MAURY USCG vessel records
← All vessels

SHANGRI-LA

SHANGRI-LA is a 2000 passenger vessel (inspected). The Coast Guard has recorded 26 inspections since 2016, most recently in August 2025, along with 63 deficiencies and 1 casualty investigation in 2005.

Records from 2005 to 2025. Most recent: inspection, 13 August 2025.

Built
2000
Last inspected
13 August 2025
Documentation
Valid · documentation file of 10 August 2026
Controls
None recorded without a removal date

Coast Guard record current through 23 August 2026, retrieved 5 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard. Records for the Passenger Ship class in Maury's sources begin in 2016.

Inspection record

Last inspected 13 August 2025
Operational controls None recorded without a removal date
Years with a record 10 calendar years (2016–2025)
Every line above is a count of records the US Coast Guard wrote, or a date it recorded. A blank resolution means none was recorded in this data; it does not establish that a deficiency is outstanding. Years with a record are calendar years in which a record exists, not years in service. What Maury does not do.

Identity

WDL7393
Flag
UNITED STATES
Maury page id
psix-5481

Documentation record

Registered dimensions (L × B × D)64.0 ft × 31.0 ft × 7.0 ft
Registered tonnagegross 36 / net 28
ITC dimensions (L × B × D)Not recorded
ITC tonnageNot recorded
BuilderGOLD COAST YACHTS INC · ST CROIX USVI · built 2000
Hull materialFRP (Fiberglass)
PropulsionAuxiliary Sail
Hull shapeShip
Hull configurationTwin Hull
Hailing portLAHAINA MAUI, HI
Trade endorsementsCoastwise, unrestricted
DocumentationValid · issued 1 December 2025 · expires 31 December 2026
Service, as the file records itPassenger (Inspected)
Hull formpowered (Maury's inference from propulsion, hull shape, material and length, rule hf-1; not a recorded fact)
Tonnage as PSIX records it28 - Simplified, Net Ton
36 - Simplified, Gross Ton
Every line above is a field of the National Vessel Documentation Center's file as served by NOAA Fisheries, dated 10 August 2026, matched to this hull on its Official Number. Registered and ITC measurements are two systems and are never combined. One snapshot is held so far; documentation history begins with the next.
Vessel history report
Every record for this hull, in one document — $299

Every recorded inspection, 2016 to 2026 for this class, in one chronology · every deficiency, with system, dates and resolution · operational controls imposed and removed · every name this hull has been recorded under · the vessels it was inspected alongside, and when · how its record compares with hulls of similar age and size, as a fact about the population and never a judgement about this vessel.

Read one first, in full: a forty-year chronology · a hull that changed operators four times · the sparse case, shown as an example, not for sale.

This report is in development and is not for sale yet. There is no date, and nothing is charged. Leave an email and we will tell you when it exists, once.

Inspection history · 26

13 August 2025 COI Inspection · Deficiency Check
Physical examination · OP location-Sector Honolulu Prevention Department- Wailuku · USCG Oceania District (CGD-O) · Activity 8208843
31 January 2025 Deficiency Check · Damage Survey
Physical examination · OP location-Sector Honolulu Prevention Department- Wailuku · USCG Oceania District (CGD-O) · Activity 8073278
9 September 2024 Drydock Exam · Examination of Repairs
Physical examination · OP location-Sector Honolulu Prevention Department- Kailua Kona · USCG Oceania District (CGD-O) · Activity 7997389
28 August 2024 Deficiency Check · Annual Inspection
Physical examination · OP location-Sector Honolulu Prevention Department- Wailuku · USCG Oceania District (CGD-O) · Activity 7992354
15 December 2023 DAPI Audit
Administrative · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 7840353
21 November 2023 Deficiency Check · Annual Inspection
Physical examination · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 7827905
30 March 2023 Deficiency Check · Administrative Inspection
Physical examination · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 7659494
12 October 2022 Deficiency Check · Annual Inspection
Physical examination · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 7576044
8 September 2022 Drydock Exam
Physical examination · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 7557434
18 February 2022 Administrative Inspection
Administrative · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 7398243
18 October 2021 Deficiency Check · Annual Inspection
Physical examination · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 7335025
16 September 2020 Drydock Exam · In-Service Inspection · Internal Structural Exam
Physical examination · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 7067104
28 August 2020 Deficiency Check · COI Inspection
Physical examination · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 7044264
21 October 2019 Deficiency Check · Annual Inspection
Physical examination · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 6839115
9 October 2019 In-Service Inspection · Administrative Inspection
Physical examination · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 6831831
29 August 2019 Administrative Inspection · Annual Inspection
Physical examination · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 6799255
28 November 2018 Construction Oversight · Administrative Inspection
Physical examination · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 6588380
4 October 2018 Administrative Inspection · Construction Oversight
Physical examination · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 6555852
2 October 2018 Annual Inspection · Administrative Inspection
Physical examination · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 6554298
7 September 2018 Drydock Exam · Administrative Inspection
Physical examination · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 6549637
9 April 2018 Deficiency Check
Physical examination · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 6388323
2 February 2018 Administrative Inspection · Deficiency Check
Physical examination · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 6348702
19 January 2018 Administrative Inspection · Deficiency Check
Physical examination · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 6340680
28 November 2017 Administrative Inspection · Annual Inspection
Physical examination · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 6315206
18 October 2016 Administrative Inspection · Annual Inspection · DAPI Audit
Physical examination · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 6031045
13 September 2016 Drydock Exam · Internal Structural Exam · Administrative Inspection
Physical examination · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 6261394

Deficiency record · 63

99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 13 August 2025 Resolved
The owner shall be prepared to conduct tests and have the vessel ready for inspection of the following: On a sailing vessel all spars, standing rigging, running rigging, blocks, fittings, and sails. Support/chaffing plate for starboard superior diamond stay found with cathodic corrosion causing plate to bend and pull away from mast. Operator shall be required to follow recommendation of 3rd party rigging survey report dated 8/10/2025 to replace standing rigging and turnbuckles no later than October 1, 2025, remove all diamond chain plates for inspection/replacement when the mast is on the ground and coordinate with USCG to receive a 6-yr mast-out inspection credit accordance with USCG NVIC 02-16. 46 CFR 176.802(a)(3)
Action required: 705 - Other - as specified
Due 1 October 2025
Resolved 23 September 2025
Resolution: Mast un-stepped and rigging renewed by 3rd party surveyor [name withheld]
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 13 August 2025 Resolved
No marine employer shall engage or employ any individual to serve as a crew member unless the individual passes a chemical test for dangerous drugs for that employer. Employer did not have pre-employment test results and proof of drug awareness training for 02 crew members. Provide satisfactory proof that all crew members have passed pre-employment testing and completed drug awareness training prior to those individuals serving in a crew member role on the vessel. 46 CFR 16.210(a)
Action required: 50 - Rectify deficiencies w/in 30 days
Due 10 September 2025
Resolved 23 September 2025
Resolution: Pre employment training and drug testing completed for (01) new employee and provided to CG. The second crew member identified was never hired by company.
09 - Working and Living Conditions › 092 - Working Conditions › Anchoring devices
Issued 31 January 2025 Resolved
A vessel must be fitted with ground tackle and mooring lines necessary for the vessel to be safely anchored or moored. Vessel reported broken anchor chain during storm. Anchor chain requires replacement. 46 CFR 183.400
Action required: 17 - Rectify deficiencies prior to departure
Due 11 February 2025
Resolved 10 February 2025
Resolution: Vessel replaced anchor chain with new 3/8" stainless G4 rating. 300ft chain.
07 - Fire Safety › N/A - No Subsystem › Fixed fire extinguishing installation
Issued 28 August 2024 Resolved
The following spaces must be equipped with a fixed gas fire extinguishing system in compliance with 181.410: A space containing machinery powered be gasoline. Fixed gas fire extinguishing system (Fireboy) for port amidship generator space. Provide a certified technician service report & demonstrate all shutdowns, alarms, and overrides to the attending USCG marine inspector. 46 CFR 181.400(a)(4)
Action required: 705 - Other - as specified
Due 13 December 2024
Resolved 23 September 2025
Resolution: Gen System non-operational and out of service. No fire extinguishing system required while system in out of service. All wiring to gen disconnected and fuel removed.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Auxiliary engine
Issued 28 August 2024 Resolved
Machinery and equipment installed on each vessel must be suitable for the vessel and its operation and for the purpose intended. Generator inoperable from start up panel. Make generator operational as designed. 46 CFR 182.100
Action required: 705 - Other - as specified
Due 13 December 2024
Resolved 23 September 2025
Resolution: Gen System non-operational, unserviceable and removed from operations. The HVAC and water maker which was serviced by the generator remain inoperable.
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 28 August 2024 Resolved
The owner shall be prepared to conduct tests and have the vessel ready for inspection of the following: On a sailing vessel all spars, standing rigging, running rigging, blocks, fittings, and sails. Support/chaffing plate for starboard superior diamond stay found with cathodic corrosion causing plate to bend and pull away from mast. Operator shall schedule a 3rd party rigging surveyor to adequately assess the safe condition of their sail rigging system in accordance with USCG NVIC 02-16, provide the survey report prior to operating under sail. 46 CFR 176.802(a)(3)
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 1 October 2024
Resolution: Aluminum doublber plate serve as spacers to keep stainless through bar from migrating port to starboard. No issues from current set up as per 3rd party rigging surveyor. Report attached.
09 - Working and Living Conditions › 091 - Living Conditions › Medical Equipment
Issued 28 August 2024 Resolved
A vessel must carry either a first-aid kit approved under approval series 160.041 or a kit with equivalent contents and instructions. First aid kit is incomplete with expired contents. Provide USCG-approved kit or a kit that complies with the list in 46 CFR 160.041. 46 CFR 184.710
Action required: 50 - Rectify deficiencies w/in 30 days
Due 27 September 2024
Resolved 14 October 2024
Resolution: New approved first aid kit installed on vessel
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 28 August 2024 Resolved
The owner shall submit the following plans,that are applicable to the vessel as determined by the OCMI: On sailing vessels: (i) Masts, including integration into the ship's structure; and (ii) Rigging plan showing sail areas and centers of effort as well as the arrangement, dimensions, and connections of the standing rigging. Provide complete updated 2024 Rigging PMP for vessel. 46 CFR 177.202(b)(12)
Action required: 50 - Rectify deficiencies w/in 30 days
Due 27 September 2024
Resolved 1 October 2024
Resolution: Received updated PMP YR 2024
02 - Structural Conditions › N/A - No Subsystem › Electrical installations in general
Issued 28 August 2024 Resolved
Electrical equipment must be installed to protect from electrical hazards. Grounding wires broken on single side band antenna and mast radio/lighting require proper reattachment. Conduit for mast wiring also broken exposing wiring. Requires replacement. 46 CFR 183.200
Action required: 50 - Rectify deficiencies w/in 30 days
Due 27 September 2024
Resolved 14 October 2024
Resolution: New conduit installed, and grounding wires renewed.
18 - Maritime Labour Convention (Not Applicable to PSC Exams conducted in the U.S.) › N/A - No Subsystem › Ship's occupational safety and health policies and programmes
Issued 28 August 2024 Resolved
Each EAP education program must include display and distribution of informational material; a community service hot-line telephone number for crew member assistance, and display and distribution of the employer's policy regarding drug and alcohol use in the workplace. Service hot-line numbers required to be posted on vessel. 46 CFR 16.401
Action required: 50 - Rectify deficiencies w/in 30 days
Due 27 September 2024
Resolved 14 October 2024
Resolution: EAP service hotline installed onboard.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Operation of machinery
Issued 21 November 2023 Resolved
All machinery and equipment must be installed and maintained in such a manner as to afford adequate protection from causing fire, explosion, machinery failure, and personnel injury. Exhaust leak located on port engine exhaust system. Repair exhaust piping to provide leak free exhaust system from port engine. 46 CFR 182.100
Action required: 17 - Rectify deficiencies prior to departure
Resolved 30 November 2023
Resolution: Leak free exhaust provided.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Operation of machinery
Issued 21 November 2023 Resolved
All machinery and equipment must be installed and maintained in such a manner as to afford adequate protection from causing fire, explosion, machinery failure, and personnel injury. Stuffing box starboard side shaft leaking. Make starboard shaft stuffing box leak free. 46 CFR 182.100
Action required: 17 - Rectify deficiencies prior to departure
Resolved 30 November 2023
Resolution: Shaft stuffing box made leak free.
07 - Fire Safety › N/A - No Subsystem › Fire fighting equipment and appliances
Issued 21 November 2023 Resolved
Portable and semi-portable extinguishers must be inspected and maintained in accordance with NFPA 10. The owner or managing operator must provide satisfactory evidence of the required servicing to the marine inspector. 46 CFR 176.810(b)(1)
Action required: 17 - Rectify deficiencies prior to departure
Resolved 1 December 2023
Resolution: Portable fire extinguishers serviced.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Operation of machinery
Issued 21 November 2023 Resolved
Machinery and equipment installed on each vessel must be suitable for the vessel and its operation and for the purpose intended. Generator was not operational. Make generator operational as designed. 46 CFR 182.100
Action required: 50 - Rectify deficiencies w/in 30 days
Due 21 December 2023
Resolved 4 March 2024
Resolution: Generator operational.
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 21 November 2023 Resolved
[withheld — contains personal information; the deficiency system, dates, and resolution status are shown above]
Action required: 50 - Rectify deficiencies w/in 30 days
Due 21 December 2023
Resolved 15 December 2023
Resolution: Completed satisfactory DAPI audit.
01 - Certificates & Documentation › 011 - Ships Certificates › Other (certificates)
Issued 21 November 2023 Resolved
The owner or managing operator of a vessel shall ensure that the vessel complies with the laws and regulations applicable to the vessel and that the vessel is otherwise satisfactory for the intended service. The inspection may include an inspection of the following items: Certificates issued by the FCC. FCC Safety Radio Certificate not valid. Provide inspection and valid FCC Safety Radio Certificate. 46 CFR 176.402
Action required: 50 - Rectify deficiencies w/in 30 days
Due 21 December 2023
Resolved 4 March 2024
Resolution: Safety Radio Cert provided.
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 21 November 2023 Resolved
The OCMI may require the vessel to get underway. Get underway in presence of marine inspector to conduct drills. 46 CFR 176.404(a)
Action required: 17 - Rectify deficiencies prior to departure
Resolved 19 December 2023
Resolution: Drills conducted.
05 - Radio Communications › N/A - No Subsystem › VHF EPIRB
Issued 21 November 2023 Resolved
Vessel is required to ensure the EPIRB's battery is replaced after it is used, or before the date required by FCC regulations in 47 CFR part 80, whichever comes sooner. Vessel's EPIRB battery was past its expiration date. Replace battery to satisfaction of attending Coast Guard Marine Inspector. Vessel restricted to within three mile of shore. 46 CFR 185.728
Action required: 705 - Other - as specified
Resolved 19 December 2023
Resolution: New EPIRB provided.
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 21 November 2023 Resolved
The EPIRB test required shall be logged or otherwise documented monthly. Vessel unable to provide log for EPIRB tests. Provide monthly EPIRB test log. 46 CFR 185.728(c)
Action required: 50 - Rectify deficiencies w/in 30 days
Due 21 December 2023
Resolved 19 December 2023
Resolution: EPIRB test logged.
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 21 November 2023 Resolved
Firefighting drills and training shall be logged or otherwise documented for review by the Coast Guard upon request. The drill entry shall include the following information: Date of the drill and training; and general description of the drill scenario and training topics. Vessel unable to provide logs for fire fighting drills and training. 46 CFR 185.524(d)
Action required: 50 - Rectify deficiencies w/in 30 days
Due 21 December 2023
Resolved 19 December 2023
Resolution: Drills logged.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Bilge pumping arrangements
Issued 21 November 2023 Resolved
A vessel must be provided with a satisfactory arrangement for draining any watertight compartment, other than small buoyancy compartments, under all practicable conditions. Bilge system inoperable in starboard midship. Make bilge pumps operate as designed from bilge float. 46 CFR 182.500 (a)
Action required: 17 - Rectify deficiencies prior to departure
Resolved 30 November 2023
Resolution: Bilge pump operates from bilge float switch.
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 21 November 2023 Resolved
Conditions of operations as may be determined by the cognizant Officer in Charge Marine Inspection (OCMI). Grills on vessel built of general purpose resin must have a dedicated 40-B:C fire extinguisher and grill shall be installed so that it can be jettisoned from the vessel with a single action while on fire, such as a pull cable to detach it from the deck railing. See Work Instruction 46 for details. 46 CFR 176.103
Action required: 50 - Rectify deficiencies w/in 30 days
Due 21 December 2023
Resolved 19 December 2023
Resolution: Grill removed.
10 - Safety of Navigation › N/A - No Subsystem › Nautical publications
Issued 21 November 2023 Resolved
[withheld — contains personal information; the deficiency system, dates, and resolution status are shown above]
Action required: 50 - Rectify deficiencies w/in 30 days
Due 21 December 2023
Resolved 12 December 2023
Resolution: Pubs provided.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Bilge pumping arrangements
Issued 21 November 2023 Resolved
In systems and applications where flexible hoses are permitted to be clamped: Double hose clamping is required where practicable. Missing double hose clamps on bilge suction and discharge. Provide double hose clamps on all bilge lines. 46 CFR 182.410 (d) (1)
Action required: 50 - Rectify deficiencies w/in 30 days
Due 21 December 2023
Resolved 30 November 2023
Resolution: Double hose clamps provided.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Operation of machinery
Issued 21 November 2023 Resolved
Shutoff valves, installed so as to close against the fuel flow, must be fitted in the fuel supply lines at the tank connection. The shutoff valve at the tank must be manually operable from outside the compartment in which the valve is located. The vessel's port fuel shutoff valve was not fully operable. Service and prove proper operation of the port fuel shutoff valve. 46 CFR 182.455(b)(4)
Action required: 17 - Rectify deficiencies prior to departure
Resolved 30 November 2023
Resolution: Fuel shut off operational.
07 - Fire Safety › N/A - No Subsystem › Fire detection and alarm system
Issued 21 November 2023 Resolved
All fiber reinforced plastic vessels constructed with general purpose resins must be fitted with a smoke activated fire detection system of an approved type (meeting 46 CFR 181.450), installed in accordance with 76.27 in subchapter H of this chapter in accommodation spaces and service spaces. Vessel does not have interconnected fire detection system for required spaces. Interconnected fire detection system must be in compliance with 46 CFR 181.450. Provide approved interconnected fire detection system and install to the satisfaction of the attending marine inspector. 46 CFR 177.410(c)(3)(ii)
Action required: 50 - Rectify deficiencies w/in 30 days
Due 21 December 2023
Resolved 4 March 2024
Resolution: Smoke activated fire detection system operational.
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 30 March 2023 Resolved
The cognizant OCMI may require that a vessel and its equipment undergo any additional test or inspection deemed reasonable and necessary to determine that the vessel and its equipment are suitable for the service in which they are to be employed. Annual inspection completed on 12 Oct 2022 with deficiency issued to provide full rigging inventory of all old and new rigging components, inspections, and rigging details. Ensure to log all inspections in accordance with vessel PMP. Keep copy of PMP on board vessel at all times and submit revised version of PMP to [name withheld] The deficiency from 12 Oct 2022 has not been cleared. Updated and accurate PMP has not been provided. The vessel shall not fly sails after 31 March 2023 with passengers onboard until a third party rig inspection is completed IAW NVIC 02-16. 46 CFR 176.840
Action required: 705 - Other - as specified
Resolved 5 April 2023
Resolution: PMP provided.
05 - Radio Communications › N/A - No Subsystem › VHF EPIRB
Issued 12 October 2022 Resolved
Vessel that operates on the high seas must have on board a FCC EPIRB installed to automatically float free. Hydrostatic release was expired. Provide valid hydrostatic release. Vessel restricted to operating within three miles from land. 46 CFR 180.64
Action required: 705 - Other - as specified
Resolved 17 November 2022
Resolution: New EPIRB hydrostatic release provided.
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 12 October 2022 Resolved
Each ring buoy with floating light must have lanyard of at least 3 ft but not more than 6 ft. Lanyard for ring buoy floating light too long. Provide lanyard of proper length. 46 CFR 180.70
Action required: 50 - Rectify deficiencies w/in 30 days
Due 12 November 2022
Resolved 17 November 2022
Resolution: Proper line provided for ring buoy.
11 - Life Saving Appliances › N/A - No Subsystem › Lifejackets incl. provision and disposition
Issued 12 October 2022 Resolved
Each life jacket must be marked with type 1 retro reflective material. 13 life jackets had worn/aged retro reflective materials. Provide new retro reflective materiel for 13 life jackets. 46 CFR 185.604(h)
Action required: 50 - Rectify deficiencies w/in 30 days
Due 12 November 2022
Resolved 17 November 2022
Resolution: Retro tape provided for lifejackets.
11 - Life Saving Appliances › N/A - No Subsystem › Other (life saving)
Issued 12 October 2022 Resolved
The name of the vessel must be marked on each side of the life float. The The number of persons capacity must be marked on each life float. Name of vessel and number missing from each life float. Provide vessel name and number capacity. 46 CFR 185.604(a) 46 CFR 185.604(e)
Action required: 50 - Rectify deficiencies w/in 30 days
Due 12 November 2022
Resolved 17 November 2022
Resolution: Name provided on life floats.
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 12 October 2022 Resolved
Each ring life buoy must be marked with retro reflective material. Worn/aged retro reflective materials on ring. Provide new retro reflective materiel for ring buoy. 46 CFR 185.604(i)
Action required: 50 - Rectify deficiencies w/in 30 days
Due 12 November 2022
Resolved 17 November 2022
Resolution: Retro tape provided for ring buoy.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 12 October 2022 Resolved
The fuel shutoff valve at the tank must be manually operable from outside the compartment in which the valve is located. Fuel shutoff would not fully close. Provide fully operational fuel shutoff. 46 CFR 182.455(b)(4)
Action required: 17 - Rectify deficiencies prior to departure
Resolved 17 October 2022
Resolution: Fuel shutoff fully operational.
11 - Life Saving Appliances › N/A - No Subsystem › Other (life saving)
Issued 12 October 2022 Resolved
The number and identification of the items stowed inside and their sizes, must be marked in clearly legible letters and number on each container for life jackets. Marking for life jacket storage missing. Provide marking for life jacket stowage. 46 CFR 185.604(f)
Action required: 50 - Rectify deficiencies w/in 30 days
Due 12 November 2022
Resolved 27 October 2022
07 - Fire Safety › N/A - No Subsystem › Fixed fire extinguishing installation
Issued 12 October 2022 Resolved
A pre-engineered fixed gas fire extinguishing system must be installed in accordance with the manufactures instructions. Port side engine room pre-engineered fixed gas fire extinguishing system was discharged during inspection. Provide new pre-engineered fixed gas fire extinguishing system for port side engine room. 46 CFR 181.420(a)
Action required: 17 - Rectify deficiencies prior to departure
Resolved 12 October 2022
Resolution: New bottle installed.
10 - Safety of Navigation › N/A - No Subsystem › Nautical publications
Issued 12 October 2022 Resolved
[withheld — contains personal information; the deficiency system, dates, and resolution status are shown above]
Action required: 50 - Rectify deficiencies w/in 30 days
Due 17 December 2022
Resolved 19 March 2023
Resolution: Nav pubs provided.
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 12 October 2022 Resolved
Sail Rigging Preventative Maintenance Plan (PMP) must be updated and onboard vessel at all times. PMP not currently updated. Provide full rigging inventory of all old and new rigging components, inspections, and rigging details. Ensure all to log all inspections in accordance with vessel PMP. Keep copy of PMP on board vessel at all times and submit revised version of PMP to [name withheld]. 46 CFR 176.802
Action required: 50 - Rectify deficiencies w/in 30 days
Due 17 December 2022
Resolved 5 April 2023
Resolution: PMP Provided.
07 - Fire Safety › N/A - No Subsystem › Fire detection and alarm system
Issued 18 October 2021 Resolved
All Fiber Reinforced Plastic(FRP) vessels constructed with general purpose resins must be fitted with a smoke activated fire detection system of an approved type. Due to generator on vessel being non operational, fire detection system is non operational. AC systems that rely on generator are not operational including general alarm, fire detection, emergency lighting. Repair generator and perform function tests on all systems that run on AC prior to taking passengers. 46 CFR 177.410(c)(3)
Action required: 17 - Rectify deficiencies prior to departure
Resolved 27 October 2021
Resolution: Generator repaired. Fire detection and emergency lighting operational.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Bilge pumping arrangements
Issued 18 October 2021 Resolved
A visual indicator must be provided at the operating station to indicate when any automatic bilge pump is operating. Mid ship port and starboard bilge pump indication not operational at operating station. Provide operational auto bilge indicators. 46 CFR 182.530(c)
Action required: 50 - Rectify deficiencies w/in 30 days
Due 18 November 2021
Resolved 27 November 2021
Resolution: New wiring installed. Operational.
09 - Working and Living Conditions › 092 - Working Conditions › Warning notices
Issued 18 October 2021 Resolved
All escape hatches used by means of escape must be marked on both side in clearly legible 2 inch letter "EMERGENCY EXIT, KEEP CLEAR". Interior emergency escape marking in both port and starboard state room missing. Provide proper emergency escape marking. 46 CFR 185. 606
Action required: 50 - Rectify deficiencies w/in 30 days
Due 18 November 2021
Resolved 18 November 2021
Resolution: Escape hatches marked.
07 - Fire Safety › N/A - No Subsystem › Fixed fire extinguishing installation
Issued 18 October 2021 Resolved
A pre-engineered fixed gas fire extinguishing system must be installed in accordance with the manufacturers instructions. New Fire Boy bottle of 400 CUFT installed while COI states 475 CUFT and old bottle was 475 CUFT. Drawings also indicate the original bottle was 475 CUFT. Area of engine rooms could not be confirmed. Provide drawings/plans of engine room area to confirm pre-engineered system of 400 CUFT will cover space. 46 CFR 181.420
Action required: 17 - Rectify deficiencies prior to departure
Resolved 27 October 2021
Resolution: Drawing of cubic foot submitted. Space has been measured and is 396 cubic foot.
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 18 October 2021 Resolved
A vessel with more that one passenger deck and a vessel with overnight accommodations must have the public address system operable from the operating station. PA system not operational. Provide operational PA system. 46 CFR 184.610(c)
Action required: 50 - Rectify deficiencies w/in 30 days
Due 18 November 2021
Resolved 27 November 2021
Resolution: New speakers installed. Operational.
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 18 October 2021 Resolved
At each inspection the owner shall be prepared to have the vessel ready for inspection of the standing rigging in accordance with their Preventative Maintenance Plan. Furler disassembly to inspect standing rigging has not been completed in this calendar year. Make standing forestay rigging ready for inspection and provide report of condition. 46 CFR 176.802
Action required: 50 - Rectify deficiencies w/in 30 days
Due 18 November 2021
Resolved 14 November 2021
Resolution: Furler disassembled and inspected IAW PMP.
01 - Certificates & Documentation › 013 - Documents › Signs, indications
Issued 28 August 2020 Resolved
Emergency instruction list missing. Post emergency instruction list.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 28 September 2020
Resolved 3 November 2020
Resolution: Emergency list posted.
01 - Certificates & Documentation › 013 - Documents › Signs, indications
Issued 28 August 2020 Resolved
Waste management plan missing. Post waste management plan.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 28 September 2020
Resolved 3 November 2020
Resolution: Waste management plan provided.
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 28 August 2020 Resolved
Alcohol testing devices expired. Provide valid alcohol testing devices.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 28 September 2020
Resolved 3 November 2020
Resolution: Alcohol testing device provided.
11 - Life Saving Appliances › N/A - No Subsystem › Lifejackets incl. provision and disposition
Issued 28 August 2020 Resolved
Life jacket storage marking missing. Provide marking for both child and adult storage of life jackets.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 28 September 2020
Resolved 3 November 2020
Resolution: Markings provided.
11 - Life Saving Appliances › N/A - No Subsystem › Maintenance of Life Saving Appliances
Issued 28 August 2020 Resolved
Lens/Light for 01 life float removed from service. Provide 01 new life float light with a lanyard of at least 18 feet in length.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 28 September 2020
Resolved 16 November 2020
Resolution: New lens and line provided.
07 - Fire Safety › N/A - No Subsystem › Fire fighting equipment and appliances
Issued 28 August 2020 Resolved
Portable and pre-engineered fixed fire fighting have not been serviced in past year. Provide service certificate of fire fighting appliances.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 28 September 2020
Resolved 3 November 2020
Resolution: Servicing conducted.
10 - Safety of Navigation › N/A - No Subsystem › Magnetic compass
Issued 28 August 2020 Resolved
Compass light not operational. Provide compass light.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 28 September 2020
Resolved 28 September 2020
Resolution: Compass light was replaced and is operational.
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 28 August 2020 Resolved
Current Light list, Coast Pilot, and Tide Tables not on vessel. Provide local extracts of publications for area to be transited.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 28 September 2020
Resolved 3 November 2020
Resolution: Pubs provided.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 28 August 2020 Resolved
Oil change pump hot-wired onto vessel battery. Remove unapproved wiring that leads directly from battery to final load source.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 28 September 2020
Resolved 3 November 2020
Resolution: Oil change pump and wiring removed.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 28 August 2020 Resolved
Natural ventilation has mechanical closure that is not allowing for full closure. Make repairs to natural ventilation closures to ensure full closure of natural ventilation.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 28 September 2020
Resolved 28 September 2020
Resolution: Aft port and starboard deck air closures caps where replaced and are able to fully close.
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 28 August 2020 Resolved
Running rust noted where chain plate meets port side of furler. Remove paint for further visual exam. NDT Dye-pen may need to be performed to rule out cracking based on visual inspection. Complete at upcoming dry dock.
Action required: 705 - Other - as specified
Resolved 28 September 2020
Resolution: Cleaned and examined chain plate on port side of furler. No deficiencies found, NDT not required.
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 28 August 2020 Resolved
Sail Rigging Preventative Maintenance Plan (PMP) not being utilized as designed. Daily, weekly, monthly, and semi-annual inspections not being conducted and/or logged as plan states in the past year. Provide full rigging survey at upcoming dry dock. Provide full rigging inventory of all old and new rigging components. Begin to log all inspections in accordance with vessel PMP. Complete at upcoming dry dock.
Action required: 705 - Other - as specified
Resolved 17 December 2020
Resolution: PMP provided. Log provided.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 9 October 2019 Resolved
Port engine shutdown solenoid failed to secure engine. Repair/renew solenoid in accordance with 46 CFR 176.804(b)
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 21 October 2019
Resolution: Port engine shutdown solenoid operated correctly. Fireboy system secured engine when tested.
07 - Fire Safety › N/A - No Subsystem › Means of escape
Issued 9 October 2019 Resolved
Port and stbd forward berth overhead emergency escapes lacked sufficient means of access. Provide satisfactory ladder in accordance with 46 CFR 177.500(j). Passengers are not allowed in forward berths.
Condition: Improper Installation
Action required: 50 - Rectify deficiencies w/in 30 days
Due 10 November 2019
Resolved 28 September 2020
Resolution: Satisfactory ladder provided.
07 - Fire Safety › N/A - No Subsystem › Means of escape
Issued 9 October 2019 Resolved
Interior side of escape hatches in forward and aft port/stbd accommodation spaces were not marked. Mark in accordance with 46 CFR 185.606.
Condition: Improper Installation
Action required: 50 - Rectify deficiencies w/in 30 days
Due 10 November 2019
Resolved 28 September 2020
Resolution: Markings provided.
07 - Fire Safety › N/A - No Subsystem › Fixed fire extinguishing installation
Issued 9 October 2019 Resolved
Generator compartment Fireboy did not secure generator when tested. Prove correct operation of Fireboy in accordance with 46 CFR 181.420.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 10 November 2019
Resolved 28 September 2020
Resolution: Fire Boy testing completed. All sat.
07 - Fire Safety › N/A - No Subsystem › Fire-dampers
Issued 29 August 2019 Resolved
Port and stbd engine compartment ventilation closures did not close completely. Prove correct operation in accordance with 46 CFR 176.810.
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 21 October 2019
Resolution: Port and stbd engine ventilation closures were satisfactory.
Lifesaving › Lifejacket/PFD (General) › Quantity
Issued 28 November 2017 Resolved
Vessel has only 52 satisfactory PFDs. Limited to 52 total persons in accordance with 46CFR 180.71.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Resolved 19 January 2018
Resolution: PFDs provided.
Fire Fighting › Fixed Fire Detection System › Alarms
Issued 28 November 2017 Resolved
Fire detection system required by 46CFR 177.410(3) is inoperable. Rounds of spaces serviced by system must be conducted every 15 minutes while passengers are onboard.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 19 February 2018
Resolved 9 April 2018
Resolution: Fire detection panel installed.
Documentation › Certificates/Documents › FCC Safety Radiotelephony Certificate
Issued 28 November 2017 Resolved
Safety Certificate required by 47 CFR is expired. Provide current certificate onboard.
Condition: Invalid
Due 19 February 2018
Resolved 2 February 2018
Resolution: Certificate provided.

Casualty record · 1

13 February 2005Routine · role: Involved in a Marine Casualty · serious marine incident, as classified · 1 injured · activity 2302300
Each line is an incident investigation the Coast Guard recorded with this hull among the vessels involved, with the date and the classification the Coast Guard gave it. Involvement is not fault. The investigation narrative is not published. Source: IIR, through 2026.

Ownership record

The Coast Guard's documentation record for this hull -- the Abstract of Title, with its owners and liens as filed -- is not in PSIX. Ask, and Maury buys it from the National Vessel Documentation Center, files it here with its date, and every reader of this page gets it.