline
Issued 19 November 1996
Resolved
In the #6 starboard outboard tank: crop and renew distorted brackets at lower edge of inboard bulkhead, provide strainer on bilge suction pipe.
Construction/Loadline
Issued 19 November 1996
Resolved
Prove proper operation of bilge dewatering system.
Construction/Loadline
Issued 19 November 1996
Resolved
Prove proper opertion of all hull skin valves and associated reach rods.
Construction/Loadline
Issued 19 November 1996
Resolved
Submit guaging report on condition of the #1 starboard wing tank aft bulkhead and starboard side shell.
Construction/Loadline
Issued 19 November 1996
Resolved
Renew bilge suction strainer in #3 starboard wing tank.
Fire Fighting
Issued 19 November 1996
Resolved
Make proper repair of firemain piping where pad welded. Repair leaking pipeat fairemain relief valve.
Construction/Loadline
Issued 19 November 1996
Resolved
Make "watertight" penetrations in bulkhaed of change room.
Construction/Loadline
Issued 19 November 1996
Resolved
Perform phase II (leg to mat) inspection of SELOID.
Lifesaving
Issued 21 February 1996
Resolved
PROVIDE CORRECT OPERATING INSTRUCTIONS FOR LIFERAFT DAVIT.
Engineering
Issued 21 February 1996
Resolved
PROVIDE A GLASS SIGHT GUAGE FOR THE EMERGENCY GENERATOR FUEL TANK.
Lifesaving
Issued 21 February 1996
Resolved
REPLACE FISHING KIT IN LIFE CAPSULE #1.
Lifesaving
Issued 21 February 1996
Resolved
REPLACE LIFERAFT DAVIT CABLE AND PERFORM A WEIGHT TEST OF THE CABLE IN PRESENCE OF A U.S. COAST GUARD MARINE INSPECTOR.
Accommodation/Occupational Safety
Issued 21 February 1996
Resolved
CROP AND RENEW HANDRAILS IN FOLLOWING LOCATIONS: BY LIFERAFT #1, STBDSIDE HELODECK, BY FIRE STATION #10, AND AFT OF AIR CONDITIONING UNITS PORTSIDE HELODECK.
Engineering
Issued 21 February 1996
Resolved
PROVIDE A GOOSENECK VENT AND 30x30 INCH MESH FLAME SCREEN FOR THE EMERGENCYGENERATOR FUEL TANK.
Engineering
Issued 21 February 1996
Resolved
PROPERLY LABEL VALVES AT FUEL MANIFOLD WITH PURPOSE OF VALVE.
Fire Fighting
Issued 21 February 1996
Resolved
REPLACE PITTED FIXED CO2 SYSTEM CYLINDER TO PAINT LOCKER.
Fire Fighting
Issued 21 February 1996
Resolved
REPAIR/REPLACE VALVE HANDLE ON FIRE PUMP #1 SUCTION.
Fire Fighting
Issued 21 February 1996
Resolved
PROVIDE PROPER FLEXIBLE JUMPER HOSE FOR FIREMAIN SYSTEM TO THE DRILL FLOOR THAT IS EQUIVALENT TO SAE-1492 SPECIFICATIONS.
Electrical
Issued 21 February 1996
Resolved
PROVE PROPER OPERATIONS OF OVERSPEED TRIP FOR EMERGENCY GENERATOR.
Fire Fighting
Issued 21 February 1996
Resolved
SUBMIT TO U.S. COAST GUARD (G-MSC) FOR APPROVAL PLANS TO INSTALL A TIME DELAY DEVICE FOR SCR ROOM FIXED HALON SYSTEM.
Electrical
Issued 21 February 1996
Resolved
PROPERLY SECURE ALL FASTENERS TO THE EXPLOSION PROOF MOTOR CONTROLLER ON DRILL FLOOR.
Lifesaving
Issued 21 February 1996
Resolved
REPAIR/REPLACE GENERAL ALARM BELL IN HYDRAULIC ROOM AND GENERAL ALARM ROTATING LIGHT IN ENGINEROOM.
Construction/Loadline
Issued 21 February 1996
Resolved
ADJUST/REPAIR WATERTIGHT DOOR IN MOTORROOM LOCATED BY FIRE EXTINGUISHER #23.
Fire Fighting
Issued 21 February 1996
Resolved
REPLACE PITTED FIXED HALON SYSTEM CYLINDER FOR ENGINEROOM.
Fire Fighting
Issued 21 February 1996
Resolved
REPLACE FADED/UNREADABLE FIRE CONTROL PLAN.
Electrical
Issued 21 February 1996
Resolved
PROPERLY LABEL "E" ALL EMERGENCY LIGHTS IN ENGINEROOM AND ON THE MAINDECK.
Electrical
Issued 21 February 1996
Resolved
PROVIDE AN EMERGENCY LIGHT FOR STAIRWAY LEADING TO ENGINEROOM FROM SCR ROOM.
Fire Fighting
Issued 21 February 1996
Resolved
HYDRO TEST EXPIRED SELF-CONTAINED BREATHING APPARATUS CYLINDER FOR FIREMAN'S OUTFIT IN GALLEY.
Documentation
Issued 9 February 1995
Resolved
RENEW FCC LICENSE.
Deck/Cargo
Issued 9 February 1995
Resolved
PERFORM PROOF LOAD AND ANNUAL CRANE TEST PRIOR TO NEXT RIG MOVE.
Electrical
Issued 9 February 1995
Resolved
PROVIDE SHUTOFF VALVE AT EMERGENCY GENERATOR AND REPLACE SUPPLY LINE TO BE NO GREATER THAN 30IN OF FLEX HOSE.
Construction/Loadline
Issued 18 November 1993
Resolved
PRIOR TO DEPARTURE FROM ZONE BUT NOT LATER THAN 31DEC93 COMPLETE MT OF THE #1 & #2 LEG TO CAN CONNECTIONS AND FINAL SWIM BY OF MAT AS REQUIRED.
Lifesaving
Issued 10 February 1993
Resolved
REPLACE BREATHING AIR (FILL) IN LIFEBOAT.
Construction/Loadline
Issued 10 February 1993
Resolved
REPAIR BILGE SUCTION LINE IN AIR COMPRESSOR ROOM.
Accommodation/Occupational Safety
Issued 10 February 1993
Resolved
REPLACE RELIEF VALVES ON AIR RECEIVERS WITH ASME APPROVED VALVES.
Lifesaving
Issued 10 February 1993
Resolved
CONDUCT LIFEBOAT DAVIT WEIGHT TEST
Electrical
Issued 10 February 1993
Resolved
REPLACE EMERGENCY SHUTDOWN SWITCH BOXES ON DRILL FLOOR WITH CLASS 1 DIVISION II APPROVED BOXES.
Lifesaving
Issued 10 February 1992
Resolved
REPOSITION QUICK RELEASE RING BOUYS TO THE OUTSIDE OF THE RAIL.
Construction/Loadline
Issued 21 November 1991
Resolved
PRESENT FOR VISUAL EXAMINATION BY VIDEO CAMERA THE MAT TOP, SIDES AND BOTTOM PLATING.
Fire Fighting
Issued 27 February 1990
Resolved
PROVIDE A RELIEF VALVE FOR BOTH FIRE PUMPS.
Documentation
Issued 27 February 1990
Resolved
PROVIDE ORDINARY SEAMEN AS PER COI
Fire Fighting
Issued 27 February 1990
Resolved
REPLACE OR HYDRO TEST SPARE COMPOSITE SCBA BOTTLE
Engineering
Issued 27 February 1990
Resolved
REPAIR OR REPLACE AIR RECIEVER RELIEF VALVES.
Engineering
Issued 27 February 1990
Resolved
REPLACE FUEL OIL TRANSFER HOSE AND PROVIDE HYDOSTATIC TEST REPORT.
Engineering
Issued 27 February 1990
Resolved
REMOVE BRASS FITTING FROM FUEL OIL STRAINERS
Electrical
Issued 10 February 1989
Resolved
REPLACE THE NON EXPLOSION PROOF SWITCH BOX ON EXTERIOR FORWARD SHALE SHAKERBULKHEAD WITH EXPLOSION PROOF TYPE OR RE-CONFIGURE FOR COMPLIANCE WITH CLASS I DIVISION I AREA.
Fire Fighting
Issued 10 February 1989
Resolved
PROVIDE A RELIEF VALVE FOR FIRE MAIN.
Unknown
Issued 10 February 1989
Resolved
REPLACE THE FLAME SCREENS ON FUEL OIL VENTS AS NECESSARY.
Unknown
Issued 10 February 1989
Resolved
REPLACE THE BOLTS TO AFT STBD SIDE DERRECK MOUNT.
Unknown
Issued 10 February 1989
Resolved
PROVIDE A FLAME SCREEN FOR PAINT LOCKER EXHAUST VENT.
Fire Fighting
Issued 10 February 1989
Resolved
REPLACE MISSING GENERAL ALARM BELL AFT OF MUD PITS.
Electrical
Issued 10 February 1989
Resolved
REPLACE THE NON EXPLOSIVE PROOF JUNCTION BOX FORWARD OF SHALE SHAKER EXTERIOR BULKHEAD WITH EXPLOSION PROOF TYPE.
Fire Fighting
Issued 12 February 1988
Resolved
PROVIDE ONBOARD AN APPROVED FIRE CONTROL PLAN.
Electrical
Issued 12 February 1988
Resolved
SHOW PROPER OPERATION OF ALL FOUR DIESEL ENGINES THE LOW LUBE OIL PRESSURE SHUT DOWNS.
Unknown
Issued 28 May 1987
Resolved
PRIOR TO PLACING VESSEL IN SERVICE, CONDUCT REQUIRED FIRE AND BOAT DRILLS WITH CREW ON BOARD.
Unknown
Issued 28 May 1987
Resolved
PRIOR TO PLACING VESSEL IN SERVICE, CONDUCT LOAD TEST ON LIFERAFT LAUNCHING DAVIT.
Unknown
Issued 28 May 1987
Resolved
PRIOR TO PLACING VESSEL IN SERVICE, CONDUCT TEST OF HIGH PRESSURE MUD PUMP RELIEF VALVES.
Deck/Cargo
Issued 5 February 1987
Resolved
PRIOR TO PLACING VESSEL IN SERVICE, CONDUCT TEST OF HIGH PRESSURE MUD PUMP RELIEV VALVES.
Fire Fighting
Issued 5 February 1987
Resolved
PRIOR TO PLACING VESSEL IN SERVICE, CONDUCT REQUIRED FIRE AND BOAT DRILLS WITH CREW ON BOARD.
Lifesaving
Issued 5 February 1987
Resolved
PRIOR TO PLACING VESSEL IN SERVICE, CONDUCT LOAD TEST ON LIFERAFT LAUNCHINGDAVIT.
Navigation
Issued 23 January 1986
Resolved
REPAINT THE SIDE LIGHT SCREENS, ANNEX 1 TO COLREGS.
Fire Fighting
Issued 23 January 1986
Resolved
REPLACE FLEXIBLE LOOP ON THE FIXED CO2 SYSTEM FOR THE PAINT LOCKER.
Navigation
Issued 23 January 1986
Resolved
MAKE OPERATIONAL THE OBSTRUCTION LIGHTS ONE OUT OF YOUR WAS INOPERATIVE.
Lifesaving
Issued 23 January 1986
Resolved
LOAD TEST THE DAVIT LAUNCH FALLS AFTER REPALCEMENT.
Lifesaving
Issued 23 January 1986
Resolved
PROVIDE ON BOARD A FIRST AID KIT PER 30 CFR 77.1707 AND 46 CFR 108.707.
Lifesaving
Issued 23 January 1986
Resolved
PROVIDE QUICK RELEASE HOOK FOR THE RESCUE BOAT HOISTING APPARARTUS.
Lifesaving
Issued 23 January 1986
Resolved
[withheld — contains personal information; the deficiency system, dates, and resolution status are shown above]
Electrical
Issued 23 January 1986
Resolved
PROVIDE BLANKS OR COVERS IN DISTRIBUTION PANELS PP1 (PANTRY), LP2 (MESS) AND LP 3 (PASSAGE).
Electrical
Issued 23 January 1986
Resolved
CHOCK ALL BATTERIES STOWED IN BOXES ON HELO DECK.
Construction/Loadline
Issued 23 January 1986
Resolved
PROVIDE A STANDARD DISCHARGE CONNECTION ON BOARD THE VESSEL.
Electrical
Issued 23 January 1986
Resolved
MAKE OPERABLE THE AUTOMATIC BUS TRANSFER.
Deck/Cargo
Issued 23 January 1986
Resolved
REPAIR OF REPLACE BROKEN EXHAUST LINE ON CRANE ENGINE.
Fire Fighting
Issued 23 January 1986
Resolved
PROVIDE SECOND FLAME SAFETY LAMP.
Navigation
Issued 23 January 1986
Resolved
MAKE OPERATIONAL THE FOGHORN.
Lifesaving
Issued 23 January 1986
Resolved
CONDUCT TEST OF THE LINE THROWING APPLIANCE AS REQUIRED PER 46 CFR 97.15-25
Lifesaving
Issued 23 January 1986
Resolved
MANNING IS INCREASE TO 33 TOTAL PERSONS ON BOARD WITH A TOTAL OF 36 LIFE JACKETS. MANNING OVER 33 PERSONS SHALL BE REMOVED FROM THE RIG PRIOR TO 1600, 4:00 PM
Fire Fighting
Issued 23 January 1986
Resolved
PROVIDE THE REQUIRED EQUIPMENT FOR THE LIFE BOAT THAT IS ON BOARD BUT NOT REQUIRED PER THE COI 46 CFR 94.05-5 AND 46 CFR 94.20-30
Fire Fighting
Issued 23 January 1986
Resolved
REPAIR BROKEN HINGES ON FIRE CABINET #11
Lifesaving
Issued 23 January 1986
Resolved
REPLACE FALLS ON THE DAVIT LAUNCH LIFERAFT DUE TO STIFFNESS AND DETERIOATION AT SWAGE FITTING AND REPLACE BROKEN CLIP (SNAP HOOK) ON RELEASE CONTROL CABLE.
Navigation
Issued 23 January 1986
Resolved
PROVIDE ADIAMOND DAY SHAPE PER COLREGS
Navigation
Issued 31 December 1982
Resolved
PRIOR TO JACKING UP ON THE OSC, THE OBSTRUCTION LIGHTS REQUIRED BY SUBCHAP-TER "N" MUST BE INSTALLED AND TESTED.
Unknown
Issued 31 December 1982
Resolved
PRIOR TO INDUSTRIAL OPERATIONS, THE PRESSURE VESSEL ON THE DRILL FLOOR AND ITS RELIEF VALVE MUST BE INSTALLED AND TESTED.
Unknown
Issued 31 December 1982
Resolved
THE FOLLOWING DEFICIENCIES PERTAINS TO THE MODU DOLPHIN TITAN RIG 106, DN653833.
Accommodation/Occupational Safety
Issued 31 December 1982
Resolved
PROVIDE DIVIDERS FOR THE TOILETS IN THE CHANGE ROOM.
Unknown
Issued 31 December 1982
Resolved
SATISFACTORLY RESOLVE ALL PLAN APPROVAL LETTER COMMENTS.
Construction/Loadline
Issued 31 December 1982
Resolved
COMPLETE ALL REQUIRED MARKING AND LABELING AND PERMENANTLY INSTALL ALL PLACARDS AND WARNING SIGNS.
Accommodation/Occupational Safety
Issued 31 December 1982
Resolved
FIRE DAMPER RELEASE CABLES FOR THE SCR ROOM VENTILATION SYSTEMS SHALL BE ROUTED TO RELEASE FROM OUTSIDE THE SCR ROOM.
Casualty record · 1
26 August 1992Major Marine Casualty · role: Involved in a Marine Casualty · activity 167669
Each line is an incident investigation the Coast Guard recorded with this hull among the vessels involved, with the date and the classification the Coast Guard gave it, and the bridge, lock or dam the investigation names where it names one. Involvement is not fault. The investigation narrative is not published. Source: IIR, through 2026.
Ownership record
The Coast Guard's documentation record for this hull -- the Abstract of Title,
with its owners and liens as filed -- is not in PSIX. Ask, and Maury buys it from the National
Vessel Documentation Center, files it here with its date, and every reader of this page gets it.