MAURY USCG vessel records
← All vessels

CAPT. JOHN & SON II

CAPT. JOHN & SON II is a 1983 passenger vessel (inspected). The Coast Guard has recorded 23 inspections since 2016, most recently in February 2026, along with 30 deficiencies.

Records from 2016 to 2026. Most recent: inspection, 9 February 2026.

Built
1983
Last inspected
9 February 2026
Documentation
Valid · documentation file of 10 August 2026
Controls
None recorded without a removal date

Coast Guard record current through 23 August 2026, retrieved 5 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard. Records for the Passenger Ship class in Maury's sources begin in 2016.

Inspection record

Last inspected 9 February 2026
Operational controls None recorded without a removal date
Years with a record 11 calendar years (2016–2026)
Every line above is a count of records the US Coast Guard wrote, or a date it recorded. A blank resolution means none was recorded in this data; it does not establish that a deficiency is outstanding. Years with a record are calendar years in which a record exists, not years in service. What Maury does not do.

Identity

WDL5797
Flag
UNITED STATES
Maury page id
psix-54912

Documentation record

Registered dimensions (L × B × D)76.6 ft × 22.1 ft × 7.4 ft
Registered tonnagegross 76 / net 51
ITC dimensions (L × B × D)Not recorded
ITC tonnageNot recorded
BuilderGULF CRAFT · PATTERSON, LA, UNITED STATES · built 1983
Hull materialAluminum
PropulsionDiesel Reduction
Hull shapeUNSPECIFIED
Hull configurationUNSPECIFIED
Hailing portPLYMOUTH, MA
Trade endorsementsCoastwise, unrestricted, Fishery, Registry
DocumentationValid · issued 24 February 2026 · expires 28 February 2027
Service, as the file records itPassenger (Inspected)
Hull formpowered (Maury's inference from propulsion, hull shape, material and length, rule hf-1; not a recorded fact)
Tonnage as PSIX records it76 - Regulatory (Subpart C or D), Gross Ton
51 - Regulatory (Subpart C or D), Net Ton
Every line above is a field of the National Vessel Documentation Center's file as served by NOAA Fisheries, dated 10 August 2026, matched to this hull on its Official Number. Registered and ITC measurements are two systems and are never combined. One snapshot is held so far; documentation history begins with the next.
Vessel history report

A report is not offered for this hull. Its record holds only 2 of the seven kinds of material a report is built from: inspections, deficiencies, operational controls, tow-unit appearances, casualty records, dimensions and documentation. That is a statement about the record, not about the vessel. What a sparse-record report looks like.

Inspection history · 23

9 February 2026 Annual Inspection
Physical examination · Marine Safety Unit Cape Cod · USCG Northeast District (CGD-NE) · Activity 8308074
12 May 2025 Deficiency Check · Annual Inspection
Physical examination · Marine Safety Unit Cape Cod · USCG Northeast District (CGD-NE) · Activity 8123264
27 March 2025 Examination of Repairs · Internal Structural Exam · Drydock Exam
Physical examination · Sector Southeastern New England · USCG Northeast District (CGD-NE) · Activity 8084176
23 April 2024 Deficiency Check · Annual Inspection
Physical examination · Marine Safety Unit Cape Cod · USCG Northeast District (CGD-NE) · Activity 7898326
11 July 2023 Administrative Inspection
Administrative · Sector Boston · USCG Northeast District (CGD-NE) · Activity 7741492
17 May 2023 Administrative Inspection
Administrative · USCG Northeast District (dp) · USCG Northeast District (CGD-NE) · Activity 7690533
28 April 2023 Internal Structural Exam · In-Service Inspection · Annual Inspection
Physical examination · Sector Boston · USCG Northeast District (CGD-NE) · Activity 7668787
14 March 2023 Deficiency Check · Examination of Repairs · Administrative Inspection · Plan Review "T" Boat
Physical examination · Marine Safety Unit New Bedford · USCG Northeast District (CGD-NE) · Activity 7651666
23 January 2023 Examination of Repairs · Drydock Exam · Internal Structural Exam · Administrative Inspection · Deficiency Check
Physical examination · Sector Southeastern New England · USCG Northeast District (CGD-NE) · Activity 7622606
23 August 2022 In-Service Inspection
Physical examination · Sector Boston · USCG Northeast District (CGD-NE) · Activity 7522065
5 May 2022 Deficiency Check · COI Inspection · Internal Structural Exam
Physical examination · Sector Boston · USCG Northeast District (CGD-NE) · Activity 7414221
17 May 2021 Annual Inspection
Physical examination · Sector Boston · USCG Northeast District (CGD-NE) · Activity 7199396
11 February 2021 Internal Structural Exam · Drydock Exam · Examination of Repairs
Physical examination · Sector Southeastern New England · USCG Northeast District (CGD-NE) · Activity 7135694
9 June 2020 DAPI Audit · Deficiency Check · Internal Structural Exam · Annual Inspection
Physical examination · Sector Southeastern New England · USCG Northeast District (CGD-NE) · Activity 6962424
28 May 2019 Administrative Inspection
Administrative · Sector Boston · USCG Northeast District (CGD-NE) · Activity 6696365
23 April 2019 Annual Inspection · Deficiency Check
Physical examination · Sector Boston · USCG Northeast District (CGD-NE) · Activity 6667479
7 March 2019 Drydock Exam · Internal Structural Exam · Examination of Repairs
Physical examination · Sector Southeastern New England · USCG Northeast District (CGD-NE) · Activity 6633543
12 September 2018 Deficiency Check · Administrative Inspection
Physical examination · Navigation Center · Activity 6539068
10 May 2018 Annual Inspection · Deficiency Check · Internal Structural Exam
Physical examination · Sector Boston · USCG Northeast District (CGD-NE) · Activity 6411135
28 March 2017 COI Inspection
Physical examination · Sector Boston · USCG Northeast District (CGD-NE) · Activity 6112868
9 March 2017 Internal Structural Exam · Drydock Exam · Examination of Repairs
Physical examination · Sector Southeastern New England · USCG Northeast District (CGD-NE) · Activity 6097146
3 August 2016 In-Service Inspection
Physical examination · Marine Safety Unit Cape Cod · USCG Northeast District (CGD-NE) · Activity 5961737
12 April 2016 Annual Inspection
Physical examination · Sector Boston · USCG Northeast District (CGD-NE) · Activity 5852179

Deficiency record · 30

04 - Emergency Systems › N/A - No Subsystem › Water level indicator
Issued 9 February 2026 Resolved
Machinery and equipment installed on each vessel must be suitable for the vessel and its operation and for the purpose intended. On a vessel of at least 7.9 meters (26 feet) in length, a visual and audible alarm must be provided at the operating station to indicate a high water level in each of the following normally unmanned spaces ...Vessel's bilge alarms (03) were not labeled in order to properly identify. Item was corrected on the spot with label maker. 46CFR 182.530
Condition: Damaged By Earlier Event
Action required: 10 - Deficiency Rectified
Due 9 February 2026
Resolved 9 February 2026
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 9 February 2026 Resolved
Each distribution panel or switchboard must be totally enclosed and of the dead front type. The FWD engineroom panel was missing a blank. Vessel fabricated and installed a protecting cover for opening. Corrected on the spot. 46CFR 183.330.b.
Condition: Damaged By Earlier Event
Action required: 10 - Deficiency Rectified
Due 9 February 2026
Resolved 9 February 2026
09 - Working and Living Conditions › 092 - Working Conditions › Safe means of access
Issued 23 April 2024 Resolved
Except as otherwise provided in this section, each space accessible to passengers or used by the crew on a regular basis, must have at least two means of escape, one of which must not be a watertight door. The fwd escape hatch for the main space was unable to be opened. Free and prove smooth and safe operation to the attending marine inspector. 46CFR 177.500.e.
Condition: Damaged By Earlier Event
Action required: 16 - Rectify deficiencies w/in 14 days
Due 7 May 2024
Resolved 3 May 2024
Resolution: Corrected as per regulation.
11 - Life Saving Appliances › N/A - No Subsystem › Lifejackets incl. provision and disposition
Issued 23 April 2024 Resolved
Each child size life jacket must be stowed in a location that is appropriately marked and separated from adult life jackets so the child size life jackets are not mistaken for adult life jackets. Currently the child and adult PFD's are stored together in the main deck location. Redistribute PFD's to be in compliance with the above regulation. 46CFR 180.78.a.5.
Condition: Damaged By Earlier Event
Action required: 16 - Rectify deficiencies w/in 14 days
Due 7 May 2024
Resolved 3 May 2024
Resolution: Corrected as per regulation.
11 - Life Saving Appliances › N/A - No Subsystem › On board training and instructions
Issued 23 April 2024 Resolved
Placards containing instructions for the donning and use of the life jackets aboard the vessel must be posted in conspicuous places that are regularly accessible and visible to the crew and passengers. PFD placard is flat mounted on main deck. Relocate for passenger visibility. 46CFR 185.516.a.
Condition: Damaged By Earlier Event
Action required: 16 - Rectify deficiencies w/in 14 days
Due 7 May 2024
Resolved 3 May 2024
Resolution: Corrected as per regulation.
01 - Certificates & Documentation › 011 - Ships Certificates › Certificate of Inspection (COI)
Issued 23 April 2024 Resolved
[withheld — contains personal information; the deficiency system, dates, and resolution status are shown above]
Condition: Damaged By Earlier Event
Action required: 16 - Rectify deficiencies w/in 14 days
Due 7 May 2024
Resolved 3 May 2024
Resolution: Corrected as per regulation.
05 - Radio Communications › N/A - No Subsystem › Distress messages: obligations and procedures
Issued 23 April 2024 Resolved
The following emergency broadcast instructions, when placed on a placard, will satisfy the requirement contained in §?184.506 for an emergency broadcast placard ...The vessel information and call sign shall be posted on the bridge IVO radios. 46CFR 184.510
Condition: Damaged By Earlier Event
Action required: 16 - Rectify deficiencies w/in 14 days
Due 7 May 2024
Resolved 3 May 2024
Resolution: Corrected as per regulation.
02 - Structural Conditions › N/A - No Subsystem › Decks - cracking
Issued 23 April 2024 Resolved
A vessel is inspected for compliance with the standards required by this subchapter. ...The top tread for the upper deck stairwell is cracked on the underside in multiple locations, in need of repair. Provide tread that is to the satisfaction of the attending marine inspector. 46CFR 176.800.a.
Condition: Damaged By Earlier Event
Action required: 50 - Rectify deficiencies w/in 30 days
Due 23 May 2024
Resolved 3 May 2024
Resolution: Corrected as per regulation.
02 - Structural Conditions › N/A - No Subsystem › Stability/strength/loading information and instruments
Issued 23 April 2024 Resolved
On a vessel on which the number of passengers permitted on upper decks is limited by stability criteria, as indicated by the vessel's stability letter, the maximum number of passengers allowed on an upper deck must be indicated by a durable marking of at least 25 millimeters (1 inch) numbers and letters at the entranceway to that deck. The vessels signage has worn and in need of renewal. 46CFR 185.602.g.
Condition: Damaged By Earlier Event
Action required: 50 - Rectify deficiencies w/in 30 days
Due 23 May 2024
Resolved 3 May 2024
Resolution: attended vessel
01 - Certificates & Documentation › 013 - Documents › Log-books/compulsory entries
Issued 23 April 2024 Resolved
The EPIRB test required by paragraph (a) shall be logged or otherwise documented, as applicable. Abandon ship and man overboard drills and training shall be logged or otherwise documented for review by the Coast Guard upon request. The drill entry shall include the following information:(1) Date of the drill and training; and (2) General description of the drill scenario and training topics. Vessel did not have documented abandonship drills or EPIRB monthly tests. 46CFR 185.728.c. 46CFR 185.520.f.
Condition: Damaged By Earlier Event
Action required: 50 - Rectify deficiencies w/in 30 days
Due 23 May 2024
Resolved 3 May 2024
Resolution: attended vessel
10 - Safety of Navigation › N/A - No Subsystem › Nautical publications
Issued 23 April 2024 Resolved
As appropriate for the intended voyage, a vessel must carry adequate and up-to-date: ...(2) U.S. Coast Pilot or similar publication; (3) Coast Guard Light List; (4) Tide tables. Vessel to provide up to date/current publications for the areas in which the vessel operates. 46CFR 184.420.a.
Condition: Damaged By Earlier Event
Action required: 50 - Rectify deficiencies w/in 30 days
Due 23 May 2024
Resolved 3 May 2024
Resolution: attended vessel
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 23 April 2024 Resolved
Flexible nonmetallic hose may be used in lube oil, fuel oil and fluid power systems, subject to the following requirements: (v) For the purpose of flexibility only, flexible hose installed in lengths of not more than 760 millimeters (30 inches) ...Vessel is able to comply with old 46CFR T on installations. Once the vessel repowered to the MTU mains (non replacement-in-kind), the vessel is required come up to the current regulations. Vessel to metallic pipe supply and return f/o lines from the f/o tank to the filter assembly/main engine. To be completed at or by next drydock to the satisfaction of the attending Marine Inspector. 46CFR 182.720
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Due 28 February 2025
Resolved 12 May 2025
Resolution: New fuel lines were installed
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 23 April 2024 Resolved
Each ring life buoy with a floating waterlight must have a lanyard ... but not more than 1,830 millimeters (6 feet). Lanyard on vessel was around 20 feet long. Vessel correct on the spot. 46CFR 180.70.d.2.
Condition: Damaged By Earlier Event
Action required: 10 - Deficiency Rectified
Due 23 April 2024
Resolved 23 April 2024
Resolution: Renewed lanyard.
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 5 May 2022 Resolved
Each floating waterlight installed after March 11, 1997, on a vessel carrying only one ring buoy, must be attached to the lanyard with a corrosion-resistant clip. The clip must have a strength of at least 22.7 kilograms (50 pounds), and allow the waterlight to be quickly disconnected from the ring life buoy. Life buoy did not have a attached waterlight..
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 16 May 2022
Resolution: Installed removable clip.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 5 May 2022 Resolved
There must be a means of accurately determining the amount of fuel in each fuel tank either by sounding, through a separate sounding pipe or a fill pipe, or by an installed marine type fuel gauge. Unapproved sight glass was installed to the tank.
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 16 May 2022
Resolution: Removed siteglass.
09 - Working and Living Conditions › 091 - Living Conditions › Water, pipes, tanks
Issued 5 May 2022 Resolved
Potable water tank piping wasted. Make repairs in kind.
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 16 May 2022
Resolution: Made repairs in kind.
02 - Structural Conditions › N/A - No Subsystem › Electrical installations in general
Issued 5 May 2022 Resolved
For alternating-current generators a means for measuring frequency shall be provided. The frequency meter was inoperable.
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 16 May 2022
Resolution: Replaced frequency meter, test sat.
02 - Structural Conditions › N/A - No Subsystem › Electrical installations in general
Issued 5 May 2022 Resolved
All cables installed where particularly liable to damage shall be specially protected by removable metal coverings. Cabling in engine room was attached using only plastic ties.
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 16 May 2022
Resolution: Installed metal supports for cable runs in engine room.
02 - Structural Conditions › N/A - No Subsystem › Electrical installations in general
Issued 5 May 2022 Resolved
All electrical equipment must be constructed and protected that its uninsulated parts cannot be inadvertently touched. Switchboard was not fully enclosed.
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 16 May 2022
Resolution: Closed opening on switchboard.
02 - Structural Conditions › N/A - No Subsystem › Hull - cracking
Issued 9 June 2020 Resolved
1) Hand rail weld cracked port side forward main deck. 2) Grab rail inside house near galley weld crack in overhead.
Action required: 17 - Rectify deficiencies prior to departure
Due 9 June 2020
Resolved 11 June 2020
Resolution: Welded hand rails.
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 9 June 2020 Resolved
3) Battery in Life float inoperable.
Action required: 17 - Rectify deficiencies prior to departure
Due 9 June 2020
Resolved 11 June 2020
Resolution: Replaced battery.
09 - Working and Living Conditions › 092 - Working Conditions › Machinery
Issued 9 June 2020 Resolved
4) Fuel return line for stbd generator leak at tank on forward bulkhead.
Action required: 17 - Rectify deficiencies prior to departure
Due 9 June 2020
Resolved 11 June 2020
Resolution: Repaired fuel leak at connection.
04 - Emergency Systems › N/A - No Subsystem › Emergency fire pump and its pipes
Issued 9 June 2020 Resolved
5) Inadequate fire main pressure at pump. (30 psi).
Action required: 17 - Rectify deficiencies prior to departure
Due 9 June 2020
Resolved 11 June 2020
Resolution: Repaired. Found impellor was fouled. Cleaned and pump is now producing 55 psi.
11 - Life Saving Appliances › N/A - No Subsystem › Lifejackets incl. provision and disposition
Issued 23 April 2019 Resolved
An adult life jacket must be provided for each person carried on board a vessel. 05 kapok life jackets did not meet serviceability requirements. Reducing passenger count from 145 to 140 allowed until new life jackets are received.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 21 May 2019
Resolved 25 April 2019
Resolution: New lifejackets procured and properly labeled.
10 - Safety of Navigation › N/A - No Subsystem › Automatic Identification System (AIS)
Issued 12 September 2018 Resolved
Vsl is broadcasting incorrect Name and Vsl is broadcasting no static draft information
Condition: Invalid
Action required: 705 - Other - as specified
Resolved 29 October 2018
Resolution: While running a query in VIVS, all information had been updated and AIS was broadcasting the proper information.
Engineering › Sea-water System (primary cooling) › Piping
Issued 15 May 2018 Resolved
Repair STBD side generator exhaust coolant water leak.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 29 May 2018
Resolved 21 May 2018
Resolution: Leak repaired.
Fire Fighting › Means of Escape › Blocked
Issued 15 May 2018 Resolved
Prove proper operation of engine room escape hatch.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 29 May 2018
Resolved 21 May 2018
Resolution: All sat.
Construction/Loadline › Hull › Longitudinal Frame
Issued 9 March 2017 Resolved
Clad weld marked areas local to keel in the 2nd void.
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 22 March 2017
Resolution: Clad welded area, all sat.
Construction/Loadline › Hull › Hull Plating
Issued 9 March 2017 Resolved
Crop and renew area in bottom plate under sewage tank in laz.
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 24 March 2017
Resolution: C/R 18"X18" inserted, 3/8" thick, Al plating in kind, hose tested, all sat.
Construction/Loadline › Hull › Weld
Issued 9 March 2017 Resolved
Make weld repairs to stbd rudder post IWO of attachements.
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 22 March 2017
Resolution: Gouged out bad welds and rewelded areas of concern, clad welded significant islolated pits.

Ownership record

The Coast Guard's documentation record for this hull -- the Abstract of Title, with its owners and liens as filed -- is not in PSIX. Ask, and Maury buys it from the National Vessel Documentation Center, files it here with its date, and every reader of this page gets it.