Records from 2009 to 2026. Most recent: inspection, 7 May 2026.
01 - Certificates & Documentation › 011 - Ships Certificates › Other (certificates)
Issued 7 May 2026
Resolved
Each vessel must meet the applicable requirements in subchapter S of this chapter. Complete all required plan submittal for an updated stability letter with authorization for lifting using the single point crane.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 14 June 2026
Resolved 24 July 2026
01 - Certificates & Documentation › 011 - Ships Certificates › Certificate of Inspection (COI)
Issued 12 February 2026
Resolved
The inspection shall be such as to insure that the vessel, as regards the structure, boilers and other pressure vessels, and their appurtenances, piping, main and auxiliary machinery, electrical installations, lifesaving appliances, fire-detecting and extinguishing equipment, pilot boarding equipment, pollution prevention equipment, and other equipment, is in satisfactory condition and fit for the service for which it is intended. MIs were unable to complete the machinery inspection or conduct drills due to vessel maintenance. Annual inspection must be complete prior to operations. 46 CFR 91.25-10
Action required: 705 - Other - as specified
Resolved 20 February 2026
Resolution: Completed annual inspection
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 12 February 2026
Resolved
Electric installations on vessels must ensure: Protection of passengers, crew, other persons, and the vessel from electrical hazards. Main Deck 208v-120v panel had tape over holding unlabeled breaker open. 46 CFR 111.01-1(a)(2)
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 20 February 2026
Resolution: Replaced blank
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 10 December 2024
Resolved
Each vessel must have a propulsion-control system operable from the pilothouse; and A means at each propulsion engine of readily disabling the propulsion-control system to permit local operation. Local operation of propulsion inoperable.
Action required: 60 - Rectify deficiencies prior to movement
Resolved 23 December 2024
Resolution: Cleared to the satisfacion of the CG.
02 - Structural Conditions › N/A - No Subsystem › Hull - corrosion
Issued 10 December 2024
Resolved
Inspector not limited. Nothing in this part shall be construed as limiting the inspector from making such tests or inspections as he or she deems necessary to be assured of the safety and seaworthiness of the vessel. Excessive rusting of sea chest caused by leaking salt water pump has impacted seaworthiness.
Action required: 60 - Rectify deficiencies prior to movement
Resolved 23 December 2024
Resolution: Cleared to the satisfacion of the CG.
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 10 December 2024
Resolved
Each OSV must carry lifebuoys approved under approval series 160.150 or 160.050. 02 lifebuoys found waterlogged exceeding the 7.5 Lb weight as per 46 CFR 160.050-4 (e)
Action required: 60 - Rectify deficiencies prior to movement
Due 19 December 2024
Resolved 20 December 2024
Resolution: Lifebouys replaced with new
15 - Safety Management Systems (ISM) › N/A - No Subsystem › Company responsibility and authority
Issued 10 December 2024
Resolved
Designate, in writing, by name or title, a Company Security Officer (CSO), a Vessel Security Officer (VSO) for each vessel, and identify how those officers can be contacted at any time. Provide VSO designation and training as required by 33 CFR.
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 19 December 2024
Resolution: VSO as designated by security plan received proper training.
05 - Radio Communications › N/A - No Subsystem › Other (radio communication)
Issued 10 December 2024
Resolved
Each cargo ship equipped with a radiotelephone station in accordance with Part II of Title III of the Communications Act must carry a marine radio operator license. Licensed marine radio operator required for each watch rotation.
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 19 December 2024
Resolution: Oncoming crew had proper certifications, offgoing crew submitted for cert.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Machinery space openings
Issued 10 December 2024
Resolved
Each piping penetration, in each bulkhead required by this subchapter to be watertight, must meet the requirements for materials and pressure design of subchapter F of this chapter, electrical piping in engine room escape trunk open to engine room.
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 19 December 2024
Resolution: Installed approved cable penetration plug.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Doors
Issued 10 December 2024
Resolved
All access openings in bulkheads at ends of enclosed superstructures shall be fitted with doors of steel. The means for securing these doors weather tight shall consist of gaskets and clamping devices. WTD dogs not fully clamping as required.
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 23 December 2024
Resolution: Cleared to the satisfacion of the CG.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 10 December 2024
Resolved
Nonmetallic flexible hose must be in accordance with SAEJ1942. Anchor hydraulic flex hoses past service life
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 23 December 2024
Resolution: Cleared to the satisfacion of the CG.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 10 December 2024
Resolved
Plastic pipe and associated fittings must be approved to approval series 164.141 Requests for the use of plastic pipe for non-vital systems, as defined in § 56.07-5, containing non-flammable or non-combustible liquids in locations that do not require fire endurance testing, as indicated in Appendix 4 of IMO Resolution A.753(18), must be submitted to the Marine Safety Center for review. PVP plastic piping found for unauthorized repairs on piping in A/c System.
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 31 December 2024
Resolution: Cleared to the satisfacion of the CG.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 10 December 2024
Resolved
Each motor controller and motor control center must be marked externally with the following information Voltage. Steering pumps local control panel lights missing.
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 23 December 2024
Resolution: Cleared to the satisfacion of the CG.
07 - Fire Safety › N/A - No Subsystem › Maintenance of Fire protection systems
Issued 10 December 2024
Resolved
The boundary bulkheads and decks separating the accommodations and machinery spaces hall be of class "A" Construction. SFP insulation removed in bow thruster engine space.
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 19 December 2024
Resolution: 3rd party insulation company installed new rockwool SFP insulation in overhead.
05 - Radio Communications › N/A - No Subsystem › MF/HF Radio installation
Issued 10 December 2024
Resolved
Vessels operated more than 100 nautical miles but not more than 200 nautical miles from the nearest land must
be equipped with a NAVTEX vessel currently has radios for 100nm route and must comply with 47 CFR 80.905 (a) (3) or (4) for intended route
Action required: 705 - Other - as specified
Resolved 21 February 2025
Resolution: Reduced route to 100MN pending install of INMARSAT.
01 - Certificates & Documentation › 011 - Ships Certificates › Certificate of Inspection (COI)
Issued 10 December 2024
Resolved
The following matters must be entered in each vessel's logbook Changes in the vessels service is stated by the
COI.
Action required: 10 - Deficiency Rectified
Resolved 11 December 2024
Resolution: Provided vessel capt with instruction and witnessed satisfactory entry.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Auxiliary engine
Issued 10 December 2024
Resolved
Valves for removing water or impurities from fuel oil systems will be permitted in the machinery space provided such valves are fitted with caps or plugs to prevent leakage. Valves fitted to filters had no plugs.
Action required: 10 - Deficiency Rectified
Resolved 11 December 2024
Resolution: Petcocks replaced with plugs
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 29 July 2024
Resolved
Vessel is required to obtain approval of remaining required plans from MSC relating to ROV/PAM installation.
Action required: 10 - Deficiency Rectified
Due 5 October 2024
Resolved 8 October 2024
Resolution: Plans approved by MSC
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 16 November 2023
Resolved
The marine employer must have a sufficient number of alcohol testing devices readily accessible onboard the vessel. Vessel did not have testing strips.
Condition: Invalid
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 20 November 2023
Resolution: Verified strips ordered.
11 - Life Saving Appliances › N/A - No Subsystem › Rescue boats
Issued 16 November 2023
Resolved
Each rescue boat must carry a fire extingusiher. Rescue boat did not have a fire extingusiher.
Condition: Improper Installation
Action required: 17 - Rectify deficiencies prior to departure
Due 20 November 2023
Resolved 20 November 2023
Resolution: Verified rescue boat had a fire extinguisher.
11 - Life Saving Appliances › N/A - No Subsystem › Launching arrangements for rescue boats
Issued 16 November 2023
Resolved
Tests and inspections of the lifesaving equipment shall be carried out during each inspection for renewal of certification. Includes a demonstration of the proper condition and operation of survival craft and rescue boat launching appliances at loads ranging from light load to full load. Marine inspectors must witness davit weight test.
Condition: Invalid
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 21 November 2023
Resolution: Verified satisfactory load test.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 16 November 2023
Resolved
The inspection for certification is made by a marine inspector to determine wheter the vessel is in a safe and seaworthy condition including man and aux machinery and fire hazards. The following items were noted:
-Diesel fuel leaks on main engine F.O. return line right by the port and starboard daytanks.
-Port main engine governor was leaking diesel fuel.
Condition: Damaged By Earlier Event
Action required: 17 - Rectify deficiencies prior to departure
Resolved 21 November 2023
Resolution: Verified no more leaks.
10 - Safety of Navigation › N/A - No Subsystem › Rudder angle indicator
Issued 18 February 2022
Resolved
All rudder angle indicators need to be calibrated and/or repaired. The steering pump motor operation indicators are inoperable.
Action required: 60 - Rectify deficiencies prior to movement
Resolved 16 March 2022
Resolution: See narrative.
07 - Fire Safety › N/A - No Subsystem › Fire detection and alarm system
Issued 18 February 2022
Resolved
The heat detector above the port MDE did not activate upon testing. Provide 3rd party report for fire detection system.
Action required: 60 - Rectify deficiencies prior to movement
Resolved 16 March 2022
Resolution: See narrative.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Doors
Issued 18 February 2022
Resolved
The water-tight doors and hatches failed chalk test and had multiple zerk fittings that were missing/painted over.
Action required: 60 - Rectify deficiencies prior to movement
Resolved 16 March 2022
Resolution: See narrative.
09 - Working and Living Conditions › 092 - Working Conditions › Steam pipes and pressure pipes
Issued 18 February 2022
Resolved
The pressure relief devices on both air receivers were set at 325psi. The MAWP of the air receivers are 200psi. Replace both pressure relief devices on both air receivers (max of 180 psi).
Action required: 60 - Rectify deficiencies prior to movement
Resolved 16 March 2022
Resolution: See narrative.
09 - Working and Living Conditions › 092 - Working Conditions › Warning notices
Issued 18 February 2022
Resolved
The general alarm bells in the E/R are barely audible and the visual indicator is inoperable.
Action required: 60 - Rectify deficiencies prior to movement
Resolved 16 March 2022
Resolution: See narrative.
07 - Fire Safety › N/A - No Subsystem › Oil accumulation in engine room
Issued 18 February 2022
Resolved
The turbo charger mating surface on the port MDE is leaking. The racor filters on the same engine have visible debris and the secondary fuel filters are crimped from over-tightening.
Action required: 60 - Rectify deficiencies prior to movement
Resolved 16 March 2022
Resolution: See narrative.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 18 February 2022
Resolved
The Ameters on the main switch board for both generators are inoperable.
Action required: 60 - Rectify deficiencies prior to movement
Resolved 16 March 2022
Resolution: See narrative.
11 - Life Saving Appliances › N/A - No Subsystem › Operational readiness of lifesaving appliances
Issued 18 February 2022
Resolved
The rescue boat manual slewing handle is broken, there are no records of life saving maintenance (including EPIRB testing), and there are no records of life saving / fire fighting drills.
Action required: 60 - Rectify deficiencies prior to movement
Resolved 16 March 2022
Resolution: See narrative.
10 - Safety of Navigation › N/A - No Subsystem › Lights, shapes, sound-signals
Issued 18 February 2022
Resolved
Both of the vessel's stern lights are inoperable.
Action required: 60 - Rectify deficiencies prior to movement
Resolved 16 March 2022
Resolution: See narrative.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 18 February 2022
Resolved
Both shaft seals are leaking excessively.
Action required: 60 - Rectify deficiencies prior to movement
Resolved 16 March 2022
Resolution: See narrative.
09 - Working and Living Conditions › 092 - Working Conditions › Protection machinery
Issued 18 February 2022
Resolved
There are no caps on the lube/hydraulic oil piping in the E/R.
Action required: 60 - Rectify deficiencies prior to movement
Resolved 16 March 2022
Resolution: See narrative.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 18 February 2022
Resolved
Remove extension cords and power strip from under the operating station console.
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 16 March 2022
Resolution: See narrative.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 18 February 2022
Resolved
Clean all non-metalic expansion joints and replace IAW manfacture's instruction.
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 16 March 2022
Resolution: See narrative.
09 - Working and Living Conditions › 092 - Working Conditions › Protection machinery
Issued 18 February 2022
Resolved
The hot-water tank needs to be piped to the bilge.
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 16 March 2022
Resolution: See narrative.
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 18 February 2022
Resolved
Provide alcohol testing strips.
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 16 March 2022
Resolution: See narrative.
10 - Safety of Navigation › N/A - No Subsystem › Nautical publications
Issued 18 February 2022
Resolved
Provide up-to-date tide/current tables.
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 16 March 2022
Resolution: See narrative.