MAURY USCG vessel records Sign in
← All vessels

ADONIS

ADONIS is a 1966 tank ship. The Coast Guard has recorded 39 inspections since 1983, most recently in April 2008, along with 61 deficiencies.

Records from 1983 to 2008. Most recent: inspection, 11 April 2008.

Built
1966
Last inspected
11 April 2008
Documentation
Not in the documentation file of 10 September 2026
Controls
None recorded without a removal date

Identity

6614267 View on MarineTraffic leaves Maury; a third-party site, nothing from it is stored here
Flag
UNITED STATES
—
Maury page id
psix-55056

Inspections, by type

…with no type recorded15
Years with a record 9 calendar years (1983–2008)
The 39 inspections in the strip above, split by the kind of activity the US Coast Guard recorded. Years with a record are calendar years in which a record exists, not years in service. What Maury does not do.

This record may be incomplete: the most recent inspection recorded for this vessel was 18 years ago. Maury shows what the Coast Guard recorded, not whether the vessel has been inspected since, is still in service, or what condition it is in. Coast Guard record current through 13 September 2026, retrieved 18 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard. Records for the Tank Ship class in Maury's sources begin in 1980.

Documentation record

Tonnage as PSIX records it38297 - Regulatory (Subpart C or D), Gross Ton
31276 - Regulatory (Subpart C or D), Net Ton
81183 - Dead Weight, Ton
98177 - Displacement, Ton
This hull's Official Number is not in the NVDC file dated 10 September 2026 as served by NOAA Fisheries, so no documentation record is shown. Absence from that file is a fact about the file, not about the hull.

Radio station licence

No FCC ship-station licence is recorded against this Official Number in the file of 6 September 2026. That is a fact about the licence file, not about the radio.

A report is not offered for this hull: Its record holds only 2 of the seven kinds of material a report is built from: inspections, deficiencies, operational controls, tow-unit appearances, casualty records, dimensions and documentation. That is a statement about the record, not about the vessel. Reports.

Inspection history · 39

11 April 2008 Administrative Inspection
Administrative · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 3181941
31 October 1991 Administrative
Administrative · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1311888
15 January 1991 Administrative
Administrative · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 915649
8 November 1989 Administrative
Administrative · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 1222089
12 June 1989 Deficiency Check
Physical examination · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 1202101
12 May 1989 Deficiency Check
Physical examination · MIO HOUSTON · USCG Heartland District (CGD-H) · Activity 1207342
10 March 1989 COI Inspection
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1352369
30 December 1988 Type not recorded
No type recorded · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 1345564
22 September 1988 Type not recorded
No type recorded · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 495505
22 September 1988 Deficiency Check
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1194849
12 August 1988 Type not recorded
No type recorded · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 325331
12 August 1988 Deficiency Check
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1038386
21 July 1988 Deficiency Check
Physical examination · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 1032652
4 May 1988 Deficiency Check
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1349322
14 April 1988 Deficiency Check
Physical examination · MIO PHILADELPHIA · USCG East District (CGD-E) · Activity 896140
7 April 1988 Deficiency Check
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1301184
26 February 1988 Re-Inspection
Physical examination · MIO PHILADELPHIA · USCG East District (CGD-E) · Activity 1294242
23 October 1987 Type not recorded
No type recorded · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 515347
26 May 1987 Deficiency Check
Physical examination · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 1025768
1 May 1987 Administrative
Administrative · COTP NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1016358
21 April 1987 Type not recorded
No type recorded · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1322188
24 February 1987 Deficiency Check
Physical examination · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 1005223
28 January 1987 Administrative
Administrative · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1007082
28 January 1987 COI Inspection
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1312305
7 January 1987 Administrative
Administrative · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1002172
12 October 1986 Deficiency Check
Physical examination · MIO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1319091
2 October 1986 Deficiency Check
Physical examination · MIO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1010582
4 March 1986 Re-Inspection
Physical examination · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 1294540
25 October 1985 Deficiency Check
Physical examination · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 991746
20 August 1985 Type not recorded
No type recorded · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 984799
21 July 1985 Type not recorded
No type recorded · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 985954
8 July 1985 Type not recorded
No type recorded · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 466226
8 July 1985 Type not recorded
No type recorded · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 983566
8 February 1985 Type not recorded
No type recorded · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 529751
11 January 1985 Type not recorded
No type recorded · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 982562
20 April 1984 Type not recorded
No type recorded · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 974188
16 April 1984 Type not recorded
No type recorded · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1285006
23 August 1983 Type not recorded
No type recorded · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1285004
21 August 1983 Type not recorded
No type recorded · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 970654

Deficiency record · 61

Lifesaving
Issued 10 March 1989 Resolved
MAKE PERMANENT REPAIRS TO #1 LIFEBOAT PORT BOW.
Condition: Unknown
Due 31 October 1989
Resolved 18 May 2002
Resolution: MISLE Maintenance - Resolved all open deficiencies issued prior to 6/1/1997 where activity was closed and deficiency due date was past
Navigation
Issued 10 March 1989 Resolved
MAKE PERMANENT REPAIRS TO BOW LOOKOUT PHONE BOX.
Condition: Unknown
Due 10 March 1989
Resolved 10 March 1989
Engineering
Issued 10 March 1989 Resolved
AUDIO GAUGE FEED WATER LINE IN APPROXIMATELY FIVE FOOT SECTION BETWEEN FIRST TWO FLANGES IN AUXILLARY BOILER. CROP OUT AND RENEW IF GREATER THAN 20% WASTAGE IS FOUND. PROVIDE RESULTS OF AUDIO GUAGING TO COGNIZANT OCMI.
Condition: Unknown
Due 31 October 1989
Resolved 18 May 2002
Resolution: MISLE Maintenance - Resolved all open deficiencies issued prior to 6/1/1997 where activity was closed and deficiency due date was past
Lifesaving
Issued 10 March 1989 Resolved
REPLACE ROTTMER GEAR SHAFTS IN #1 AND #2 LIFEBOATS.
Condition: Unknown
Due 31 October 1989
Resolved 18 May 2002
Resolution: MISLE Maintenance - Resolved all open deficiencies issued prior to 6/1/1997 where activity was closed and deficiency due date was past
Electrical
Issued 10 March 1989 Resolved
REPLACE CONTROLLER ENCLOSURE FOR FRESH WATER TRANSFER PUMP, AND INSTALL DRIP GUARDS OVER ADJACENT CONTROLLER ENCLOSURES.
Condition: Unknown
Due 10 March 1989
Resolved 10 March 1989
Deck/Cargo
Issued 10 March 1989 Resolved
HYPOSTATIC TEST MAIN CARGO PIPING TO 150% MAWP.
Condition: Unknown
Due 10 March 1989
Resolved 10 March 1989
Engineering
Issued 10 March 1989 Resolved
REALIGN ENGINE AND REPLACE OR REPAIR MAIN AND CROSSHEAD BEARINGS IAW MANUFACTURER'S SPECIFICATIONS. MAIN ENGINE IS NOT TO BE OPERATED IN EXCESS OF 98 RPMS UNTIL REPAIRS ARE COMPLETED.
Condition: Unknown
Due 31 October 1989
Resolved 18 May 2002
Resolution: MISLE Maintenance - Resolved all open deficiencies issued prior to 6/1/1997 where activity was closed and deficiency due date was past
Construction/Loadline
Issued 10 March 1989 Resolved
REFINISH KNIFE EDGES, ADJUST DOGS AND HINGES, AND REPLACE GASKETS AND DOGGING BARS AS NEEDED ON THE WATERTIGHT DOORS.
Condition: Unknown
Due 31 October 1989
Resolved 18 May 2002
Resolution: MISLE Maintenance - Resolved all open deficiencies issued prior to 6/1/1997 where activity was closed and deficiency due date was past
Fire Fighting
Issued 10 March 1989 Resolved
PROVIDE ONE (1) ADDITIONAL FIREMAN'S OUTFIT TO BRING SHIP TOTAL TO FOUR (4)AS REQUIRED BY SOLAS II-2-17.3.1.2.
Condition: Unknown
Due 31 October 1989
Resolved 18 May 2002
Resolution: MISLE Maintenance - Resolved all open deficiencies issued prior to 6/1/1997 where activity was closed and deficiency due date was past
Engineering
Issued 10 March 1989 Resolved
LIFT SAFETY VALVES FOR WASTE HEAT BOILER. REQUEST USCG AT NEXT U.S. PORT TOSEAL SAFETIES. INFORM MSO HONOLULU IN WRITING UPON LIFTING OF SAFETY VALVES, AND LIFTING AND SEATING PRESSURES FOR EACH SAFETY VALVE.
Condition: Unknown
Due 10 March 1989
Resolved 10 March 1989
Deck/Cargo
Issued 10 March 1989 Resolved
REPLACE MISSING BALLAST MONITOR SYSTEM ACTUATOR FOR #4 CENTER TANK RECIRCULATION LINE.
Condition: Unknown
Due 10 March 1989
Resolved 10 March 1989
Lifesaving
Issued 10 March 1989 Resolved
REPLACE OUTBOARD GRIPE GUIDES ON #1 LIFEBOAT AND REPAIR DAMAGED PORTION OF GUNWHALES IN WAY OF GUIDES.
Condition: Unknown
Due 31 October 1989
Resolved 18 May 2002
Resolution: MISLE Maintenance - Resolved all open deficiencies issued prior to 6/1/1997 where activity was closed and deficiency due date was past
Lifesaving
Issued 10 March 1989 Resolved
REPAIR #2 LIFEBOAT MOTOR COVER WHERE HOLED.
Condition: Unknown
Due 31 October 1989
Resolved 18 May 2002
Resolution: MISLE Maintenance - Resolved all open deficiencies issued prior to 6/1/1997 where activity was closed and deficiency due date was past
Fire Fighting
Issued 26 February 1988 Resolved
PROVIDE ADDITIONAL HALON BOTTLE BRACKET SUPPORTS TO ELIMINATE BOTTLE MOVEMENT IN THE FORE AND AFT DIRECTION. (ORIGINAL COMPLIANCE DATE IS 30MAR88.)
Condition: Unknown
Due 26 February 1988
Resolved 26 February 1988
Engineering
Issued 26 February 1988 Resolved
WHILE AT SEA WITNESS AND RECORD THE LIFTING AND SETTING PRESSURE OF THE SAFETY VALVES FOR THE WASTE HEAT STEAM DRUM AND HAVE A COAST GUARD MARINE INSPECTOR SEAL THE SUBJECT VALVES UPON A RECEIPT OF TEST CONFIRMATION LETTER. (ORIGINAL COMPLIANCE DATE IS 30MAR88.)
Condition: Unknown
Due 26 February 1988
Resolved 26 February 1988
Navigation
Issued 26 February 1988 Resolved
DOUBLE NUT OR USE AN EQUIVALENT SECURING METHOD TO SET THE LINK PINS FOR THE RUDDER FOLLOWUP GEAR LINKAGE. (ORIGINAL COMPLIANCE DATE IS 30MAR88.)
Condition: Unknown
Due 26 February 1988
Resolved 26 February 1988
Electrical
Issued 26 February 1988 Resolved
RENEW THE #1 SHIP SERVICE GENERATORS CRANKING PANEL RESET RELAY. (ORIGINAL COMPLIANCE DATE IS 30MAR88.)
Condition: Unknown
Due 26 February 1988
Resolved 26 February 1988
Fire Fighting
Issued 26 February 1988 Resolved
RENEW THE HALON DISCHARGE FLEXIBLE HOSE LINE WHERE THE RUBBER PROTECTIVE COVER HAS BEEN PEELED BACK. THIS HOSE IS FITTED WITH ELECTRICIANS TAPE ANDIS LOCATED ON THE OUTBOARD BANK, INBOARD ROW 2ND BOTTLE FROM FORWARD. (ORIGINAL COMPLIANCE DATE IS 30MAR88.)
Condition: Unknown
Due 26 February 1988
Resolved 26 February 1988
Accommodation/Occupational Safety
Issued 26 February 1988 Resolved
LABEL EMERGENCY SHUT DOWNS STARBOARD SIDE GALLEY PASSAGEWAY. (ORIGINAL COMPLIANCE DATE IS 26MAR88.)
Condition: Unknown
Due 26 February 1988
Resolved 26 February 1988
Deck/Cargo
Issued 26 February 1988 Resolved
REPLACE BRAKE BANDS AS NEEDED ON THE PORT AND STARBOARD CARGO BOOM RUNNER WINCHES AND PROVE OPERATION OF THE BRAKES. (ORIGINAL COMPLIANCE DATE IS 26MAR88.)
Condition: Unknown
Due 26 February 1988
Resolved 26 February 1988
Deck/Cargo
Issued 26 February 1988 Resolved
RENEW SAFETY GUARDS AS NEEDED ON THE PORT AND STARBOARD CARGO BOOM RUNNER WINCHES. (ORIGINAL COMPLIANCE DATE IS 26MAR88.)
Condition: Unknown
Due 26 February 1988
Resolved 26 February 1988
Accommodation/Occupational Safety
Issued 26 February 1988 Resolved
REPAIR AND PROVE OPERATION OF THE EMERGENCY RELEASE FOR THE REEFER DOOR. (ORIGINAL COMPLIANCE DATE IS 26MAR88.)
Condition: Unknown
Due 26 February 1988
Resolved 26 February 1988
Accommodation/Occupational Safety
Issued 26 February 1988 Resolved
DEMONSTRATE THE HOUSE VENTILATION EMERGENCY STOP CIRCUIT - TRIP SWITCH IS ON THE ES-2 CIRCUIT AND IS LOCATED ON THE PORT SIDE OF THE WHEELHOUSE - TRIP GALLEY AND ACCOMMODATIONS VENTILATION. (ORIGINAL COMPLIANCE DATE IS 30MAR88.)
Condition: Unknown
Due 26 February 1988
Resolved 26 February 1988
Electrical
Issued 26 February 1988 Resolved
RENEW WHERE NECESSARY THE DIESEL FUEL RETURN LINES WHERE EXPOSED TO THE WEATHER FOR THE EMERGENCY GENERATOR FUEL TANK, AND RENEW THE ASSOCIATED PIPE HANGERS AS NEEDED. (ORIGINAL COMPLIANCE DATE IS 30MAR88.)
Condition: Unknown
Due 26 February 1988
Resolved 26 February 1988
Deck/Cargo
Issued 26 February 1988 Resolved
REPAIR AND PROVE OPERATION OF THE LAMP INDICATORS FOR THE HIGH LEVEL ALARM PANEL IN THE CARGO CONTROL ROOM. (ORIGINAL COMPLIANCE DATE IS 26MAR88.)
Condition: Unknown
Due 26 February 1988
Resolved 26 February 1988
Electrical
Issued 26 February 1988 Resolved
PUT INTO GOOD ORDER ALL PUMPROOM LIGHTING FIXTURES. (ORIGINAL COMPLIANCE DATE IS 26MAR88.)
Condition: Unknown
Due 26 February 1988
Resolved 26 February 1988
Deck/Cargo
Issued 26 February 1988 Resolved
REPAIR AND PROVE OPERATION OF THE LOW-LOW IGS PRESSURE AND HIGH PRESSURE ALARM PANEL IN THE IGS ROOM ONLY. (ORIGINAL COMPLIANCE DATE IS 26MAR88.)
Condition: Unknown
Due 26 February 1988
Resolved 26 February 1988
Fire Fighting
Issued 26 February 1988 Resolved
REPAIR AND PROVE OPERATION OF ALL LOCAL FIRE SCREEN DOOR RELEASES ON THE STARBOARD SIDE. (ORIGINAL COMPLIANCE DATE IS 26MAR88.)
Condition: Unknown
Due 26 February 1988
Resolved 26 February 1988
Fire Fighting
Issued 26 February 1988 Resolved
RENEW THE FIRE/BUTTERWORTH RELIEF VALVES STEM, DISC AND SPRING MECHANSIM. (ORIGINAL COMPLIANCE DATE IS 30MAR88.)
Condition: Unknown
Due 26 February 1988
Resolved 26 February 1988
Engineering
Issued 26 February 1988 Resolved
REPAIR OR RENEW WHERE HOLED THE CAM OIL COOLING WATER DISCHARGE LINE. SUBJECT LINE IS PRESENTLY SOFT PATCHED. PROBLEM AREA IS LOCATED OUTBOARD FROM THE FRESH WATER/HOT WATER PUMPS. (ORIGINAL COMPLIANCE DATE IS 30MAR88.)
Condition: Unknown
Due 26 February 1988
Resolved 26 February 1988
Documentation
Issued 26 February 1988 Resolved
PAINT IN LOADLINE AND DRAFT MARKS. (ORIGINAL COMPLIANCE DATE IS 26MAR88.)
Condition: Unknown
Due 26 February 1988
Resolved 26 February 1988
Deck/Cargo
Issued 26 February 1988 Resolved
RENEW THE BILGE SLOP LINE IN WAY OF THE #3 MAIN CARGO PUMP WHERE PATCHED.
Condition: Unknown
Due 26 February 1988
Resolved 26 February 1988
Deck/Cargo
Issued 26 February 1988 Resolved
REPAIR STEAM LEAKS FROM WASTED PIPING ON THE PORT FORWARD AND PORT MIDSHIP WINCHES. (ORIGINAL COMPLIANCE DATE IS 26MAR88.)
Condition: Unknown
Due 26 February 1988
Resolved 26 February 1988
Deck/Cargo
Issued 26 February 1988 Resolved
REPAIR OR RENEW PV FLAME SCREEN BRACKET AS NEEDED TO EFFECT A TIGHT SEAL. (ORIGINAL COMPLIANCE DATE IS 26MAR88.)
Condition: Unknown
Due 26 February 1988
Resolved 26 February 1988
Construction/Loadline
Issued 26 February 1988 Resolved
RENEW GASKET FOR THE PORT FOSCLE WATERTIGHT DOOR. (ORIGINAL COMPLIANCE DATE IS 26MAR88.)
Condition: Unknown
Due 26 February 1988
Resolved 26 February 1988
Deck/Cargo
Issued 26 February 1988 Resolved
REPAIR NUMEROUS STEAM LEAKS FROM THE MAIN DECK STEAM LINES. (ORIGINAL COMPLIANCE DATE IS 26MAR88.)
Condition: Unknown
Due 26 February 1988
Resolved 26 February 1988
Engineering
Issued 21 April 1987 Resolved
MAKE READY FOR SETTING AND SEALING THE AUXILIARY BOILER'S DRUM SAFETY VALVE.
Condition: Unknown
Due 21 April 1987
Resolved 21 April 1987
Engineering
Issued 21 April 1987 Resolved
REPLACE THE TEFLON SEALS ON THE WASTE HEAT BOILER MOUNTING'S DIAPHRAM (PNEUMATIC) CONTROL VALVES.
Condition: Unknown
Due 21 April 1987
Resolved 21 April 1987
Electrical
Issued 28 January 1987 Resolved
INSTALL BLANK COVERS ON THE EMERGENCY SWITCHBOARD BREAKERS LABELED 15AT AND 70AT.
Condition: Unknown
Due 28 January 1987
Resolved 28 January 1987
Electrical
Issued 28 January 1987 Resolved
REMOVE BARE ELECTRICAL WIRING ADJACENT TO THE FORWARD ELECTRICAL GENERATOR JUNCTION BOX.
Condition: Unknown
Due 28 January 1987
Resolved 28 January 1987
Construction/Loadline
Issued 28 January 1987 Resolved
CONDUCT SATISFACTORY REPAIRS TO PORT SIDE OF FORECASTLE DECK ABOVE PAINT LOCKER PRIOR TO COMPLETION OF NEXT DRYDOCKING.
Condition: Unknown
Due 31 October 1989
Resolved 18 May 2002
Resolution: MISLE Maintenance - Resolved all open deficiencies issued prior to 6/1/1997 where activity was closed and deficiency due date was past
Electrical
Issued 28 January 1987 Resolved
LABEL EMERGENCY LIGHTS IN THE MAIN ENGINE ROOM.
Condition: Unknown
Due 28 January 1987
Resolved 28 January 1987
Construction/Loadline
Issued 28 January 1987 Resolved
OPEN AND CLEAN THE HIGH PRESSURE SIDE OF THE ANNULAR TRANSMITTER ON THE BALLAST DISCHARGE MONITORING SYSTEM.
Condition: Unknown
Due 28 January 1987
Resolved 28 January 1987
Deck/Cargo
Issued 28 January 1987 Resolved
REPLACE AND/OR MAKE OPERABLE THE ACTUATOR FOR THE RECIRCULATION VALVE FOR THE #4 CENTER (SLOP) TANK.
Condition: Unknown
Due 28 January 1987
Resolved 28 January 1987
Deck/Cargo
Issued 28 January 1987 Resolved
CLEAN FLAME SCREENS ON ALL CARGO TANK P/V VALVES.
Condition: Unknown
Due 28 January 1987
Resolved 28 January 1987
Construction/Loadline
Issued 28 January 1987 Resolved
PROPERLY REINSTALL OR REPLACE FLAME SCREENS ON THE GOOSENECK VENTS FOR DEEPTANKS LOCATED ON THE FORECASTLE DECK.
Condition: Unknown
Due 28 January 1987
Resolved 28 January 1987
Fire Fighting
Issued 28 January 1987 Resolved
SUBMIT FOR APPROVAL, A REVISED FIRE AND SAFETY PLAN INDICATING THE CORRECT LOCATION AND NUMBER OF FIREMANS OUTFITS, RAFTS, EPIRB, AND PYROTECHNICS.
Condition: Unknown
Due 28 January 1987
Resolved 28 January 1987
Lifesaving
Issued 28 January 1987 Resolved
CONDUCT FUEL CHANGE FOR PORT AND STARBOARD LIFEBOATS AND RECORD SUCH CHANGEIN LOGBOOK.
Condition: Unknown
Due 28 January 1987
Resolved 28 January 1987
Navigation
Issued 28 January 1987 Resolved
INSTALL SUITABLE NON-SKID GRATING AROUND THE STEERING GEAR MACHINERY AND CONTROLS IN THE AFT STEERING COMPARTMENT.
Condition: Unknown
Due 28 January 1987
Resolved 28 January 1987
Engineering
Issued 28 January 1987 Resolved
MAKE THE AUXILARY BOILER MOUNTINGS AND THE WASTE HEAT BOILER MOUNTINGS AVAILABLE FOR INTERNAL INSPECTION.
Condition: Unknown
Due 28 January 1987
Resolved 28 January 1987
Engineering
Issued 28 January 1987 Resolved
REPLACE RELIEF VALVES ON BOTH STARTING AIR RECEIVERS AND TEST IN THE PRESENCE OF A COAST GUARD MARINE INSPECTOR.
Condition: Unknown
Due 28 January 1987
Resolved 28 January 1987
Engineering
Issued 28 January 1987 Resolved
MAKE THE D/C HEATER AVAILABLE FOR INSPECTION.
Condition: Unknown
Due 28 January 1987
Resolved 28 January 1987
Deck/Cargo
Issued 4 March 1986 Resolved
PROVIDE FOR OPERATIONAL TESTING OF INERT GAS SYSTEM TO THE SATISFACTION OF ATTENDING MARINE INSPECTOR PRIOR TO VESSELS CARRIAGE OF OIL PRODUCTS ANDIN ANY CASE NO LATER THAN 31 MAY 1986.
Condition: Unknown
Due 4 March 1986
Resolved 4 March 1986
Engineering
Issued 20 August 1985 Resolved
MAKE AUXILIARY BOILER AVAILABLE FOR FIRE AND WATER SIDE INSPECTION NOT LATER THEN 31 MAY 1986.
Condition: Unknown
Due 20 August 1985
Resolved 20 August 1985
Engineering
Issued 20 August 1985 Resolved
CONDUCT AUXILIARY BOILER AUTOMATION AND OPERATION TESTS AT FIRST U.S. PORT OF CALL NOT LATER THEN 22 OCTOBER 1985.
Condition: Unknown
Due 20 August 1985
Resolved 20 August 1985
Engineering
Issued 21 July 1985 Resolved
TEST WASTE HEAT BOILER IN PRESENCE OF MARINE INSPECTOR.
Condition: Unknown
Due 21 July 1985
Resolved 21 July 1985
Engineering
Issued 21 July 1985 Resolved
CONDUCT FIRESIDE AND WATERSIDE INSPECTION OF AUXILIARY BOILER. THESE REQUIREMENTS ARETO BE MADE TO THE SATISFACITON OF THE COGNIZANT OCMI PRIOR TO O1OCT85.
Condition: Unknown
Due 21 July 1985
Resolved 21 July 1985
Fire Fighting
Issued 11 January 1985 Resolved
OBTAIN PH ANALYSIS OF FIRE FIGHTING FOAM AND PROVIDE COPY TO THIS OFFICE.
Condition: Unknown
Due 11 January 1985
Resolved 11 January 1985
Unknown
Issued 16 April 1984 Resolved
THE FOLLOWING DEFICIENCY IS FOR THE ADONIS, DN653691.
Condition: Unknown
Due 16 April 1984
Resolved 16 April 1984
Construction/Loadline
Issued 16 April 1984 Resolved
UPON COMPLETION OF CARGO DISCHARGE, PRESENT VESSEL FOR INTERNAL INSPECTION IN WAY OF #2 PORT WING TANK.
Condition: Unknown
Due 16 April 1984
Resolved 16 April 1984
Construction/Loadline
Issued 16 April 1984 Resolved
PRESENT VESSEL'S TANKS #2 P, C, & S, #3 P, C, & S, AND #4 P, C, & S FOR COAST GUARD INSPECTION.
Condition: Unknown
Due 16 April 1984
Resolved 16 April 1984

Ownership record

The Coast Guard's documentation record for this hull -- the Abstract of Title, with its owners and liens as filed -- is not in PSIX. Ask, and Maury buys it from the National Vessel Documentation Center, files it here with its date, and every reader of this page gets it.