MAURY USCG vessel records Sign in
← All vessels

TERRY TIDE

TERRY TIDE is a 1983 offshore supply vessel. The Coast Guard has recorded 61 inspections since 1983, most recently in February 2016, along with 89 deficiencies and 1 operational control.

Records from 1983 to 2016. Most recent: inspection, 19 February 2016.

Built
1983
Last inspected
19 February 2016
Documentation
Not in the documentation file of 10 September 2026
Controls
None recorded without a removal date

Identity

8213146 View on MarineTraffic leaves Maury; a third-party site, nothing from it is stored here
Flag
VANUATU
—
Maury page id
psix-54794

Inspections, by type

…with no type recorded9
Years with a record 23 calendar years (1983–2016)
The 61 inspections in the strip above, split by the kind of activity the US Coast Guard recorded. Years with a record are calendar years in which a record exists, not years in service. What Maury does not do.

This record may be incomplete: the most recent inspection recorded for this vessel was 10 years ago. Maury shows what the Coast Guard recorded, not whether the vessel has been inspected since, is still in service, or what condition it is in. Coast Guard record current through 13 September 2026, retrieved 18 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard. Records for the Offshore class in Maury's sources begin in 1978.

Documentation record

Tonnage as PSIX records it180 - Regulatory (Subpart C or D), Net Ton
264 - Regulatory (Subpart C or D), Gross Ton
This hull's Official Number is not in the NVDC file dated 10 September 2026 as served by NOAA Fisheries, so no documentation record is shown. Absence from that file is a fact about the file, not about the hull.

Radio station licence

WRB6924MMSI not assigned · cancelled · compulsorily equipped · granted 8 August 1994, cancelled 4 August 2004
FCC Universal Licensing System ship-station file of 6 September 2026, matched to this hull on its US Official Number. Status and dates are the file’s own. The licensee is not read from the file and is not shown. A lapsed licence’s MMSI is still the number the vessel transmitted under while it was valid.

Inspection history · 61

19 February 2016 Deficiency Check
Physical examination · Activities Europe · Activity 5818044
24 June 2005 Administrative Inspection
Administrative · Activities Europe · Activity 2401279
12 April 2004 Administrative Inspection
Administrative · Activities Europe · Activity 2042073
29 December 2003 Security Plan Review - VSP
Administrative · Marine Safety Center (MSC) · Activity 1971082
16 July 2003 COI Inspection
Physical examination · Activities Europe · Activity 1778111
12 April 2003 Hull Examination · Internal Structural Exam
Physical examination · Activities Europe · Activity 1751708
14 January 2003 Deficiency Check
Physical examination · Activities Europe · Activity 1742735
1 August 2002 Type not recorded
No type recorded · Activities Europe · Activity 1663108
24 June 2002 Annual Inspection
Physical examination · Activities Europe · Activity 1618915
1 October 2001 Administrative
Administrative · Activities Europe · Activity 1073812
2 August 2001 Administrative
Administrative · Activities Europe · Activity 1070967
21 June 2001 Hull Examination
Physical examination · Activities Europe · Activity 1076039
21 June 2001 Hull Examination
Physical examination · Activities Europe · Activity 1370275
1 May 2000 COI Inspection
Physical examination · Activities Europe · Activity 1076038
1 May 2000 COI Inspection
Physical examination · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1440306
23 November 1999 Administrative
Administrative · Activities Europe · Activity 810098
19 March 1999 Damage Survey · Re-Inspection
Physical examination · Activities Europe · Activity 1410071
22 February 1999 Type not recorded
No type recorded · Activities Europe · Activity 68924
2 July 1998 Deficiency Check
Physical examination · Activities Europe · Activity 1128683
30 June 1998 Deficiency Check
Physical examination · Activities Europe · Activity 1127684
16 May 1998 COI Inspection · Hull Examination
Physical examination · Activities Europe · Activity 1126536
20 May 1997 Re-Inspection
Physical examination · Activities Europe · Activity 1113050
8 April 1997 Administrative
Administrative · Activities Europe · Activity 1097472
14 April 1996 COI Inspection
Physical examination · Activities Europe · Activity 1082014
12 April 1996 Hull Examination
Physical examination · Activities Europe · Activity 1355790
24 July 1995 Administrative
Administrative · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1191649
13 February 1995 Re-Inspection
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1140323
12 October 1994 Deficiency Check
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1178409
20 July 1994 Deficiency Check
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1178179
15 July 1994 Deficiency Check
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 867518
18 May 1994 Deficiency Check
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1180392
22 April 1994 Deficiency Check
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1171027
16 March 1994 MARPOL Annex V Examination · COI Inspection
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 856523
6 December 1993 Deficiency Check
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1158757
17 September 1993 Hull Examination
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 831200
1 April 1993 Re-Inspection
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1148357
11 February 1993 Administrative
Administrative · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 834743
18 March 1992 COI Inspection
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1263757
28 May 1991 Administrative
Administrative · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 940780
29 March 1991 Administrative
Administrative · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 924184
1 March 1991 Administrative
Administrative · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1211369
22 February 1991 Re-Inspection
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 907977
15 February 1991 Hull Examination
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1219785
13 January 1991 Type not recorded
No type recorded · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1230866
5 December 1990 Type not recorded
No type recorded · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 918966
21 June 1990 Deficiency Check
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1229958
6 March 1990 COI Inspection
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 910981
12 September 1989 Administrative
Administrative · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1341357
1 May 1989 Re-Inspection
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1206167
1 August 1988 Hull Examination
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1042779
25 May 1988 Administrative
Administrative · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1352709
6 April 1988 Administrative
Administrative · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 994757
10 February 1988 COI Inspection
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1335966
22 June 1987 MARPOL Annex II Examination
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1320415
22 June 1987 Re-Inspection
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1320724
11 February 1986 COI Inspection · Credit Drydock
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 990405
10 January 1984 Type not recorded
No type recorded · MIO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1280181
30 December 1983 Type not recorded
No type recorded · MIO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 971457
7 March 1983 Type not recorded
No type recorded · MSO Mobile · USCG Heartland District (CGD-H) · Activity 1271365
7 March 1983 Type not recorded
No type recorded · MSO Mobile · USCG Heartland District (CGD-H) · Activity 1281647
1 March 1983 Type not recorded
No type recorded · MIO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1276983

Deficiency record · 89

Fire Fighting › Fire Main
Issued 17 July 2003 Resolved
Prove proper operations of main fire pump to the satisfaction of the attending Marine Inspector/ABS surveyor prior to commencing operations. LEGACY COMPONENT DESC: Condition
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Resolved 18 July 2003
Resolution: ABS survey report received attesting to proper operation of the main fire pump.
Navigation › Electronic Positioning › GPS/DGPS Receiver
Issued 17 July 2003 Resolved
Provide new compass deviation card.
Due 17 August 2003
Resolved 19 February 2016
Resolution: Vessel reflagged Deficiencies no longer apply
Deck/Cargo › Holds/Tanks › Valve, Pressure Vacuum Relief
Issued 17 July 2003 Resolved
Prove proper operation of bulk tank relief valve for forward tank starboard.
Due 17 August 2003
Resolved 19 February 2016
Resolution: Vessel reflagged Deficiencies no longer apply
Documentation › Certificates/Documents
Issued 17 July 2003 Resolved
Provide copy of International Load Line Certificate prior to vessel operating. LEGACY COMPONENT DESC: International Load Line Certificate
Action required: 17 - Rectify deficiencies prior to departure
Resolved 18 July 2003
Resolution: ABS survey conducted on 18July03 issued new Certificate.
Construction/Loadline › Hull › Hull Plating
Issued 15 April 2003 Resolved
1. Make permanent repair to wasted and bent frames and brackets as noted in #1 port and starboard ballast tanks #2 port ballast tank and aft void LEGACY COMPONENT DESC: Transverse Frame
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 15 May 2003
Resolved 19 February 2016
Resolution: Vessel reflagged Deficiencies no longer apply
Navigation › Collision/Grounding Avoidance
Issued 15 April 2003 Resolved
2. Renew expired SART battery LEGACY COMPONENT DESC: Transponder
Action required: 705 - Other - as specified
Due 15 May 2003
Resolved 17 July 2003
Electrical › Lighting (emergency)
Issued 15 April 2003 Resolved
3. Trouble shoot repair and prove proper operation of embarkation light at the starboard life raft station. LEGACY COMPONENT DESC: Lighting Fixture
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 15 May 2003
Resolved 17 July 2003
Electrical › Electrical Distribution System (service)
Issued 15 April 2003 Resolved
4. Renew/replace cover for fan motor junction box located in the port fan room. LEGACY COMPONENT DESC: Junction Box
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 15 May 2003
Resolved 17 July 2003
Deck/Cargo › Cargo Transfer/Lightering (liquid)
Issued 15 April 2003 Resolved
5. Renew wasted/damaged flame screens for the # 2 fuel oil vent port and the starboard fuel oil day tank. LEGACY COMPONENT DESC: Flame Screens
Condition: Unknown
Action required: 705 - Other - as specified
Due 15 May 2003
Resolved 17 July 2003
Lifesaving › Rescue Boat
Issued 15 April 2003 Resolved
6. Narwal work/rescue boat buoyancy tube soft/leaking. Make permanent repair to buoyancy tube and prove air tight. LEGACY COMPONENT DESC: Hull (inflated)
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Due 15 May 2003
Resolved 17 July 2003
Construction/Loadline › Hull › Keel
Issued 15 April 2003 Resolved
7. Crop and renew buckled bracket and side shell stiffner located starboard side fan room. LEGACY COMPONENT DESC: Transverse Frame
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Due 15 May 2003
Resolved 19 February 2016
Resolution: Vessel reflagged Deficiencies no longer apply
Engineering › Shafting/Propeller Arrangements › Propeller Shaft
Issued 15 April 2003 Resolved
8. Renew worn/pitted port and starboard tailshafts LEGACY COMPONENT DESC: Propeller Shaft
Action required: 705 - Other - as specified
Due 15 May 2003
Resolved 19 February 2016
Resolution: Vessel reflagged Deficiencies no longer apply
Construction/Loadline › Hull › Stool
Issued 15 April 2003 Resolved
9. The following spaces were not available for examination not safe for entry - no ventilation/safe for entry certificate: #3 port and starboard ballast tanks #4 port and starboard ballast tanks #5 port and starboard aft peak tanks Make tanks safe for entry and ready for examination.
Action required: 705 - Other - as specified
Due 15 May 2003
Resolved 19 February 2016
Resolution: Vessel reflagged Deficiencies no longer apply
Construction/Loadline › Structures › Longitudinal Bulkhead
Issued 8 August 2002 Resolved
Longitudinal bulkhead, starboard side forward tunnel (bow thruster engine room): Crop and renew 3/8 inch (9.6mm) plate from frame 12 to frame 20. Compare gauging report from Douala, Cameroon 17Sep02. LEGACY COMPONENT DESC: Longitudinal Bulkhead
Condition: Improper/Lack of Maintenance
Due 31 May 2003
Resolved 12 April 2004
Resolution: 12 April 2004: Received DOC, COI, ILLC and the bridge record card for TERRY TIDE. Vessel has been reflagged, documentation has been forwarded from this office to NVDC. Deactivated COI.
Construction/Loadline › Structures › Longitudinal Bulkhead
Issued 8 August 2002 Resolved
Longitudinal bulkhead, port side aft tunnel: Crop and renew 5/16 inch (8mm) plate from frame 77 to frame 80. Compare gauging report from Douala, Cameroon dated 17Sep02. LEGACY COMPONENT DESC: Longitudinal Bulkhead
Condition: Improper/Lack of Maintenance
Due 31 May 2003
Resolved 12 April 2004
Resolution: 12 April 2004: Received DOC, COI, ILLC and the bridge record card for TERRY TIDE. Vessel has been reflagged, documentation has been forwarded from this office to NVDC. Deactivated COI.
Engineering › Pressure Vessel
Issued 8 August 2002 Resolved
Gauge and repair, as necessary, pitting found in the bottom sections of No. 3 and No. 4 pressure vessels in the starboard #3 ballast tank. LEGACY COMPONENT DESC: Shell Plate
Condition: Improper/Lack of Maintenance
Due 31 May 2003
Resolved 17 July 2003
Resolution: All 4 PV tanks were replaced. Tanks inspected and stamped.
Construction/Loadline › Hull › Longitudinal Frame
Issued 8 August 2002 Resolved
Crop and renew doubler plate between frame 85 and frame 86 in the No. 5 port ballast tank. LEGACY COMPONENT DESC: Hull Plating
Condition: Improper Installation
Due 31 May 2003
Resolved 12 April 2004
Resolution: 12 April 2004: Received DOC, COI, ILLC and the bridge record card for TERRY TIDE. Vessel has been reflagged, documentation has been forwarded from this office to NVDC. Deactivated COI.
Construction/Loadline › Structures › Deck Plating
Issued 8 August 2002 Resolved
Crop and renew buckled port deck plate (focsle) and associated framing around frame 23 (forward port galley). LEGACY COMPONENT DESC: Deck Plating
Condition: Damaged By Earlier Event
Due 31 May 2003
Resolved 12 April 2004
Resolution: 12 April 2004: Received DOC, COI, ILLC and the bridge record card for TERRY TIDE. Vessel has been reflagged, documentation has been forwarded from this office to NVDC. Deactivated COI.
Construction/Loadline › Structures › Longitudinal Bulkhead
Issued 8 August 2002 Resolved
Crop and renew starboard longitudinal bulkhead 5/16 inch (9.6mm) plate from frame 12 back aft to an appropriate frame (improper fit-up) as directed by the attending Marine Inspector. LEGACY COMPONENT DESC: Longitudinal Bulkhead
Condition: Improper Installation
Due 31 May 2003
Resolved 12 April 2004
Resolution: 12 April 2004: Received DOC, COI, ILLC and the bridge record card for TERRY TIDE. Vessel has been reflagged, documentation has been forwarded from this office to NVDC. Deactivated COI.
Accommodation/Occupational Safety › Occupational Safety
Issued 8 August 2002 Resolved
Ensure Emergency Exits (port and starboard) from the engine room, can be easily opened from the inside and remains in an open position for exit.
Condition: Improper Installation
Due 24 October 2002
Resolved 23 October 2002
Construction/Loadline › Hull
Issued 8 August 2002 Resolved
Ensure name and hailing port is painted on the stern of the vessel.
Due 24 October 2002
Resolved 23 October 2002
Operations/Management › Drug and Alcohol Testing
Issued 8 August 2002 Resolved
Ensure vessel has a letter from the operating company stating the vessel is enrolled and participating in a Drug and Alcohol Testing Program. LEGACY COMPONENT DESC: Employee Coverage
Condition: Unknown
Due 23 November 2002
Resolved 8 January 2003
Resolution: Received notice from the master, [name withheld] of correction.
Navigation
Issued 8 August 2002 Resolved
Ensure vessel has updated International Rules of the Road aboard.
Due 23 November 2002
Resolved 8 January 2003
Resolution: Received notice of correction from the master, [name withheld].
Engineering › Fuel Oil Storage/Transfer System
Issued 8 August 2002 Resolved
Ensure diesel liquid level indicating devices are of a heat resistant material, adequately protected from mechanical damage or provided at the tank connections with devices which will automatically close. LEGACY COMPONENT DESC: Gauge
Due 23 November 2002
Resolved 8 January 2003
Resolution: Received notice of correction from the master, [name withheld].
Navigation
Issued 19 March 1999 Resolved
Provide current copies of Local Notice to Mariners.
Condition: Unknown
Due 19 March 1999
Resolved 19 March 1999
Navigation
Issued 19 March 1999 Resolved
Provide current deviation card for magnetic compass.
Condition: Unknown
Due 11 June 1999
Resolved 11 June 1999
Fire Fighting
Issued 19 March 1999 Resolved
Prove proper operation of fire pump with 2 hoses opened at different ends of vessel and providing a minimum of 50 PSI of pressure.
Condition: Unknown
Due 19 March 1999
Resolved 19 March 1999
Fire Fighting
Issued 19 March 1999 Resolved
Provide a currently hydroed bottle for the SCBA; bottle must be a U.S. DOT bottle and be hydroed at an U.S. DOT approved facility.
Condition: Unknown
Due 11 June 1999
Resolved 11 June 1999
Accommodation/Occupational Safety
Issued 16 May 1998 Resolved
PROVIDE ONBOARD EXHAUST FAN/GREASE TRAP FOR GALLEY RANGE HOOD.
Condition: Unknown
Due 16 May 1998
Resolved 16 May 1998
Fire Fighting
Issued 16 May 1998 Resolved
PROPERLY REPAIR HOLE IN FIRE MAIN AT FIRST "TEE" JOINT AFTER FIRE PUMP PRIOR TO VESSEL DEPARTING PORT.
Condition: Unknown
Due 19 May 1998
Resolved 19 May 1998
Unknown
Issued 16 May 1998 Resolved
PROVIDE PROPER DOCUMENTATION OF FULLY COMPLIANT CHEMICAL TESTING PROGRAM FOR THE FOLLOWING DEFICIENCIES: PROVIDE ONBOARD EMPLOYEE ASSISTANCE PROGRAMMATERIAL AND TRAINING IAW 46CFR16.401. MARINE EMPLOYER IS NOT AUTHORIZED TO OPERATE AFTER 16JUN98 UNLESS THIS REQUIREMENT HAS BEEN CLEARED.
Condition: Unknown
Due 16 May 1998
Resolved 16 May 1998
Engineering
Issued 13 February 1995 Resolved
INSTALL EXHAUST LAGGING BOTH MDE MDE TURBOS.
Condition: Unknown
Due 13 February 1995
Resolved 13 February 1995
Accommodation/Occupational Safety
Issued 13 February 1995 Resolved
INSTALL VENTILATION SCREENS IN E/R WHERE WASTED.
Condition: Unknown
Due 13 February 1995
Resolved 13 February 1995
Accommodation/Occupational Safety
Issued 13 February 1995 Resolved
REMOVE ALL STORES FROM STATE ROOMS.
Condition: Unknown
Due 28 March 1995
Resolved 28 March 1995
Construction/Loadline
Issued 13 February 1995 Resolved
REPAIR ALL WASTED TANK VENT SCREENS AS REQUIRED.
Condition: Unknown
Due 13 February 1995
Resolved 13 February 1995
Unknown
Issued 13 February 1995 Resolved
NAV LIGHT ALARMS FOR MAST & STERN LIGHT NEED TO BE FIXED.
Condition: Unknown
Due 13 February 1995
Resolved 13 February 1995
Electrical
Issued 13 February 1995 Resolved
INSTALL PROPER BLANK IN GALLEY 110 V PWR PANEL.
Condition: Unknown
Due 13 February 1995
Resolved 13 February 1995
Electrical
Issued 13 February 1995 Resolved
LABEL ALL EMERGENCY BATTERIES.
Condition: Unknown
Due 13 February 1995
Resolved 13 February 1995
Fire Fighting
Issued 13 February 1995 Resolved
REPLACE STUFFING FWD BOX ON BOW THRUSTER MONITOR PUMP.
Condition: Unknown
Due 13 February 1995
Resolved 13 February 1995
Construction/Loadline
Issued 13 February 1995 Resolved
CROP AND RENEW WASTED E/R BALLAST PIPING WHERE ATTACHED.
Condition: Unknown
Due 13 February 1995
Resolved 13 February 1995
Lifesaving
Issued 13 February 1995 Resolved
REPLACE LIFEJACKET LIGHTS WITH COAST GUARD APPROVED LIGHTS.
Condition: Unknown
Due 13 February 1995
Resolved 13 February 1995
Lifesaving
Issued 13 February 1995 Resolved
RELABEL LIFERAFT STATIONS TO COINCIDE WITH LIFERAFT CAPACITY.
Condition: Unknown
Due 13 February 1995
Resolved 13 February 1995
Navigation
Issued 13 February 1995 Resolved
PROVE PROPER OPERATION OF E/R RUDDER ANGLE INDICATOR.
Condition: Unknown
Due 13 February 1995
Resolved 13 February 1995
Engineering
Issued 13 February 1995 Resolved
INSTALL BELT GUARD AFT E/R AIR COMPRESSOR.
Condition: Unknown
Due 13 February 1995
Resolved 13 February 1995
Fire Fighting
Issued 16 March 1994 Resolved
PROVIDE DOT APPROVED CO2 BOTTLE FOR FIXED SYSTEM TO PAINT LOCKER (NEED UPDATED HYDRO BY DOT APPROVED FACILITY).
Condition: Unknown
Due 16 March 1994
Resolved 16 March 1994
Engineering
Issued 16 March 1994 Resolved
REPLACE/REPAIR BOTH MDE HIGH LUBE OIL TEMP SENSORS.
Condition: Unknown
Due 16 March 1994
Resolved 16 March 1994
Fire Fighting
Issued 16 March 1994 Resolved
REPLACE 6 PORTABLE EXTINGUISHERS WITH CG/UL APPROVED.
Condition: Unknown
Due 16 March 1994
Resolved 16 March 1994
Lifesaving
Issued 16 March 1994 Resolved
REPLACE EPIRB.
Condition: Unknown
Due 16 March 1994
Resolved 16 March 1994
Lifesaving
Issued 16 March 1994 Resolved
REPLACE RESCUE BOAT.
Condition: Unknown
Due 16 March 1994
Resolved 16 March 1994
Lifesaving
Issued 16 March 1994 Resolved
PROVIDE CG APPROVED HYDROSTATIC RELEASES FOR LIFERAFTS.
Condition: Unknown
Due 16 March 1994
Resolved 16 March 1994
Engineering
Issued 16 March 1994 Resolved
INSTALL AND PROVE PROPER OPERATION OF BOTH SS/GENERATORS HIGH L/O TEMP SENSORS.
Condition: Unknown
Due 16 March 1994
Resolved 16 March 1994
Navigation
Issued 16 March 1994 Resolved
FABRICATE NEW AFT ANCHOR LIGHT AND REWIRE.
Condition: Unknown
Due 16 March 1994
Resolved 16 March 1994
Deck/Cargo
Issued 17 September 1993 Resolved
REPLACE ALL LINKS IN BOTH PORT AND STBD ANCHOR CHAINS WASTED BEYOND 12% OF ORIGINAL.
Condition: Unknown
Due 17 September 1993
Resolved 17 September 1993
Engineering
Issued 17 September 1993 Resolved
PROVE PROPER OPERATION OF REMOTE SHUTDOWN FOR PORT MAIN DIESEL ENGINE.
Condition: Unknown
Due 14 October 1993
Resolved 14 October 1993
Navigation
Issued 17 September 1993 Resolved
PROVE PROPER OPERATION OF ENGINE ROOM RUDDER ANGLE INDICATOR.
Condition: Unknown
Due 14 October 1993
Resolved 14 October 1993
Electrical
Issued 17 September 1993 Resolved
PROVE PROPER OPERATION OF STBD GENERATOR AMP METER ON MAIN SWITCHBOARD.
Condition: Unknown
Due 14 October 1993
Resolved 14 October 1993
Engineering
Issued 1 April 1993 Resolved
PROVE PROPER OPERATION OF REMOTE SHUTDOWN FOR PORT MAIN DIESEL ENGINE.
Condition: Unknown
Due 1 April 1993
Resolved 1 April 1993
Navigation
Issued 1 April 1993 Resolved
PROVE PROPER OPERATION OF ENGINE ROOM RUDDER ANGLE INDICATOR.
Condition: Unknown
Due 1 April 1993
Resolved 1 April 1993
Electrical
Issued 1 April 1993 Resolved
PROVE PROPER OPERATION OF STBD GENERATOR AMP METER ON MAIN SWITCHBOARD.
Condition: Unknown
Due 1 April 1993
Resolved 1 April 1993
Deck/Cargo
Issued 18 March 1992 Resolved
REPLACE HAND WINCH ON WORK BOAT DAVIT AND PROVE PROPER OPERATION. UPON COMPLETION SEND A COPY OF INVOICE AND LETTER ATTESTING TO THE OPERATION TO [name withheld].
Condition: Unknown
Due 30 March 1992
Resolved 30 March 1992
Engineering
Issued 18 March 1992 Resolved
PROVE PROPER OPERATION OF FWD S/S GENERATOR AND BULK TANK AIR COMPRESSOR OVERSPEED TRIPS. SEND COPY OF LOG ENTRY SIGNED BY THE [name withheld] TO [name withheld].
Condition: Unknown
Due 30 March 1992
Resolved 30 March 1992
Documentation
Issued 13 January 1991 Resolved
PROVIDE COMPREHENSIVE REPORT FOR ALTERNATE REINSPECTION AUTHORIZED BY NYCMILTR DTD 14JAN91.
Condition: Unknown
Due 13 January 1991
Resolved 13 January 1991
Documentation
Issued 6 March 1990 Resolved
OBTAIN FOR VESSEL COPIES OF 46 CFR SUBCHAPTERS I,F, AND J.
Condition: Unknown
Due 6 March 1990
Resolved 6 March 1990
Lifesaving
Issued 6 March 1990 Resolved
REPLACE OUTDATED SHOULDER LINE THROWING GUN CARTRIDGES.
Condition: Unknown
Due 6 March 1990
Resolved 6 March 1990
Engineering
Issued 1 May 1989 Resolved
MAKE OPERABLE AUDIBLE ALARM PANEL ON BRIDGE.
Condition: Unknown
Due 1 May 1989
Resolved 1 May 1989
Electrical
Issued 1 May 1989 Resolved
PROVIDE EMERGENCY LIGHTS FOR ENGINE ROOM EMERGENCY ESCAPE.
Condition: Unknown
Due 1 May 1989
Resolved 1 May 1989
Fire Fighting
Issued 1 May 1989 Resolved
HAVE SERVICED AND HYDROSTATICALLY TESTED ALL PORTABLE AND SEMI-PORTABLE FIRE EXTINGUISHERS.
Condition: Unknown
Due 1 May 1989
Resolved 1 May 1989
Engineering
Issued 10 February 1988 Resolved
RENEW SEAL TO FUEL OIL TRANSFER PUMP LOCATED IN ENGINE ROOM.
Condition: Unknown
Due 10 February 1988
Resolved 10 February 1988
Engineering
Issued 10 February 1988 Resolved
REMOVE TEMPORARY PATCH AND MAKE PERMANENT REPAIR TO EXPANSION JOINT FOR STBD MAIN COOLING WATER.
Condition: Unknown
Due 10 February 1988
Resolved 10 February 1988
Electrical
Issued 10 February 1988 Resolved
REPLACE MOTOR CONTROLLER TO #1 VENTILATION FAN FOR ENGINE ROOM.
Condition: Unknown
Due 10 February 1988
Resolved 10 February 1988
Electrical
Issued 10 February 1988 Resolved
REPAIR AND PROVE PROPER OPERATION OF OVERSPEED TRIP FOR STBD SSDG.
Condition: Unknown
Due 10 February 1988
Resolved 10 February 1988
Lifesaving
Issued 10 February 1988 Resolved
PROVIDE ONE WATER LIGHT FOR A RING BUOY.
Condition: Unknown
Due 10 February 1988
Resolved 10 February 1988
Lifesaving
Issued 10 February 1988 Resolved
HYDROSTATICALLY TEST ALL FOUR (4) EMERGENCY BREATHING APPARATUS AIR BOTTLES.
Condition: Unknown
Due 10 February 1988
Resolved 10 February 1988
Fire Fighting
Issued 10 February 1988 Resolved
WEIGH CO2 CYLINDER FOR FIXED CO2 SYSTEM FOR PAINT LOCKER.
Condition: Unknown
Due 10 February 1988
Resolved 10 February 1988
Electrical
Issued 22 June 1987 Resolved
REWIRE STARBOARD BATTERY BOX AND REPLACE AFTER BATTERY INSIDE BOX.
Condition: Unknown
Due 22 June 1987
Resolved 22 June 1987
Engineering
Issued 22 June 1987 Resolved
REPAIR BILGE ALARMS FOR ENGINEROOM PASSAGEWAY AND STEERING FLAT.
Condition: Unknown
Due 22 June 1987
Resolved 22 June 1987
Electrical
Issued 22 June 1987 Resolved
REPAIR OR REPLACE EMERGENCY LIGHTING FIXTURES IN STEERING FLAT AND ENGINEROOM PASSAGEWAY.
Condition: Unknown
Due 22 June 1987
Resolved 22 June 1987
Electrical
Issued 22 June 1987 Resolved
PROVE PROPER OPERATION OF 12V ALL DISTRESS LAMP.
Condition: Unknown
Due 22 June 1987
Resolved 22 June 1987
Fire Fighting
Issued 22 June 1987 Resolved
HYDROSTATICALLY TEST ALL 4 EMERGENCY BREATHING APPARATI AIR BOTTLES.
Condition: Unknown
Due 22 June 1987
Resolved 22 June 1987
Lifesaving
Issued 22 June 1987 Resolved
PROVIDE 2 USCG APPROVED WATERLIGHTS TO BE ATTACHED TO PORT AND STARBOARD RING BUOYS.
Condition: Unknown
Due 22 June 1987
Resolved 22 June 1987
Fire Fighting
Issued 22 June 1987 Resolved
MOUNT FIRE AXE ON FOC'SLE BULKHEAD AS SHOWN ON VESSEL'S GENERAL ARRANGEMENTPLANS.
Condition: Unknown
Due 22 June 1987
Resolved 22 June 1987
Electrical
Issued 22 June 1987 Resolved
REPAIR AND PROVE PROPER OPERATION OF OVERSPEED TRIP FOR STARBOARD SSDG.
Condition: Unknown
Due 22 June 1987
Resolved 22 June 1987
Construction/Loadline
Issued 22 June 1987 Resolved
REPAIR AND PROVE PROPER OPERATION OF FOREPEAK REACH ROD.
Condition: Unknown
Due 22 June 1987
Resolved 22 June 1987
Lifesaving
Issued 22 June 1987 Resolved
PROVIDE A WEAK LINK FOR USE ON PORT LIFERAFT.
Condition: Unknown
Due 22 June 1987
Resolved 22 June 1987
Engineering
Issued 22 June 1987 Resolved
REPAIR REMOTE FUEL OIL TRANSFER PUMP REMOTE STOP AND PROVE PROPER OPERATIONFROM ALL LOCATIONS.
Condition: Unknown
Due 22 June 1987
Resolved 22 June 1987
Construction/Loadline
Issued 22 June 1987 Resolved
REPAIR OR REMOVE PORT STERN VOID VENT.
Condition: Unknown
Due 22 June 1987
Resolved 22 June 1987
Electrical
Issued 22 June 1987 Resolved
REPAIR ELECTRICAL SWITCHBOARD STATUS INDICATOR LIGHTS.
Condition: Unknown
Due 22 June 1987
Resolved 22 June 1987
Deck/Cargo
Issued 22 June 1987 Resolved
PROVIDE HAND LIFTING GEAR FOR BULK CONTROL AIR RECEIVER RELIEF VALVE.
Condition: Unknown
Due 22 June 1987
Resolved 22 June 1987
Construction/Loadline
Issued 30 December 1983 Resolved
PROVIDE STRUCTURAL DWGS HOWING THE TOW PIN INSTALLATION THE DWGS ARE TO CONTAIN WELDING DETAILS, TOW PIN BOX CONNECTION TO EXISTING FRAMES ALSO
Condition: Unknown
Due 1 February 1984
Resolved 18 May 2002
Resolution: MISLE Maintenance - Resolved all open deficiencies issued prior to 6/1/1997 where activity was closed and deficiency due date was past

Ownership record

The Coast Guard's documentation record for this hull -- the Abstract of Title, with its owners and liens as filed -- is not in PSIX. Ask, and Maury buys it from the National Vessel Documentation Center, files it here with its date, and every reader of this page gets it.