← All vessels
NA KIKA FPS
NA KIKA FPS is a 2003 industrial vessel. The Coast Guard has recorded 98 inspections since 2002, most recently in July 2026, along with 81 deficiencies.
Records from 2002 to 2026. Most recent: inspection, 27 July 2026.
- Built
- 2003
- Last inspected
- 27 July 2026
- Documentation
- Not in the documentation file of 10 September 2026
- Deficiencies
- 81 recorded · 0 without a recorded resolution
- Controls
- None recorded without a removal date
Identity
WQMN816
565914
Flag
UNITED STATES
—
Maury page id
psix-565914
Inspections, by type
…with no type recorded12
Years with a record
24 calendar years (2002–2026)
The 98 inspections in the strip above, split by the kind of activity the US
Coast Guard recorded. Years with a record are calendar years in which a record exists, not
years in service. What Maury does not do.
Coast Guard record current through 13 September 2026, retrieved 18 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard. Records for the Offshore class in Maury's sources begin in 1978.
Documentation record
Tonnage as PSIX records itNot recorded
This hull's Official Number is not in the NVDC file dated 10 September 2026 as served by NOAA Fisheries, so no documentation record is shown. Absence from that file is a fact about the file, not about the hull.
Radio station licence
No FCC ship-station licence is recorded against this Official Number in the file of
6 September 2026. That is a fact about the licence file, not about the radio.
A report is not offered for this hull: Its record holds only 2 of the seven kinds of material a report is built from: inspections, deficiencies, operational controls, tow-unit appearances, casualty records, dimensions and documentation. That is a statement about the record, not about the vessel. Reports.
Inspection history · 98
27 July 2026
Administrative Inspection
Administrative · USCG Heartland District (ocs) · USCG Heartland District (CGD-H) · Activity 8447829
20 February 2026
Administrative Inspection
Administrative · USCG Heartland District (ocs) · USCG Heartland District (CGD-H) · Activity 8313316
17 February 2026
Administrative Inspection
Administrative · USCG Heartland District (ocs) · USCG Heartland District (CGD-H) · Activity 8311826
23 December 2025
Administrative Inspection
Administrative · USCG Heartland District (ocs) · USCG Heartland District (CGD-H) · Activity 8286666
23 December 2025
Administrative Inspection · Annual Inspection
Physical examination · USCG Heartland District (ocs) · USCG Heartland District (CGD-H) · Activity 8286731
5 September 2025
Administrative Inspection
Administrative · USCG Heartland District (ocs) · USCG Heartland District (CGD-H) · Activity 8230977
5 February 2025
Administrative Inspection
Administrative · USCG Heartland District (ocs) · USCG Heartland District (CGD-H) · Activity 8074856
15 November 2024
MTSA Verification · Annual Inspection
Physical examination · USCG Heartland District (ocs) · USCG Heartland District (CGD-H) · Activity 8036850
12 March 2024
MTSA Verification · Annual Inspection
Physical examination · USCG Heartland District (ocs) · USCG Heartland District (CGD-H) · Activity 7878558
9 September 2023
Type not recorded
No type recorded · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 7818006
30 May 2023
Annual Inspection · Administrative Inspection · MTSA Verification
Physical examination · USCG Heartland District (ocs) · USCG Heartland District (CGD-H) · Activity 7701351
13 February 2023
Administrative Inspection
Administrative · USCG Heartland District (ocs) · USCG Heartland District (CGD-H) · Activity 7640042
25 January 2023
Type not recorded
No type recorded · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 7638565
15 October 2022
Deficiency Check · Administrative Inspection
Physical examination · USCG Heartland District (ocs) · USCG Heartland District (CGD-H) · Activity 7578009
20 September 2022
Type not recorded
No type recorded · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 7567365
1 July 2022
Administrative Inspection
Administrative · USCG Heartland District (ocs) · USCG Heartland District (CGD-H) · Activity 7503647
23 May 2022
Type not recorded
No type recorded · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 7482649
18 January 2022
COI Inspection · In-Service Inspection
Physical examination · USCG Heartland District (ocs) · USCG Heartland District (CGD-H) · Activity 7379191
12 December 2021
Type not recorded
No type recorded · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 7381664
5 December 2021
Type not recorded
No type recorded · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 7382072
26 May 2021
Type not recorded
No type recorded · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 7221310
5 April 2021
Administrative Inspection
Administrative · USCG Heartland District (ocs) · USCG Heartland District (CGD-H) · Activity 7169043
2 March 2021
Administrative Inspection
Administrative · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 7148800
27 January 2021
Administrative Inspection
Administrative · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 7131723
14 January 2021
Annual Inspection · MTSA Verification
Physical examination · USCG Heartland District (ocs) · USCG Heartland District (CGD-H) · Activity 7125076
1 October 2020
Administrative Inspection
Administrative · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 7069344
16 September 2020
Type not recorded
No type recorded · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 7067665
20 August 2020
Construction Oversight
Physical examination · Marine Safety Unit Lafayette · USCG Heartland District (CGD-H) · Activity 7123400
11 August 2020
Administrative Inspection
Administrative · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 7029887
26 June 2020
Type not recorded
No type recorded · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 6987570
11 March 2020
Type not recorded
No type recorded · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 6942411
9 January 2020
MTSA Verification · Annual Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 6848629
16 December 2019
Security Plan Review - VSP
Administrative · USCG Heartland District (ocs) · USCG Heartland District (CGD-H) · Activity 6993427
7 November 2019
Administrative Inspection
Administrative · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 6859184
18 October 2019
Administrative Inspection
Administrative · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 6837278
7 May 2019
Damage Survey
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 6725688
10 October 2018
Administrative Inspection · Damage Survey
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 6558369
9 October 2018
COI Inspection · MTSA Verification
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 6557780
5 October 2018
Administrative Inspection
Administrative · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 6555729
3 October 2018
Administrative Inspection
Administrative · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 6554018
24 September 2018
Administrative Inspection
Administrative · USCG Heartland District · USCG Heartland District (CGD-H) · Activity 6596077
2 June 2018
Type not recorded
No type recorded · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 6438051
29 April 2018
Construction Oversight
Physical examination · Marine Safety Unit Lafayette · USCG Heartland District (CGD-H) · Activity 6401998
17 April 2018
Construction Oversight
Physical examination · Marine Safety Unit Lafayette · USCG Heartland District (CGD-H) · Activity 6393427
8 March 2018
Construction Oversight · Administrative Inspection
Physical examination · Marine Safety Unit Lafayette · USCG Heartland District (CGD-H) · Activity 6371206
7 March 2018
Construction Oversight
Physical examination · Marine Safety Unit Lafayette · USCG Heartland District (CGD-H) · Activity 6368527
2 November 2017
Administrative Inspection
Administrative · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 6300285
18 October 2017
Internal Structural Exam · COI Inspection · MTSA Verification
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 6290194
14 September 2017
Administrative Inspection
Administrative · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 6270751
29 March 2017
Administrative Inspection
Administrative · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 6114019
2 March 2017
Construction Oversight · Administrative Inspection
Physical examination · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 6097843
17 October 2016
Administrative Inspection · Construction Oversight
Physical examination · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 6024128
17 October 2016
MTSA Verification · Internal Structural Exam · Periodic Inspection
Physical examination · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 6025974
6 September 2016
Administrative Inspection
Administrative · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 5993372
5 August 2016
Examination of Repairs
Physical examination · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 5966208
18 July 2016
Construction Oversight
Physical examination · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 5954683
1 July 2016
Construction Oversight
Physical examination · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 5925947
15 June 2016
Administrative Inspection
Administrative · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 5908265
20 May 2016
Administrative Inspection
Administrative · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 5885284
3 May 2016
Administrative Inspection
Administrative · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 5868111
3 May 2016
Administrative Inspection
Administrative · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 5868127
29 April 2016
Administrative Inspection
Administrative · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 5865860
26 February 2016
Construction Oversight · Administrative Inspection
Physical examination · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 5823713
27 January 2016
Construction Oversight
Physical examination · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 5804501
5 January 2016
Construction Oversight
Physical examination · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 5792314
16 December 2015
Construction Oversight
Physical examination · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 5782931
24 November 2015
Construction Oversight
Physical examination · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 5773108
22 October 2015
Construction Oversight
Physical examination · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 5748856
15 October 2015
Administrative Inspection
Administrative · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 5777026
9 September 2015
Construction Oversight · Administrative Inspection
Physical examination · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 5717722
2 September 2015
In-Service Inspection
Physical examination · Sector Corpus Christi · USCG Heartland District (CGD-H) · Activity 5233104
12 August 2015
Annual Inspection · MTSA Verification
Physical examination · USCG Heartland District · USCG Heartland District (CGD-H) · Activity 5214171
4 August 2014
Administrative Inspection
Administrative · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 4943732
4 August 2014
Examination of Repairs · Welding Related Inspections Qualification Testing
Physical examination · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 4944070
19 June 2014
Construction Oversight
Physical examination · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 4893331
11 January 2012
Annual Inspection · MTSA Verification
Physical examination · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 4230777
2 February 2011
MTSA Verification
Physical examination · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 3938749
29 October 2010
Examination of Repairs
Physical examination · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 4014165
21 October 2010
MTSA Verification · Annual Inspection
Physical examination · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 3924187
16 December 2009
Annual Inspection · MTSA Verification
Physical examination · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 3654128
23 October 2008
COI Inspection
Physical examination · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 3352177
29 July 2008
Administrative Inspection
Administrative · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 3283236
29 April 2008
Administrative Inspection
Administrative · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 3195329
20 November 2007
MTSA Verification · Annual Inspection
Physical examination · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 3101941
12 July 2007
Type not recorded
No type recorded · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 3036145
13 April 2007
In-Service Inspection
Physical examination · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 2907248
26 March 2007
Administrative Inspection
Administrative · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 2895337
28 September 2006
In-Service Inspection
Physical examination · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 2800836
15 September 2006
In-Service Inspection
Physical examination · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 2779312
2 February 2006
Administrative Inspection
Administrative · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 2578160
27 January 2006
Re-Inspection · MTSA Verification
Physical examination · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 2574528
11 October 2005
In-Service Inspection
Physical examination · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 2518782
16 May 2005
Administrative Inspection
Administrative · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 2359268
25 January 2005
In-Service Inspection
Physical examination · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 2359262
30 November 2004
Re-Inspection
Physical examination · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 2251554
25 November 2003
Initial Certification
Physical examination · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1962638
7 March 2003
Welding Related Inspections Qualification Testing · Inclining Experiment · Initial Construction-Excluding Oversight · Deadweight Survey
Physical examination · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 1759679
17 May 2002
Initial Construction-Excluding Oversight
Physical examination · Marine Inspections Unit Singapore · USCG Oceania District (CGD-O) · Activity 1617813
Deficiency record · 81
03 - Water/Weathertight Conditions › N/A - No Subsystem › Ventilators, air pipes, casings
Issued 5 February 2025
Resolved
Each enclosed space must be vented or ventilated.
NA KIKA reported to OCS OCMI that ventilation fans are damaged and needing to be replaced due to fan motors being grounded and J-Box motor not being supported properly. Unit conducted additional investigation of ventilation units installed and determined SW shaft ventilation and the SE oil pump room are both without functioning ventilation systems, as required. MI request that proper repairs be made to bring units back into normal operation. Until final repairs completed, unit will ensure all personnel must receive permission prior to entry, entering personnel shall have properly calibrated portable gas detector to monitor O2 and LEL, any increase in LEL will require immediate evacuation of personnel and re-establishment of ventilation. Unit shall keep MI updated on any changes in mitigating factors and notify MI or OCS OCMI when all repair are completed.
46CFR1018.181(a)
03 - Water/Weathertight Conditions › N/A - No Subsystem › Freeboard marks
Issued 9 January 2020
Resolved
Each unit must have draft marks for each foot of immersion if the unit is column stabilized. No draft marks were present on any columns. Make suitable repairs.
04 - Emergency Systems › N/A - No Subsystem › Public address system
Issued 9 January 2020
Resolved
The P.A. system must be installed with regard to acoustically marginal conditions. The PA system is not audible at LS stations (muster), and other locations. Make suitable repairs.
06 - Cargo Operations Including Equipment › N/A - No Subsystem › Other (cargo)
Issued 9 January 2020
Resolved
Each crane must be designed in accordance with API Spec 2C. Multiple deficiencies identified in 2018 Seatrax report remain outstanding. Make suitable repairs.
07 - Fire Safety › N/A - No Subsystem › Fire detection and alarm system
Issued 7 May 2019
Resolved
ESS-2 panel, titled "Receiving Module West," accounts for majority of all safety function located in the NW column and west side of the facility, such as, fire water (deluge, sprinkler, and monitors) header blowdown, ESD, and ventilation. The water inside the panel activited emergency shutdown procedures.
Lifesaving › Lifeboat › Self-contained Air Support System
Issued 18 October 2017
Resolved
Each lifeboat must be a fire protected lifeboat approved under series 160.135 and have a self contained air system. Multiple lifeboats on the unit have air systems leaking at the regulator. Replace/renew to original approved condition.
Operations/Management › Vessel Safety Management › Emergency Preparedness
Issued 29 March 2017
Resolved
Provide lifeboat familiarization procedures from Nakika's SEMS program that demostrates every person on the facility is required to muster under emergency conditions and is provided with adequate training on how to embark lifeboats to include proper entry.
Accommodation/Occupational Safety › Medical/First Aid › Hospital Space
Issued 2 September 2015
Resolved
Found exterior door to the treatment room to be blocked with misc. gear. Remove the gear and keep the doorway/egress clear at all times.
Electrical › Electrical Distribution System (service) › Circuit Breaker
Issued 2 September 2015
Resolved
Boxes were also found to be blocking electrical panels in the pantry. Clear the space.
Fire Fighting › Fire Hoses › Condition
Issued 2 September 2015
Resolved
Gear boxes were found blocking a fire hose station in the pantry.
Electrical › Lighting (emergency) › Lighting Branch Circuit
Issued 2 September 2015
Resolved
Multiple e-lights were found extinguished. Also noted several standard/normal lights extinguished. Complete lighting survey, indentify extinguished lights & correct the same.
Operations/Management › Drills/Instruction › Fire
Issued 2 September 2015
Resolved
Check of fire control plan to equipment revealed inaccuracy. Verify to installed arrangement, redraw & submit Fire Control plan for review & approval.
Operations/Management › Vessel Safety Management › Documentation Maintenance/Control
Issued 2 September 2015
Resolved
Provide documentation/data proving that the 60st of riser bridge modifications are documented in the marine operations manual.
Fire Fighting › Structural - A Class Divisions › Accommodation Spaces
Issued 2 September 2015
Resolved
Roll down fire shutter for the scullery was found to be blocked with silverware 'bucket'. The container would prevent full self-closure in the event of a fire/thermal release.
Fire Fighting › Fixed Low-Expansion Foam Fire Extinguishing System › Quantity of Foam
Issued 12 August 2015
Resolved
Multiple AFFF samples failed in Oct 2014 and AFFF in tanks have not been reviewed.
Lifesaving › Launching Appliances › Davit
Issued 12 August 2015
Resolved
Davit label plates were not installed on davits. Install davit plates as required.
Lifesaving › Lifeboat › Self-contained Air Support System
Issued 21 October 2010
Resolved
Refill air bottles in lifeboats #1, #3, and #4 to manufacturers specification of 20 mpa (2900 psi).
Lifesaving › Lifeboat Equipment › Anti-seasickness Medicine
Issued 21 October 2010
Resolved
Provide enough seasickness pills, for everyone on board lifebat, for 48 hour period.
Operations/Management › Lifesaving › Op Readiness/Maintenance/Inspection
Issued 21 October 2010
Resolved
Complete quarterly lifeboat launch at first available opportunity.
Fire Fighting › Fire Pumps
Issued 24 June 2003
Resolved
Prove proper operation of main firewater pumps.
Fire Fighting › Fixed Deck Foam System
Issued 24 June 2003
Resolved
Prove proper operation of all foam firefighting systems.
Fire Fighting › Fire Hydrants
Issued 24 June 2003
Resolved
Prove proper operation of helideck foam systems (prior to conducting helicopter fueling).
Documentation › Safety/Response Plans/Programs
Issued 24 June 2003
Resolved
Review, verify accuracy of, & obtain CG approval of area classification plan (hazardous locations, fixtures). LEGACY COMPONENT DESC: General Arrangement Plans
Electrical › Electrical Distribution System (service) › Junction Box
Issued 24 June 2003
Resolved
Pour all explosion-proof fixtures & proof proper operation of all others (e.g. purged/pressed).
Fire Fighting › Automatic Sprinkler System
Issued 24 June 2003
Resolved
Prove proper operation of automatic sprinkler alarms. LEGACY COMPONENT DESC: Testing Switches (Alarm/Sprinklers)
Accommodation/Occupational Safety › Occupational Safety
Issued 24 June 2003
Resolved
Prove proper operation of elevators prior to use.
Engineering › Fuel Oil Storage/Transfer System
Issued 24 June 2003
Resolved
Prpve proper operation & adequacy of helicopter fueling equipment prior to fueling operations.
Engineering › Fuel Oil Storage/Transfer System
Issued 24 June 2003
Resolved
Prove adequacy of diesel day tanks for firewater pumps, cranes, & fast rescue boat. Prove adequacy of helicopter fuel tank. LEGACY COMPONENT DESC: Tank
Documentation › Manuals/Policy Documentation
Issued 24 June 2003
Resolved
Provide approved operating manual & construction portfolio prior to permanent COI.
Engineering › Bilge Water Management System
Issued 24 June 2003
Resolved
Replace missing blank flange for open drain piping in NE valve room. LEGACY COMPONENT DESC: Piping
Accommodation/Occupational Safety › Occupational Safety
Issued 24 June 2003
Resolved
Replace missing grating clasps in east pontoon.
Fire Fighting › Fire Main
Issued 24 June 2003
Resolved
Secure slow leaks in firemain at fire stations FS-CNWO-01, FS-CWPA-02 (inside hull). LEGACY COMPONENT DESC: Condition
Accommodation/Occupational Safety › Occupational Safety
Issued 24 June 2003
Resolved
Secure for sea - ventilation trunks, spare light fixture, & spare flanges stored at level 3, NE column - prior to departure.
Accommodation/Occupational Safety › Occupational Safety
Issued 24 June 2003
Resolved
Secure for sea - boxes & equipment IWO upper level E&I Building, NW column.
Accommodation/Occupational Safety › Occupational Safety
Issued 24 June 2003
Resolved
Secure for sea - fire extinguishers & miscellaneous stores & equipment in welding shop.
Deck/Cargo › Holds/Tanks
Issued 24 June 2003
Resolved
Replace hinge pin for NW column booby hatch. LEGACY COMPONENT DESC: Watertight Door
Deck/Cargo › Holds/Tanks
Issued 24 June 2003
Resolved
Provide means to secure/protect metering valves on hydraulic power operated watertight doors so that they can not be inadvertently adjusted LEGACY COMPONENT DESC: Watertight Door
Deck/Cargo › Holds/Tanks › Weathertight Door
Issued 24 June 2003
Resolved
Prove proper operation of local manual watertight door closure (for all sliding watertight doors) under the required maximum time of 90 seconds. LEGACY COMPONENT DESC: Watertight Door
Engineering › Gas Turbine (auxiliary)
Issued 24 June 2003
Resolved
Prove proper operation, required trips, and reverse-power-relay function for #2 & #3 ship service generators. LEGACY COMPONENT DESC: Overspeed Device
Accommodation/Occupational Safety › Potable Water System
Issued 24 June 2003
Resolved
Prove proper operation of reverse-osmosis potable water maker.
Stability › Watertight Integrity › General
Issued 24 June 2003
Resolved
Submit for review & approval, "as-built" drawings to accurately reflect substantial modifications made - for all power-operated sliding water tight doors.
Electrical › Lighting (service)
Issued 18 June 2003
Resolved
Deck lighting in various areas did not function under normal power - prove operation.
Lifesaving › Embarkation Appliances/Stations
Issued 18 June 2003
Resolved
No lifeboat spot/floodlights are provided to illuminate the water below lifboat davit on north side. Provide lighting and prove operation as required by 46 CFR 112.15-1(g).
Electrical › Lighting (emergency)
Issued 18 June 2003
Resolved
Emergency lights were not marked on field gas compressor skid. Mark e-lights as required by 46 CFR 108.639. LEGACY COMPONENT DESC: Lighting Fixture
Accommodation/Occupational Safety › Occupational Safety
Issued 18 June 2003
Resolved
Scaffolding hardware and scrap wood shall not be used in lieu of proper guardrails. Replace the arrangements with proper guardrails. LEGACY COMPONENT DESC: Deck Rail
Communications › Alarms/Indicators
Issued 18 June 2003
Resolved
Remote indications of ballast tank levels substantially differ from those taken by manual sounding of tanks. Correct problem and prove proper operation of system.
Deck/Cargo › Holds/Tanks
Issued 17 June 2003
Resolved
Provide additional counterbalance & adjust watertight escape scuttle from diesel pump room to ease opening/closure. LEGACY COMPONENT DESC: Scuttle
Engineering › Fuel Oil Storage/Transfer System
Issued 17 June 2003
Resolved
Properly mark helicopter fueling facility "WARNING - HELICOPTER FUELING STATION - KEEP LIGHTS AND FIRE AWAY" with 3 inch lettering iaw 46 CFR 108.653(a).
Fire Fighting › Structural - A Class Divisions › Machinery Spaces
Issued 17 June 2003
Resolved
Provide documentation/evidence to show that emergency generator enclosure provides A-Class structural fire protection as required by 46 CFR 108.139.
Accommodation/Occupational Safety › Occupational Safety
Issued 17 June 2003
Resolved
Provide storm rails on at least one side of passageways inside of permanent quarters, and each accessible (exterior) side of permanent quarters building as required by 46 CFR 108.221. LEGACY COMPONENT DESC: Storm Rail
Communications › Alarms/Indicators
Issued 17 June 2003
Resolved
Properly label all general alarm speakers/signals iaw 46 CFR 113.25-20. LEGACY COMPONENT DESC: General Alarm
Accommodation/Occupational Safety › Sleeping Accommodations
Issued 17 June 2003
Resolved
Provide lockers for permanent & temp quarters as required by 46 CFR 108.203(k) - {must be at least 60 inches high}. LEGACY COMPONENT DESC: Locker
Deck/Cargo › Holds/Tanks
Issued 13 June 2003
Resolved
Make permanent repairs to NE column supply air duct 8231 - currently, temporary repair to ducting is leaking. LEGACY COMPONENT DESC: Ventilation Intake Trunking
Deck/Cargo › Holds/Tanks
Issued 13 June 2003
Resolved
Make permanent repairs to leak at discharge side of 48" supply fan 2991 in NE column. LEGACY COMPONENT DESC: Ventilation Intake Trunking
Accommodation/Occupational Safety › Occupational Safety
Issued 13 June 2003
Resolved
Install guardrail in way of air supply duct (SH 8231) gas detectors, level 3, NE column. LEGACY COMPONENT DESC: Deck Rail
Communications › Alarms/Indicators
Issued 13 June 2003
Resolved
Reposition strobes in SE column pump room so that they are not obstructed & clearly visible. LEGACY COMPONENT DESC: General Alarm
Fire Fighting › Structural Fire Protection - General
Issued 13 June 2003
Resolved
Install L1 grating or other equivalent walkway/deck material on platform landing supporting required helideck foam stations and in aviation fuel station @ helideck.
Fire Fighting › Fixed Deck Foam System
Issued 13 June 2003
Resolved
Cap open deluge fitting & replace missing deluge nozzle at outboard side of helideck. LEGACY COMPONENT DESC: Piping
Communications › Alarms/Indicators
Issued 13 June 2003
Resolved
Sound pressure levels for GA in permanent quarters washrooms measured to only 60 dB(A). Adjust volume for all interior spaces so that sound pressure levels for PA/GA reaches at least 75 dB(A) iaw 46 CFR 113.25-12 & 113.50-15. LEGACY COMPONENT DESC: General Alarm
Communications › Alarms/Indicators
Issued 13 June 2003
Resolved
GA/PA was not audible in reefer space. Provide general emergency alarm signal for this space. LEGACY COMPONENT DESC: General Alarm
Communications › Alarms/Indicators
Issued 13 June 2003
Resolved
General emergency alarm was not audible on top of columns where sound pressure levels ranged from 110-120 dB(A). Provide audible signals for these areas that are at least 15 dB(A) above background noise level, or install flashing lights/rotating beacons iaw 46 CFR 113.25-10. LEGACY COMPONENT DESC: General Alarm
Communications › Alarms/Indicators
Issued 13 June 2003
Resolved
Prove audible GA/PA signal for exterior spaces of lower deck (IWO columns) that produce sound pressure levels at least 15 dB(A) above maximum background noise levels or provide lights/rotating beacons for these areas iaw 46 CFR 113.25-10. LEGACY COMPONENT DESC: General Alarm
Electrical › Lighting (service)
Issued 13 June 2003
Resolved
Replace all damaged light covers/guards throughout platform.
Fire Fighting › Nozzles
Issued 9 June 2003
Resolved
Provide CG approval documentation for all firehose nozzles to be used on FOI. LEGACY COMPONENT DESC: Type
Pollution Prevention/Response › Prevention Equipment
Issued 9 June 2003
Resolved
Provide fixed containment under all diesel fueling stations. LEGACY COMPONENT DESC: Fixed Containment
Deck/Cargo › Holds/Tanks
Issued 9 June 2003
Resolved
Prove proper operation of all watertight doors under ALL modes of operation to the satisfaction of attending CG Marine Inspector. ***Requirement remains open due to local manual closure times exceeding 90 seconds.*** LEGACY COMPONENT DESC: Watertight Door
Fire Fighting › Fire Hydrants
Issued 3 June 2003
Resolved
Provide addt'l hydrants for the following: Active columns-at least one(1) addt'l hydrant for upper level instrument rooms; Passive columns; enough hydrants to cover all accessible areas (all levels, both columns). VRU compressor skid; enough hydrants to cover all levels & accessible areas. LEGACY COMPONENT DESC: Number
Accommodation/Occupational Safety › Other Accommodation Spaces › Open Deck Space
Issued 27 May 2003
Resolved
Replace all damaged FRP gratings for all locations prior to departure
Fire Fighting › Fire Hydrants
Issued 27 May 2003
Resolved
Provide addt'l hydrants as indicated by topsides dwgs (in case file): Lower deck-at least four (4) addt'l hydrants; Intermediate deck-at least one (1) addt'l hydrant; Upper deck-at least one (1) addt'l hydrant. Provide proposal for addt'l on field gas compressor & glycol reconcentration skids. LEGACY COMPONENT DESC: Number
Communications › Alarms/Indicators
Issued 20 May 2003
Resolved
Provide documentation or other evidence that bilge alarms are suitable for Class 1, Div 1, Group D locations. LEGACY COMPONENT DESC: Bilge Alarm
Documentation › Safety/Response Plans/Programs
Issued 20 May 2003
Resolved
Provide copy of approved general arrangement plan for FOI (including temp quarters). LEGACY COMPONENT DESC: General Arrangement Plans
Fire Fighting › Fire Hoses
Issued 15 May 2003
Resolved
Provide fire stations equipped with lined commercial fire hoses meeting UL-19 or fed spec ZZ-H-451f, & all other equipment req'd by 46 CFR 108.425 for all interior areas incl. columns, pump rooms & pontoons. Hose reels shall not be used as a substitute for req'd equipment in these areas.
Fire Fighting › Fire Hydrants
Issued 6 May 2003
Resolved
Demonstrate that the fire main system has enough hydrants so that each accessible space may be sprayed with at least two spray patterns of water - at least one spray pattern must be from one (50') length of fire hose IAW 46 CFR 108.423. Apparently, there aren't enough hydrants to meet this req. LEGACY COMPONENT DESC: Number
Accommodation/Occupational Safety › Occupational Safety
Issued 30 April 2003
Resolved
Provide non-removable guardrails for all exposed deck peripheries that meet the requirements of 46 CFR 108.217 & 219(b) to include at least three courses not more than 38 cm apart with the lowest course not more than 23 cm above the deck. LEGACY COMPONENT DESC: Deck Rail
Fire Fighting › Fixed Deck Foam System
Issued 30 April 2003
Resolved
Provide additional bracing/support for deck foam monitors and prove operation of monitors (that they are not obstructed) to the satisfaction of attending Coast Guard Marine Inspector. LEGACY COMPONENT DESC: Monitors
Electrical › Electrical Distribution System (service)
Issued 24 April 2003
Resolved
Provide documentation or other evidence showing compliance/approval of 4160 (& all other) cable drops & installation in MCC Space. Cable drops are unsupported, and secured via plastic ties, twine, etc.. LEGACY COMPONENT DESC: Cable
Communications › Internal Communications System
Issued 24 April 2003
Resolved
Ensure that communications cable is installed physically separate (& in an approved arrangement/tray) through entire run iaw 46 CFR 111.60-2.
Construction/Loadline › Hull › Weld
Issued 20 January 2003
Resolved
"The hull welding is complete. Air testing, which is certified by Shell at HHI, is considered witnessed and approved by USCG (Verify at departure)."
Issued by MIDET Singapore, became CG835 upon departure from Corpus Christi.
Fire Fighting › Fire Main
Issued 20 December 2002
Resolved
"Some fire main was hydro tested. No system operational test was conducted."
Issued by MIDET Singapore, became CG835 upon departure from Corpus Christi. LEGACY COMPONENT DESC: Condition
Deck/Cargo › Ballast
Issued 20 December 2002
Resolved
"Ballast system was completely hydro tested in Korea. No system operational testing conducted (Verify at departure)."
Issued by MIDET Singapore, became CG835 upon departure from Corpus Christi.
Electrical › Electric Generation Source (emergency)
Issued 20 December 2002
Resolved
"Emergency Generator fuel oil shut down valve is missing."
Issued by MIDET Singapore, became CG835 upon departure from Corpus Christi.
Ownership record
The Coast Guard's documentation record for this hull -- the Abstract of Title,
with its owners and liens as filed -- is not in PSIX. Ask, and Maury buys it from the National
Vessel Documentation Center, files it here with its date, and every reader of this page gets it.