Records from 2016 to 2026. Most recent: inspection, 21 May 2026.
Documentation record
Registered dimensions (L × B × D)55.0 ft × 17.6 ft × 8.0 ft
Registered tonnagegross 51 / net 41
ITC dimensions (L × B × D)Not recorded
ITC tonnageNot recorded
BuilderGLADDING-HEARN SHIPBUILDING · SOMERSET, MA, UNITED STATES · built 2002
Hull materialAluminum
PropulsionDiesel Reduction
Hull shapeShip
Hull configurationMonohull
Hailing portNORFOLK, VA
Trade endorsementsCoastwise, unrestricted
DocumentationValid · issued 23 July 2026 · expires 31 July 2027
Service, as the file records itPassenger (Inspected)
Hull formpowered (Maury's inference from propulsion, hull shape, material and length, rule hf-1; not a recorded fact)
Tonnage as PSIX records it51 - Simplified, Gross Ton
41 - Simplified, Net Ton
Every line above is a field of the National Vessel Documentation Center's file as served by NOAA Fisheries, dated 10 August 2026, matched to this hull on its Official Number. Registered and ITC measurements are two systems and are never combined. One snapshot is held so far; documentation history begins with the next.
Inspection history · 26
21 May 2026
Annual Inspection
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 8378140
2 March 2026
Drydock Exam · Internal Structural Exam
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 8318840
14 March 2025
Annual Inspection
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 8086157
21 March 2024
COI Inspection
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 7875467
8 February 2024
Internal Structural Exam · Drydock Exam
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 7861637
22 January 2024
In-Service Inspection
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 7852830
27 June 2023
Type not recorded
No type recorded · Station Little Creek · USCG East District (CGD-E) · Activity 7725723
20 June 2023
Annual Inspection · Administrative Inspection · Deficiency Check
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 7715572
17 April 2023
Deficiency Check · Examination of Repairs
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 7670457
6 June 2022
Annual Inspection
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 7470503
11 April 2022
Examination of Repairs · Damage Survey
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 7428697
7 April 2022
Administrative Inspection
Administrative · Sector Virginia · USCG East District (CGD-E) · Activity 7426959
3 March 2022
Examination of Repairs · Internal Structural Exam · Drydock Exam
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 7404925
21 April 2021
Examination of Repairs
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 7183686
9 March 2021
Annual Inspection
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 7146043
5 August 2020
Annual Inspection
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 6983568
3 April 2020
Hull Examination · Deficiency Check · Internal Structural Exam · Plan Review "T" Boat · Administrative Inspection
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 6924436
8 April 2019
Deficiency Check
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 6662485
21 March 2019
COI Inspection
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 6641020
16 August 2018
Administrative Inspection
Administrative · Navigation Center · Activity 6513690
24 May 2018
Annual Inspection
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 6421389
25 April 2018
Hull Examination
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 6397783
25 April 2017
Annual Inspection
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 6124401
1 June 2016
Deficiency Check
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 5894384
17 May 2016
Annual Inspection
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 5857460
4 April 2016
Hull Examination
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 5838735
01 - Certificates & Documentation › 012 - Crew Certificates › Medical certificate
Issued 21 May 2026
Resolved
Master did not have medical certificate on board vessel.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 5 June 2026
Resolved 11 June 2026
Resolution: Master retired and no longer operates vessel
02 - Structural Conditions › N/A - No Subsystem › Electrical installations in general
Issued 21 May 2026
Resolved
Vsl had daisy chained power strips near the research area.
Action required: 10 - Deficiency Rectified
Resolved 22 May 2026
Resolution: Corrected on the spot.
01 - Certificates & Documentation › 012 - Crew Certificates › Certificates for radio personnel
Issued 21 May 2026
Resolved
Master did not have FCC radio operator permit on board.
Action required: 10 - Deficiency Rectified
Resolved 22 May 2026
Resolution: Corrected on the spot.
05 - Radio Communications › N/A - No Subsystem › SART/AIS-SART
Issued 21 May 2026
Resolved
Vessel's AIS had invalid MMSI number.
Action required: 10 - Deficiency Rectified
Resolved 22 May 2026
Resolution: Corrected on the spot.
09 - Working and Living Conditions › 091 - Living Conditions › Medical Equipment
Issued 21 March 2024
Resolved
46 CFR 184.710: A vessel must carry either a first-aid kit that meets the requirements in 46 CFR 199.175(b)(10) or a kit with equivalent contents and instructions. For equivalent kits, the contents must be stowed in a suitable, watertight container that is marked “First-Aid Kit”. A first-aid kit must be easily visible and readily available to the crew. Vessels first aid kit does not meet the ISO 18813:2006(E) paragraph 4.12 requirements found in 46 CFR 199.175(b)(10). Missing/expired items do not meet required ISO Standard items.
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 15 April 2024
Resolution: Recieved photo new First Aid Kit
05 - Radio Communications › N/A - No Subsystem › Functional requirements
Issued 21 March 2024
Resolved
46CFR184.502: A vessel must comply with the applicable requirements for any radio, including the requirements for a station license and installation certificates to be issued by the Federal Communications Commission, as set forth in 47 CFR part 80. Both VHF radios did not contain correct MMSI number.
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 11 April 2024
Resolution: Received photos of radios with correct MMSI numbers.
07 - Fire Safety › N/A - No Subsystem › Other (fire safety)
Issued 21 March 2024
Resolved
46CFR176.810(b)(2): The owner/managing operator must provide satisfactory evidence of the required fire protection servicing to the marine inspector. Corrected on the spot.
Action required: 10 - Deficiency Rectified
Resolved 21 March 2024
Resolution: Corrected on the spot.
11 - Life Saving Appliances › N/A - No Subsystem › Lifejackets incl. provision and disposition
Issued 21 March 2024
Resolved
46 CFR 176.808(b):Each item of lifesaving equipment determined by the marine inspector to not be in serviceable condition must be repaired or replaced. Found 3 adult lifejackets with broken strap clips. Corrected on the spot.
Action required: 10 - Deficiency Rectified
Resolved 21 March 2024
Resolution: Corrected on the Spot
05 - Radio Communications › N/A - No Subsystem › Satellite EPIRB 406MHz/1.6GHz
Issued 21 March 2024
Resolved
46 CFR 185.604(c): The name of the vessel must be marked or painted in clearly legible letters on each Emergency Position Indicating Radiobeacon (EPIRB). Corrected on the spot.
Action required: 10 - Deficiency Rectified
Resolved 21 March 2024
Resolution: Corrected on the spot.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 20 June 2023
Resolved
All machinery and equipment must be installed and maintained in such a manner as to afford adequate protection from causing fire, explosion, machinery failure, and personnel injury. Vessel's high pressure fuel return line on both port and starboard engines were found to be chaffed with the outer layer worn through.
46 CFR 182.100
Action required: 50 - Rectify deficiencies w/in 30 days
Due 20 July 2023
Resolved 11 July 2023
Resolution: Received Caterpillar work report and visually inspected newly installed fuel return hoses on the port and starboard engine with chafing gear installed. Requested Captain to start both engines to visually inspected hoses for leaks and vibration, all sat.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 20 June 2023
Resolved
Electrical equipment on a vessel must be installed and maintained to: Provide services necessary for safety under normal and emergency conditions. The DC powered light in the engine room was found to be inoperable.
46 CFR 183.200(a)
Action required: 50 - Rectify deficiencies w/in 30 days
Due 20 July 2023
Resolved 7 July 2023
Resolution: The light in question was determined to be emergency lighting and was tested satisfactorily by securing power (going dark). Ensured it was marked with an E for emergency lighting.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 17 April 2023
Resolved
A vessel must be provided with a main steering gear that is: (1) Of adequate strength and capable of steering the vessel at all service speeds; (2) Designed to operate at maximum astern speed without being damaged or jammed; and (3) Capable of moving the rudder from 35 degrees on one side to 30 degrees on the other side in not more than 28 seconds with the vessel moving ahead at maximum service speed. Owner operator self-reported steering system failure and leakage of steering fluid in the lazarette.
46 CFR 182.610(a)(3)
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 24 April 2023
Resolution: Steering examined dockside. Operated hard over port and starboard for several cycles. Got underway/maneuvered for 30 minutes.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 6 June 2022
Resolved
Each distribution panel and switchboard must be totally enclosed and of the dead front type. Vessel's main distribution panel had two missing circuit breakers that aren't covered with electrical panel circuit breaker blanks.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 1 July 2022
Resolved 24 June 2022
Resolution: O/O submitted picture of main eletrical panel with OEM breaker filler plates.
10 - Safety of Navigation › N/A - No Subsystem › Life-saving signals
Issued 6 June 2022
Resolved
A vessel on an ocean going route shall have at least 6 red hand flares and 6 orange hand flares. Vessel was missing one red hand flare.
Action required: 10 - Deficiency Rectified
Due 1 July 2022
Resolved 17 June 2022
Resolution: Vessel owner corrected on the spot and added one additional red hand flare to make up 6 red hand flares in total.
07 - Fire Safety › N/A - No Subsystem › Fire fighting equipment and appliances
Issued 9 March 2021
Resolved
Carbon dioxide cylinders forming part of a fixed fire extinguishing system must be retested at least every 12 years. Fixed CO2 bottle in Engine Room has not been hydrostatically tested since 2007.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 9 April 2021
Resolved 25 March 2021
Resolution: Master submitted documentation providing satisfactory CO2 bottle hydrotesting
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 21 March 2019
Resolved
Electrical equipment on a vessel must be installed and maintained to provide services necessary for safety under normal conditions. Found wiring for starboard transmission chaffed and exposed. Replace to the satisfaction of CG Marine Inspector.
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 4 April 2019
Resolved 8 April 2019
Resolution: Wiring had been repaired and reinstalled.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 21 March 2019
Resolved
Materials used in piping systems must meet must meet the requirements and be acceptable to the cognizant OCMI. Found crank case exhaust hose split. Replace to the satisfaction of a Coast Guard Marine Inspector.
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 4 April 2019
Resolved 12 April 2019
Resolution: Starboard engine crankcase exhaust hose replaced.
10 - Safety of Navigation › N/A - No Subsystem › Automatic Identification System (AIS)
Issued 16 August 2018
Resolved
The vessel is currently broadcasting (1) Improper Call Sign, (2) Improper Name
Condition: Invalid
Action required: 705 - Other - as specified
Due 16 September 2018
Resolved 3 November 2022
Resolution: Verified vessel name and call sign are updated and broadcasting correctly.
Lifesaving › Lifejacket/PFD (General) › Lights
Issued 17 May 2016
Resolved
All life jackets lights have expired chemical lights. Vessel is limited to 20 nautical miles from harbor safe refuge.
Action required: 705 - Other - as specified
Due 16 June 2016
Resolved 1 June 2016