Records from 1985 to 1991. Most recent: inspection, 9 May 1991.
A report is not offered for this hull: Its record holds only 2 of the seven kinds of material a report is built from: inspections, deficiencies, operational controls, tow-unit appearances, casualty records, dimensions and documentation. That is a statement about the record, not about the vessel. Reports.
Inspection history · 17
9 May 1991
Administrative
Administrative · MSO PORTLAND MAINE · USCG Northeast District (CGD-NE) · Activity 919362
23 October 1990
Type not recorded
No type recorded · MSO PORTLAND MAINE · USCG Northeast District (CGD-NE) · Activity 914749
29 May 1990
Re-Inspection
Physical examination · MSO PORTLAND MAINE · USCG Northeast District (CGD-NE) · Activity 1244695
4 October 1989
Hull Examination
Physical examination · MSO PORTLAND MAINE · USCG Northeast District (CGD-NE) · Activity 1328215
7 June 1989
COI Inspection
Physical examination · MSO PORTLAND MAINE · USCG Northeast District (CGD-NE) · Activity 1339681
16 May 1988
Re-Inspection
Physical examination · MSO PORTLAND MAINE · USCG Northeast District (CGD-NE) · Activity 1348583
20 April 1988
Hull Examination
Physical examination · MSO PORTLAND MAINE · USCG Northeast District (CGD-NE) · Activity 1032699
28 January 1988
Hull Examination
Physical examination · MSO PORTLAND MAINE · USCG Northeast District (CGD-NE) · Activity 1014106
14 August 1987
Type not recorded
No type recorded · MSO PORTLAND MAINE · USCG Northeast District (CGD-NE) · Activity 1029622
30 June 1987
Administrative
Administrative · MSO PORTLAND MAINE · USCG Northeast District (CGD-NE) · Activity 1009341
18 June 1987
Re-Inspection
Physical examination · MSO PORTLAND MAINE · USCG Northeast District (CGD-NE) · Activity 1312933
14 November 1986
Administrative
Administrative · MSO PORTLAND MAINE · USCG Northeast District (CGD-NE) · Activity 1323836
4 September 1986
Deficiency Check
Physical examination · MSO PORTLAND MAINE · USCG Northeast District (CGD-NE) · Activity 1316579
23 May 1986
COI Inspection
Physical examination · MSO PORTLAND MAINE · USCG Northeast District (CGD-NE) · Activity 1292389
25 March 1986
Credit Drydock
Administrative · MSO PORTLAND MAINE · USCG Northeast District (CGD-NE) · Activity 996792
16 May 1985
Type not recorded
No type recorded · MSO PORTLAND MAINE · USCG Northeast District (CGD-NE) · Activity 1289938
27 March 1985
Type not recorded
No type recorded · MSO PORTLAND MAINE · USCG Northeast District (CGD-NE) · Activity 980091
Lifesaving
Issued 7 June 1989
Resolved
PROVIDE NINE (09) ADULT LIFE PRESERVERS.
Condition: Unknown
Due 7 June 1989
Resolved 7 June 1989
Navigation
Issued 16 May 1988
Resolved
IN ACCORDANCE WITH 46 CFR 184.25, MAKE REPAIRS TO THE VHF RADIO OUTPUT METER.
Condition: Unknown
Due 16 May 1988
Resolved 16 May 1988
Construction/Loadline
Issued 20 April 1988
Resolved
RENEW THE SKEG AS ORIGINAL.
Condition: Unknown
Due 20 April 1988
Resolved 20 April 1988
Construction/Loadline
Issued 20 April 1988
Resolved
RENEW AS ORIGINAL THE #2 PORT PLANK FROM STERN TO FIRST BUTT.
Condition: Unknown
Due 20 April 1988
Resolved 20 April 1988
Lifesaving
Issued 18 June 1987
Resolved
IN ACCORDANCE WITH 46 CFR 180.25-5 PROVIDE AN ADDITIONAL 5 ADULT PFD'S FOR A TOTAL OF 35, UNTIL CORRECTED VESSEL IS RESTRICTED TO CARRYING NOT MORE THAN 30 PERSONS TOTAL.
Condition: Unknown
Due 18 June 1987
Resolved 18 June 1987
Navigation
Issued 18 June 1987
Resolved
IN ORDER TO COMPLY WITH RULE 23 OF THE INTERNATIONAL NAVIGATION RULES, INSTALL A STERN LIGHT AND RAISE THE MASTHEAD LIGHT 1 METER ABOVE THE SIDE LIGHRTS OR OMIT THE STERN LIGHT, REMOVE THE MASTHEAD LIGHT AND UTILIZE THE ANCHOR LIGHT AS AN ALL ROUND WHITE RUNNING LIGHT.
Condition: Unknown
Due 18 June 1987
Resolved 18 June 1987
Construction/Loadline
Issued 18 June 1987
Resolved
IN ACCORDANCE WITH 46 CFR 171.119(B) INSTALL A VALVE AS NEAR TO THE HULL ASPOSSIBLE AT THE HULL PENETRATION OF THE FORWARD BILGE PUMP DISCHARGE LINE.
Condition: Unknown
Due 30 October 1987
Resolved 18 May 2002
Resolution: MISLE Maintenance - Resolved all open deficiencies issued prior to 6/1/1997 where activity was closed and deficiency due date was past
Engineering
Issued 18 June 1987
Resolved
IN ACCORDANCE WITH 46 CFR 182.20-35(D) INSTALL A 30/30 MESH FLAME SCREEN ATTHE DISCHARGE END OF THE FUEL TANK VENT WITHOUT REDUCING THE NET CROSS SECTIONAL AREA OF THE VENT PIPE.
Condition: Unknown
Due 30 October 1987
Resolved 18 May 2002
Resolution: MISLE Maintenance - Resolved all open deficiencies issued prior to 6/1/1997 where activity was closed and deficiency due date was past
Documentation
Issued 18 June 1987
Resolved
IN ACCORDANCE WITH 46 CFR 184.25-1, REPAIR THE RADIO LIGHT, RADIO METER AND OBTAIN A COPY OF THE FCC RADIO SAFETY CERTIFICATE.
Condition: Unknown
Due 18 June 1987
Resolved 18 June 1987
Unknown
Issued 23 May 1986
Resolved
REPAIR CRACKED RAIL STANCHION AT STBD STERN.
Condition: Unknown
Due 23 May 1986
Resolved 23 May 1986
Lifesaving
Issued 23 May 1986
Resolved
IN ACCORDANCE WITH 46 CFR 180.35-10 PROVIDE A WATERTIGHT CONTAINER FOR ALL FLARES.
Condition: Unknown
Due 23 May 1986
Resolved 23 May 1986
Construction/Loadline
Issued 23 May 1986
Resolved
IN ACCORDANCE WITH 46 CFR 171.124 PROVIDE SECURING DEVICES FOR ENGINE HATCH
Condition: Unknown
Due 23 May 1986
Resolved 23 May 1986