Inspection history · 88
27 October 2025
Annual Inspection
Physical examination · Marine Safety Unit Paducah · USCG Heartland District (CGD-H) · Activity 8259246
4 September 2024
Periodic Inspection
Physical examination · Marine Safety Unit Paducah · USCG Heartland District (CGD-H) · Activity 7999156
17 October 2023
Annual Inspection
Physical examination · Marine Safety Unit Paducah · USCG Heartland District (CGD-H) · Activity 7809903
19 April 2023
Examination of Repairs · Deficiency Check · Damage Survey
Physical examination · Marine Safety Unit Paducah · USCG Heartland District (CGD-H) · Activity 7671704
11 October 2022
Annual Inspection
Physical examination · Marine Safety Unit Paducah · USCG Heartland District (CGD-H) · Activity 7574835
13 September 2021
Administrative Inspection · Cargo Tank Internal · COI Inspection · Drydock Exam · Internal Structural Exam · Examination of Repairs
Physical examination · Marine Safety Unit Paducah · USCG Heartland District (CGD-H) · Activity 7311509
23 September 2020
Annual Inspection
Physical examination · Marine Safety Unit Paducah · USCG Heartland District (CGD-H) · Activity 7063562
2 October 2019
Administrative Inspection · Annual Inspection · MTSA Verification
Physical examination · Marine Safety Unit Paducah · USCG Heartland District (CGD-H) · Activity 6826672
21 September 2018
Periodic Inspection · MTSA Verification · Administrative Inspection
Physical examination · Marine Safety Unit Paducah · USCG Heartland District (CGD-H) · Activity 6545862
23 March 2018
Type not recorded
No type recorded · Marine Safety Unit Paducah · USCG Heartland District (CGD-H) · Activity 6378988
14 September 2017
Annual Inspection · Administrative Inspection · MTSA Verification
Physical examination · Marine Safety Unit Paducah · USCG Heartland District (CGD-H) · Activity 6274672
19 September 2016
MTSA Verification · COI Inspection · Internal Structural Exam · Administrative Inspection
Physical examination · Marine Safety Unit Paducah · USCG Heartland District (CGD-H) · Activity 6004293
31 August 2016
Administrative Inspection · MTSA Verification · Internal Structural Exam · COI Inspection
Physical examination · Marine Safety Unit Paducah · USCG Heartland District (CGD-H) · Activity 6004137
6 October 2015
Annual Inspection · MTSA Verification
Physical examination · Marine Safety Unit Paducah · USCG Heartland District (CGD-H) · Activity 5747305
23 February 2015
Type not recorded
No type recorded · Marine Safety Unit Paducah · USCG Heartland District (CGD-H) · Activity 5073582
7 November 2014
Damage Survey · Examination of Repairs · Administrative Inspection
Physical examination · Marine Safety Unit Paducah · USCG Heartland District (CGD-H) · Activity 5026925
15 October 2014
MTSA Verification · Administrative Inspection · Annual Inspection
Physical examination · Marine Safety Unit Paducah · USCG Heartland District (CGD-H) · Activity 5012933
9 October 2013
Annual Inspection · Administrative Inspection · MTSA Verification
Physical examination · Marine Safety Unit Paducah · USCG Heartland District (CGD-H) · Activity 4731954
21 December 2012
Administrative Inspection · Examination of Repairs · Annual Inspection
Physical examination · Marine Safety Unit Paducah · USCG Heartland District (CGD-H) · Activity 4539665
15 November 2010
Damage Survey · Examination of Repairs
Physical examination · Marine Safety Unit Paducah · USCG Heartland District (CGD-H) · Activity 3888852
24 April 2009
Administrative Inspection
Administrative · Marine Safety Unit Paducah · USCG Heartland District (CGD-H) · Activity 3467102
18 December 2008
Annual Inspection · Deficiency Check · MTSA Verification
Physical examination · Marine Safety Unit Paducah · USCG Heartland District (CGD-H) · Activity 3382224
13 February 2008
MTSA Verification · Annual Inspection
Physical examination · Marine Safety Unit Paducah · USCG Heartland District (CGD-H) · Activity 3147072
1 February 2008
Examination of Repairs
Physical examination · Marine Safety Unit Paducah · USCG Heartland District (CGD-H) · Activity 3140434
18 November 2007
Type not recorded
No type recorded · Marine Safety Unit Paducah · USCG Heartland District (CGD-H) · Activity 3100372
17 November 2007
Type not recorded
No type recorded · Marine Safety Unit Paducah · USCG Heartland District (CGD-H) · Activity 3100363
13 December 2006
COI Inspection
Physical examination · Marine Safety Unit Paducah · USCG Heartland District (CGD-H) · Activity 2838711
5 May 2006
Security Plan Amendment Review - VSP
Administrative · Marine Safety Center (MSC) · Activity 2641481
6 March 2006
Security Plan Amendment Review - VSP
Administrative · Marine Safety Center (MSC) · Activity 2596803
3 March 2006
Annual Inspection · Internal Structural Exam
Physical examination · Marine Safety Unit Paducah · USCG Heartland District (CGD-H) · Activity 2595557
11 January 2005
Type not recorded
No type recorded · MSO Paducah · USCG Heartland District (CGD-H) · Activity 2277069
17 December 2004
MTSA Verification · Re-Inspection
Physical examination · MSO Paducah · USCG Heartland District (CGD-H) · Activity 2261490
27 August 2004
Type not recorded
No type recorded · MSO Paducah · USCG Heartland District (CGD-H) · Activity 2182432
30 April 2004
Damage Survey · Examination of Repairs
Physical examination · MSO Paducah · USCG Heartland District (CGD-H) · Activity 2059679
30 December 2003
Security Plan Review - VSP
Administrative · Marine Safety Center (MSC) · Activity 1997510
22 October 2003
Periodic Inspection
Physical examination · MSO Paducah · USCG Heartland District (CGD-H) · Activity 1938405
10 October 2003
Type not recorded
No type recorded · MSO Paducah · USCG Heartland District (CGD-H) · Activity 1925448
10 March 2003
Re-Inspection
Physical examination · MSO Paducah · USCG Heartland District (CGD-H) · Activity 1755029
13 December 2001
COI Inspection
Physical examination · MSO Paducah · USCG Heartland District (CGD-H) · Activity 1379666
5 October 2001
Type not recorded
No type recorded · MSO Paducah · USCG Heartland District (CGD-H) · Activity 294452
26 January 2001
Hull Examination · Re-Inspection
Physical examination · MSO Paducah · USCG Heartland District (CGD-H) · Activity 1463629
14 December 1999
COI Inspection
Physical examination · MSO Paducah · USCG Heartland District (CGD-H) · Activity 1372850
10 December 1999
Examination of Repairs
Physical examination · MSO Paducah · USCG Heartland District (CGD-H) · Activity 812114
11 March 1999
Deficiency Check
Physical examination · MSO Paducah · USCG Heartland District (CGD-H) · Activity 805582
16 February 1999
Type not recorded
No type recorded · MSO Paducah · USCG Heartland District (CGD-H) · Activity 425629
16 February 1999
Deficiency Check
Physical examination · MSO Paducah · USCG Heartland District (CGD-H) · Activity 1131220
16 February 1999
Re-Inspection
Physical examination · MSO Paducah · USCG Heartland District (CGD-H) · Activity 1413481
30 January 1998
Type not recorded
No type recorded · MSO Paducah · USCG Heartland District (CGD-H) · Activity 450973
17 December 1997
Type not recorded
No type recorded · MSO Paducah · USCG Heartland District (CGD-H) · Activity 411582
17 December 1997
COI Inspection
Physical examination · MSO Paducah · USCG Heartland District (CGD-H) · Activity 1445292
10 December 1996
Re-Inspection
Physical examination · MSO Paducah · USCG Heartland District (CGD-H) · Activity 1363881
19 December 1995
COI Inspection
Physical examination · MSO Paducah · USCG Heartland District (CGD-H) · Activity 1452098
15 December 1994
COI Inspection
Physical examination · MSO Paducah · USCG Heartland District (CGD-H) · Activity 841356
6 September 1994
Type not recorded
No type recorded · MSO Paducah · USCG Heartland District (CGD-H) · Activity 658935
25 August 1994
Type not recorded
No type recorded · MSO Paducah · USCG Heartland District (CGD-H) · Activity 500651
13 June 1994
Type not recorded
No type recorded · MSO Paducah · USCG Heartland District (CGD-H) · Activity 506762
16 March 1994
Type not recorded
No type recorded · MSO Paducah · USCG Heartland District (CGD-H) · Activity 526302
7 January 1994
Re-Inspection
Physical examination · MSO Paducah · USCG Heartland District (CGD-H) · Activity 1164186
6 August 1993
Type not recorded
No type recorded · MSO Paducah · USCG Heartland District (CGD-H) · Activity 22731
3 March 1993
Type not recorded
No type recorded · MSO Paducah · USCG Heartland District (CGD-H) · Activity 456301
17 December 1992
Hull Examination · Examination of Repairs · COI Inspection
Physical examination · MSO Paducah · USCG Heartland District (CGD-H) · Activity 826675
15 June 1992
Type not recorded
No type recorded · MSO Paducah · USCG Heartland District (CGD-H) · Activity 455353
26 December 1991
Re-Inspection
Physical examination · MSO Paducah · USCG Heartland District (CGD-H) · Activity 1269719
18 December 1991
Type not recorded
No type recorded · MSO Paducah · USCG Heartland District (CGD-H) · Activity 473961
14 June 1991
Type not recorded
No type recorded · MSO Paducah · USCG Heartland District (CGD-H) · Activity 441082
21 December 1990
COI Inspection · Examination of Repairs · Damage Survey
Physical examination · MSO Paducah · USCG Heartland District (CGD-H) · Activity 921511
14 December 1990
Type not recorded
No type recorded · MSO Paducah · USCG Heartland District (CGD-H) · Activity 470286
20 June 1990
Type not recorded
No type recorded · MSO Paducah · USCG Heartland District (CGD-H) · Activity 472650
16 March 1990
Type not recorded
No type recorded · MSO Paducah · USCG Heartland District (CGD-H) · Activity 472715
18 December 1989
COI Inspection
Physical examination · MSO Paducah · USCG Heartland District (CGD-H) · Activity 1243316
7 September 1989
Type not recorded
No type recorded · MSO Paducah · USCG Heartland District (CGD-H) · Activity 436272
1 February 1989
Type not recorded
No type recorded · MSO Paducah · USCG Heartland District (CGD-H) · Activity 491396
22 December 1988
Drydock Extension · Re-Inspection
Physical examination · MSO Paducah · USCG Heartland District (CGD-H) · Activity 1343832
28 November 1988
Type not recorded
No type recorded · MSO Paducah · USCG Heartland District (CGD-H) · Activity 503882
17 May 1988
Type not recorded
No type recorded · MSO Paducah · USCG Heartland District (CGD-H) · Activity 509084
4 February 1988
Administrative
Administrative · MSO Paducah · USCG Heartland District (CGD-H) · Activity 1017878
22 December 1987
COI Inspection
Physical examination · MSO Paducah · USCG Heartland District (CGD-H) · Activity 1313631
9 November 1987
Type not recorded
No type recorded · MSO Paducah · USCG Heartland District (CGD-H) · Activity 485566
13 June 1987
Type not recorded
No type recorded · MSO Paducah · USCG Heartland District (CGD-H) · Activity 497189
19 December 1986
Re-Inspection
Physical examination · MSO Paducah · USCG Heartland District (CGD-H) · Activity 1334560
12 December 1986
Type not recorded
No type recorded · MSO Paducah · USCG Heartland District (CGD-H) · Activity 515994
2 December 1986
Type not recorded
No type recorded · MSO Paducah · USCG Heartland District (CGD-H) · Activity 457670
28 May 1986
Type not recorded
No type recorded · MSO Paducah · USCG Heartland District (CGD-H) · Activity 536492
31 December 1985
Credit Drydock · COI Inspection
Physical examination · MSO Paducah · USCG Heartland District (CGD-H) · Activity 989415
25 October 1985
Type not recorded
No type recorded · MSO Paducah · USCG Heartland District (CGD-H) · Activity 451354
28 March 1985
Type not recorded
No type recorded · MSO Paducah · USCG Heartland District (CGD-H) · Activity 488564
25 March 1985
Type not recorded
No type recorded · MSO Paducah · USCG Heartland District (CGD-H) · Activity 979634
21 September 1984
Type not recorded
No type recorded · MSO Paducah · USCG Heartland District (CGD-H) · Activity 442797
Deck/Cargo › Holds/Tanks › Bulkhead
Issued 7 November 2014
Resolved
Integral water tank wasted throughout. Plate summary placed in MISLE narrative.
Action required: 705 - Other - as specified
Resolved 2 December 2014
Resolution: Witnessed satisfactory airtest of plate repairs.
Construction/Loadline › Markings › Draft Marks/Indicating System
Issued 21 December 2012
Resolved
Were not painted in contrasting color to hull.
Action required: 705 - Other - as specified
Due 21 January 2013
Resolved 8 January 2013
Accommodation/Occupational Safety › Occupational Safety › Guards for Exposed Hazards
Issued 21 December 2012
Resolved
Prime mover required guards placed around moving parts.
Action required: 705 - Other - as specified
Due 21 January 2013
Resolved 8 January 2013
Deck/Cargo › Holds/Tanks › Hatch
Issued 19 December 2008
Resolved
Properly stencil slop tank hatch.
Action required: 705 - Other - as specified
Resolved 8 December 2009
Resolution: Hatch stenciled properly.
Fire Fighting › Portable Dry Chemical Fire Extinguisher › Mounting Bracket
Issued 19 December 2008
Resolved
Provide proper mounting bracket for fire extinguishers.
Action required: 705 - Other - as specified
Resolved 8 December 2009
Resolution: Proper mounting bracket for fire extinguishers.
Pollution Prevention/Response › Prevention Equipment › Fixed Containment
Issued 19 December 2008
Resolved
Clean containment; remove oil and water for proper capacity.
Action required: 705 - Other - as specified
Resolved 8 December 2009
Construction/Loadline › Markings › Draft Marks/Indicating System
Issued 19 December 2008
Resolved
Paint draft makings in contrasting color.
Action required: 705 - Other - as specified
Resolved 8 December 2009
Construction/Loadline › Markings › Vessel Name/Home Port
Issued 19 December 2008
Resolved
Paint vessel name and home port on stern in contrasting color.
Action required: 705 - Other - as specified
Resolved 8 December 2009
Deck/Cargo › Cargo Transfer/Lightering (liquid) › Emergency Shut-down
Issued 13 February 2008
Resolved
Remote pump engine shut down, was frozen at the time of inspection. The pump engine could be shut down locally but the conduit the cable ran through was frozen. Defrost the conduit and prove proper operation of remote shut down.
Action required: 705 - Other - as specified
Resolved 19 December 2008
Resolution: Emergncy shut-down operated properly.
Deck/Cargo › Holds/Tanks › Hatch Cover
Issued 13 February 2008
Resolved
Properly stencil cargo tank hatches.
Action required: 705 - Other - as specified
Resolved 19 December 2008
Resolution: All cargo tank hatches properly stenciled, with the exception of the slop tank.
Pollution Prevention/Response › Prevention Equipment › Fixed Containment
Issued 13 February 2008
Resolved
Empty containment, to maintain proper capacity.
Action required: 705 - Other - as specified
Resolved 8 December 2009
Resolution: Containment empty.
Deck/Cargo › Cargo Transfer/Lightering (liquid) › Cargo Pump
Issued 13 December 2006
Resolved
CLEAN UP OILY RESIDUE IN WAY OF THE CARGO PUMP CONTAINMENT AREA.
Action required: 701 - Prior to carriage of passengers/cargo
Due 14 December 2006
Resolved 13 December 2006
Deck/Cargo › Holds/Tanks › Independent Tank
Issued 13 December 2006
Resolved
Gas Free deck cargo tank and make available for internal inspection.
Due 21 January 2007
Resolved 30 January 2007
Deck/Cargo › Holds/Tanks › Independent Tank
Issued 13 December 2006
Resolved
Crop out improper doubler patches in way of the bottom of the deck lube oil tank; crop out wasted plate and insert new plate as original prior to loading tank.
Action required: 705 - Other - as specified
Due 28 February 2007
Resolved 13 February 2007
Deck/Cargo › Cargo Transfer/Lightering (liquid) › Cargo Pump
Issued 1 March 2006
Resolved
Properly repair leaking fuel return line on cargo pump.
Due 8 March 2006
Resolved 11 March 2006
Deck/Cargo › Cargo Transfer/Lightering (liquid) › Cargo Pump
Issued 1 March 2006
Resolved
Remove temp electrical block heater from cargo pump
Due 8 March 2006
Resolved 11 March 2006
Deck/Cargo › Cargo Transfer/Lightering (liquid) › Cargo Pump
Issued 1 March 2006
Resolved
Install support brackets for the fuel lines running from the day tank to the cargo pump.
Due 8 March 2006
Resolved 11 March 2006
Deck/Cargo › Cargo Transfer/Lightering (liquid) › Cargo Pump
Issued 1 March 2006
Resolved
Replace all high-pressure hydraulic lines to the cargo pump drive unit.
Due 8 March 2006
Resolved 11 March 2006
Deck/Cargo › Cargo Transfer/Lightering (liquid) › Cargo Pump
Issued 1 March 2006
Resolved
Properly secure all electrical starter wires.
Due 8 March 2006
Resolved 11 March 2006
Deck/Cargo › Cargo Transfer/Lightering (liquid) › Cargo Manifold
Issued 1 March 2006
Resolved
Properly tighten packing on the aft, amidship main valve.
Due 8 March 2006
Resolved 11 March 2006
Deck/Cargo › Cargo Transfer/Lightering (liquid) › Cargo Manifold
Issued 1 March 2006
Resolved
Properly correct leaky piping on starboard manifold.
Due 8 March 2006
Resolved 11 March 2006
Deck/Cargo › Holds/Tanks › Ullage
Issued 1 March 2006
Resolved
Replace flame screen on ullage as discussed.
Due 8 March 2006
Resolved 11 March 2006
Electrical › Electrical Distribution System (service) › Wiring
Issued 1 March 2006
Resolved
Ensure all electrical equipment is in compliance with 46 CFR 111.105-31, paragraph I
Due 8 March 2006
Resolved 11 March 2006
Documentation › Certificates/Documents › Certificate of Inspection
Issued 28 February 2006
Resolved
Failed to conduct required ISE.
Action required: 705 - Other - as specified
Resolved 11 March 2006
Construction/Loadline
Issued 26 January 2001
Resolved
REMOVE ACCUMULATED MUD IN #1 WING VOID AND MAKE ALL PLATE AND FRAMING VISIBLY ACCESSIBLE FOR THE ATTENDING USCG MARINE INSPECTOR.
Condition: Unknown
Due 26 January 2001
Resolved 26 January 2001
Deck/Cargo
Issued 26 January 2001
Resolved
INSTALL OVERFILL PROTECTION DEVICES ON THE AFT INTEGRAL HYDRAULIC OIL TANKS.
Condition: Unknown
Due 26 January 2001
Resolved 26 January 2001
Deck/Cargo
Issued 16 February 1999
Resolved
Provide valve position indicators on 3 reachrod valves in cargo system.
Condition: Unknown
Due 16 February 1999
Resolved 16 February 1999
Deck/Cargo
Issued 16 February 1999
Resolved
Provide valve position indicators on 3 reachrod valves in cargo system.
Condition: Unknown
Due 16 February 1999
Resolved 16 February 1999
Deck/Cargo
Issued 16 February 1999
Resolved
Provide proof of current annual cargo header/piping/valve testing.
Condition: Unknown
Due 16 February 1999
Resolved 16 February 1999
Deck/Cargo
Issued 7 January 1994
Resolved
TRANSFER PROCEDURES LACKING PROCEDURES FOR CLOSING VALVES AT END OF TRANSFER. PROVIDE PROCEDURES PRIOR TO TRANSFER OF CARGO BUT NOT LATER THANCOMPLIANCE DATE.
Condition: Unknown
Due 16 January 1994
Resolved 16 January 1994
Construction/Loadline
Issued 17 December 1992
Resolved
UPPER 8' OF THE PORT STERN CORNER AND SIDE PLATE FORWARD SIX FEET SET-IN AND FRACTURED.
Condition: Unknown
Due 23 December 1992
Resolved 23 December 1992
Construction/Loadline
Issued 21 December 1990
Resolved
MULTIPLE FRACTURES OF WELDS JOINING VERTICAL AND HORIZONTAL FRAMES ALONG SIDE PLATE, MULTIPLE GUSSETS IMPROPERLY WELDED INTO PLACE OR BROKEN FREE, AND A 3" FRACTURE TO MAIN CARGO TANK AT PORT FORWARD AREA JUST BELOW MAIN DECK.
Condition: Unknown
Due 21 December 1990
Resolved 21 December 1990