MAURY USCG vessel records Sign in
← All vessels

MARTIGNY

MARTIGNY is a 2002 freight ship. The Coast Guard has recorded 40 inspections since 2002, most recently in May 2019, along with 23 deficiencies and 9 operational controls.

Records from 2002 to 2019. Most recent: inspection, 13 May 2019.

Built
2002
Last inspected
13 May 2019
Documentation
Not in the documentation file of 10 September 2026
Controls
None recorded without a removal date

Identity

9229867 View on MarineTraffic leaves Maury; a third-party site, nothing from it is stored here
563435
Flag
SWITZERLAND
—
Maury page id
psix-563435

Inspections, by type

…with no type recorded14
Years with a record 15 calendar years (2002–2019)
The 40 inspections in the strip above, split by the kind of activity the US Coast Guard recorded. Years with a record are calendar years in which a record exists, not years in service. What Maury does not do.

This record may be incomplete: the most recent inspection recorded for this vessel was 7 years ago. Maury shows what the Coast Guard recorded, not whether the vessel has been inspected since, is still in service, or what condition it is in. Coast Guard record current through 13 September 2026, retrieved 18 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard. Records for the Bulk Carrier class in Maury's sources begin in 1981.

Documentation record

Tonnage as PSIX records it20035 - Dead Weight, Ton
25099 - Displacement, Ton
12578 - Convention (Subpart B), Gross Ton
6861 - Convention (Subpart B), Net Ton
This hull's Official Number is not in the NVDC file dated 10 September 2026 as served by NOAA Fisheries, so no documentation record is shown. Absence from that file is a fact about the file, not about the hull.

Radio station licence

No FCC ship-station licence is recorded against this Official Number in the file of 6 September 2026. That is a fact about the licence file, not about the radio.

Inspection history · 40

13 May 2019 Ballast Water Examination · ISPS II Exam · COE-Dockside · PII Safety Exam
Physical examination · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 6678828
18 November 2017 PII Safety Exam · Ballast Water Examination · ISPS II Exam
Physical examination · Sector San Juan · USCG Southeast District (CGD-SE) · Activity 6307872
11 August 2016 Type not recorded
No type recorded · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 5965802
12 December 2015 Type not recorded
No type recorded · Station Alexandria Bay · USCG Great Lakes District (CGD-GL) · Activity 5780556
4 December 2015 PII Safety Exam · ISPS II Exam
Physical examination · Marine Safety Unit Cleveland · USCG Great Lakes District (CGD-GL) · Activity 5769308
2 December 2015 Joint Vessel Security Verification (Massena only) · ISPS II Exam · Enhanced Seaway Inspection (Massena only)
Physical examination · Marine Safety Detachment Massena · USCG Great Lakes District (CGD-GL) · Activity 5774390
23 October 2014 PII Safety Exam · Ballast Water Examination · ISPS II Exam
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 5004659
23 February 2012 COE-Dockside
Physical examination · Resident Inspection Office Ponce · USCG Southeast District (CGD-SE) · Activity 4250038
22 February 2012 Type not recorded
No type recorded · Sector San Juan · USCG Southeast District (CGD-SE) · Activity 4248963
27 September 2011 COE-Offshore · ISPS I Exam · PII Safety Exam · Ballast Water Examination
Physical examination · Marine Safety Unit Savannah · USCG Southeast District (CGD-SE) · Activity 4149620
20 September 2011 Type not recorded
No type recorded · Marine Safety Unit Savannah · USCG Southeast District (CGD-SE) · Activity 4149875
19 January 2011 Deficiency Check · Administrative Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 3929390
18 December 2010 PII Safety Exam · ISPS II Exam · Ballast Water Examination
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 3912919
17 December 2010 Type not recorded
No type recorded · Sector Virginia · USCG East District (CGD-E) · Activity 3912689
10 May 2009 Type not recorded
No type recorded · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 3471370
27 January 2009 Type not recorded
No type recorded · Maritime Safety & Security Team New York (91106) · Activity 3401031
23 January 2009 Administrative Inspection
Administrative · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 3398833
22 January 2009 PII Safety Exam · Ballast Water Examination · ISPS II Exam · Administrative Inspection
Physical examination · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 3398235
25 February 2008 Deficiency Check
Physical examination · Resident Inspection Office St. Croix · USCG Southeast District (CGD-SE) · Activity 3153152
8 January 2008 Deficiency Check
Physical examination · Resident Inspection Office St. Croix · USCG Southeast District (CGD-SE) · Activity 3126772
2 January 2008 PII Safety Exam · ISPS II Exam
Physical examination · Resident Inspection Office St. Croix · USCG Southeast District (CGD-SE) · Activity 3121258
7 August 2006 PII Safety Exam · ISPS II Exam
Physical examination · Marine Safety Unit New Bedford · USCG Northeast District (CGD-NE) · Activity 2738827
7 August 2006 Type not recorded
No type recorded · Sector Southeastern New England · USCG Northeast District (CGD-NE) · Activity 2739122
31 March 2006 ISPS II Exam
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 2618414
23 March 2006 Type not recorded
No type recorded · Sector Southeastern New England · USCG Northeast District (CGD-NE) · Activity 2605573
22 March 2006 Type not recorded
No type recorded · Sector Southeastern New England · USCG Northeast District (CGD-NE) · Activity 2607708
21 March 2006 Type not recorded
No type recorded · Sector Southeastern New England · USCG Northeast District (CGD-NE) · Activity 2611856
18 November 2005 PII Safety Exam · ISPS III Exam · Ballast Water Examination
Physical examination · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 2532416
9 March 2005 Ballast Water Examination · Deficiency Check
Physical examination · MSO PUGET SOUND · USCG Northwest District (CGD-NW) · Activity 2306592
8 March 2005 Type not recorded
No type recorded · GROUP SEATTLE · USCG Northwest District (CGD-NW) · Activity 2306576
14 December 2004 Ballast Water Examination · PII Safety Exam
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 2258257
14 August 2004 ISPS II Exam
Physical examination · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 2163263
7 June 2004 Administrative Inspection
Administrative · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 2091301
3 June 2004 Type not recorded
No type recorded · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 2089170
3 June 2004 Type not recorded
No type recorded · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 2093273
6 October 2003 MARPOL Annex I Examination · MARPOL Annex V Examination · Annual Inspection
Physical examination · MSO TAMPA · USCG Southeast District (CGD-SE) · Activity 1922353
28 July 2003 Security Inspection
Physical examination · GROUP/MSO LONG ISLAND SOUND · USCG Northeast District (CGD-NE) · Activity 1861588
29 May 2002 Deficiency Check · Administrative Inspection
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1622790
21 April 2002 MARPOL Annex I Examination · Annual Inspection
Physical examination · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 1607002
21 April 2002 Security Inspection
Physical examination · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 1610182

Deficiency record · 23

Engineering › Diesel Engine (propulsion-direct drive) › Turbocharger
Issued 18 November 2017 Resolved
The condition of the ship and its equipment shall be maintained to conform with the provisions of the present regulations to ensure that the ship in all respects will remain fit to proceed to sea without danger to the ship or persons on board. The vessel's main engine turbo charger was damaged while underway and the vessel entered the Port of San Juan under reduced propulsion. A class report must be provided prior to departure.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 22 November 2017
Resolution: Received class report.
Construction/Loadline › Structures › Trunk
Issued 18 November 2017 Resolved
All hatchways in Position 1 and 2 shall be fitted with hatch covers of steel or equivalent material. The means for securing and maintaining weather tightness shall be to the satisfaction of the Administration. The arrangements shall ensure that the tightness can be maintained in any sea condition. The hatchway above aft rope storage allowed rain water to enter the space.
Action required: 705 - Other - as specified
Due 2 December 2017
Resolved 22 November 2017
Resolution: Received class report.
Electrical › Electric Generation Source (emergency) › Panelboard
Issued 15 December 2015 Resolved
The emergency generator panel indicates a low insulation condition on the 440v circuit.
Condition: Invalid
Action required: 705 - Other - as specified
Due 29 December 2015
Resolved 27 November 2017
Resolution: Received class report attesting to correction of the deficiency.
Engineering › Steering Gear System › Pump
Issued 23 October 2014 Resolved
0936-Steering Gear-Every ship shall be provided w/ a main steering gear to the satisfaction of the Administration. PSCO observed #2 steering pump had difficulty reaching 35 deg movement of rudder. PSCO heard noise coming from pump assoc. w/air in syst. After several minutes hyd tank became over press and began leaking fluid. Prov Class survey attest to sat oper of system-74 SOLAS (a) II-1/29
Action required: 17 - Rectify deficiencies prior to departure
Due 23 October 2014
Resolved 25 October 2014
Resolution: Received, reviewed and accepted class report from [name withheld] stating the deficiency was rectified. The hydraulic lines were opened, the head tank valves were overhauled, the lines were drained, refilled, cleared of air and positively tested.
Engineering › Compressed Air System (start air) › Valve
Issued 23 October 2014 Resolved
1499-Other-Means shall be provided to prevent overpressure in any part of compressed air systems. Suitable press relief arrangements shall be provided for all systems. PSCO observed severe corrosion buildup on both start air receiver relief valves. Provide class report attesting to proper operation of both relief valves.-74 SOLAS (a) II-1/34
Action required: 705 - Other - as specified
Due 6 November 2014
Resolved 25 October 2014
Resolution: Received, reviewed and accepted class report from BV stating the deficiency was rectified. Ships force cleaned valves. BV surveyor noted handle was broken on one valve. Condition of class was issued and new valve was place on order.
Engineering › Fuel Oil Service System › Piping
Issued 23 October 2014 Resolved
1430-Aux Engines-Connections w/in the fuel supply and spill lines shall be constructed having regard to prevent oil fuel leaks while in service and after maint. PSCO observed f/o leak on f/o return copper tubing line of #2 SSG. Provide documentation attesting to copper tubing being fixed and leak stopped.-74 SOLAS (a) II-2/4.2.2.5.4
Action required: 705 - Other - as specified
Due 6 November 2014
Resolved 25 October 2014
Resolution: Received, reviewed and accepted class report from BV stating the deficiency was rectified. New copper washers were installed.
Electrical › Lighting (service) › Lighting Fixture
Issued 23 October 2014 Resolved
0950-Elec Equip-After any survey of the ship has been completed, no change shall be made to items covered by survey. PSCO observed several spot lights in E/R not working as well as one removed w/wiring hanging. Portable drop lights have been installed in place of perm lighting. Requesting clarification from cert issuing authority attesting to installation of temporary lighting-74 SOLAS (a) I/11
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Due 23 October 2014
Resolved 25 October 2014
Resolution: Received, reviewed and accepted class report from BV stating the deficiency was rectified. New light was installed and bulbs were ordered for remaining lights. Temporary lighting was removed.
Engineering › Steam Boiler (auxiliary/waste heat) › Fuel Oil Burner
Issued 23 October 2014 Resolved
1080-Boiler-After any survey of the ship has been completed, no change shall be made to the items covered by the survey. PSCO observed valve selector handle for boiler fuel source removed. Fuel source relay switches, which operate by way of valve, were being held in place by wire hangers. Provide class report attesting to proper operation of system-74 SOLAS (a) I/11
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Due 23 October 2014
Resolved 25 October 2014
Resolution: Received, reviewed and accepted class report from BV stating the deficiency was rectified. New valve handle and switches were installed and tested satisfactorily.
Fire Fighting › Structural Fire Protection - General › Structural Bulkhead Construction
Issued 18 December 2010 Resolved
The intergrity of the oil purifier room hatch is compromised allowing the spread of fire.
Action required: 705 - Other - as specified
Due 18 January 2011
Resolved 18 January 2011
Resolution: Received class report from Bureau Veritas satisfying requirement.
Pollution Prevention/Response › Prevention Equipment › Oily Water Separator (15 ppm)
Issued 18 December 2010 Resolved
Oily water separator (OWS) is not operating properly. Engine crew needs proper training on the operation of the OWS. To the satisfaction of Class/RO/RSO.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 19 December 2010
Resolution: Received report from Class, defective three way valve and pump, no parts available, no recent calibration records available for 15 ppm. Vessel has adequate holding capacity for one month, conditional IOPP issued, repairs to be completed in one month.
Engineering › Diesel Engine (propulsion-direct drive) › Cylinder
Issued 2 January 2008 Resolved
Noted that the sealing ring for the # 8 cylinder liner on main engine is leaking. Make repairs to #8 cylinder prior to departure from port to the satisfaction of the Coast Guard.
Action required: 705 - Other - as specified
Due 8 February 2008
Resolved 25 February 2008
Resolution: Deficiency cleared.
Pollution Prevention/Response › Prevention Equipment › Bilge Monitor
Issued 2 January 2008 Resolved
Make repairs to SLT 08C water ingress alarm system. the water ingress program control board does not work and the system continuosly alarms so the crew shut the system off. make repairs prior to departure from port to the satisfaction of Class/ RO/ RSO.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 8 January 2008
Resolution: Water Ingress Alarm System is repaired as origional and operationally tested. all Satisfactory. Def. Cleared
Communications › Radio Communications › VHF Radiotelephone
Issued 27 December 2007 Resolved
Provide adequate number of handheld radios. (according to the vessels crew, five radios are required for the implemintation of the security plan. 3 radios are on board)
Action required: 705 - Other - as specified
Due 9 January 2008
Resolved 8 January 2008
Resolution: Two additional handheld radios are now on board and considered satisfactory. Def Cleared.
Deck/Cargo › Holds/Tanks › Ullage
Issued 27 December 2007 Resolved
Make repairs to #3 hold port side bilge valve. Until #3 is corrected, vessel is prohibited from cargo operations and must manually sound and log the bilge levels at least every 4 hours. make repairs to the satisfaction of class/RO/RSO Prior to departure from port. *repairs are not permitted in US waters while the vessel is underway.*
Action required: 17 - Rectify deficiencies prior to departure
Resolved 4 January 2008
Deck/Cargo › Mooring/Anchoring › Anchor
Issued 27 December 2007 Resolved
Make repairs to the anchor locker bilge suction. until corrected provide adequate means to dewater the bilge locker. Make repairs prior to departure to the satisfaction of Class/RO/RSO.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 4 January 2008
Operations/Management › Pollution › Control of Garbage
Issued 18 November 2005 Resolved
Mixed garbage was found throughout the ship, garbage is not segregated in accordance with the vessels garbage management plan, plastic found in paper receptacles and paper found in food waste receptacles. MARPOL Ax V Reg 9
Action required: 705 - Other - as specified
Resolved 21 November 2005
Resolution: Resolved
Operations/Management › Pollution › Control of Garbage
Issued 18 November 2005 Resolved
The vessel garbage management plan is not ship specific. The person in charge of garbage management is not identified, and trash collection methods have not been established. Shipboard garbage management procedures are not in accordance with the ship's garbage manual. The master and crew are not familiar with essential shipboard procedures related to the prevention of pollution. MARPOL Ax V Reg 9
Action required: 705 - Other - as specified
Resolved 21 November 2005
Resolution: Resolved
Operations/Management › Pollution › Control of Garbage
Issued 18 November 2005 Resolved
The vessel's garbage log documents discharges of improper garbage in a regulated special area. Noted (paper, dunnage, glass, packaging, and metal) products discharged in a regulated special area (international waters) - Caribbean Sea. MARPOL Ax V Reg 5
Action required: 705 - Other - as specified
Resolved 21 November 2005
Resolution: resolved
Documentation › Manuals/Policy Documentation › Dedicated Clean Ballast Tanks Operations Manual
Issued 14 December 2004 Resolved
Develop a vessel specific ballast water management plan.
Action required: 15 - Rectify deficiencies by next port
Resolved 9 March 2005
Resolution: Vessel had onboard a draft of its vessel specific Ballast Water Plan and had documentation proving that the draft had been sent to its company for approval.
Documentation › Logs/Records › Ballast Water Reporting Form
Issued 14 December 2004 Resolved
Ensure reporting requirements are met in accordance with 33CFR151.2041.
Action required: 15 - Rectify deficiencies by next port
Resolved 9 March 2005
Resolution: Vessel had onboard documentation that the Ballast Water Reporting form had been sent to the NBIC and the State of Washington.
Operations/Management › Cargo Transfer/Lightering
Issued 21 April 2002 Resolved
Post bunkering procedures IAW 33 CFR 155.720 LEGACY COMPONENT DESC: Conducted IAW Vessel Transfer Procedures
Due 20 May 2002
Resolved 29 May 2002
Resolution: Received a satisfactory faxed copy of bunkering procedures.
Lifesaving › Lifebuoys
Issued 21 April 2002 Resolved
Repair or replace lights from lifebouys IAW SOLAS 74/78 (ammended) III/7.1 LEGACY COMPONENT DESC: Self-igniting Lights
Condition: Placed in Improper Service
Due 20 May 2002
Resolved 29 May 2002
Resolution: Received faxed reciept of self igniting lights for lifebuoys.
Navigation › Piloting/Steering
Issued 21 April 2002 Resolved
Post warning sign on the Maneuvering information fact sheet IAW 33 CFR 164.35 LEGACY COMPONENT DESC: Maneuvering Information Fact Sheet
Due 20 May 2002
Resolved 29 May 2002
Resolution: Received faxed copy of Maneuvering fact sheet.

Ownership record

The Coast Guard's documentation record for this hull -- the Abstract of Title, with its owners and liens as filed -- is not in PSIX. Ask, and Maury buys it from the National Vessel Documentation Center, files it here with its date, and every reader of this page gets it.