Records from 1984 to 1995. Most recent: inspection, 12 July 1995.
Documentation record
Registered dimensions (L × B × D)31.7 ft × 10.7 ft × 5.5 ft
Registered tonnagegross 11 / net 9
ITC dimensions (L × B × D)Not recorded
ITC tonnageNot recorded
BuilderPEARSON CORPORATION · BRISTOL, RI, UNITED STATES · built 1962
Hull materialFRP (Fiberglass)
PropulsionDiesel Reduction
Hull shapeNot recorded
Hull configurationNot recorded
Hailing portCLAYTON, NY
Trade endorsementsCoastwise, unrestricted
DocumentationExpired · issued 30 June 2004
Service, as the file records itPassenger (Uninspected)
Hull formpowered (Maury's inference from propulsion, hull shape, material and length, rule hf-1; not a recorded fact)
Tonnage as PSIX records it11 - Regulatory (Subpart C or D), Gross Ton
9 - Regulatory (Subpart C or D), Net Ton
Every line above is a field of the National Vessel Documentation Center's file as served by NOAA Fisheries, dated 10 September 2026, matched to this hull on its Official Number. Registered and ITC measurements are two systems and are never combined. One snapshot is held so far; documentation history begins with the next.
A report is not offered for this hull: Its record holds only 2 of the seven kinds of material a report is built from: inspections, deficiencies, operational controls, tow-unit appearances, casualty records, dimensions and documentation. That is a statement about the record, not about the vessel. Reports.
Inspection history · 20
12 July 1995
Administrative
Administrative · MSO BUFFALO · USCG Great Lakes District (CGD-GL) · Activity 883126
17 November 1994
Administrative
Administrative · MSO BUFFALO · USCG Great Lakes District (CGD-GL) · Activity 868041
19 October 1994
Hull Examination
Physical examination · MSO BUFFALO · USCG Great Lakes District (CGD-GL) · Activity 1463856
4 November 1993
Deficiency Check
Physical examination · MSO BUFFALO · USCG Great Lakes District (CGD-GL) · Activity 841001
26 October 1993
Deficiency Check
Physical examination · MSO BUFFALO · USCG Great Lakes District (CGD-GL) · Activity 1136677
3 September 1993
COI Inspection
Physical examination · MSO BUFFALO · USCG Great Lakes District (CGD-GL) · Activity 1397940
8 September 1992
Deficiency Check
Physical examination · MSO BUFFALO · USCG Great Lakes District (CGD-GL) · Activity 935654
16 July 1992
Re-Inspection
Physical examination · MSO BUFFALO · USCG Great Lakes District (CGD-GL) · Activity 1384972
12 July 1991
Re-Inspection
Physical examination · MSO BUFFALO · USCG Great Lakes District (CGD-GL) · Activity 1247224
26 July 1990
COI Inspection
Physical examination · MSO BUFFALO · USCG Great Lakes District (CGD-GL) · Activity 1216501
12 March 1990
Hull Examination
Physical examination · MSO BUFFALO · USCG Great Lakes District (CGD-GL) · Activity 909218
5 September 1989
Re-Inspection
Physical examination · MSO BUFFALO · USCG Great Lakes District (CGD-GL) · Activity 1352550
19 May 1989
Administrative
Administrative · MSO BUFFALO · USCG Great Lakes District (CGD-GL) · Activity 1045146
21 April 1989
Hull Examination
Physical examination · MSO BUFFALO · USCG Great Lakes District (CGD-GL) · Activity 1207839
15 July 1988
Re-Inspection
Physical examination · MSO BUFFALO · USCG Great Lakes District (CGD-GL) · Activity 898192
13 June 1988
Type not recorded
No type recorded · MSO BUFFALO · USCG Great Lakes District (CGD-GL) · Activity 890603
28 April 1987
COI Inspection
Physical examination · MSO BUFFALO · USCG Great Lakes District (CGD-GL) · Activity 1024282
26 August 1986
Re-Inspection
Physical examination · MSO BUFFALO · USCG Great Lakes District (CGD-GL) · Activity 1316294
14 August 1985
Re-Inspection
Physical examination · MSO BUFFALO · USCG Great Lakes District (CGD-GL) · Activity 984844
2 July 1984
Type not recorded
No type recorded · MSO BUFFALO · USCG Great Lakes District (CGD-GL) · Activity 1292810
Navigation
Issued 19 October 1994
Resolved
Replace all bolts in rudder cross member support.
Condition: Unknown
Due 30 June 1995
Resolved 18 May 2002
Resolution: MISLE Maintenance - Resolved all open deficiencies issued prior to 6/1/1997 where activity was closed and deficiency due date was past
Construction/Loadline
Issued 19 October 1994
Resolved
Tie weather deck edges into bulwerks, install scuppers and flanges on hatches. (Vessel in winter layup)
Condition: Unknown
Due 19 October 1994
Resolved 19 October 1994
Lifesaving
Issued 3 September 1993
Resolved
Post emergency check off list.
Condition: Unknown
Due 3 September 1993
Resolved 3 September 1993
Unknown
Issued 3 September 1993
Resolved
Permanently install hailing port on stern of the vessel.
Condition: Unknown
Due 8 September 1993
Resolved 13 September 1993
Lifesaving
Issued 3 September 1993
Resolved
Provide evidence that drug testing program meets requirements of 46 CFR, part 16.
Condition: Unknown
Due 3 September 1993
Resolved 3 September 1993
Engineering
Issued 3 September 1993
Resolved
Replace deteriorated oil pressure gage line, fwd part of MDE.
Condition: Unknown
Due 7 September 1993
Resolved 9 September 1993
Electrical
Issued 3 September 1993
Resolved
Remove or cap off bare wire in overhead of fwd compartment.
Condition: Unknown
Due 7 September 1993
Resolved 9 September 1993
Lifesaving
Issued 3 September 1993
Resolved
Provide one additional Adult life preserver - until corrected, vessel limited to 24 passengers.
Condition: Unknown
Due 3 September 1993
Resolved 3 September 1993
Lifesaving
Issued 16 July 1992
Resolved
PROVIDE 1 ADDITIONAL ADULT LIFE JACKET - UNTIL ITEM CLEARED, VSL LIMITED TO24 PASSENGERS.
Condition: Unknown
Due 16 July 1992
Resolved 16 July 1992
Accommodation/Occupational Safety
Issued 16 July 1992
Resolved
INSTALL CABLE/ADDITIONAL COURSE ON HANDRAILS.
Condition: Unknown
Due 16 July 1992
Resolved 16 July 1992
Deck/Cargo
Issued 16 July 1992
Resolved
PROVIDE ADEQUATE ANCHOR LINE (270 FT)
Condition: Unknown
Due 16 July 1992
Resolved 16 July 1992
Lifesaving
Issued 16 July 1992
Resolved
PROVIDE SEPERATE STOWAGE FOR CHILD LIFE JACKETS.
Condition: Unknown
Due 16 July 1992
Resolved 16 July 1992
Documentation
Issued 16 July 1992
Resolved
POST STABILITY LETTER
Condition: Unknown
Due 16 July 1992
Resolved 16 July 1992
Fire Fighting
Issued 16 July 1992
Resolved
PROVIDE ADEQUATE SUCTION HOSE FOR HAND PUMP.
Condition: Unknown
Due 16 July 1992
Resolved 16 July 1992