MAURY USCG vessel records Sign in
← All vessels

DOLPHIN 106

DOLPHIN 106 is a 1982 mobile offshore drilling unit. The Coast Guard has recorded 101 inspections since 1982, most recently in August 2015, along with 148 deficiencies and 1 casualty investigation in 1992.

Records from 1982 to 2015. Most recent: inspection, 4 August 2015.

Built
1982
Last inspected
4 August 2015
Documentation
Not in the documentation file of 10 September 2026
Controls
None recorded without a removal date

Identity

WCJ7760
Flag
UNITED STATES
—
Maury page id
psix-54716

Inspections, by type

…with no type recorded25
Years with a record 29 calendar years (1982–2015)
The 101 inspections in the strip above, split by the kind of activity the US Coast Guard recorded. Years with a record are calendar years in which a record exists, not years in service. What Maury does not do.

This record may be incomplete: the most recent inspection recorded for this vessel was 11 years ago. Maury shows what the Coast Guard recorded, not whether the vessel has been inspected since, is still in service, or what condition it is in. Coast Guard record current through 13 September 2026, retrieved 18 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard. Records for the Offshore class in Maury's sources begin in 1978.

Documentation record

Tonnage as PSIX records it943 - Regulatory (Subpart C or D), Gross Ton
943 - Regulatory (Subpart C or D), Net Ton
This hull's Official Number is not in the NVDC file dated 10 September 2026 as served by NOAA Fisheries, so no documentation record is shown. Absence from that file is a fact about the file, not about the hull.

Radio station licence

WCJ7760MMSI not assigned · cancelled · voluntarily equipped · granted 15 July 1994, cancelled 14 June 2002
FCC Universal Licensing System ship-station file of 6 September 2026, matched to this hull on its US Official Number. Status and dates are the file’s own. The licensee is not read from the file and is not shown. A lapsed licence’s MMSI is still the number the vessel transmitted under while it was valid.

Inspection history · 101

4 August 2015 Load Line/Change of Employment
Administrative · USCG Heartland District · USCG Heartland District (CGD-H) · Activity 5209070
8 November 2010 Damage Survey
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 3887025
14 October 2010 Administrative Inspection
Administrative · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 3869806
7 April 2009 Administrative Inspection
Administrative · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 3452980
18 March 2009 Re-Inspection
Physical examination · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 3447840
23 November 2008 Administrative Inspection
Administrative · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 3367897
9 October 2008 Administrative Inspection
Administrative · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 3341395
27 March 2008 Re-Inspection
Physical examination · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 3172482
22 March 2007 Type not recorded
No type recorded · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 2892777
5 July 2006 Hull Examination
Physical examination · Marine Safety Unit Galveston · USCG Heartland District (CGD-H) · Activity 2740646
6 April 2006 Examination of Repairs · Damage Survey
Physical examination · Sector Mobile · USCG Heartland District (CGD-H) · Activity 2620918
5 October 2005 Type not recorded
No type recorded · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 2516404
5 April 2005 Re-Inspection
Physical examination · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 2327143
27 January 2005 Deficiency Check · Hull Examination
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 2280053
14 April 2004 Re-Inspection
Physical examination · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 2043918
22 September 2002 Administrative Inspection
Administrative · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1678650
15 July 2002 Administrative Inspection
Administrative · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1646730
15 July 2002 Administrative Inspection
Administrative · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1646737
13 March 2002 Annual Inspection
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1493067
7 February 2002 Hull Examination
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1484889
25 August 2001 Administrative
Administrative · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1073144
25 August 2001 Administrative
Administrative · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1073150
31 May 2001 Administrative
Administrative · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1066352
20 May 2001 Administrative
Administrative · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1063812
13 May 2001 Administrative
Administrative · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1064119
15 March 2001 Administrative
Administrative · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1060129
13 February 2001 Administrative
Administrative · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1058040
9 January 2001 COI Inspection
Physical examination · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1061038
9 May 2000 Deficiency Check
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1049381
24 April 2000 Administrative
Administrative · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 816980
10 March 2000 Deficiency Check
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1046195
7 February 2000 Deficiency Check
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 815317
12 January 2000 Re-Inspection · Hull Examination
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1466092
22 January 1999 Deficiency Check · COI Inspection
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1404690
15 January 1999 COI Inspection
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1117340
15 January 1999 Deficiency Check · COI Inspection
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1360760
9 July 1998 Administrative
Administrative · MSO Mobile · USCG Heartland District (CGD-H) · Activity 793712
24 March 1998 Deficiency Check
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1122662
11 March 1998 Administrative
Administrative · MSO Mobile · USCG Heartland District (CGD-H) · Activity 786592
15 January 1998 Re-Inspection
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1426015
3 November 1997 Damage Survey
Physical examination · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1458473
22 September 1997 Administrative
Administrative · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1111559
10 June 1997 Damage Survey
Physical examination · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1425911
13 March 1997 Damage Survey
Physical examination · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1398629
18 January 1997 COI Inspection · Hull Examination
Physical examination · MSO TAMPA · USCG Southeast District (CGD-SE) · Activity 1388196
19 November 1996 Hull Examination
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1102344
6 May 1996 Deficiency Check
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1082339
21 March 1996 Administrative
Administrative · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1078304
21 February 1996 Re-Inspection
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1424195
3 January 1996 Administrative
Administrative · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1188314
14 September 1995 Administrative
Administrative · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1185173
4 August 1995 Type not recorded
No type recorded · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1187228
26 July 1995 Type not recorded
No type recorded · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 883489
9 February 1995 COI Inspection
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1434217
2 February 1994 Re-Inspection
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1431339
22 January 1994 Type not recorded
No type recorded · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 37376
18 November 1993 Hull Examination
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 853793
7 April 1993 Deficiency Check
Physical examination · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 838496
10 February 1993 COI Inspection
Physical examination · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1366795
1 October 1992 Type not recorded
No type recorded · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 832180
2 September 1992 Permit to Proceed
Administrative · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 957357
26 August 1992 Type not recorded
No type recorded · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 167669
20 July 1992 Type not recorded
No type recorded · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 946335
13 May 1992 Administrative
Administrative · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 1268231
7 March 1992 Deficiency Check
Physical examination · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 1262047
3 March 1992 Type not recorded
No type recorded · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 963028
10 February 1992 Re-Inspection
Physical examination · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 943579
21 November 1991 Hull Examination
Physical examination · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 1263087
11 February 1991 COI Inspection
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1218215
21 January 1991 Type not recorded
No type recorded · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 953035
17 April 1990 Type not recorded
No type recorded · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1238758
27 February 1990 Re-Inspection
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1234547
7 February 1990 Administrative
Administrative · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 900060
13 June 1989 Deficiency Check
Physical examination · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1201195
5 May 1989 Deficiency Check
Physical examination · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1348188
28 April 1989 Type not recorded
No type recorded · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1034429
21 February 1989 Deficiency Check
Physical examination · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1348232
10 February 1989 COI Inspection
Physical examination · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1348351
22 November 1988 Hull Examination
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 936720
22 November 1988 Hull Examination
Physical examination · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 1208330
21 September 1988 Type not recorded
No type recorded · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 886907
23 May 1988 Type not recorded
No type recorded · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1044891
6 April 1988 Type not recorded
No type recorded · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1342140
18 March 1988 Administrative
Administrative · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1295637
12 February 1988 Re-Inspection
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1297534
15 October 1987 Hull Examination
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1024623
24 September 1987 Administrative
Administrative · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1321392
28 May 1987 Type not recorded
No type recorded · MIO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1028866
5 February 1987 COI Inspection
Physical examination · MIO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1006622
5 February 1987 Hull Examination
Physical examination · MIO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1333928
28 January 1987 Type not recorded
No type recorded · MIO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1316543
17 June 1986 Deficiency Check
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1300316
28 April 1986 Type not recorded
No type recorded · MIO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 992504
19 February 1986 Type not recorded
No type recorded · MIO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 996793
23 January 1986 Re-Inspection
Physical examination · MIO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1293457
14 March 1985 Type not recorded
No type recorded · MIO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1291576
13 December 1984 Type not recorded
No type recorded · MIO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1286272
13 December 1984 Type not recorded
No type recorded · MIO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1316644
6 May 1983 Type not recorded
No type recorded · MIO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 968478
31 December 1982 Type not recorded
No type recorded · MIO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1274855
31 December 1982 Type not recorded
No type recorded · MIO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1282447

Deficiency record · 148

Deck/Cargo › Mooring/Anchoring › Winch
Issued 8 November 2010 Resolved
Evaluate and repair #2 leg jacking gear system. Provide the Marine Inspector with a tech. report showing the cause of the failure and the repairs made.
Action required: 705 - Other - as specified
Resolved 17 November 2010
Resolution: Received tech. report and witnessed a satisfactory test of the jacking system.
Deck/Cargo › Mooring/Anchoring › Winch
Issued 8 November 2010 Resolved
Evaluate #1, #3, & #4 legs jacking gear systems to ensure proper operation.
Action required: 705 - Other - as specified
Resolved 17 November 2010
Resolution: Received a tech. report showing the repairs and tests done on #1, #2, & #3 and witness a satisfactory test of the jacking system.
Engineering › Compressed Air System (control) › Receiver/Bottle
Issued 27 March 2008 Resolved
Air Receiver needs UlA and exam conducted, or replace.
Action required: 705 - Other - as specified
Due 7 April 2008
Resolved 11 June 2008
Resolution: New air receiver has been installed and U1A has been received.
Lifesaving › Lifeboat › Propulsion Engine
Issued 27 March 2008 Resolved
Repair Exhust leak on lifeboat engine.
Action required: 705 - Other - as specified
Due 2 April 2008
Resolved 31 March 2008
Construction/Loadline › Hull › Hull Plating
Issued 8 April 2006 Resolved
No. 3 Port Inboard Wet Tank (repair of cracked longitudinal bulkhead plating and flotation recess (moon pool): -Crop out fractured plating at connection to 10"structural piping connection and reinsert with new plate. -27"(h)X25"(w) X 3/8"(t). Correct as per NVIC 7/68.
Due 8 April 2006
Resolved 8 April 2006
Resolution: Repaired and tested satisfactorily.
Construction/Loadline › Structures › Deck Plating
Issued 6 April 2006 Resolved
No. 3 Port Outboard Wet Tank: -Crop out and reinsert (w/new) one access opening in side shell at bottom plate intersect. -31"(h) X 36"(w) X 3/8"(t). Replace as per NVIC 7/68
Action required: 705 - Other - as specified
Due 8 April 2006
Resolved 8 April 2006
Resolution: Satisfactory Repair.
Construction/Loadline › Hull › Hull Plating
Issued 6 April 2006 Resolved
No. 5 Port Outboard Wet Tank: -Crop out and renew one access opening in side shell at bottom plate intersect approximately 24" (h) X 18" (w) X 3/8" (t) to the satisfaction of the attending marine inspector.
Action required: 705 - Other - as specified
Due 8 April 2006
Resolved 8 April 2006
Resolution: Repaired and Tested Satisfactorily.
Construction/Loadline › Hull › Hull Plating
Issued 6 April 2006 Resolved
No. 6 Port Centerline Wet Tank: -Crop out and renew one access opening in side shell (stern) at bottom plate intersect. 24" (h) X 18" (w) X 3/4" (t). Repair as per NVIC 7/68.
Due 8 April 2006
Resolved 8 April 2006
Resolution: Repaired and tested sat.
Construction/Loadline › Hull › Hull Plating
Issued 6 April 2006 Resolved
No. 7 Port Outboard Wet Tank: -Made proper repairs to previously made insert at Mat Deck to stern plating intersect. Welded out insert to structural member connections and fillet welds that had previously been left incomplete. Repair as required by NVIC 7/68.
Action required: 705 - Other - as specified
Due 8 April 2006
Resolved 8 April 2006
Resolution: Repaired and tested sat.
Construction/Loadline › Hull › Hull Plating
Issued 6 April 2006 Resolved
No. 3 Starboard Outboard Wet Tank: -Crop out and reinsert (w/ new) one access opening in side shell at bottom plate intersect. 24" (h) X 18" (w) X 3/8" (t). Repair as per NVIC 7/68.
Action required: 705 - Other - as specified
Due 8 April 2006
Resolved 8 April 2006
Resolution: Repaired and tested sat.
Construction/Loadline › Hull › Hull Plating
Issued 6 April 2006 Resolved
No. 5 Stbd Outboard Wet Tank: -Crop out and reinsert (w/ new) one access opening in side shell at bottom plate intersect. 24" (h) X 18" (w) X 3/8" (t). Repair as per NVIC 7/68.
Action required: 705 - Other - as specified
Due 8 April 2006
Resolved 8 April 2006
Resolution: Repaired and tested sat.
Construction/Loadline › Hull › Hull Plating
Issued 6 April 2006 Resolved
No. 6 Stbd Centerline Wet Tank. Crop out and reinsert (w/ new) one access opening in side shell (stern) at bottom plate intersect. 24" (h) X 18" (w) X 3/4" (t). Repair as per NVIC 7/68.
Action required: 705 - Other - as specified
Due 8 April 2006
Resolved 8 April 2006
Resolution: Repaired and tested sat.
Construction/Loadline › Hull › Hull Plating
Issued 6 April 2006 Resolved
No. 7 Stbd Outboard Wet Tank. Crop out and reinsert (w/ new) one access opening in side shell (stern) at bottom plate intersect. 24" (h) X 18" (w) X 3/8" (t). Repair as per NVIC 7/68.
Action required: 705 - Other - as specified
Due 8 April 2006
Resolved 8 April 2006
Resolution: Repaired and tested sat.
Construction/Loadline › Hull › Hull Plating
Issued 6 April 2006 Resolved
No. 7 Stbd Outboard Wet Tank (repair of inset damage): Cropped out and inserted one section of side shell (stern) plating at insect with top of mat deck. 18" (h) X 18" (w) X 1/2" (t). Cropped out and inserted one section of mat deck plating corresponding to insect with above side shell (stern) plating. 24" (h) X 30" (w) X 3/8" (t).
Action required: 705 - Other - as specified
Due 8 April 2006
Resolved 8 April 2006
Resolution: Repaired and tested sat.
Construction/Loadline › Hull › Hull Plating
Issued 27 January 2005 Resolved
Complete Phase II of SEILOD before conducting any OCS operation or activities. Vessel is overdue for drydock inspection.
Action required: 705 - Other - as specified
Resolved 29 January 2005
Resolution: Vessel completed Phase II of SEILOD. Vessel is cleared for operations.
Construction/Loadline
Issued 9 January 2001 Resolved
ARREST CORROSION ON ITEM S FORWARD SECTION OF RIG TO INCLUDE BUT NOT LIMITED TO HELO DECK SUPPORTS, LIFERAFT EMBARKATION DECK SUPPORTS, ETC.
Condition: Unknown
Due 7 March 2001
Resolved 7 March 2001
Unknown
Issued 9 January 2001 Resolved
PROVIDE 100 PSI OR LESS SAFETY RELIEF VALVES FOR ALL THREE DOMESTIC HOT WATER HEATERS.
Condition: Unknown
Due 31 January 2001
Resolved 31 January 2001
Fire Fighting
Issued 9 January 2001 Resolved
PROVIDE CLOSURE DEVICE FOR VENT ON PAINT LOCKER. MODIFY OPERATING INSTRUCTIONS FOR PAINT LOCKER CO2 TO INCLUDE THE CLOSING OF VENT PRIOR TO DISCHARGE OF CO2.
Condition: Unknown
Due 31 January 2001
Resolved 31 January 2001
Engineering
Issued 9 January 2001 Resolved
CONDUCT HYDROSTATIC TEST OF FUEL OIL TRANSFER HOSE TO 1.5 X MAWP.
Condition: Unknown
Due 31 January 2001
Resolved 31 January 2001
Lifesaving
Issued 9 January 2001 Resolved
PROVIDE SAFER ACCESS TO SHALE SHAKER AREA.
Condition: Unknown
Due 31 January 2001
Resolved 31 January 2001
Construction/Loadline
Issued 10 March 2000 Resolved
Crop and renew wasted bulkhead and/or sideshell plating and stiffeners in No 1 Stbd O/B ballast tank, No 6 port and stbd wing ballast tanks and No 2 stbd wing ballast tank as recommended by ABS UWILD survey report no. MC11948, dated 07FEB00.
Condition: Unknown
Due 10 March 2000
Resolved 10 March 2000
Unknown
Issued 12 January 2000 Resolved
Submit copy of ABS hull/UWILD survey report o MSO New Orleans and provide copy of associated hull/structural gaugings for those suspect areas noted in ABS UWILD survey.
Condition: Unknown
Due 12 January 2000
Resolved 12 January 2000
Electrical
Issued 12 January 2000 Resolved
Make bilge pump operational from emergency generator circuit.
Condition: Unknown
Due 12 January 2000
Resolved 12 January 2000
Electrical
Issued 12 January 2000 Resolved
Make deepwell saltwater pump operational from the emergency generator circuit.
Condition: Unknown
Due 12 January 2000
Resolved 12 January 2000
Lifesaving
Issued 12 January 2000 Resolved
Refurbish the port side lifeboat (capsule) including repair/replacement of following: inoperative emergency breathing air regulating valve; wasted steering rudder stock upper support; expired emergency drinking water; wasted fire sprinkler distribution fittings; broken throttle/clutch control
Condition: Unknown
Due 12 January 2000
Resolved 12 January 2000
Unknown
Issued 12 January 2000 Resolved
Complete Phase II (underwater swim-by and leg-to-mat critical weld inspection) of SEILODD upon leaving current drilling site (WD 24) and priorto commencing drilling operations at next site.
Condition: Unknown
Due 12 January 2000
Resolved 12 January 2000
Fire Fighting
Issued 22 January 1999 Resolved
PROVE PROPER OPERATION OF SMOKE DETECTOR IN ROOM #6.
Condition: Unknown
Due 8 February 1999
Resolved 8 February 1999
Electrical
Issued 22 January 1999 Resolved
MARK "E" ON LIGHTING TO MUSTER AREA IN WAY OF LIFE BOAT.
Condition: Unknown
Due 8 February 1999
Resolved 8 February 1999
Electrical
Issued 22 January 1999 Resolved
REPLACE BULB IN YELLOW FLASHING LIGHT IN ENGINE ROOM.
Condition: Unknown
Due 9 February 1999
Resolved 9 February 1999
Electrical
Issued 22 January 1999 Resolved
REPLACE PLASTIC WIRE TIES IN MUD PITS WITH APPROVED METALIC TIES IAW IEEE STD 45.
Condition: Unknown
Due 9 February 1999
Resolved 9 February 1999
Electrical
Issued 22 January 1999 Resolved
REPLACE LOOSE EYS PACKING NUT FOR EXPLOSION PROOF LIGHT IN PAINT LOCKER.
Condition: Unknown
Due 8 February 1999
Resolved 8 February 1999
Electrical
Issued 22 January 1999 Resolved
REPAIR SPRUNG SELF CLOSING OUTLET COVERS ON DRILL FLOOR.
Condition: Unknown
Due 8 February 1999
Resolved 8 February 1999
Deck/Cargo
Issued 22 January 1999 Resolved
PROVIDE COPY OF ANNUAL/QUADRIENNEL CRANE INSPECTION TEST REPORTS FROM ABS.
Condition: Unknown
Due 8 February 1999
Resolved 8 February 1999
Electrical
Issued 22 January 1999 Resolved
PROVIDE WIRE DIAGRAMS FOR ALL MOTOR CONTROLLERS IN SCR ROOM.
Condition: Unknown
Due 8 February 1999
Resolved 8 February 1999
Engineering
Issued 22 January 1999 Resolved
MARK WORKING PRESSURE ON FUEL OIL TRANSFER HOSE AS WELL AS "OIL SERVICE" ONHOSE ENDS.
Condition: Unknown
Due 8 February 1999
Resolved 8 February 1999
Lifesaving
Issued 22 January 1999 Resolved
IN THE PRESENCE OF A CG MARINE INSPECTOR CONDUCT FULL WEIGHT TEST ON DAVIT LAUNCHED LIFERAFT STATION.
Condition: Unknown
Due 8 February 1999
Resolved 8 February 1999
Lifesaving
Issued 22 January 1999 Resolved
REPLACE WORN/HOLED RING BUOYS ON PORT AND STBD SIDE OF RIG (BOTH RING BUOYSW/SMOKES).
Condition: Unknown
Due 8 February 1999
Resolved 8 February 1999
Lifesaving
Issued 22 January 1999 Resolved
REPLACE FADED (NOW YELLOW) RING BUOYS ON PORT SIDE HELO DECK, AFTER STERN HOUSE.
Condition: Unknown
Due 8 February 1999
Resolved 8 February 1999
Fire Fighting
Issued 22 January 1999 Resolved
PROVIDE INSTRUCTIONS FOR HALON ROOM FIXED FIRE FIGHTING DISCHARGE STATION.
Condition: Unknown
Due 8 February 1999
Resolved 8 February 1999
Deck/Cargo
Issued 22 January 1999 Resolved
PROVIDE COPY OF CRANE INSPECTORS DESIGNATED IN WRITING.
Condition: Unknown
Due 8 February 1999
Resolved 8 February 1999
Lifesaving
Issued 22 January 1999 Resolved
REPLACE 5 PFD'S FOR ONES IDENTIFIED AS NO LONGER FIT FOR SERVICE.
Condition: Unknown
Due 8 February 1999
Resolved 8 February 1999
Fire Fighting
Issued 22 January 1999 Resolved
REPLACE DRILL FLOOR HOSE STATION #15
Condition: Unknown
Due 8 February 1999
Resolved 8 February 1999
Electrical
Issued 22 January 1999 Resolved
LABEL SWITCHES ON DRILL FLOOR.
Condition: Unknown
Due 9 February 1999
Resolved 9 February 1999
Construction/Loadline
Issued 15 January 1998 Resolved
Provide CG approved fire stop cable penetrations in boundary bulkhead penetrations in the emergency generator space and in the engine room aft bulkhead multi-cable thru-penetration over watertight door.
Condition: Unknown
Due 11 February 1998
Resolved 11 February 1998
Accommodation/Occupational Safety
Issued 15 January 1998 Resolved
Replace the existing 150 psi/210 degree pressure/temperature relief valves on both galley water heaters and on the laundry room water heater with relief valves rated at no more than 100 psi/210 degrees F.
Condition: Unknown
Due 28 January 1998
Resolved 28 January 1998
Fire Fighting
Issued 15 January 1998 Resolved
Develop and install instruction to be placed by the SCR room Halon system activation stations (remote location and cylinder stowage station) that instructs user to close all fire associated fire dampers prior to activating system. Also properly label fire damper pull cables.
Condition: Unknown
Due 28 January 1998
Resolved 28 January 1998
Lifesaving
Issued 15 January 1998 Resolved
Demonstrate compliance with all of the requirements of the 1996 edition of 46CFR109; specifically 109.213. All new requirements for developing a training manual and/or audiovisual training aid program as well as the conducting and loggig of said drills shall be iaw D8 guidance, enclosure(1)
Condition: Unknown
Due 15 January 1998
Resolved 15 January 1998
Documentation
Issued 3 November 1997 Resolved
SUBMIT ABS, NDT AND OTHER PERTINENT REPORTS ON LEG REPAIRS TO [name withheld].
Condition: Unknown
Due 3 November 1997
Resolved 3 November 1997
Construction/Loadline
Issued 13 March 1997 Resolved
CROP AND RENEW INTERNAL LEG BRACES ON PORT/STBD BOW LEGS. REPLACE LEG RACK TEETH. NDT ALL REPAIRS, BENT BRACES AND LEG WALL THICKNESS. REPAIRS TO BE COMPLETED IN ACCORDANCE WITH APPROVED CONSTRUCTION PORTFOLIO AND TO THE SATISFACTION OF ATTENDING ABS SURVEYOR AND CG INSPECTOR.
Condition: Unknown
Due 17 March 1997
Resolved 17 March 1997
Construction/Loadline
Issued 13 March 1997 Resolved
SUBMIT REPAIR PROCEDURES FOR FWD PORT AND STBD LEGS. SUBMIT WELD PROCEDURESAND NDT REPORTS. PROVIDE COPY OF ABS SURVEYOR'S REPORT.
Condition: Unknown
Due 13 March 1997
Resolved 13 March 1997
Construction/Loadline
Issued 19 November 1996 Resolved
Open and make ready for inspection the leg jacking mechanism of each leg.
Condition: Unknown
Due 19 November 1996
Resolved 19 November 1996
Construction/Loadline
Issued 19 November 1996 Resolved
In the #1 port wing tank: crop and renew all verticle stiffeners full length, corp and renw the 2 transverse underdeck stiffener brackets at sideshell.
Condition: Unknown
Due 19 November 1996
Resolved 19 November 1996
Construction/Loadline
Issued 19 November 1996 Resolved
In the #3 port outboard tank: crop and renew the holed and distorted transverse under deck bracket.
Condition: Unknown
Due 19 November 1996
Resolved 19 November 1996
Construction/Loadline
Issued 19 November 1996 Resolved
In the #4 port wing tank: make proper repair by welding the piping at dresser coupling.
Condition: Unknown
Due 19 November 1996
Resolved 19 November 1996
Construction/Loadline
Issued 19 November 1996 Resolved
In the #6 port wing tank: crop and renew aft most underdeck stiffener and bracket. Scale and clean tank bottom to allow for examination of stiffeners and bottom shell.
Condition: Unknown
Due 19 November 1996
Resolved 19 November 1996
Construction/Loadline
Issued 19 November 1996 Resolved
In the #7 port outboard tank: crop and renew transverse bulkhead stringer,scale and clean tank for examination of bottomsiffners and shell, crop and renew the two forward most bottom stiffner together with bottom plating as needed.
Condition: Unknown
Due 19 November 1996
Resolved 19 November 1996
Fire Fighting
Issued 19 November 1996 Resolved
Crop and renew wasted piping at fire stations #12 and #15.
Condition: Unknown
Due 19 November 1996
Resolved 19 November 1996
Fire Fighting
Issued 19 November 1996 Resolved
Repair/replace leaking valve at fire station #7.
Condition: Unknown
Due 19 November 1996
Resolved 19 November 1996
Construction/Loadline
Issued 19 November 1996 Resolved
Provide gauging report on condition of bulkhead at port companion way to laundry room. Above main deck at ladder enclosure and below main deck adjcent to #5 port wing tank.
Condition: Unknown
Due 19 November 1996
Resolved 19 November 1996
Construction/Loadline
Issued 19 November 1996 Resolved
In the #5 starboard wing tank: crop and renew all lower brackets at stiffners, crop and renew vertical stiffeners in way of brackets, crop and renew bottom aft trasverse stiffeners, provide gauging report on bottom hull plate.
Condition: Unknown
Due 19 November 1996
Resolved 19 November 1996
Construction/Loadline
Issued 19 November 1996 Resolved
In the #6 starboard wing tank: crop and renew under deck stiffners and brackets in first bay, near access hatch.
Condition: Unknown
Due 19 November 1996
Resolved 19 November 1996
Construction/Loadline
Issued 19 November 1996 Resolved
In the #6 starboard outboard tank: crop and renew distorted brackets at lower edge of inboard bulkhead, provide strainer on bilge suction pipe.
Condition: Unknown
Due 19 November 1996
Resolved 19 November 1996
Construction/Loadline
Issued 19 November 1996 Resolved
Prove proper operation of bilge dewatering system.
Condition: Unknown
Due 19 November 1996
Resolved 19 November 1996
Construction/Loadline
Issued 19 November 1996 Resolved
Prove proper opertion of all hull skin valves and associated reach rods.
Condition: Unknown
Due 19 November 1996
Resolved 19 November 1996
Construction/Loadline
Issued 19 November 1996 Resolved
Submit guaging report on condition of the #1 starboard wing tank aft bulkhead and starboard side shell.
Condition: Unknown
Due 19 November 1996
Resolved 19 November 1996
Construction/Loadline
Issued 19 November 1996 Resolved
Renew bilge suction strainer in #3 starboard wing tank.
Condition: Unknown
Due 19 November 1996
Resolved 19 November 1996
Fire Fighting
Issued 19 November 1996 Resolved
Make proper repair of firemain piping where pad welded. Repair leaking pipeat fairemain relief valve.
Condition: Unknown
Due 19 November 1996
Resolved 19 November 1996
Construction/Loadline
Issued 19 November 1996 Resolved
Make "watertight" penetrations in bulkhaed of change room.
Condition: Unknown
Due 19 November 1996
Resolved 19 November 1996
Construction/Loadline
Issued 19 November 1996 Resolved
Perform phase II (leg to mat) inspection of SELOID.
Condition: Unknown
Due 19 November 1996
Resolved 19 November 1996
Lifesaving
Issued 21 February 1996 Resolved
PROVIDE CORRECT OPERATING INSTRUCTIONS FOR LIFERAFT DAVIT.
Condition: Unknown
Due 15 April 1996
Resolved 15 April 1996
Engineering
Issued 21 February 1996 Resolved
PROVIDE A GLASS SIGHT GUAGE FOR THE EMERGENCY GENERATOR FUEL TANK.
Condition: Unknown
Due 15 April 1996
Resolved 15 April 1996
Lifesaving
Issued 21 February 1996 Resolved
REPLACE FISHING KIT IN LIFE CAPSULE #1.
Condition: Unknown
Due 15 April 1996
Resolved 15 April 1996
Lifesaving
Issued 21 February 1996 Resolved
REPLACE LIFERAFT DAVIT CABLE AND PERFORM A WEIGHT TEST OF THE CABLE IN PRESENCE OF A U.S. COAST GUARD MARINE INSPECTOR.
Condition: Unknown
Due 15 April 1996
Resolved 15 April 1996
Accommodation/Occupational Safety
Issued 21 February 1996 Resolved
CROP AND RENEW HANDRAILS IN FOLLOWING LOCATIONS: BY LIFERAFT #1, STBDSIDE HELODECK, BY FIRE STATION #10, AND AFT OF AIR CONDITIONING UNITS PORTSIDE HELODECK.
Condition: Unknown
Due 15 April 1996
Resolved 15 April 1996
Engineering
Issued 21 February 1996 Resolved
PROVIDE A GOOSENECK VENT AND 30x30 INCH MESH FLAME SCREEN FOR THE EMERGENCYGENERATOR FUEL TANK.
Condition: Unknown
Due 15 April 1996
Resolved 15 April 1996
Engineering
Issued 21 February 1996 Resolved
PROPERLY LABEL VALVES AT FUEL MANIFOLD WITH PURPOSE OF VALVE.
Condition: Unknown
Due 15 April 1996
Resolved 15 April 1996
Fire Fighting
Issued 21 February 1996 Resolved
REPLACE PITTED FIXED CO2 SYSTEM CYLINDER TO PAINT LOCKER.
Condition: Unknown
Due 15 April 1996
Resolved 15 April 1996
Fire Fighting
Issued 21 February 1996 Resolved
REPAIR/REPLACE VALVE HANDLE ON FIRE PUMP #1 SUCTION.
Condition: Unknown
Due 15 April 1996
Resolved 15 April 1996
Fire Fighting
Issued 21 February 1996 Resolved
PROVIDE PROPER FLEXIBLE JUMPER HOSE FOR FIREMAIN SYSTEM TO THE DRILL FLOOR THAT IS EQUIVALENT TO SAE-1492 SPECIFICATIONS.
Condition: Unknown
Due 15 April 1996
Resolved 15 April 1996
Electrical
Issued 21 February 1996 Resolved
PROVE PROPER OPERATIONS OF OVERSPEED TRIP FOR EMERGENCY GENERATOR.
Condition: Unknown
Due 15 April 1996
Resolved 15 April 1996
Fire Fighting
Issued 21 February 1996 Resolved
SUBMIT TO U.S. COAST GUARD (G-MSC) FOR APPROVAL PLANS TO INSTALL A TIME DELAY DEVICE FOR SCR ROOM FIXED HALON SYSTEM.
Condition: Unknown
Due 15 March 1996
Resolved 15 March 1996
Electrical
Issued 21 February 1996 Resolved
PROPERLY SECURE ALL FASTENERS TO THE EXPLOSION PROOF MOTOR CONTROLLER ON DRILL FLOOR.
Condition: Unknown
Due 15 April 1996
Resolved 15 April 1996
Lifesaving
Issued 21 February 1996 Resolved
REPAIR/REPLACE GENERAL ALARM BELL IN HYDRAULIC ROOM AND GENERAL ALARM ROTATING LIGHT IN ENGINEROOM.
Condition: Unknown
Due 15 April 1996
Resolved 15 April 1996
Construction/Loadline
Issued 21 February 1996 Resolved
ADJUST/REPAIR WATERTIGHT DOOR IN MOTORROOM LOCATED BY FIRE EXTINGUISHER #23.
Condition: Unknown
Due 15 April 1996
Resolved 15 April 1996
Fire Fighting
Issued 21 February 1996 Resolved
REPLACE PITTED FIXED HALON SYSTEM CYLINDER FOR ENGINEROOM.
Condition: Unknown
Due 15 April 1996
Resolved 15 April 1996
Fire Fighting
Issued 21 February 1996 Resolved
REPLACE FADED/UNREADABLE FIRE CONTROL PLAN.
Condition: Unknown
Due 15 April 1996
Resolved 15 April 1996
Electrical
Issued 21 February 1996 Resolved
PROPERLY LABEL "E" ALL EMERGENCY LIGHTS IN ENGINEROOM AND ON THE MAINDECK.
Condition: Unknown
Due 15 April 1996
Resolved 15 April 1996
Electrical
Issued 21 February 1996 Resolved
PROVIDE AN EMERGENCY LIGHT FOR STAIRWAY LEADING TO ENGINEROOM FROM SCR ROOM.
Condition: Unknown
Due 15 April 1996
Resolved 15 April 1996
Fire Fighting
Issued 21 February 1996 Resolved
HYDRO TEST EXPIRED SELF-CONTAINED BREATHING APPARATUS CYLINDER FOR FIREMAN'S OUTFIT IN GALLEY.
Condition: Unknown
Due 15 April 1996
Resolved 15 April 1996
Documentation
Issued 9 February 1995 Resolved
RENEW FCC LICENSE.
Condition: Unknown
Due 9 March 1995
Resolved 17 February 1995
Deck/Cargo
Issued 9 February 1995 Resolved
PERFORM PROOF LOAD AND ANNUAL CRANE TEST PRIOR TO NEXT RIG MOVE.
Condition: Unknown
Due 23 February 1995
Resolved 17 February 1995
Electrical
Issued 9 February 1995 Resolved
PROVIDE SHUTOFF VALVE AT EMERGENCY GENERATOR AND REPLACE SUPPLY LINE TO BE NO GREATER THAN 30IN OF FLEX HOSE.
Condition: Unknown
Due 9 March 1995
Resolved 17 February 1995
Construction/Loadline
Issued 18 November 1993 Resolved
PRIOR TO DEPARTURE FROM ZONE BUT NOT LATER THAN 31DEC93 COMPLETE MT OF THE #1 & #2 LEG TO CAN CONNECTIONS AND FINAL SWIM BY OF MAT AS REQUIRED.
Condition: Unknown
Due 4 January 1994
Resolved 4 January 1994
Lifesaving
Issued 10 February 1993 Resolved
REPLACE BREATHING AIR (FILL) IN LIFEBOAT.
Condition: Unknown
Due 26 February 1993
Resolved 26 February 1993
Construction/Loadline
Issued 10 February 1993 Resolved
REPAIR BILGE SUCTION LINE IN AIR COMPRESSOR ROOM.
Condition: Unknown
Due 26 February 1993
Resolved 26 February 1993
Accommodation/Occupational Safety
Issued 10 February 1993 Resolved
REPLACE RELIEF VALVES ON AIR RECEIVERS WITH ASME APPROVED VALVES.
Condition: Unknown
Due 26 February 1993
Resolved 26 February 1993
Lifesaving
Issued 10 February 1993 Resolved
CONDUCT LIFEBOAT DAVIT WEIGHT TEST
Condition: Unknown
Due 26 February 1993
Resolved 26 February 1993
Electrical
Issued 10 February 1993 Resolved
REPLACE EMERGENCY SHUTDOWN SWITCH BOXES ON DRILL FLOOR WITH CLASS 1 DIVISION II APPROVED BOXES.
Condition: Unknown
Due 26 February 1993
Resolved 26 February 1993
Lifesaving
Issued 10 February 1992 Resolved
REPOSITION QUICK RELEASE RING BOUYS TO THE OUTSIDE OF THE RAIL.
Condition: Unknown
Due 10 February 1992
Resolved 10 February 1992
Construction/Loadline
Issued 21 November 1991 Resolved
PRESENT FOR VISUAL EXAMINATION BY VIDEO CAMERA THE MAT TOP, SIDES AND BOTTOM PLATING.
Condition: Unknown
Due 21 November 1991
Resolved 21 November 1991
Fire Fighting
Issued 27 February 1990 Resolved
PROVIDE A RELIEF VALVE FOR BOTH FIRE PUMPS.
Condition: Unknown
Due 27 February 1990
Resolved 27 February 1990
Documentation
Issued 27 February 1990 Resolved
PROVIDE ORDINARY SEAMEN AS PER COI
Condition: Unknown
Due 27 February 1990
Resolved 27 February 1990
Fire Fighting
Issued 27 February 1990 Resolved
REPLACE OR HYDRO TEST SPARE COMPOSITE SCBA BOTTLE
Condition: Unknown
Due 27 February 1990
Resolved 27 February 1990
Engineering
Issued 27 February 1990 Resolved
REPAIR OR REPLACE AIR RECIEVER RELIEF VALVES.
Condition: Unknown
Due 27 February 1990
Resolved 27 February 1990
Engineering
Issued 27 February 1990 Resolved
REPLACE FUEL OIL TRANSFER HOSE AND PROVIDE HYDOSTATIC TEST REPORT.
Condition: Unknown
Due 27 February 1990
Resolved 27 February 1990
Engineering
Issued 27 February 1990 Resolved
REMOVE BRASS FITTING FROM FUEL OIL STRAINERS
Condition: Unknown
Due 27 February 1990
Resolved 27 February 1990
Electrical
Issued 10 February 1989 Resolved
REPLACE THE NON EXPLOSION PROOF SWITCH BOX ON EXTERIOR FORWARD SHALE SHAKERBULKHEAD WITH EXPLOSION PROOF TYPE OR RE-CONFIGURE FOR COMPLIANCE WITH CLASS I DIVISION I AREA.
Condition: Unknown
Due 10 February 1989
Resolved 10 February 1989
Fire Fighting
Issued 10 February 1989 Resolved
PROVIDE A RELIEF VALVE FOR FIRE MAIN.
Condition: Unknown
Due 10 February 1989
Resolved 10 February 1989
Unknown
Issued 10 February 1989 Resolved
REPLACE THE FLAME SCREENS ON FUEL OIL VENTS AS NECESSARY.
Condition: Unknown
Due 10 February 1989
Resolved 10 February 1989
Unknown
Issued 10 February 1989 Resolved
REPLACE THE BOLTS TO AFT STBD SIDE DERRECK MOUNT.
Condition: Unknown
Due 10 February 1989
Resolved 10 February 1989
Unknown
Issued 10 February 1989 Resolved
PROVIDE A FLAME SCREEN FOR PAINT LOCKER EXHAUST VENT.
Condition: Unknown
Due 10 February 1989
Resolved 10 February 1989
Fire Fighting
Issued 10 February 1989 Resolved
REPLACE MISSING GENERAL ALARM BELL AFT OF MUD PITS.
Condition: Unknown
Due 10 February 1989
Resolved 10 February 1989
Electrical
Issued 10 February 1989 Resolved
REPLACE THE NON EXPLOSIVE PROOF JUNCTION BOX FORWARD OF SHALE SHAKER EXTERIOR BULKHEAD WITH EXPLOSION PROOF TYPE.
Condition: Unknown
Due 10 February 1989
Resolved 10 February 1989
Fire Fighting
Issued 12 February 1988 Resolved
PROVIDE ONBOARD AN APPROVED FIRE CONTROL PLAN.
Condition: Unknown
Due 12 February 1988
Resolved 12 February 1988
Electrical
Issued 12 February 1988 Resolved
SHOW PROPER OPERATION OF ALL FOUR DIESEL ENGINES THE LOW LUBE OIL PRESSURE SHUT DOWNS.
Condition: Unknown
Due 12 February 1988
Resolved 12 February 1988
Unknown
Issued 28 May 1987 Resolved
PRIOR TO PLACING VESSEL IN SERVICE, CONDUCT REQUIRED FIRE AND BOAT DRILLS WITH CREW ON BOARD.
Condition: Unknown
Due 28 May 1987
Resolved 28 May 1987
Unknown
Issued 28 May 1987 Resolved
PRIOR TO PLACING VESSEL IN SERVICE, CONDUCT LOAD TEST ON LIFERAFT LAUNCHING DAVIT.
Condition: Unknown
Due 28 May 1987
Resolved 28 May 1987
Unknown
Issued 28 May 1987 Resolved
PRIOR TO PLACING VESSEL IN SERVICE, CONDUCT TEST OF HIGH PRESSURE MUD PUMP RELIEF VALVES.
Condition: Unknown
Due 28 May 1987
Resolved 28 May 1987
Deck/Cargo
Issued 5 February 1987 Resolved
PRIOR TO PLACING VESSEL IN SERVICE, CONDUCT TEST OF HIGH PRESSURE MUD PUMP RELIEV VALVES.
Condition: Unknown
Due 5 February 1987
Resolved 5 February 1987
Fire Fighting
Issued 5 February 1987 Resolved
PRIOR TO PLACING VESSEL IN SERVICE, CONDUCT REQUIRED FIRE AND BOAT DRILLS WITH CREW ON BOARD.
Condition: Unknown
Due 5 February 1987
Resolved 5 February 1987
Lifesaving
Issued 5 February 1987 Resolved
PRIOR TO PLACING VESSEL IN SERVICE, CONDUCT LOAD TEST ON LIFERAFT LAUNCHINGDAVIT.
Condition: Unknown
Due 5 February 1987
Resolved 5 February 1987
Navigation
Issued 23 January 1986 Resolved
REPAINT THE SIDE LIGHT SCREENS, ANNEX 1 TO COLREGS.
Condition: Unknown
Due 23 January 1986
Resolved 23 January 1986
Fire Fighting
Issued 23 January 1986 Resolved
REPLACE FLEXIBLE LOOP ON THE FIXED CO2 SYSTEM FOR THE PAINT LOCKER.
Condition: Unknown
Due 23 January 1986
Resolved 23 January 1986
Navigation
Issued 23 January 1986 Resolved
MAKE OPERATIONAL THE OBSTRUCTION LIGHTS ONE OUT OF YOUR WAS INOPERATIVE.
Condition: Unknown
Due 23 January 1986
Resolved 23 January 1986
Lifesaving
Issued 23 January 1986 Resolved
LOAD TEST THE DAVIT LAUNCH FALLS AFTER REPALCEMENT.
Condition: Unknown
Due 23 January 1986
Resolved 23 January 1986
Lifesaving
Issued 23 January 1986 Resolved
PROVIDE ON BOARD A FIRST AID KIT PER 30 CFR 77.1707 AND 46 CFR 108.707.
Condition: Unknown
Due 23 January 1986
Resolved 23 January 1986
Lifesaving
Issued 23 January 1986 Resolved
PROVIDE QUICK RELEASE HOOK FOR THE RESCUE BOAT HOISTING APPARARTUS.
Condition: Unknown
Due 23 January 1986
Resolved 23 January 1986
Lifesaving
Issued 23 January 1986 Resolved
[withheld — contains personal information; the deficiency system, dates, and resolution status are shown above]
Condition: Unknown
Due 23 January 1986
Resolved 23 January 1986
Electrical
Issued 23 January 1986 Resolved
PROVIDE BLANKS OR COVERS IN DISTRIBUTION PANELS PP1 (PANTRY), LP2 (MESS) AND LP 3 (PASSAGE).
Condition: Unknown
Due 23 January 1986
Resolved 23 January 1986
Electrical
Issued 23 January 1986 Resolved
CHOCK ALL BATTERIES STOWED IN BOXES ON HELO DECK.
Condition: Unknown
Due 23 January 1986
Resolved 23 January 1986
Construction/Loadline
Issued 23 January 1986 Resolved
PROVIDE A STANDARD DISCHARGE CONNECTION ON BOARD THE VESSEL.
Condition: Unknown
Due 23 January 1986
Resolved 23 January 1986
Electrical
Issued 23 January 1986 Resolved
MAKE OPERABLE THE AUTOMATIC BUS TRANSFER.
Condition: Unknown
Due 23 January 1986
Resolved 23 January 1986
Deck/Cargo
Issued 23 January 1986 Resolved
REPAIR OF REPLACE BROKEN EXHAUST LINE ON CRANE ENGINE.
Condition: Unknown
Due 23 January 1986
Resolved 23 January 1986
Fire Fighting
Issued 23 January 1986 Resolved
PROVIDE SECOND FLAME SAFETY LAMP.
Condition: Unknown
Due 23 January 1986
Resolved 23 January 1986
Navigation
Issued 23 January 1986 Resolved
MAKE OPERATIONAL THE FOGHORN.
Condition: Unknown
Due 23 January 1986
Resolved 23 January 1986
Lifesaving
Issued 23 January 1986 Resolved
CONDUCT TEST OF THE LINE THROWING APPLIANCE AS REQUIRED PER 46 CFR 97.15-25
Condition: Unknown
Due 23 January 1986
Resolved 23 January 1986
Lifesaving
Issued 23 January 1986 Resolved
MANNING IS INCREASE TO 33 TOTAL PERSONS ON BOARD WITH A TOTAL OF 36 LIFE JACKETS. MANNING OVER 33 PERSONS SHALL BE REMOVED FROM THE RIG PRIOR TO 1600, 4:00 PM
Condition: Unknown
Due 23 January 1986
Resolved 23 January 1986
Fire Fighting
Issued 23 January 1986 Resolved
PROVIDE THE REQUIRED EQUIPMENT FOR THE LIFE BOAT THAT IS ON BOARD BUT NOT REQUIRED PER THE COI 46 CFR 94.05-5 AND 46 CFR 94.20-30
Condition: Unknown
Due 23 January 1986
Resolved 23 January 1986
Fire Fighting
Issued 23 January 1986 Resolved
REPAIR BROKEN HINGES ON FIRE CABINET #11
Condition: Unknown
Due 23 January 1986
Resolved 23 January 1986
Lifesaving
Issued 23 January 1986 Resolved
REPLACE FALLS ON THE DAVIT LAUNCH LIFERAFT DUE TO STIFFNESS AND DETERIOATION AT SWAGE FITTING AND REPLACE BROKEN CLIP (SNAP HOOK) ON RELEASE CONTROL CABLE.
Condition: Unknown
Due 23 January 1986
Resolved 23 January 1986
Navigation
Issued 23 January 1986 Resolved
PROVIDE ADIAMOND DAY SHAPE PER COLREGS
Condition: Unknown
Due 23 January 1986
Resolved 23 January 1986
Navigation
Issued 31 December 1982 Resolved
PRIOR TO JACKING UP ON THE OSC, THE OBSTRUCTION LIGHTS REQUIRED BY SUBCHAP-TER "N" MUST BE INSTALLED AND TESTED.
Condition: Unknown
Due 31 December 1982
Resolved 31 December 1982
Unknown
Issued 31 December 1982 Resolved
PRIOR TO INDUSTRIAL OPERATIONS, THE PRESSURE VESSEL ON THE DRILL FLOOR AND ITS RELIEF VALVE MUST BE INSTALLED AND TESTED.
Condition: Unknown
Due 31 December 1982
Resolved 31 December 1982
Unknown
Issued 31 December 1982 Resolved
THE FOLLOWING DEFICIENCIES PERTAINS TO THE MODU DOLPHIN TITAN RIG 106, DN653833.
Condition: Unknown
Due 31 December 1982
Resolved 31 December 1982
Accommodation/Occupational Safety
Issued 31 December 1982 Resolved
PROVIDE DIVIDERS FOR THE TOILETS IN THE CHANGE ROOM.
Condition: Unknown
Due 31 December 1982
Resolved 31 December 1982
Unknown
Issued 31 December 1982 Resolved
SATISFACTORLY RESOLVE ALL PLAN APPROVAL LETTER COMMENTS.
Condition: Unknown
Due 31 December 1982
Resolved 31 December 1982
Construction/Loadline
Issued 31 December 1982 Resolved
COMPLETE ALL REQUIRED MARKING AND LABELING AND PERMENANTLY INSTALL ALL PLACARDS AND WARNING SIGNS.
Condition: Unknown
Due 31 December 1982
Resolved 31 December 1982
Accommodation/Occupational Safety
Issued 31 December 1982 Resolved
FIRE DAMPER RELEASE CABLES FOR THE SCR ROOM VENTILATION SYSTEMS SHALL BE ROUTED TO RELEASE FROM OUTSIDE THE SCR ROOM.
Condition: Unknown
Due 31 December 1982
Resolved 31 December 1982

Casualty record · 1

26 August 1992Major Marine Casualty · role: Involved in a Marine Casualty · activity 167669
Each line is an incident investigation the Coast Guard recorded with this hull among the vessels involved, with the date and the classification the Coast Guard gave it, and the bridge, lock or dam the investigation names where it names one. Involvement is not fault. The investigation narrative is not published. Source: IIR, through 2026.

Ownership record

The Coast Guard's documentation record for this hull -- the Abstract of Title, with its owners and liens as filed -- is not in PSIX. Ask, and Maury buys it from the National Vessel Documentation Center, files it here with its date, and every reader of this page gets it.