Records from 1985 to 1992. Most recent: inspection, 27 March 1992.
A report is not offered for this hull: Its record holds only 2 of the seven kinds of material a report is built from: inspections, deficiencies, operational controls, tow-unit appearances, casualty records, dimensions and documentation. That is a statement about the record, not about the vessel. Reports.
Inspection history · 19
27 March 1992
Administrative
Administrative · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 948364
10 May 1991
Type not recorded
No type recorded · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 1239350
16 July 1990
Type not recorded
No type recorded · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 904117
3 April 1990
Re-Inspection
Physical examination · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 922977
12 October 1989
Hull Examination
Physical examination · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 1038244
28 April 1989
Deficiency Check
Physical examination · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 1340649
5 April 1989
COI Inspection
Physical examination · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 896186
4 October 1988
Hull Examination
Physical examination · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 1198446
20 April 1988
Deficiency Check
Physical examination · MIO PHILADELPHIA · USCG East District (CGD-E) · Activity 1343393
5 April 1988
Re-Inspection
Physical examination · MIO PHILADELPHIA · USCG East District (CGD-E) · Activity 1030873
14 October 1987
Hull Examination
Physical examination · MIO PHILADELPHIA · USCG East District (CGD-E) · Activity 1325473
10 April 1987
Deficiency Check
Physical examination · MIO PHILADELPHIA · USCG East District (CGD-E) · Activity 1320479
3 April 1987
Deficiency Check · Re-Inspection
Physical examination · MIO PHILADELPHIA · USCG East District (CGD-E) · Activity 1011657
12 March 1987
Deficiency Check
Physical examination · MIO PHILADELPHIA · USCG East District (CGD-E) · Activity 1322914
7 January 1987
Administrative
Administrative · MIO PHILADELPHIA · USCG East District (CGD-E) · Activity 1311822
16 October 1986
Hull Examination
Physical examination · MIO PHILADELPHIA · USCG East District (CGD-E) · Activity 1328256
31 March 1986
COI Inspection
Physical examination · MIO PHILADELPHIA · USCG East District (CGD-E) · Activity 991067
22 October 1985
Credit Drydock
Administrative · MIO PHILADELPHIA · USCG East District (CGD-E) · Activity 992235
5 April 1985
Type not recorded
No type recorded · MIO PHILADELPHIA · USCG East District (CGD-E) · Activity 1289646
Engineering
Issued 12 October 1989
Resolved
PROVIDE STRAINER ON ENGINE ROOM BILGE SUCTION.
Condition: Unknown
Due 12 October 1989
Resolved 12 October 1989
Engineering
Issued 12 October 1989
Resolved
PROVIDE A HEAT DEFLECTOR ON RACOR FUEL FILTER.
Condition: Unknown
Due 12 October 1989
Resolved 12 October 1989
Navigation
Issued 5 April 1989
Resolved
PROVIDE AN ANCHOR BALL NLT 10 MAY 89
Condition: Unknown
Due 5 April 1989
Resolved 5 April 1989
Navigation
Issued 5 April 1989
Resolved
PROVIDE A 1989 TIDE CHART FOR VESSEL'S AREA OF OPERATION.
Condition: Unknown
Due 5 April 1989
Resolved 5 April 1989
Documentation
Issued 4 October 1988
Resolved
PROVIDE ALL VESSEL'S PAPERS FOR INSPECTION. VESSEL'S PAPERS PRESENTLY NOT ONBOARD.
Condition: Unknown
Due 4 October 1988
Resolved 4 October 1988
Accommodation/Occupational Safety
Issued 4 October 1988
Resolved
MAKE AVAILABLE FOR INSPECTION, FORWARD DECK COMPARTMENT.
Condition: Unknown
Due 4 October 1988
Resolved 4 October 1988
Navigation
Issued 5 April 1988
Resolved
CHANGE METHOD OF ATTACHING THE TILLER TO THE RUDDER POST OR MOVE THE HINGE ON THE STEERING COMPARTMENT HATCH TO ENABLE THE TILLER TO BE ATTACHED TO THE RUDDER POST.
Condition: Unknown
Due 5 April 1988
Resolved 5 April 1988
Fire Fighting
Issued 5 April 1988
Resolved
PROVIDE ONE (1) APPROVED B-II FIRE EXTINGUISHER.
Condition: Unknown
Due 5 April 1988
Resolved 5 April 1988
Engineering
Issued 5 April 1988
Resolved
LABEL FUEL SHUT OFF VALVE LOCATION.
Condition: Unknown
Due 5 April 1988
Resolved 5 April 1988
Lifesaving
Issued 5 April 1988
Resolved
REPLACE THE WEAK LINK FOR THE BUOYANT APPARATUS.
Condition: Unknown
Due 5 April 1988
Resolved 5 April 1988
Accommodation/Occupational Safety
Issued 5 April 1988
Resolved
RE-ROUTE MSD VENT TO TERMINATE OUTSIDE OF MSD VOID TO THE ATMOSPHERE.
Condition: Unknown
Due 5 April 1988
Resolved 5 April 1988
Engineering
Issued 16 October 1986
Resolved
REPLACE STRUT CUTLASS BEARING.
Condition: Unknown
Due 16 October 1986
Resolved 16 October 1986
Construction/Loadline
Issued 16 October 1986
Resolved
SCRAPE AND TREAT DECK BEAM IN WAY OF ENGINE COVER AFT OF MAIN ENGINE.
Condition: Unknown
Due 16 October 1986
Resolved 16 October 1986
Construction/Loadline
Issued 16 October 1986
Resolved
DOUBLE CLAMP TWO (2) MSD SEA VALVES.
Condition: Unknown
Due 16 October 1986
Resolved 16 October 1986
Engineering
Issued 16 October 1986
Resolved
REPLACE FUEL TANK VENT FLAME SCREEN WITH ONE OF 30/30 MESH.
Condition: Unknown
Due 16 October 1986
Resolved 16 October 1986
Electrical
Issued 16 October 1986
Resolved
REMOVE DEAD ENDED BILGE ALARM WIRE IN STEERING COMPARTMENT.
Condition: Unknown
Due 16 October 1986
Resolved 16 October 1986
Construction/Loadline
Issued 16 October 1986
Resolved
PROVIDE PROPOSAL FOR REPAIR OF CRACKING IN WAY OF DECK/SIDESHELL JOINT.
Condition: Unknown
Due 16 October 1986
Resolved 16 October 1986