MAURY USCG vessel records
← All vessels

TONTO

TONTO is a 1980 passenger vessel (inspected). The Coast Guard has recorded 15 inspections since 2016, most recently in May 2025, along with 41 deficiencies.

Records from 2016 to 2025. Most recent: inspection, 14 May 2025.

Built
1980
Last inspected
14 May 2025
Documentation
Not in the documentation file of 10 August 2026
Controls
None recorded without a removal date

Coast Guard record current through 23 August 2026, retrieved 5 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard. Records for the Passenger Ship class in Maury's sources begin in 2016.

Inspection record

Last inspected 14 May 2025
Operational controls None recorded without a removal date
Years with a record 10 calendar years (2016–2025)
Every line above is a count of records the US Coast Guard wrote, or a date it recorded. A blank resolution means none was recorded in this data; it does not establish that a deficiency is outstanding. Years with a record are calendar years in which a record exists, not years in service. What Maury does not do.

Identity

Flag
UNITED STATES
Maury page id
psix-55027

Documentation record

Tonnage as PSIX records it5 - Regulatory (Subpart C or D), Gross Ton
4 - Regulatory (Subpart C or D), Net Ton
0 - Dead Weight, Ton
This hull's Official Number is not in the NVDC file dated 10 August 2026 as served by NOAA Fisheries, so no documentation record is shown. Absence from that file is a fact about the file, not about the hull.
Vessel history report

A report is not offered for this hull. Its record holds only 2 of the seven kinds of material a report is built from: inspections, deficiencies, operational controls, tow-unit appearances, casualty records, dimensions and documentation. That is a statement about the record, not about the vessel. What a sparse-record report looks like.

Inspection history · 15

14 May 2025 COI Inspection
Physical examination · Sector Boston · USCG Northeast District (CGD-NE) · Activity 8129230
24 June 2024 Hull Examination · Internal Structural Exam · Deficiency Check · Annual Inspection
Physical examination · Sector Boston · USCG Northeast District (CGD-NE) · Activity 7937519
10 June 2024 Deficiency Check · Administrative Inspection
Physical examination · Sector Boston · USCG Northeast District (CGD-NE) · Activity 7932007
6 July 2023 Annual Inspection · Deficiency Check
Physical examination · Sector Boston · USCG Northeast District (CGD-NE) · Activity 7725539
10 June 2022 Deficiency Check · Annual Inspection
Physical examination · Sector Boston · USCG Northeast District (CGD-NE) · Activity 7465693
25 April 2022 Hull Examination · Internal Structural Exam
Physical examination · Sector Boston · USCG Northeast District (CGD-NE) · Activity 7437575
17 June 2021 Deficiency Check · Annual Inspection
Physical examination · Sector Boston · USCG Northeast District (CGD-NE) · Activity 7235082
7 May 2020 COI Inspection · Deficiency Check
Physical examination · Sector Boston · USCG Northeast District (CGD-NE) · Activity 6944596
15 April 2020 Hull Examination
Physical examination · Sector Boston · USCG Northeast District (CGD-NE) · Activity 6949580
10 October 2019 Administrative Inspection
Administrative · Sector Boston · USCG Northeast District (CGD-NE) · Activity 6833017
2 July 2018 Deficiency Check · Annual Inspection
Physical examination · Sector Boston · USCG Northeast District (CGD-NE) · Activity 6464087
11 April 2018 Hull Examination
Physical examination · Sector Boston · USCG Northeast District (CGD-NE) · Activity 6390495
30 May 2017 Annual Inspection · Deficiency Check
Physical examination · Sector Boston · USCG Northeast District (CGD-NE) · Activity 6159812
21 April 2017 Hull Examination
Physical examination · Sector Boston · USCG Northeast District (CGD-NE) · Activity 6131665
2 June 2016 COI Inspection · Deficiency Check
Physical examination · Sector Boston · USCG Northeast District (CGD-NE) · Activity 5894278

Deficiency record · 41

13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 8 July 2024 Resolved
Wiring joints and splices shall be mechanically secure and made in a junction boxes. Multiple joints and splices are exposed the inclement weather and are not in junction boxes. This issue must be addressed/corrected. 46 CFR 183.05-50(b)
Condition: Improper Installation
Action required: 16 - Rectify deficiencies w/in 14 days
Due 22 July 2024
Resolved 26 July 2024
Resolution: Received an email from Rep with objective evidence of the wire inside a junction box.
09 - Working and Living Conditions › 091 - Living Conditions › Medical Equipment
Issued 8 July 2024 Resolved
A vessel must carry either a first-aid kit that meets the requirements in 46 CFR 199.175(b)(10) or a kit with equivalent contents and instructions. Vessel's first-aid kit was expired, must be replaced. 46 CFR 184.710
Condition: Invalid
Action required: 16 - Rectify deficiencies w/in 14 days
Due 22 July 2024
Resolved 12 July 2024
Resolution: Received objective evidence (photo) from Rep showing issue has been corrected.
07 - Fire Safety › N/A - No Subsystem › Other (fire safety)
Issued 8 July 2024 Resolved
The owner or managing operator must provide satisfactory evidence of the required servicing to the marine inspector. If any of the equipment or records have not been properly maintained, a qualified servicing facility must perform the required inspections, maintenance procedures, and hydrostatic pressure tests. Maintenance was being conducted but not documented in a log. This corresponds with Monthly maintenance under NFPA 10. 46CFR176.810(b)(2)(iv)
Action required: 10 - Deficiency Rectified
Resolved 8 July 2024
Resolution: Corrected on the spot with Rep with education.
04 - Emergency Systems › N/A - No Subsystem › Man Overboard Drill (MOB)
Issued 8 July 2024 Resolved
Abandon ship and man overboard drills and training shall be logged or otherwise documented for review by the Coast Guard upon request. Drills was being conducted but not documented in a log. 46 CFR 185.520(f)
Action required: 10 - Deficiency Rectified
Resolved 8 July 2024
Resolution: Corrected on the spot with Rep with education.
02 - Structural Conditions › N/A - No Subsystem › Hull damage impairing seaworthiness
Issued 10 June 2024 Resolved
A vessel that is exposed to salt water more than three months in any 12 month period since the last examination must undergo a drydock examination and an internal structural at least once every two years. Vessel did not complete credit hull exam by required date of 30APR24. Vessel must complete credit hull exam prior to carriage of passengers.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 1 July 2024
Resolution: O/O completed credit hull exam.
07 - Fire Safety › N/A - No Subsystem › Fire fighting equipment and appliances
Issued 6 July 2023 Resolved
At each initial and subsequent inspection for certification, the owner or managing operator must be prepared to conduct tests and have the vessel ready for inspection of its fire protection equipment. Fire extinguishing equipment hasn't been inspected since MAY2022, and one portable extinguisher gauge is in the red. MI will not proceed with inspection due to safety concerns. Reschedule and complete a satisfactory Annual Inspection with an attending MI prior to carrying passengers.
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 13 July 2023
Resolution: Equipment serviced
07 - Fire Safety › N/A - No Subsystem › Oil accumulation in engine room
Issued 6 July 2023 Resolved
At each initial and subsequent inspection for certification of a vessel, the owner or managing operator shall be prepared to conduct tests and have the vessel ready for inspections of machinery, fuel, and piping systems. Upon opening the engine compartment, it was noted that there is an estimated 5 gallons of diesel fuel in the bilge alongside the engine. MI will not proceed with inspection due to safety concerns. Reschedule and complete a satisfactory Annual Inspection with an attending MI prior to carrying passengers.
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 13 July 2023
Resolution: Fluid removed
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 10 June 2022 Resolved
Propulsion machinery must be suitable in type and design for propulsion requirements of the hull in which it is installed and capable of operating at constant marine load under such requirements without exceeding its designed limitations. The heat exchanger pinhole where sea water was escaping from.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Resolved 23 June 2022
Resolution: Repaired leak.
07 - Fire Safety › N/A - No Subsystem › Ventilation
Issued 10 June 2022 Resolved
Provision must be made for closing all supply duct cowls or scoops and exhaust duct discharge openings for a space protected by a fixed gas extinguishing system. All closure devices must be readily available and mounted in the vicinity of the vent. Vessel did not have appropriate means to secure the ventilation.
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 24 June 2022
Resolved 23 June 2022
Resolution: Means to secure ventilation provided.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 10 June 2022 Resolved
Nonmetallic hose may be used for wet exhaust systems provided it is especially adapted to resist the action of oil, acid, and heat, has a wall thickness sufficient to prevent collapsing or panting, and is double clamped where practicable. Exhaust hose was missing double clamps on both ends.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 24 June 2022
Resolved 23 June 2022
Resolution: Hose double hose-clamped.
01 - Certificates & Documentation › 013 - Documents › Log-books/compulsory entries
Issued 10 June 2022 Resolved
The master shall conduct sufficient drills and give sufficient instructions to make sure that all crew members are familiar with their duties during emergencies that necessitate abandoning ship or the recovery of persons who have fallen overboard. Drills and training shall be logged or otherwise documented for review by the Coast Guard upon request. The drill entry shall include Date of the drill and training; and general description of the drill scenario and training topics. Drill have not being documented properly.
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 24 June 2022
Resolved 23 June 2022
Resolution: Drills documented.
09 - Working and Living Conditions › 091 - Living Conditions › Medical Equipment
Issued 10 June 2022 Resolved
A vessel must carry either a first-aid kit approved under approval series 160.041 or a kit with equivalent contents and instructions. For equivalent kits, the contents must be stowed in a suitable, watertight container that is marked “First-Aid Kit”. A first-aid kit must be easily visible and readily available to the crew. First aid kit has expired medication.
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 24 June 2022
Resolved 23 June 2022
Resolution: Expired medications replaced.
11 - Life Saving Appliances › N/A - No Subsystem › Lifejackets incl. provision and disposition
Issued 10 June 2022 Resolved
An adult life jacket must be provided for each person carried on board a vessel. The number of child size life jackets equal to at least 10% of the number of persons permitted on board must be provided.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 24 June 2022
Resolved 23 June 2022
Resolution: PFDs provided.
01 - Certificates & Documentation › 011 - Ships Certificates › USCG Certificate of Documentation (COD)
Issued 24 June 2021 Resolved
Except as provided in §173.17, no person may use a vessel to which this part applies. The vessel state registration was not valid. 33 CFR 173.15(a)
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 25 June 2021
Resolution: Operated provided copies of new, valid state registration.
11 - Life Saving Appliances › N/A - No Subsystem › Maintenance of Life Saving Appliances
Issued 24 June 2021 Resolved
Ring life buoy must be marked with Type II retroreflective material approved in accordance with 46 CFR 164.018 or other standard specified by the Commandant. The Ring life buoy did not have the retroreflective on it.
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 8 July 2021
Resolved 27 July 2021
Resolution: Confirmed the tape was installed.
07 - Fire Safety › N/A - No Subsystem › Other (fire safety)
Issued 24 June 2021 Resolved
Each fuel tank shall be fitted with a vent pipe which shall be connected to the tank at its highest point under normal operating conditions. The vessel's diesel tank vent hose was found with dry rot and cracking. Replace w/ a serviceable hose. 46CFR182.20-35(a)
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 8 July 2021
Resolved 27 July 2021
Resolution: Observed the renewed hose.
04 - Emergency Systems › N/A - No Subsystem › Damage control plan
Issued 24 June 2021 Resolved
The master and crew of a vessel will be familiar with the content of and have mounted at the operating station, emergency instructions containing the actions to be taken in the event of fire, heavy weather, or man overboard conditions. The vessel does not have these instruction posted.
Condition: Improper Installation
Action required: 16 - Rectify deficiencies w/in 14 days
Due 8 July 2021
Resolved 27 July 2021
Resolution: Confirmed the placard was posted.
11 - Life Saving Appliances › N/A - No Subsystem › Other (life saving)
Issued 24 June 2021 Resolved
Placards containing instructions for the donning and use of the life jackets aboard the vessel must be posted in conspicuous places that are regularly accessible and visible to the crew and passengers. The vessel does not have the donning instruction posted. Post the instructions for the master and pax to utilize.
Condition: Improper Installation
Action required: 16 - Rectify deficiencies w/in 14 days
Due 8 July 2021
Resolved 27 July 2021
Resolution: Confirmed placard was posted.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Bilge pumping arrangements
Issued 7 May 2020 Resolved
A submersible electric bilge pump may be used as a power bilge pump provided that a positive shutoff valve is installed at the hull penetrations. Vessel has two submersible bilge pumps and neither has a shutoff valve at the hull penetration.
Condition: Damaged By Earlier Event
Action required: 16 - Rectify deficiencies w/in 14 days
Due 21 May 2020
Resolved 26 May 2020
Resolution: Verified installation of positive action valves
07 - Fire Safety › N/A - No Subsystem › Ventilation
Issued 7 May 2020 Resolved
Provisions must be made for closing all supply duct cowls or scoops and exhaust duct discharge openings for a space protected by a fixed gas extinguishing system. All closure devices must be readily available and mounted in the vicinity of the vent. Vessel has no means to secure ventilation leading to engine space protected by fireboy.
Condition: Damaged By Earlier Event
Action required: 16 - Rectify deficiencies w/in 14 days
Due 21 May 2020
Resolved 26 May 2020
Resolution: Operator equiped vessel with acceptable means to secure ventilation
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 7 May 2020 Resolved
Non-metallic hose may be used for wet exhaust systems provided it is double clamped where practicable. Exhaust hose was missing double clamps on both ends.
Condition: Damaged By Earlier Event
Action required: 16 - Rectify deficiencies w/in 14 days
Due 21 May 2020
Resolved 26 May 2020
Resolution: All exhaust hoses have been double clamped.
07 - Fire Safety › N/A - No Subsystem › Ready availability of fire fighting equipment
Issued 7 May 2020 Resolved
A vessel not required to have a power driven fire pump must have 3 fire buckets with an attached lanyard, placed so to be easily available during emergency. All 3 fire buckets were missing lanyards.
Condition: Damaged By Earlier Event
Action required: 16 - Rectify deficiencies w/in 14 days
Due 21 May 2020
Resolved 26 May 2020
Resolution: All firebuckets were equiped with laynards.
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 7 May 2020 Resolved
A vessel not more than 26 feet must carry one life buoy and be fitted with a 60 foot lifeline. Life buoy and lifeline is in poor condition and needs to be replaced.
Condition: Damaged By Earlier Event
Action required: 16 - Rectify deficiencies w/in 14 days
Due 21 May 2020
Resolved 26 May 2020
Resolution: Operator replaced lifeline on life buoy.
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 7 May 2020 Resolved
Each ring life buoy with a floating waterlight must have a lanyard of at least 3 feet, securing the waterlight around the body of the ring life buoy. The lanyard is in poor condition and needs to be replaced.
Condition: Damaged By Earlier Event
Action required: 16 - Rectify deficiencies w/in 14 days
Due 21 May 2020
Resolved 26 May 2020
Resolution: Operator replaced lanyard on float light
02 - Structural Conditions › N/A - No Subsystem › Closing devices/watertight doors
Issued 7 May 2020 Resolved
The weather deck on a flush deck vessel must be watertight and have no obstruction to overboard drainage. The watertight opening above the steering compartment is not secured/screwed to the deck.
Condition: Damaged By Earlier Event
Action required: 16 - Rectify deficiencies w/in 14 days
Due 21 May 2020
Resolved 26 May 2020
Resolution: The hatch to the steering compartment was reattached to the deck.
01 - Certificates & Documentation › 011 - Ships Certificates › Other (certificates)
Issued 7 May 2020 Resolved
The COI must be posted on board but if impracticable, it must be kept on board in a weather tight container readily available for crew or passengers. COI was not on board the vessel.
Condition: Damaged By Earlier Event
Action required: 16 - Rectify deficiencies w/in 14 days
Due 21 May 2020
Resolved 26 May 2020
Resolution: COI was put onboard the vessel in a waterright container.
01 - Certificates & Documentation › 011 - Ships Certificates › Other (certificates)
Issued 7 May 2020 Resolved
The stability letter must be posted on board but if impracticable, it must be kept on board in a weather tight container readily available for crew or passengers. The stability letter was not on board the vessel.
Condition: Damaged By Earlier Event
Action required: 16 - Rectify deficiencies w/in 14 days
Due 21 May 2020
Resolved 26 May 2020
Resolution: The stability letter was put into a watertight container.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 2 July 2018 Resolved
Install two clamps at ends of flexible fuel hose.
Condition: Improper Installation
Action required: 16 - Rectify deficiencies w/in 14 days
Due 16 July 2018
Resolved 9 August 2018
Resolution: Two clamps installed at ends of flexible fuel hose.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 2 July 2018 Resolved
Properly bundle and mount engine electrical wires.
Condition: Improper Installation
Action required: 16 - Rectify deficiencies w/in 14 days
Due 16 July 2018
Resolved 9 August 2018
Resolution: Engine electrical wires properly bundled and mounted.
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 2 July 2018 Resolved
Properly stow ring life buoy.
Condition: Improper Installation
Action required: 16 - Rectify deficiencies w/in 14 days
Due 16 July 2018
Resolved 9 August 2018
Resolution: Ring life buoy properly stowed.
Engineering › Bilge Water Management System › Not Installed
Issued 30 May 2017 Resolved
Install bilge high water level alarm in engine compartment.
Condition: Improper Installation
Action required: 701 - Prior to carriage of passengers/cargo
Due 30 May 2017
Resolved 15 June 2017
Resolution: Installed bilge high level water alarm in ENG room.
Lifesaving › Lifebuoys › Self-igniting Lights
Issued 30 May 2017 Resolved
Repair/replace water light on ring life bouy.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 13 June 2017
Resolved 15 June 2017
Resolution: Replaced ring bouy water light.
Fire Fighting › Remote Fuel Shutoff › General
Issued 30 May 2017 Resolved
Label fuel shut-off on deck.
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 13 June 2017
Resolved 15 June 2017
Resolution: Labeled fuel shut-off.
Operations/Management › Bilge/Bilge System Management › Control of Excess Water
Issued 30 May 2017 Resolved
Provide hand bilge pump.
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 13 June 2017
Resolved 15 June 2017
Resolution: Provided portable hand bilge pump.
Navigation › Collision/Grounding Avoidance › Navigation Lights
Issued 30 May 2017 Resolved
Repair/replace masthead light.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 13 June 2017
Resolved 15 June 2017
Resolution: Repaird masthead light.
Engineering › Bilge Water Management System › Not Operational
Issued 30 May 2017 Resolved
Repair/replace bilge pump indicator light.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 13 June 2017
Resolved 15 June 2017
Resolution: Repaired bilge pump indicator light.
Construction/Loadline › Structures › Deck Plating
Issued 30 May 2017 Resolved
Make permenant repairs to 03 rotted deck beams IWO rudder post.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 20 March 2018
Resolved 11 April 2018
Resolution: Permanent repairs were made to the deck & deck frames IWO the rudder posts.
Communications › Audible Communications › Horn/Whistle
Issued 2 June 2016 Resolved
Horn found INOP Repair/Replace.
Due 16 June 2016
Resolved 27 June 2016
Resolution: Horn has been repaired and video emailed showing proper operation.
Operations/Management › Drills/Instruction › Man Overboard Recovery
Issued 2 June 2016 Resolved
Must provide drill log book with new hire drills logged.
Due 16 June 2016
Resolved 27 June 2016
Resolution: Drill log book has been added and confirmed with picture.
Engineering › Fuel Oil Service System › Filter
Issued 2 June 2016 Resolved
Fuel filter missing flame protection bolw. Provide authorized filter.
Due 16 June 2016
Resolved 27 June 2016
Resolution: New fuel filter has been installed.
Lifesaving › Lifebuoys › Buoyant Lifeline
Issued 2 June 2016 Resolved
Missing 60ft life line attached to ring life buoy. Provide line in accordance with regulations.
Due 16 June 2016
Resolved 27 June 2016
Resolution: New line has been attached

Ownership record

The Coast Guard's documentation record for this hull -- the Abstract of Title, with its owners and liens as filed -- is not in PSIX. Ask, and Maury buys it from the National Vessel Documentation Center, files it here with its date, and every reader of this page gets it.