Records from 1984 to 2022. Most recent: inspection, 3 March 2022.
A report is not offered for this hull: Its record holds only 2 of the seven kinds of material a report is built from: inspections, deficiencies, operational controls, tow-unit appearances, casualty records, dimensions and documentation. That is a statement about the record, not about the vessel. Reports.
Documentation › Certificates/Documents › Certificate of Inspection
Issued 2 August 2017
No resolution recorded
Vessel's annual inspection has not been completed within the three month window. Vessel is currently located at a T-Boat shipyard and is undergoing extensive repairs.
Condition: Invalid
Action required: 701 - Prior to carriage of passengers/cargo
Due 2 August 2017 — due date passed with no resolution recorded
Construction/Loadline › Hull › Bottom Plating
Issued 6 June 2016
Resolved
Provide repair plan for bottom planks in way of chine have areas of weepage in all spaces, with a leak in the FWD Saloon, all areas marked.
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 21 November 2016
Resolution: Vessel owners provided repair proposal and are proceeding with plank replacements.
Construction/Loadline › Hull › Hull Plating
Issued 6 June 2016
Resolved
Vessel to be hauled out for hull exam for further inspection of areas of concern.
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 17 November 2016
Resolution: Vessel was hauled out for drydock in Heathsville, VA. Owners are working with inspectors from Sector Hampton Roads to complete repairs.
Lifesaving › Lifejacket/PFD (Type I) › Condition
Issued 6 June 2016
Resolved
Vessel has a k-poc life jackets on board, found 10 that are no longer servicable, reduced POB count to 101 to match the total lifesaving availible on board.
Condition: Improper/Lack of Maintenance
Due 6 July 2016
Resolved 24 April 2017
Electrical › Electrical Distribution System (service) › Wiring
Issued 6 June 2016
Resolved
Vessel has wiring that connected the out of service GENSET that has been dead ended, properly terminate the end of the wire to ensure no risk of shock to crew.
Condition: Improper Installation
Due 6 July 2016
Resolved 24 April 2017
Construction/Loadline › Hull › Hull Plating
Issued 6 June 2016
Resolved
Upon completion of the hull exam and repairs vessel shall conduct sea trials to the satisfaction of the attending MI.
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 24 April 2017
Construction/Loadline › Hull › Hull Plating
Issued 16 September 2015
Resolved
While underway noted water intrusion around both sides of the Stem and weapage under ladder in forpeak, determine cause and properly repair.
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 29 April 2024
Construction/Loadline › Hull › Side Shell
Issued 16 September 2015
Resolved
Noted areas in side shell where 5200 was used as seam compound with gaps allowing light to pass through. Reapir to the satisfaction of attending Marine Inspector.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 18 September 2015
Resolution: Confered with USCG wood boat SME, concluded that due to the location of the repairs (above the water line) that repair conducted would be sufficient. But should be montitored and throughly inspected at the next annual and haul out(fastner pull in Nov 16)
Construction/Loadline › Hull › Side Shell
Issued 3 August 2015
Resolved
Repair/replace 05 side shell planks at the deck line Port & Stbd, PTCP and no later than 03 Sep 2015.
Action required: 701 - Prior to carriage of passengers/cargo
Due 3 September 2015
Resolved 16 September 2015
Construction/Loadline › Hull › Strut/Cross Tie
Issued 3 August 2015
Resolved
Repair corner frames in way of transome Port side at chine and Top/Stbd side at top. PTCP and no later than 03 Sep 2015.
Action required: 701 - Prior to carriage of passengers/cargo
Due 3 September 2015
Resolved 16 September 2015
Operations/Management › Drills/Instruction › Man Overboard Recovery
Issued 3 August 2015
Resolved
Conduct underway drills prior to carrying passengers for hire.
Action required: 701 - Prior to carriage of passengers/cargo
Due 3 August 2015
Resolved 16 September 2015
Operations/Management › Drug and Alcohol Testing › Testing, Equipment
Issued 3 August 2015
Resolved
Provide valid alcohol test kits and crew member consortium membership prior to carrying passengers for hire.
Action required: 701 - Prior to carriage of passengers/cargo
Due 3 August 2015
Resolved 16 September 2015
Communications › Radio Communications › EPIRB
Issued 3 August 2015
Resolved
EPIRB needs to be relocated so it is float free. 46 CFR 180.64.
Action required: 701 - Prior to carriage of passengers/cargo
Due 3 August 2015
Resolved 16 September 2015
Lifesaving › Lifebuoys › Markings (ship name/port)
Issued 3 August 2015
Resolved
Life rings need additional retro-reflective tape, (SOLAS), applied. 46 CFR 185.604(i).
Action required: 701 - Prior to carriage of passengers/cargo
Due 3 August 2015
Resolved 16 September 2015
Construction/Loadline › Hull › Side Shell
Issued 6 October 2014
Resolved
Port and Starboard side planks were wasted/rotted in numerous locations. Provide repair proposal for side planks
Action required: 701 - Prior to carriage of passengers/cargo
Due 6 October 2014
Resolved 3 August 2015
Resolution: Attended vessel and cleared above deficiency.
Construction/Loadline › Hull › Side Shell
Issued 6 October 2014
Resolved
Transon corners were rotted on both the port and starboard sides. Provide repair proposal for both corners.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 3 August 2015
Resolution: Attended vessel and cleared above deficiency.
Construction/Loadline › Hull › Side Shell
Issued 6 October 2014
Resolved
Bottom planks on interior of forward compartment were soft and rotting. Provide repair proposal for the replacement of these planks as marked.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 3 August 2015
Resolution: Attended vessel and cleared above deficiency.
Construction/Loadline › Structures › Superstructure
Issued 6 October 2014
Resolved
Centerline floor support in forward compartment below main deck wasted. Provide repair proposal for replacement of wasted wood.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 3 August 2015
Resolution: Attended vessel and cleared above deficiency.
Construction/Loadline › Structures › Deck Plating
Issued 6 October 2014
Resolved
main deck forward of the housing unit is soft and unstable. Provide repair proposal to replace to good wood in this area.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 3 August 2015
Resolution: Attended vessel and cleared above deficiency.
Construction/Loadline › Structures › Superstructure
Issued 6 October 2014
Resolved
Transom corners at the top of the chine in the steering compartment rotted and wasting away. Provide repair proposal to address these areas as marked.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 3 August 2015
Resolution: Attended vessel and cleared above deficiency.
Construction/Loadline › Penetrations › Valve Flange
Issued 6 October 2014
Resolved
Starboard Aft Through hull opening no longer in use, Previously used for sewage tank that has been removed from vessel. Cap off or remove throough hull opening.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 3 August 2015
Resolution: Attended vessel and cleared above deficiency.
Construction/Loadline › Hull › Side Shell
Issued 18 May 2012
Resolved
Complete items 07 and item 09 of your repairs proprosal to the satisfaction of the attending Marine inspector.
Action required: 705 - Other - as specified
Due 30 June 2012
Resolved 31 July 2012
Resolution: Received pictures via e-mail showing the satisfactory repair of the above deficiencies.
Construction/Loadline › Hull › Side Shell
Issued 27 February 2009
Resolved
Investigate and provide a plan proposal to fix areas of weeping in the forward compartments in the vicinity of the starboard chine board, and forward stave planks.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 1 May 2009
Resolution: Area of repairs was examined for weepaing, none noted.
Stability › Severe Wind/Roll › General
Issued 27 February 2009
Resolved
Vessel required to have a SST prior to operating.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 1 May 2009
Resolution: Vessel completed a SST.
Construction/Loadline › Structures › Deck Plating
Issued 27 February 2009
Resolved
Provide repairs to forward deck area on port and starboard side to replace rotted wood.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 1 May 2009
Resolution: Rotted wood was replaced with new planking.
Construction/Loadline › Hull › Hull Plating
Issued 27 February 2009
Resolved
Provide repairs to the rotted areas of the starboard chine board.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 1 May 2009
Resolution: A new chine board was installed on the starboard side.
Construction/Loadline › Hull › Transverse Frame
Issued 27 February 2009
Resolved
Provide repairs to the transverse deck support in steering compartment.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 1 May 2009
Resolution: New transverse deck support was replaced in the steering compartment.
Construction/Loadline › Structures › Transverse Bulkhead
Issued 27 February 2009
Resolved
Provide repairs to the rotted areas of the starboard transom.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 1 May 2009
Resolution: Repairs were made to the starboard transom.
Construction/Loadline › Hull › Hull Plating
Issued 27 February 2009
Resolved
Replace rotted stave planks (05) on port and starboard side (fwd).
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 1 May 2009
Resolution: Planks were replaced and tested while u/w, sat.
Engineering › Shafting/Propeller Arrangements › Stern Tube
Issued 27 February 2009
Resolved
Replace fastener on stern tube.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 1 May 2009
Resolution: New fastener was placed in service.
Construction/Loadline › Hull › Hull Plating
Issued 27 February 2009
Resolved
Investigat weeping area at the starboard chine board scarf joint and provide repairs.
Due 1 June 2009
Resolved 1 June 2009
Resolution: Additional caulking was added to stop weeping.
Construction/Loadline › Structures › Deck Plating
Issued 27 February 2009
Resolved
Investigate areas of leaking and provide repairs.
Due 1 June 2009
Resolved 1 June 2009
Resolution: Caulking was inserted in areas of the deck that was leaking.
Construction/Loadline › Structures › Deck Plating
Issued 27 February 2009
Resolved
Provide repairs to the rotted wood by the kingpost forward.
Due 1 June 2009
Resolved 1 June 2009
Resolution: Owner removed rotten wood and replaced entire area of the deck.
Pollution Prevention/Response › Prevention Equipment › Marine Sanitation Device, Type III
Issued 27 February 2009
Resolved
Provide permanent connection to type III MSD tank.
Due 1 June 2009
Resolved 1 June 2009
Resolution: Owner had new fitting welded to the tank.
Construction/Loadline › Hull › Side Shell
Issued 29 January 2009
Resolved
Investigate and provide a plan proposal to fix areas of weeping in the forward compartments in the vicinity of the starboard chine board, and forward stave planks.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 9 June 2009
Stability › Severe Wind/Roll › General
Issued 29 January 2009
Resolved
Vessel completed an approved project top side to replace deck furniture. Vessel owner is required to complete a SST prior to operating with pax.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 9 June 2009
Construction/Loadline › Structures › Deck Plating
Issued 29 January 2009
Resolved
Provide repair proposal for areas of rotted deck on port and starboard side (fwd).
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 9 June 2009
Construction/Loadline › Hull › Hull Plating
Issued 29 January 2009
Resolved
Provide repair proposal for starboard chine board.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 9 June 2009
Construction/Loadline › Hull › Transverse Frame
Issued 29 January 2009
Resolved
Provide repair proposal for repairs to the transverse deck support in steering compt.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 9 June 2009
Construction/Loadline › Structures › Transverse Bulkhead
Issued 29 January 2009
Resolved
Provide repair proposal to rotted areas of the starboard transom.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 9 June 2009
Construction/Loadline › Hull › Hull Plating
Issued 29 January 2009
Resolved
Provide repair proposal for replacement of 05 stave planks on port and starboard side (fwd).
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 1 April 2009
Resolution: Replaced 05 stave planks in-kind with yellow plank.
Engineering › Shafting/Propeller Arrangements › Stern Tube
Issued 29 January 2009
Resolved
Replace fastener on stern tube.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 9 June 2009
Operations/Management › Drug and Alcohol Testing › Testing, Equipment
Issued 7 May 2008
Resolved
Provide alcohol test kits onboard for the event of a SMI.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 13 May 2008
Resolution: 04 Alcohol test kits were purchased and placed onboard.
Documentation › Markings/Placards › Lifejacket Placard
Issued 7 May 2008
Resolved
Provide donning placards for both styles of life jackets onboard.
Due 15 May 2008
Resolved 13 May 2008
Resolution: A donning placard was purchased and placed in service to meet the requirement.
Construction/Loadline › Hull › Keel
Issued 7 May 2008
Resolved
Provide repairs to weeping for keelson, forward pax compt, and fuel compt port side at the sheer line.
Due 29 January 2009
Resolved 6 October 2008
Resolution: Area was caulked by owner and leaking was stopped.
Engineering › Fuel Oil Service System › Hose
Issued 7 May 2008
Resolved
Replace f/o lines at the tank with USCG approved hose or copper lines.
Due 1 July 2008
Resolved 13 May 2008
Resolution: F/O lines replaced w/ copper tubing w/ flared connections.
Engineering › Fuel Oil Service System › Piping
Issued 7 May 2008
Resolved
Provide watertight coupling on f/o line thru hull.
Due 1 October 2008
Resolved 6 October 2008
Resolution: Owner will install water tight coupling during upcoming drydock.
Engineering › Bilge Water Management System › Piping
Issued 7 May 2008
Resolved
Remoe PVC piping on all bilge pumps and replace with rigid, flexible hose.
Due 16 June 2008
Resolved 6 June 2008
Resolution: Vessel removed all pvc piping and replaced with rigid, flexible hose.
Engineering › Fuel Oil Service System › Hose
Issued 7 May 2008
Resolved
Replace f/o fill hoses on both tanks.
Due 16 June 2008
Resolved 6 June 2008
Resolution: F/O fill hose replaced.
Electrical › Electrical Distribution System (service) › Grounding Conductor
Issued 7 May 2008
Resolved
Check continuity of both f/o tank ground wires.
Due 16 June 2008
Resolved 6 June 2008
Resolution: Continuity checked for grounding wire, sat.
Engineering › Fuel Oil Storage/Transfer System › Valve
Issued 7 May 2008
Resolved
Remove valve from port f/o tank and replace with a standard drain plug.
Due 1 October 2008
Resolved 6 October 2008
Resolution: Valve we be removed during upcoming drydock.
Accommodation/Occupational Safety › Potable Water System › General
Issued 7 May 2008
Resolved
Provide positive shut-off for grey water ovbd.
Due 16 June 2008
Resolved 6 June 2008
Resolution: Replaced with brass, ball valve.
Engineering › Shafting/Propeller Arrangements › Coupling
Issued 7 May 2008
Resolved
Tighten/repack port shaft coupling.
Due 15 May 2008
Resolved 13 May 2008
Resolution: Packing gland was tightened.
Accommodation/Occupational Safety › Washroom/Toilet › Toilet
Issued 7 May 2008
Resolved
Double clamp head pump hose and repair leak.
Due 1 June 2008
Resolved 13 May 2008
Resolution: Replaced hose and double clamped.
Electrical › Electric Supply System (service) › Battery Charger
Issued 7 May 2008
Resolved
Perm. install wiring for battery charger to battery.
Due 15 May 2008
Resolved 13 May 2008
Resolution: Charger removed until perm. wiring can be installed.
Electrical › Electrical Distribution System (service) › Overcurrent Device
Issued 7 May 2008
Resolved
Procure/install thermocouple for battery.
Due 15 May 2008
Resolved 13 May 2008
Resolution: Procured and placed in to service new thermocouple.
Electrical › Electrical Distribution System (service) › Wiring
Issued 7 May 2008
Resolved
Procure/install metal wire hangers for wires and remove plastic.
Due 1 June 2008
Resolved 13 May 2008
Resolution: Metal wire hangers have been installed in vessel.
Engineering › Fuel Oil Service System › Hose
Issued 7 May 2008
Resolved
Replace f/o lines on both secondary filters with USCG approved hose.
Action required: 701 - Prior to carriage of passengers/cargo
Due 15 May 2008
Resolved 15 May 2008
Resolution: F/O lines were replaced w/ USCG approved hose.
Construction/Loadline › Structures › Deck Plating
Issued 7 May 2008
Resolved
Provide repairs to deck on upper deck (port side wheelhouse).
Due 30 September 2008
Resolved 6 October 2008
Resolution: Decks were reinforced with aluminum angle and welded in place.
Electrical › Electrical Distribution System (service) › Conductor
Issued 13 November 2007
Resolved
Remove all non-boat cables from vessel or prove that all conductors are "Boat Cables" IAW 46 CFR 183.340.
Due 27 November 2007
Resolved 9 June 2009
Engineering › Fuel Oil Storage/Transfer System › Filter/Strainer
Issued 13 November 2007
Resolved
Provide proper drain caps on fuel filter strainer bowl IAW 46 CFR 182.455.
Due 27 November 2007
Resolved 9 June 2009
Communications › Radio Communications › VHF Radiotelephone
Issued 13 November 2007
Resolved
Vessel is restricted to operating not more than 1000 feet from shore until proof of proper operation of VHF radio is provided to the attending marine inspector IAW 46 CFR 184.502, 47 CFR 80.905.
Due 27 November 2007
Resolved 9 June 2009
Engineering › Bilge Water Management System › Valve
Issued 13 November 2007
Resolved
Install positive shutoff valves on all bilge pump overboard discharges IAW 46 CFR 182.520.
Due 27 November 2007
Resolved 9 June 2009
Construction/Loadline › Hull › Side Shell
Issued 22 January 2007
Resolved
Crop and renew as original 11th plank aft of bow stem, from garboard strake to chine.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Resolved 24 January 2007
Resolution: Replace as original 11th plank aft of bow stem, from garboard strake to chine.
Construction/Loadline › Hull › Side Shell
Issued 22 January 2007
Resolved
Crop and renew as original 19th plank aft of bow stem portside from garboard strake to chine.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Resolved 24 January 2007
Resolution: 19th plank replaced as required.
Construction/Loadline › Hull › Longitudinal Frame
Issued 22 January 2007
Resolved
Properly sister forth side shell frame portside of vessel.
Condition: Improper Installation
Action required: 705 - Other - as specified
Resolved 28 June 2007
Resolution: Side shell frame portside of vessel appears to be sistered properly.
Construction/Loadline › Hull › Side Shell
Issued 22 January 2007
Resolved
Replace 2nd plank from top portside in between frames 3 thru 8 as original.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Resolved 24 January 2007
Resolution: Replaced 2nd plank as required.
Engineering › Diesel Engine (propulsion-direct drive) › Piping (exhaust)
Issued 22 January 2007
Resolved
Replace exhaust piping clamps as needed in Lazzarette.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Resolved 28 June 2007
Resolution: All clamps appear to have been replace as needed.
Engineering › Bilge Water Management System › Piping
Issued 22 January 2007
Resolved
Ensure all electric bilge pumps are secured to deck and piping has shut off valves placed at end in way of thru hull fittings.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Resolved 9 June 2009
Construction/Loadline › Hull › Weld
Issued 9 May 2006
Resolved
Build up welds along both rudder tubes.
Action required: 705 - Other - as specified
Resolved 23 January 2007
Resolution: Completed build up of weld on both rudder tubes.
Engineering › Fuel Oil Storage/Transfer System › Ventilation
Issued 9 May 2006
Resolved
Replace both flame screens with 30/30 mesh.
Action required: 705 - Other - as specified
Resolved 28 June 2007
Resolution: 30/30 mesh replaced.
Construction/Loadline › Hull › Longitudinal Frame
Issued 9 May 2006
Resolved
Crop and renew as original all wood rot on the longitudinal side planking under rub rail as needed. IAW NVIC- 7-95
Action required: 705 - Other - as specified
Resolved 22 January 2007
Resolution: Wood rot on the longitudinal side planking under rub rail was replaced.
Construction/Loadline › Hull › Hull Plating
Issued 9 May 2006
Resolved
Replace the longitudinal side planking at midship just above the chine log on the port side. IAW NVIC 7-95
Action required: 705 - Other - as specified
Resolved 22 January 2007
Resolution: Replaced longitudinal side planking at midship just above the chine log on the port side as required.
Engineering › Shafting/Propeller Arrangements › Bearing
Issued 9 May 2006
Resolved
Replace both cutless bearings on the stbd shaft.
Action required: 705 - Other - as specified
Resolved 22 January 2007
Resolution: Both cutlass bearings on stbd shaft were replaced.
Construction/Loadline › Hull › Keel
Issued 9 May 2006
Resolved
Repair damage wood along the Keel.
Action required: 705 - Other - as specified
Resolved 22 January 2007
Resolution: Repaired as needed damaged wood along the keel.
Construction/Loadline › Hull › Hull Plating
Issued 9 May 2006
Resolved
Repair as original the 23rd dead rise planking on the port side just aft of bow stem. IAW NVIC 7-95
Action required: 705 - Other - as specified
Resolved 22 January 2007
Resolution: Repaired the 23rd dead rise planking on the port side just aft of bow stem.
Engineering › Bilge Water Management System › Not Installed
Issued 9 May 2006
Resolved
Repair high level float switch in forepeak secure to deck.
Action required: 705 - Other - as specified
Resolved 28 June 2007
Resolution: High level float switch in forepeak was secured to the deck.
Construction/Loadline › Hull › Hull Plating
Issued 9 May 2006
Resolved
Recaulk as needed along the vessel. IAW NVIC 7-95
Action required: 705 - Other - as specified
Resolved 22 January 2007
Resolution: Vessel appeared to recaulked as needed.
Construction/Loadline › Hull › Hull Plating
Issued 9 May 2006
Resolved
Crop and renew as original the rot along port bow stem. IAW NVIC 7-95
Action required: 705 - Other - as specified
Resolved 22 January 2007
Resolution: Cropped and renew as original rot along port bow stem.
Construction/Loadline › Penetrations › Bottom Plug Packing
Issued 9 May 2006
Resolved
Properly ream clean and fill with dowels all fasteners along the vessel. IAW NVIC 7-95
Action required: 705 - Other - as specified
Resolved 22 January 2007
Resolution: All fasteners properly covered on vessel.
Construction/Loadline › Hull › Hull Plating
Issued 9 May 2006
Resolved
Replace as original all dead rise planking damaged by worm rot. IAW NVIC-7-95
Action required: 705 - Other - as specified
Resolved 22 January 2007
Resolution: Vessel replaced all apparent planking that was damaged by worm rot.
Electrical › Electrical Distribution System (emergency) › Wiring
Issued 9 May 2006
Resolved
Replace the wiring in the bilge system.
Action required: 705 - Other - as specified
Resolved 28 June 2007
Resolution: Wiring in bilge appears to be replaced.
Construction/Loadline › Structures › Deck Plating
Issued 9 May 2006
Resolved
Replace as original all wood rot along main deck. IAW NVIC 7-95
Action required: 705 - Other - as specified
Resolved 28 June 2007
Resolution: Wood along main deck appears to be replaced as needed.
Engineering › Bilge Water Management System › Hose
Issued 9 May 2006
Resolved
Show proof, repair or replace all hoses on vital systems.
Action required: 705 - Other - as specified
Resolved 28 June 2007
Resolution: All hoses appear to be repaired/replaced as needed.
Engineering › Bilge Water Management System › Strainer
Issued 9 May 2006
Resolved
Replace bilge suction with suitable strainer.
Action required: 705 - Other - as specified
Resolved 9 June 2009
Engineering › Bilge Water Management System › Hose
Issued 9 May 2006
Resolved
Repair, replace, and tighten all clamps thoughout the vessel.
Action required: 705 - Other - as specified
Resolved 28 June 2007
Resolution: Clamps throughout vessel appear to be installed and tightened as required.
Construction/Loadline › Hull › Bracket
Issued 9 May 2006
Resolved
Replace as original the inboard engine mount on the stbd engine. IAW NVIC- 7-95
Action required: 705 - Other - as specified
Resolved 28 June 2007
Resolution: Inboard engine mount on the stbd engine was replaced and appears to be in satisfactory condition.
Engineering › Bilge Water Management System › Piping
Issued 9 May 2006
Resolved
Replace the bilge piping in lazarette.
Action required: 705 - Other - as specified
Resolved 28 June 2007
Resolution: Bilge piping in lazarette appears to be replaced as required.
Construction/Loadline › Structures › Deck Plating
Issued 9 May 2006
Resolved
Replace the deck area, back aft, port side in lazarette. IAW NVIC 7-95
Action required: 705 - Other - as specified
Resolved 28 June 2007
Resolution: Deck area in back aft port side in lazarette was replaced.
Construction/Loadline › Hull › Stiffener
Issued 9 May 2006
Resolved
Crop and renew as original the deck beam in the port side in lazarette. IAW 7-95
Action required: 705 - Other - as specified
Resolved 28 June 2007
Resolution: Deck beam on the port side in lazarette was cut out and sisters as required IAW NAVIC 7-95.
Electrical › Lighting (service) › Conductor
Issued 24 August 2005
Resolved
Remove wire nuts from various electrical circuits through out vessel IAW 46CFR183.340.
Due 23 September 2005
Resolved 28 September 2005
Resolution: Wire nuts removed from electrical systems.
Documentation › Certificates/Documents › Certificate of Documentation (CG-1270)
Issued 24 August 2005
Resolved
Provide current certificate of documentation IAW 46CFR67.1.
Due 23 September 2005
Resolved 28 September 2005
Resolution: Owner provided current Certificate of Documentation.
Engineering › Sea-water System (primary cooling) › Pump
Issued 24 August 2005
Resolved
Port engine sea water pump leaking excessively, repair IAW 182.420.
Due 23 September 2005
Resolved 28 September 2005
Resolution: Port engine sea water pump repaired, leak stopped.
Lifesaving › Lifebuoys › Markings (ship name/port)
Issued 24 August 2005
Resolved
Install retro reflective tape on lifebuoys IAW 46CFR185.604(i).
Due 23 September 2005
Resolved 28 September 2005
Resolution: Retro reflective tape installed on lifebuoys.
Navigation › Piloting/Steering › Coast Guard Light List
Issued 24 August 2005
Resolved
Provide current Coast Guard light list IAW 46CFR184.420.
Due 23 September 2005
Resolved 28 September 2005
Resolution: Current Coast Guard light list publication provided.
Navigation › Piloting/Steering › Tide/Tidal Current Tables
Issued 24 August 2005
Resolved
Provide tide and tidal current tables onboard vessel IAW 46CFRR184.420.
Due 23 September 2005
Resolved 28 September 2005
Resolution: Tide and tidal current tables provided onboard the vessel.
Communications › Alarms/Indicators › Bilge Alarm
Issued 24 August 2005
Resolved
Provide at operating station working audible and visual high level bilge alarms in all compartments IAW 46CFR182.530. Vessel restricted from carriage of passengers.
Due 23 September 2005
Resolved 14 December 2005
Resolution: Vessel provided proof that audible and visual high level bilge alarm worked to the satisfaction of the attending Marine Inspector.
Communications › Radio Communications › VHF Radiotelephone
Issued 24 August 2005
Resolved
Provide working VHF radio IAW 46CFR184.502.
Due 23 September 2005
Resolved 28 September 2005
Resolution: Properly operating VHF radio provided onboard the vessel.
Operations/Management › Bilge/Bilge System Management › Control of Oil Mixtures
Issued 24 August 2005
Resolved
Remove excessive oil in engine room bilge and around bilge pump IAW 46CFR176.830. Restricted from carriage of passengers.
Due 23 September 2005
Resolved 28 September 2005
Resolution: Excessive oil in engine room bilge and around bilge pumps removed. Restriction removed.
Operations/Management › Navigation Safety › Carriage of Charts and Publications
Issued 24 August 2005
Resolved
Provide Inland Nav Rules onboard vessel IAW 46CFR184.420.
Due 23 September 2005
Resolved 28 September 2005
Resolution: Inland Nav rules provided onboard vessel.
Engineering › Fuel Oil Service System › Valve
Issued 24 August 2005
Resolved
Label remote emergency fuel valve shut offs IAW 46CFR185.608.
Due 23 September 2005
Resolved 28 September 2005
Resolution: Emergency fuel shut off valves labeled.
Engineering › Fuel Oil Service System › Valve, Control
Issued 24 August 2005
Resolved
Stbd engine remote emergency fuel shut off valve does not work IAW 46CFR182.455.
Due 23 September 2005
Resolved 28 September 2005
Resolution: Stbd engine remote emergency fuel valve reach rod reinstalled on fuel shut off valve.
Lifesaving › Lifebuoys › Serviceable
Issued 24 August 2005
Resolved
Life buoy on port side is no longer serviceable, grab line is deteriorated IAW 46CFR180.70.
Due 23 September 2005
Resolved 28 September 2005
Resolution: Life buoy replaced.
Communications › Internal Communications System › Voice Tube
Issued 24 August 2005
Resolved
Public address system does not work IAW 46CFR184.610(c).
Due 23 September 2005
Resolved 28 September 2005
Resolution: Properly operating public address system provided.
Lifesaving › Embarkation Appliances/Stations › Handholds
Issued 1 October 2004
Resolved
Rescue ladder broke in half during man overbaord drill, Authorized to use temp rescue laddrer until 17 OCT 04 until permanent resuce ladder ladder can be built or purchased.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 17 October 2004
Resolved 4 November 2004
Resolution: Rescue ladder installed.
Documentation › Certificates/Documents › Certificate of Documentation (CG-1270)
Issued 25 August 2004
Resolved
COD expired 31 MAY 2004
Action required: 701 - Prior to carriage of passengers/cargo
Due 24 September 2004
Resolved 30 September 2004
Resolution: Valid COD
Construction/Loadline › Hull › Side Shell
Issued 25 August 2004
Resolved
Repair/Replace caulking between two hull planks near the waterline where the stern meets the port quarter. Daylight was observed coming through planks during aft steering inspection that measured approximately 12 inches long and 1/8 inch thick, plank caulking wasted away.
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Due 24 September 2004
Resolved 30 September 2004
Engineering › Bilge Water Management System › Pump
Issued 25 August 2004
Resolved
Repair/Replace bilge pump in lazerette/aft steering. Bilge pump was in approximately 1 foot of water and in-op.
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Due 24 September 2004
Resolved 30 September 2004
Resolution: Alarm replaced and operational
Communications › Alarms/Indicators › High Water Alarm
Issued 25 August 2004
Resolved
Repair/Replace high water alarm, audible alarm not working, only bridge light indicator is working.
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Due 24 September 2004
Resolved 30 September 2004
Resolution: Alarm operational.
Communications › Alarms/Indicators › High Water Alarm
Issued 25 August 2004
Resolved
Repair/Replace/Secure high water alarm in forepeak, alarm is not mounted, mount corroded and wasted, not attached to anything but to the wire itself.
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Due 24 September 2004
Resolved 30 September 2004
Resolution: Alarm operational and mounted.
Documentation › Certificates/Documents › FCC SSL
Issued 25 August 2004
Resolved
Renew FCC Safety Radio Telephony Certificate, expired 7 JUL 2004. Vessel limited to 1000 feet from shore.
Action required: 705 - Other - as specified
Due 24 September 2004
Resolved 30 September 2004
Resolution: Valid FCC certificate obtained.
Engineering › Bilge Water Management System › Pump
Issued 25 August 2004
Resolved
Repair/Replace bilge pump in forepeak, pump in-op.
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Due 24 September 2004
Resolved 30 September 2004
Resolution: Bilge pump replaced and operational.
Engineering › Steering Gear System › Linkage
Issued 25 August 2004
Resolved
Provide cotter pin or double nut steering gear linkage on jockey bar, only one nut on linkage.
Condition: Improper Installation
Action required: 701 - Prior to carriage of passengers/cargo
Due 24 September 2004
Resolved 30 September 2004
Resolution: Double nuts installed on steering gear linkage on jockey bar.
Lifesaving › Hand Flares
Issued 13 May 2003
Resolved
Provide 3 red flares and 3 orange distress signals; prior to the carriage of passengers.
Due 13 June 2003
Resolved 16 May 2003
Navigation › Piloting/Steering
Issued 13 May 2003
Resolved
Provide current U.S. Coast Pilot. Prior to the carriage of passengers. LEGACY COMPONENT DESC: US Coast Pilot
Due 13 June 2003
Resolved 16 May 2003
Navigation › Piloting/Steering
Issued 13 May 2003
Resolved
Provide current tide and current tables. Prior to the carriage of passengers. LEGACY COMPONENT DESC: Tide/Tidal Current Tables
Due 13 June 2003
Resolved 16 May 2003
Lifesaving › Lifejacket/PFD (General)
Issued 13 May 2003
Resolved
Post a lifejacket donning placard for the type of lifejacket that is onboard. Prior to the carriage of passengers.
Due 13 June 2003
Resolved 16 May 2003
Personnel › Certificates/Documents/Licenses
Issued 13 May 2003
Resolved
Post operator's license on the bridge; prior to the carriage of passengers.
Due 13 June 2003
Resolved 16 May 2003
Lifesaving › Lifejacket/PFD (Type I)
Issued 13 May 2003
Resolved
Relabel 19 lifejackets with the vessel's name. Prior to the carriage of passengers.
Due 13 June 2003
Resolved 16 May 2003
Lifesaving › Lifejacket/PFD (Type I)
Issued 13 May 2003
Resolved
Replace clips on 6 lifejackets; prior to the carriage of passengers.
Due 13 June 2003
Resolved 16 May 2003
Accommodation/Occupational Safety
Issued 13 May 2003
Resolved
Store portable light for the engine room near the entrance. Prior to the carriage of passengers.
Due 13 June 2003
Resolved 16 May 2003
Pollution Prevention/Response › Prevention Equipment
Issued 13 May 2003
Resolved
Post a MARPOL V placard; prior to the carriage of passengers.
Due 13 June 2003
Resolved 16 May 2003
Electrical
Issued 13 May 2003
Resolved
Wire nuts needed on exposed wired on high water alarm in engine room.
Due 13 June 2003
Resolved 16 May 2003
Accommodation/Occupational Safety
Issued 13 May 2003
Resolved
Stow equipment in engine room so there is not stray equipment lying all over machinery. Prior to the carriage of passengers.
Due 13 June 2003
Resolved 16 May 2003
Construction/Loadline
Issued 13 May 2003
Resolved
Cable penetrations through bulkhead are not watertight, penetrations should be enclosed. Prior to the carriage of passengers.
Due 13 June 2003
Resolved 16 May 2003
Accommodation/Occupational Safety › Medical/First Aid
Issued 13 May 2003
Resolved
Provide eye wash for first aid kit; prior to the carriage of passengers.
Due 13 June 2003
Resolved 16 May 2003
Accommodation/Occupational Safety › Medical/First Aid
Issued 13 May 2003
Resolved
Provide various sizes of gauze pads for first aid kit. Prior to the carriage of passengers.
Due 13 June 2003
Resolved 16 May 2003
Operations/Management › Lifesaving
Issued 13 May 2003
Resolved
Conduct a man overboard and fire drill with 2 required deckhands on board. Prior to carriage of passengers.
Due 13 June 2003
Resolved 16 May 2003
Construction/Loadline › Structures
Issued 22 October 2002
Resolved
Permanently install stanchion in passenger accommodations. Tie stanchion into existing structural members. New stanchion is to be of same size and material as existing ones.
Action required: 705 - Other - as specified
Due 30 April 2003
Resolved 13 May 2003
Engineering
Issued 22 October 2002
Resolved
Secure hydraulic lines throughout vessel using approved supports.
Due 30 April 2003
Resolved 13 May 2003
Engineering
Issued 22 October 2002
Resolved
Replace starboard engine shift cable.
Action required: 705 - Other - as specified
Due 30 April 2003
Resolved 16 May 2003
Accommodation/Occupational Safety › Other Accommodation Spaces
Issued 22 October 2002
Resolved
Repair/replace passenger benches on upper deck.
Action required: 705 - Other - as specified
Due 30 April 2003
Resolved 13 May 2003
Electrical
Issued 22 October 2002
Resolved
Repair/Replace wiring throughout vessel to bring in accordance with 46 CFR subchapter T.
Action required: 705 - Other - as specified
Due 30 April 2003
Resolved 13 May 2003
Construction/Loadline
Issued 22 October 2002
Resolved
Repair as original front of pilot house cutting out rotten wood.
Action required: 705 - Other - as specified
Due 30 April 2003
Resolved 13 May 2003
Operations/Management
Issued 22 October 2002
Resolved
Submit repair proposal for waste, waterway, guard rail and planks.
Action required: 705 - Other - as specified
Due 30 April 2003
Resolved 13 May 2003
Engineering
Issued 22 October 2002
Resolved
Starboard main engine, outboard mount. Repair as original.
Action required: 705 - Other - as specified
Due 30 April 2003
Resolved 16 May 2003
Pollution Prevention/Response › Prevention Equipment › Fixed Containment
Issued 22 October 2002
Resolved
clean out oil in engine room bilge prior to hauling vessel out or NLT 4 Nov 02.
Action required: 705 - Other - as specified
Due 4 November 2002
Resolved 13 May 2003
Personnel › Training
Issued 26 August 2002
Resolved
Provide proof of current CPR and current First Aid training for operator of the vessel and at least one deckhand. LEGACY COMPONENT DESC: First Aid/CPR
Action required: 705 - Other - as specified
Due 26 September 2002
Resolved 13 May 2003
Electrical
Issued 23 August 2002
Resolved
Provide metal wire support clips throughout vessel every 24 inches.
Action required: 705 - Other - as specified
Due 30 August 2002
Resolved 30 August 2002
Engineering › Bilge Water Management System
Issued 23 August 2002
Resolved
Repair audible alarm for high water bilge alarm in compartment below passenger accommodation. While carrying passengers for hire deckhand must visually examine the bilges every 30 minutes. Visual inspections must be noted in bridge logbook.
Action required: 705 - Other - as specified
Due 30 August 2002
Resolved 30 August 2002
Operations/Management › Drug and Alcohol Testing
Issued 9 July 2002
Resolved
Provide proof of deckhands enrollment in drug and alcohol program. Vessel permitted to carry only 100 passengers with upper deck secured until documentation of enrollment provided. LEGACY COMPONENT DESC: Employee Coverage
Action required: 705 - Other - as specified
Due 9 August 2002
Resolved 23 August 2002
Operations/Management › Drills/Instruction
Issued 9 July 2002
Resolved
Provide proof of conducting training with crew.
Action required: 705 - Other - as specified
Due 9 August 2002
Resolved 23 August 2002
Lifesaving › Lifejacket/PFD (Type I)
Issued 9 July 2002
Resolved
Replace clasps on 11 lifejackets. LEGACY COMPONENT DESC: Condition
Action required: 705 - Other - as specified
Due 9 August 2002
Resolved 23 August 2002
Documentation › Certificates/Documents
Issued 9 July 2002
Resolved
Post stability letter. LEGACY COMPONENT DESC: Stability Letter
Action required: 705 - Other - as specified
Due 9 August 2002
Resolved 23 August 2002
Documentation › Logs/Records
Issued 9 July 2002
Resolved
Provide training, lifesaving and bridge log books.
Action required: 705 - Other - as specified
Due 9 August 2002
Resolved 23 August 2002
Navigation › Piloting/Steering
Issued 9 July 2002
Resolved
Provide following navigation pubs: coast pilot, light list, tide tables, current tables.
Action required: 701 - Prior to carriage of passengers/cargo
Due 9 July 2002
Resolved 23 August 2002
Lifesaving › Lifebuoys
Issued 9 July 2002
Resolved
Provide corrosion resistant clip on lanyard with waterlight.
Action required: 701 - Prior to carriage of passengers/cargo
Due 9 July 2002
Resolved 23 August 2002
Accommodation/Occupational Safety › Medical/First Aid
Issued 9 July 2002
Resolved
Replace expired medication in first aid kit.
Action required: 705 - Other - as specified
Due 9 August 2002
Resolved 23 August 2002
Lifesaving › Lifejacket/PFD (Type I)
Issued 9 July 2002
Resolved
Provide storage for 152 lifejackets. LEGACY COMPONENT DESC: Storage
Action required: 705 - Other - as specified
Due 9 August 2002
Resolved 23 August 2002
Stability
Issued 9 July 2002
Resolved
Post stability letter.
Action required: 705 - Other - as specified
Due 9 August 2002
Resolved 23 August 2002
Lifesaving
Issued 9 July 2002
Resolved
Replace clips on rescue ladder.
Action required: 701 - Prior to carriage of passengers/cargo
Due 9 July 2002
Resolved 23 August 2002
Engineering › Fuel Oil Service System › Ventilation
Issued 1 May 2002
Resolved
Replace flame screens throughout vessel.
Condition: Improper/Lack of Maintenance
Due 14 May 2002
Resolved 14 May 2002
Pollution Prevention/Response › Prevention Equipment
Issued 1 May 2002
Resolved
Replace sewage vent line foe sewage holding tank. LEGACY COMPONENT DESC: Sewage System Piping
Condition: Improper/Lack of Maintenance
Due 14 May 2002
Resolved 14 May 2002
Engineering › Diesel Engine (propulsion-direct drive)
Issued 1 May 2002
Resolved
Replace stbd MDE engine mounts LEGACY COMPONENT DESC: Engine Mounts
Condition: Improper/Lack of Maintenance
Due 14 May 2002
Resolved 14 May 2002
Communications › Alarms/Indicators › Bilge Alarm
Issued 1 May 2002
Resolved
Prove operation of bilge high level alarms.
Condition: Improper/Lack of Maintenance
Due 14 May 2002
Resolved 14 May 2002
Engineering › Bilge Water Management System › Pump
Issued 1 May 2002
Resolved
Prove operation of bilge pump.
Condition: Improper/Lack of Maintenance
Due 14 May 2002
Resolved 14 May 2002
Engineering › Diesel Engine (auxiliary) › Piping (exhaust)
Issued 1 May 2002
Resolved
Remove plug and make permanent repairs to old generator exhaust piping that penetrates transom.
Condition: Unknown
Due 14 May 2002
Resolved 14 May 2002
Construction/Loadline › Hull
Issued 1 May 2002
Resolved
Repair main deck on transom. LEGACY COMPONENT DESC: Main Deck
Condition: Improper/Lack of Maintenance
Due 14 May 2002
Resolved 14 May 2002
Accommodation/Occupational Safety › Occupational Safety › Hand Grab
Issued 1 May 2002
Resolved
Install missing screws on main deck handrail support brackets.
Condition: Improper/Lack of Maintenance
Due 14 May 2002
Resolved 14 May 2002
Construction/Loadline › Structures › Deck Plating
Issued 1 May 2002
Resolved
Make final weld repairs on aluminum deck around bridge area.
Condition: Design Flaw
Due 14 May 2002
Resolved 14 May 2002
Construction/Loadline › Hull
Issued 1 May 2002
Resolved
Replace rotten guards and wood immediately behind guards. LEGACY COMPONENT DESC: Guard
Condition: Improper/Lack of Maintenance
Due 1 December 2002
Resolved 13 May 2003
Construction/Loadline › Hull
Issued 1 May 2002
Resolved
Replace rotten wood in way of water ways throughout vessel. LEGACY COMPONENT DESC: Water Way
Condition: Improper/Lack of Maintenance
Due 1 December 2002
Resolved 13 May 2003
Construction/Loadline › Hull
Issued 1 May 2002
Resolved
Replace rotten wood in way of waste throughout vessel. LEGACY COMPONENT DESC: Waste
Condition: Improper/Lack of Maintenance
Due 1 December 2002
Resolved 13 May 2003
Lifesaving
Issued 18 May 2001
Resolved
STENCILE LIFEJACKET STOWAGE AREAS.
Condition: Unknown
Due 18 July 2001
Resolved 18 July 2001
Accommodation/Occupational Safety
Issued 18 May 2001
Resolved
MAXIMUM NUMBER OF PASSENGERS ON MAIN DECK IS ONE HUNDRED.
Condition: Unknown
Due 20 July 2001
Resolved 20 July 2001
Documentation
Issued 18 May 2001
Resolved
PROVIDE DETAILED PLANS ON UPPER DECK MODIFICATION.
Condition: Unknown
Due 20 July 2001
Resolved 20 July 2001
Navigation
Issued 18 May 2001
Resolved
PROVIDE THE FOLLOWING NAVIGATION PUBLICATIONS.
Condition: Unknown
Due 20 July 2001
Resolved 20 July 2001
Accommodation/Occupational Safety
Issued 18 May 2001
Resolved
MAKE REPAIRS TO ALL BROKEN WELDS TO MAIN DECK & UPPER DECK RAILING & STANTIONS.
Condition: Unknown
Due 20 July 2001
Resolved 20 July 2001
Lifesaving
Issued 18 May 2001
Resolved
STOW ADULT AND CHILDREN LIFEJACKETS SEPARATELY.
Condition: Unknown
Due 18 July 2001
Resolved 18 July 2001
Lifesaving
Issued 18 May 2001
Resolved
STENCILE MAX CAPICITY ON UPPER DECK.
Condition: Unknown
Due 20 July 2001
Resolved 20 July 2001
Lifesaving
Issued 18 May 2001
Resolved
PROVIDE RING BUOY.
Condition: Unknown
Due 20 July 2001
Resolved 20 July 2001
Construction/Loadline
Issued 18 May 2001
Resolved
VESSEL RESTRICTED FROM CARRIAGE OF PASSENGERS ON UPPER DECK.
Condition: Unknown
Due 20 July 2001
Resolved 20 July 2001
Construction/Loadline
Issued 18 May 2001
Resolved
MAKE VESSEL AVAILABLE TO PULL FASTENERS NLT 31OCT01.
Condition: Unknown
Due 31 October 2001
Resolved 1 May 2002
Accommodation/Occupational Safety
Issued 18 May 2001
Resolved
MODIFY HAND RAILS LEADING TO UPPER DECK.
Condition: Unknown
Due 18 July 2001
Resolved 18 July 2001
Fire Fighting
Issued 18 May 2001
Resolved
PROVIDE OPERATING INSTRUCTION AND SCHEMATIC FOR FIXED F/F SYSTEM.
Condition: Unknown
Due 18 July 2001
Resolved 18 July 2001
Construction/Loadline
Issued 18 May 2001
Resolved
PROVIDE PROPER SUPPORT TO TRANSERSE UNDER DECK FRAMES IN WAY OF UPPER DECK.
Condition: Unknown
Due 20 July 2001
Resolved 20 July 2001
Construction/Loadline
Issued 18 May 2001
Resolved
MAKE REPAIRS TO BROKEN WELDS IN WAY OF UPPER DECK.
Condition: Unknown
Due 20 July 2001
Resolved 20 July 2001
Fire Fighting
Issued 11 May 2000
Resolved
PROVIDE SERVICING FOR FIXED CO2 SYSTEM ON INSTALLATION ANNIVERSARY IN AUG 2000.
Condition: Unknown
Due 11 May 2000
Resolved 11 May 2000
Fire Fighting
Issued 11 May 2000
Resolved
SECURELY MOUNT FIRE EXTINGUISHER BRACKET.
Condition: Unknown
Due 11 May 2000
Resolved 11 May 2000
Lifesaving
Issued 11 May 2000
Resolved
RENEW PADDLES FOR LIFE FLOATS.
Condition: Unknown
Due 17 May 2000
Resolved 17 May 2000
Navigation
Issued 11 May 2000
Resolved
PROVIDE NAV RULES BOOK
Condition: Unknown
Due 17 May 2000
Resolved 17 May 2000
Lifesaving
Issued 11 May 2000
Resolved
RENEW OUTDATED ITEMS IN FIRST AID KIT.
Condition: Unknown
Due 17 May 2000
Resolved 17 May 2000
Lifesaving
Issued 11 May 2000
Resolved
RENEW BATTERY IN WATERLIGHT FOR STBD SIDE LIFE FLOAT.
Condition: Unknown
Due 17 May 2000
Resolved 17 May 2000
Fire Fighting
Issued 11 May 2000
Resolved
PROVIDE NOZZEL FOR FIRE HOSE.
Condition: Unknown
Due 17 May 2000
Resolved 17 May 2000
Lifesaving
Issued 11 May 2000
Resolved
PROVIDE PROPER LENGTH OF LINE FOR LIFE FLOAT PAINTER.
Condition: Unknown
Due 17 May 2000
Resolved 17 May 2000
Construction/Loadline
Issued 11 May 2000
Resolved
STOP LEAKAGE THRU WATER TIGHT BULKHEAD FWD OF ENGINE ROOM.
Condition: Unknown
Due 17 May 2000
Resolved 17 May 2000
Lifesaving
Issued 11 May 2000
Resolved
PROVIDE TAGS FOR PAINTER WEAK LINKS.
Condition: Unknown
Due 11 May 2000
Resolved 11 May 2000
Lifesaving
Issued 11 May 2000
Resolved
DEMONSTRATE SATISFACTORY MAN OVERBOARD DRILL.
Condition: Unknown
Due 17 May 2000
Resolved 17 May 2000
Lifesaving
Issued 11 May 2000
Resolved
RENEW RETRO ON 35 ADULT AND 4 CHILD PFD'S.
Condition: Unknown
Due 11 May 2000
Resolved 11 May 2000
Engineering
Issued 11 May 2000
Resolved
TIGHTEN SHAFT PACKING ON PORT AND STBD SHAFTS.
Condition: Unknown
Due 17 May 2000
Resolved 17 May 2000
Engineering
Issued 11 May 2000
Resolved
RENEW ENGINEMOUNT SPACER BLOCK ON PORT ENGINE.
Condition: Unknown
Due 17 May 2000
Resolved 17 May 2000
Lifesaving
Issued 13 May 1998
Resolved
Renew deteriorated pendants on both twenty-two(22) person life floats.
Condition: Unknown
Due 13 May 1998
Resolved 13 May 1998
Electrical
Issued 13 May 1998
Resolved
Install cover on battery box in engine room.
Condition: Unknown
Due 13 May 1998
Resolved 13 May 1998
Construction/Loadline
Issued 13 May 1998
Resolved
Plug holes through main deck to engine room located alongside emergency fuel oil cut-out valves in main salon.
Condition: Unknown
Due 13 May 1998
Resolved 13 May 1998
Lifesaving
Issued 13 May 1998
Resolved
Provide emergency broadcast placard at operating station VHF radio.
Condition: Unknown
Due 13 May 1998
Resolved 13 May 1998
Lifesaving
Issued 13 May 1998
Resolved
Install retroreflective tape on both side of the three(3) life rings on board. Renew lifeline on 30 inch life ring located portside aft of the pilot house.
Condition: Unknown
Due 13 May 1998
Resolved 13 May 1998
Lifesaving
Issued 13 May 1998
Resolved
Provide signs at stairways to upper deck indicating the maximum number of passengers allowed (50).
Condition: Unknown
Due 13 May 1998
Resolved 13 May 1998
Construction/Loadline
Issued 22 April 1998
Resolved
RENEW DETERIORATED DECK IN WAY OF THE FORWARD PORT SAMSON POST.
Condition: Unknown
Due 22 April 1998
Resolved 22 April 1998
Construction/Loadline
Issued 22 April 1998
Resolved
RENEW DETERIORATED BILGE SUCTION LINE IN FORWARD HOLD.
Condition: Unknown
Due 22 April 1998
Resolved 22 April 1998
Lifesaving
Issued 30 April 1997
Resolved
PROCURE ALL ITEMS NEEDED FOR FIRST AID KIT.
Condition: Unknown
Due 30 April 1997
Resolved 30 April 1997
Electrical
Issued 30 April 1997
Resolved
PROPERLY WIRE BILGE PUMP IN STEERING SPACE.
Condition: Unknown
Due 30 April 1997
Resolved 30 April 1997
Lifesaving
Issued 30 April 1997
Resolved
PRIOR TO CARRYING PASSENGERS, PROCURE FOUR (4) NEW PADDLES FOR LIFEFLOATS.
Condition: Unknown
Due 30 April 1997
Resolved 30 April 1997
Lifesaving
Issued 30 April 1997
Resolved
PROCURE PROPER DISTRESS SIGNAL CONTAINER.
Condition: Unknown
Due 30 April 1997
Resolved 30 April 1997
Lifesaving
Issued 30 April 1997
Resolved
PRIOR TO CARRYING PASSENGERS, PROCURE ADDITIONAL LIFE RING.
Condition: Unknown
Due 30 April 1997
Resolved 30 April 1997
Lifesaving
Issued 30 April 1997
Resolved
VESSEL LIMITED TO DAYLIGHT OPERATION PENDING REPAIRS TO WATER LIGHT.
Condition: Unknown
Due 30 April 1997
Resolved 30 April 1997
Construction/Loadline
Issued 16 May 1995
Resolved
CROP AND RENEW ROTTED WOOD; IN UPPER DECK, ALONG STERN, AROUND LADDER WELLS, AND AREAS AROUND WHEEL HOUSE.
Condition: Unknown
Due 16 May 1995
Resolved 16 May 1995
Documentation
Issued 12 May 1992
Resolved
PROVIDE EVIDENCE OF ENROLLMENT IN THE RANDOM DRUG TESTING PROGRAM FOR ALL _x001C_CREWMEMBERS.
Condition: Unknown
Due 12 May 1992
Resolved 12 May 1992
Lifesaving
Issued 12 May 1992
Resolved
RENEW BOTH 25 MAN LIFEFLOATS AND THEIR EQUIPMENT.
Condition: Unknown
Due 12 May 1992
Resolved 12 May 1992
Construction/Loadline
Issued 12 May 1992
Resolved
INSTALL CHECK VALVES ON ALL BILGE OVERBOARD DISCHARGE LINES.
Condition: Unknown
Due 12 May 1992
Resolved 12 May 1992
Engineering
Issued 30 May 1991
Resolved
PROVIDE PROPER FLAME SCREENS FOR BOTH FUEL TANK VENTS.
Condition: Unknown
Due 30 May 1991
Resolved 30 May 1991
Lifesaving
Issued 30 May 1991
Resolved
REMOVE BUNGIE CORD FROM LIFE FLOATS AND PROPERLY RIG FOR PROPER DEPLOYMENT.TO BE COMPLETED PRIOR TO CARRIAGE OF PASSENGERS.
Condition: Unknown
Due 30 May 1991
Resolved 30 May 1991
Lifesaving
Issued 30 May 1991
Resolved
PROVIDE ADEQUATE RETRO-REFLECTIVE TAPE ON BOTH LIFE FLOATS.
Condition: Unknown
Due 30 May 1991
Resolved 30 May 1991
Lifesaving
Issued 30 May 1991
Resolved
PROVIDE A WATER-TIGHT CONTAINER FOR FLARES.
Condition: Unknown
Due 30 May 1991
Resolved 30 May 1991
Documentation
Issued 30 May 1991
Resolved
OBTAIN AND POST PROPER CERTIFICATE OF DOCUMENTATION.
Condition: Unknown
Due 30 May 1991
Resolved 30 May 1991
Construction/Loadline
Issued 9 July 1990
Resolved
REMOVEROT AND RENEW AS NECESSARY; TOP OF PILOT HOUSE AROUND MAST, INSIDE BULWARK STBD SIDE NEAR BOW, INSIDE BULWARKNEAR 2ND UPPER RAIL VERTICAL STANTION, INSIDE BULWARKPORTSIDE NEAR MENS HEAD AND INSIDE BULWARD PORTSIDE ALONG TRANSOM.
Condition: Unknown
Due 9 July 1990
Resolved 9 July 1990
Construction/Loadline
Issued 9 July 1990
Resolved
RECALK UPPER CORNERS COLLISION BULKHEAD AND 2ND BULKHEAD AFT COLLISION BULKHEAD.
Condition: Unknown
Due 9 July 1990
Resolved 9 July 1990
Accommodation/Occupational Safety
Issued 17 June 1989
Resolved
SECURE ALL RAILS ON UPPER DECK.
Condition: Unknown
Due 17 June 1989
Resolved 17 June 1989
Lifesaving
Issued 17 June 1989
Resolved
STENCIL ALL LIFE JACKET BOXES WITH THE NUMBER OF LIFE JACKETS CONTAINED AND MAKE SURE ALL CHILD-SIZED LIFE JACKETS ARE STORED SEPARATE.
Condition: Unknown
Due 17 June 1989
Resolved 17 June 1989
Accommodation/Occupational Safety
Issued 17 June 1989
Resolved
REPAIR LADDER TO UPPER DECK ON PORT STERN OF VESSEL.
Condition: Unknown
Due 17 June 1989
Resolved 17 June 1989
Lifesaving
Issued 15 May 1989
Resolved
REPLACE YELLOW LINES ON LIFE FLOATS.
Condition: Unknown
Due 15 May 1989
Resolved 15 May 1989
Lifesaving
Issued 15 May 1989
Resolved
PAINT AND RESTENCIL LIFEFLOATS.
Condition: Unknown
Due 15 May 1989
Resolved 15 May 1989
Lifesaving
Issued 15 May 1989
Resolved
REMOVE STRAPES TO ALLOW FLOATS TO FLOAT FREE.
Condition: Unknown
Due 15 May 1989
Resolved 15 May 1989
Accommodation/Occupational Safety
Issued 15 May 1989
Resolved
SECURE RAILS AT THE STAIRS PART AND STARBOARD AND AMIDSHIP STARBOARD ON THETOP DECK.
Condition: Unknown
Due 15 May 1989
Resolved 15 May 1989
Lifesaving
Issued 15 May 1989
Resolved
PROVIDE 4 PROPERLY STENCILED PADDLES FOR LIFE FLOATS.
Condition: Unknown
Due 15 May 1989
Resolved 15 May 1989
Navigation
Issued 15 May 1989
Resolved
PROVIDE EVIDANCE OF A VALID RADIO TELEPHONY CERTIFICATE.
Condition: Unknown
Due 15 May 1989
Resolved 15 May 1989
Lifesaving
Issued 15 May 1989
Resolved
PROPERLY STENCIL ALL LIFE JACKET STORAGE BOXES.
Condition: Unknown
Due 15 May 1989
Resolved 15 May 1989
Engineering
Issued 5 April 1989
Resolved
SECURE EMERGENCY FUEL SHUT OFF VALVE TO A SOLID MEMBER OF THE VESSEL.
Condition: Unknown
Due 5 April 1989
Resolved 5 April 1989
Navigation
Issued 8 August 1988
Resolved
PROVIDE THREE BLACK BALL DAY SHAPES.
Condition: Unknown
Due 8 August 1988
Resolved 8 August 1988
Engineering
Issued 8 August 1988
Resolved
PROPERLY REMOVE OILY WATER FROM BILGES. DO NOT PUMP INTO WATER.
Condition: Unknown
Due 8 August 1988
Resolved 8 August 1988
Documentation
Issued 8 August 1988
Resolved
PROVIDE AND PROPERLY POST POLLUTION PREVENTION PLACARD.
Condition: Unknown
Due 8 August 1988
Resolved 8 August 1988
Accommodation/Occupational Safety
Issued 8 August 1988
Resolved
PROPERLY REPAIR BROKEN RAILING PORT SIDE UPPER DECK.
Condition: Unknown
Due 8 August 1988
Resolved 8 August 1988
Lifesaving
Issued 6 July 1987
Resolved
PROVIDE 2 TYPE I ADULT LIFEJACKETS FOR A TOTAL OF 157. THE VESSEL IS NOT TOCARRY MORE THAN 155 ADULTS TOTAL UNTIL THIS REQUIREMENT IS SATISFIED.
Condition: Unknown
Due 6 July 1987
Resolved 6 July 1987
Lifesaving
Issued 6 July 1987
Resolved
PROVIDE 6 HAND HELD RED DISTRESS FLARES.
Condition: Unknown
Due 6 July 1987
Resolved 6 July 1987
Navigation
Issued 1 July 1986
Resolved
PROVIDE PROOF 80% LIGHT TRANSMITTANCE OF SIDE AND REAR PILOT HOUSE WINDOWS OR REPLACE.
Condition: Unknown
Due 1 July 1986
Resolved 1 July 1986