Inspection history · 22
21 July 1994
Administrative
Administrative · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1172697
15 July 1994
Deadweight Survey
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1374093
24 September 1993
Deficiency Check
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1154017
4 August 1993
Deficiency Check
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 843636
26 May 1993
Deficiency Check
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 831702
7 May 1993
Type not recorded
No type recorded · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 839567
30 April 1993
Administrative
Administrative · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1147140
16 April 1993
COI Inspection
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1139102
16 April 1993
Examination of Repairs · Re-Inspection
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1419099
29 December 1992
Administrative
Administrative · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1139446
22 September 1992
Administrative
Administrative · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1245466
12 June 1992
Deficiency Check
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1269671
22 April 1992
Administrative
Administrative · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1257769
22 April 1992
Type not recorded
No type recorded · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1257939
18 April 1992
Hull Examination
Physical examination · MSO Mobile · USCG Heartland District (CGD-H) · Activity 953451
4 March 1992
COI Inspection · Hull Examination
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1257495
25 November 1991
Type not recorded
No type recorded · MSO TAMPA · USCG Southeast District (CGD-SE) · Activity 946499
4 September 1990
Deficiency Check
Physical examination · MSO TAMPA · USCG Southeast District (CGD-SE) · Activity 923159
20 November 1989
Administrative
Administrative · MSO TAMPA · USCG Southeast District (CGD-SE) · Activity 905972
1 November 1989
Damage Survey
Physical examination · MSO TAMPA · USCG Southeast District (CGD-SE) · Activity 1323230
4 April 1989
Damage Survey
Physical examination · MSO TAMPA · USCG Southeast District (CGD-SE) · Activity 895333
9 September 1988
Hull Examination · COI Inspection
Physical examination · MSO TAMPA · USCG Southeast District (CGD-SE) · Activity 1194536
Documentation
Issued 16 April 1993
Resolved
NOTIFY [name withheld] ITEM 1 HAS BEEN CLEARED FOR AMENDED CERTIFICATE OF INSPECTION TO BE ISSUED.
Condition: Unknown
Due 16 April 1993
Resolved 16 April 1993
Construction/Loadline
Issued 16 April 1993
Resolved
PROVIDE LATEST HULL GUAGING REPORT TO [name withheld] OR TAKE NEW GUAGINGSOF MAIN DECK WHERE BOTH HOUSES WERE LOCATED AND SIDESHELL PLATING IN WAY OFSHAFT ALLEY.
Condition: Unknown
Due 16 April 1993
Resolved 16 April 1993
Documentation
Issued 16 April 1993
Resolved
PRIOR TO LOADING CARGO PROVIDE PERMANENT STABILITY LETTER, NEW LOADLINE, ABS CLASS CERTIFICATE, MOU 10-82 LETTER AND APPROVED GRAIN LOADING MANUAL.
Condition: Unknown
Due 16 April 1993
Resolved 16 April 1993
Deck/Cargo
Issued 22 April 1992
Resolved
HYDROSTATICALLY TEST CARGO PIPING AS REQUIRED BY 33 CFR SUB PART D AND SUBMIT TEST RESULTS TO [name withheld] PRIOR TO LOADING CARGO.
Condition: Unknown
Due 22 April 1992
Resolved 22 April 1992
Documentation
Issued 18 April 1992
Resolved
VESSEL TO PROCEED TO NEW ORLEANS, LA UNLOADED AND UNMANNED WITH NO INTERMEDIATE STOPS. PROVIDE APPROVED LOADING BOOKLET, NEW STABILITY LETTER AND VALID LOADLINE CERTIFICATE._x001C_ _x001C_
Condition: Unknown
Due 18 April 1992
Resolved 18 April 1992
Construction/Loadline
Issued 18 April 1992
Resolved
PROVIDE CALCULATIONS SHOWING THAT VESSEL MEETS REQUIRED SCANTLINGS FOR A VESSEL OF THIS TYPE IN AREAS SHOWING OVER 30% WASTAGE IN WAY OF BOTTOM LONGITUDENALS._x001C_ _x001C_
Condition: Unknown
Due 18 April 1992
Resolved 18 April 1992
Documentation
Issued 4 March 1992
Resolved
VESSEL IS AUTHORIZED SINGLE VOYAGE IN ACCORDANCE WITH G-MSC-1 LETTER DATED 28FEB92. PRIOR TO FURTHER VOYAGES PROVIDE APPROVED LOADING BOOKLET AND NEW STABILITY LETTER.
Condition: Unknown
Due 4 March 1992
Resolved 4 March 1992
Construction/Loadline
Issued 4 March 1992
Resolved
PROVIDE CALCULATIONS THAT SHOW REMOVED PORTIONS OF CENTER TANK SWASH BULKHEADS ARE NOT REQUIRED SCANTLINGS OR REINSTALL SAME.
Condition: Unknown
Due 4 March 1992
Resolved 4 March 1992
Construction/Loadline
Issued 4 March 1992
Resolved
CROP AND RENEW BOW SHELL PLATE BETWEEN 3RD AND 4TH BREAST HOOK (DOUBLER).
Condition: Unknown
Due 4 March 1992
Resolved 4 March 1992
Engineering
Issued 4 March 1992
Resolved
PROVIDE INSPECTION OF THE AFTER PORT AND STARBOARD FUEL OIL TANKS.
Condition: Unknown
Due 4 March 1992
Resolved 4 March 1992
Construction/Loadline
Issued 4 March 1992
Resolved
CROP AND RENEW ANY STEEL THICKNESS THAT EXCEEDS 25% WASTAGE AS DOCUMENTED ON GUAGING REPORT.
Condition: Unknown
Due 4 March 1992
Resolved 4 March 1992
Construction/Loadline
Issued 4 March 1992
Resolved
CROP AND RENEW SET IN PLATES (2 EACH) AND ASSOCIATED INTERNALS IN #5 STARBOARD WING TANK (APPROXIMATELY FRAME #59-1/2 TO 60-1/2).
Condition: Unknown
Due 4 March 1992
Resolved 4 March 1992
Construction/Loadline
Issued 4 September 1990
Resolved
#5 STBD WING - INSTALL HEADERS BETWEEN THE NEW SIDE LONG AT HALFWAY POINT BETWEEN TRANSVERSE FRAMES.
Condition: Unknown
Due 4 September 1990
Resolved 4 September 1990
Construction/Loadline
Issued 4 September 1990
Resolved
THE SET IN PLATE (1 EA.) IN #6 STBD WING MAY REMAIN UNTIL NEXT D/D BUT INTERNAL TRANSVERSE AND LONG SIDE STIFFNERS ARE TO BE RENEWED WHERE DAMAGED
Condition: Unknown
Due 4 September 1990
Resolved 4 September 1990
Construction/Loadline
Issued 4 September 1990
Resolved
THE SET IN PLATE (2 EA) IN #5 STBD WING MAY REMAIN UNTIL NEXT D/D BUT THE INTERNAL FRAMING IWO THESE SET INS IS TO BE RENEWED AND SCRIBED TO FIT THE SHAPE OF THE HULL
Condition: Unknown
Due 4 September 1990
Resolved 4 September 1990
Construction/Loadline
Issued 1 November 1989
Resolved
RENEW SIDE PLATE FROM FRAME 63-66. SHEER J.H.G. STRAKE IWO #3 & #4 STBD WING TANK. AFTER THE SHEER STRAKE HAS BEEN RELEASED FROM ITS INTERNAL FRAMING, SECTION THAT CAN BE FAIRED MAY REMAIN.
Condition: Unknown
Due 1 November 1989
Resolved 1 November 1989
Construction/Loadline
Issued 1 November 1989
Resolved
REPLACE ALL DAMAGED INTERNAL FRAMING IN #3 & #4 STBD WING TANK.
Condition: Unknown
Due 1 November 1989
Resolved 1 November 1989
Construction/Loadline
Issued 1 November 1989
Resolved
THE SET IN PLATE (2 EA.)IN #5 STBD WING MAY REMAIN UNTIL NEXT D/D BUT THE INTERNAL FRAMING IWO THESE SET INS IS TO BE RENEWED AND SCRIBED TO FIT THE SHAPE OF THE HULL.
Condition: Unknown
Due 1 November 1989
Resolved 1 November 1989
Construction/Loadline
Issued 1 November 1989
Resolved
THE SET IN PLATE (1 EA.) IN #6 STBD WING MAY REMAIN UNTIL NEXT D/D BUT INTERNAL TRANSVERSE AND LONG SIDE STIFFNERS ARE TO BE RENEWED WHERE DAMAGED.
Condition: Unknown
Due 1 November 1989
Resolved 1 November 1989
Construction/Loadline
Issued 1 November 1989
Resolved
#5 STBD WING - INSTALL HEADERS BETWEEN THE NEW SIDE LONG AT HALFWAY POINT BETWEEN TRANSVERSE FRAMES.
Condition: Unknown
Due 1 November 1989
Resolved 1 November 1989
Construction/Loadline
Issued 1 November 1989
Resolved
CROP TO FAIR METAL TRANSVERSE WATERTIGHT BKHD SEPARATING #3 & #4 STBD WING TANK.
Condition: Unknown
Due 1 November 1989
Resolved 1 November 1989
Documentation
Issued 9 September 1988
Resolved
PROVIDE A LTR. FOR THE [name withheld] ALL THE EQUIPMENT THAT IS TO REMAIN IN OPERATION. THIS EQIUPMENT WILL HAVE TO BE MAINTAINED & TESTED ASREQUIRED BY APPLICABLE REGULATIONS. THE REMAINING EQUIPMENT SHALL BE DISABLED IN A MANNER THAT WOULD PREVENT IT FROM BEING RETURNED TO SERVICE.
Condition: Unknown
Due 9 September 1988
Resolved 9 September 1988
Documentation
Issued 9 September 1988
Resolved
PROVIDE DRAWINGS OF THE SHIP'S ELECTRICAL SYSTEMS THAT ARE REMAINING OPERATIONAL WITH ANY MODIFICATIONS.
Condition: Unknown
Due 9 September 1988
Resolved 9 September 1988
Documentation
Issued 9 September 1988
Resolved
PROVIDE U.T. GAGING REPORT FOR THE SHAFT ALLEY AND MACHINERY SPACE TANK TOPS.
Condition: Unknown
Due 9 September 1988
Resolved 9 September 1988
Construction/Loadline
Issued 9 September 1988
Resolved
CROP TO GOOD METAL AND INSERT THE FWD. CHAIN LOCKER BULKHEAD IN WAY OF THE SECOND DECK.
Condition: Unknown
Due 9 September 1988
Resolved 9 September 1988
Documentation
Issued 9 September 1988
Resolved
PRIOR TO LOADING CARGO PROOF OF A VALID DOCUMENT IS TO BE PROVIDED TO [name withheld]
Condition: Unknown
Due 9 September 1988
Resolved 9 September 1988
Engineering
Issued 9 September 1988
Resolved
CROP TO GOOD METAL AND INSERT THE SHAFT ALLEY TANK TOPS IN WAY OF ALL PLATE SHOWING 25% WASTAGE.
Condition: Unknown
Due 9 September 1988
Resolved 9 September 1988
Documentation
Issued 9 September 1988
Resolved
THE FOLLOWING DATA IS TO BE PROVIDED FOR AIR RECEIVER, NATIONAL BOARD #88881; MANUFACTURER'S DATA REPORT, PLANS WITH STRUCTURAL ANALYSIS.
Condition: Unknown
Due 9 September 1988
Resolved 9 September 1988
Deck/Cargo
Issued 9 September 1988
Resolved
PRIOR TO DISCHARGING CARGO THE OPERATION OF THE CARGO PUMP REMOTE SHUT DOWNIS TO BE PROVEN TO THE COGNIZANT OCMI.
Condition: Unknown
Due 9 September 1988
Resolved 9 September 1988