Records from 2009 to 2026. Most recent: inspection, 3 July 2026.
Everything above is free. The detail below — the inspection history, the deficiency record, the tow units, the casualty record and the documentation record — is Professional, $39 a month. Sign in.
Documentation record
Registered dimensions (L × B × D)76.4 ft × 19.3 ft × 10.0 ft
Registered tonnagegross 70 / net 47
ITC dimensions (L × B × D)Not recorded
ITC tonnageNot recorded
BuilderEDWARD A GOODICK · GLOUCESTER, MA, UNITED STATES · built 1930
Hull materialWood
PropulsionAuxiliary Sail
Hull shapeUNSPECIFIED
Hull configurationUNSPECIFIED
Hailing portROCKLAND, ME
Trade endorsementsCoastwise, unrestricted, Registry
DocumentationValid · issued 16 January 2026 · expires 31 January 2027
Service, as the file records itPassenger (Inspected)
Hull formpowered (Maury's inference from propulsion, hull shape, material and length, rule hf-1; not a recorded fact)
Tonnage as PSIX records it70 - Regulatory (Subpart C or D), Gross Ton
47 - Regulatory (Subpart C or D), Net Ton
Every line above is a field of the National Vessel Documentation Center's file as served by NOAA Fisheries, dated 10 August 2026, matched to this hull on its Official Number. Registered and ITC measurements are two systems and are never combined. One snapshot is held so far; documentation history begins with the next.
Professional
Detail on this page
32 inspections, each with its date, unit and type; 21 deficiencies with the resolution recorded against each; 1 vessel inspected with it, by name and date; 6 casualty investigations, with date and classification; the documentation record: dimensions, tonnage, builder, hailing port, endorsements, dates. The counts in the summary above are the same
counts, and they are free.
$39 a month or $299 a year, every vessel page, cancel any time.
Founding rate $19.99 a month for life, for the first 200 subscribers.
Plans
Sign in
Maury does not score, rate or grade vessels, at any price.
Inspection history · 32
3 July 2026
In-Service Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 8426932
11 May 2026
Administrative Inspection · Annual Inspection
Physical examination · Marine Safety Unit Belfast · USCG Northeast District (CGD-NE) · Activity 8324951
7 April 2026
Internal Structural Exam · Hull Examination
Physical examination · Marine Safety Unit Belfast · USCG Northeast District (CGD-NE) · Activity 8344509
31 March 2025
COI Inspection · Internal Structural Exam · Hull Examination
Physical examination · Marine Safety Unit Belfast · USCG Northeast District (CGD-NE) · Activity 8102352
22 October 2024
Examination of Repairs
Physical examination · Marine Safety Unit Belfast · USCG Northeast District (CGD-NE) · Activity 8042634
1 May 2024
COI Inspection · Hull Examination
Physical examination · Marine Safety Unit Belfast · USCG Northeast District (CGD-NE) · Activity 7904888
13 November 2023
Examination of Repairs · In-Service Inspection
Physical examination · Marine Safety Unit Belfast · USCG Northeast District (CGD-NE) · Activity 7850551
7 October 2023
Type not recorded
No type recorded · Marine Safety Unit Belfast · USCG Northeast District (CGD-NE) · Activity 7807260
3 May 2023
COI Inspection · Deficiency Check
Physical examination · Marine Safety Unit Belfast · USCG Northeast District (CGD-NE) · Activity 7680333
17 April 2023
Internal Structural Exam · Hull Examination
Physical examination · Marine Safety Unit Belfast · USCG Northeast District (CGD-NE) · Activity 7654967
21 March 2023
Administrative Inspection
Administrative · Marine Safety Unit Belfast · USCG Northeast District (CGD-NE) · Activity 7679620
2 February 2023
Examination of Repairs
Physical examination · Marine Safety Unit Belfast · USCG Northeast District (CGD-NE) · Activity 7631086
5 January 2023
Construction Oversight · Administrative Inspection · Plan Review "T" Boat
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 7616981
9 July 2022
Deficiency Check · Examination of Repairs
Physical examination · Marine Safety Unit Belfast · USCG Northeast District (CGD-NE) · Activity 7510060
8 July 2022
Type not recorded
No type recorded · Sector Northern New England · USCG Northeast District (CGD-NE) · Activity 7505955
25 April 2022
DAPI Audit · Hull Examination · MTSA Verification · Internal Structural Exam · COI Inspection
Physical examination · Marine Safety Unit Belfast · USCG Northeast District (CGD-NE) · Activity 7400724
20 April 2022
Administrative Inspection
Administrative · Marine Safety Unit Belfast · USCG Northeast District (CGD-NE) · Activity 7466150
30 April 2021
DAPI Audit · MTSA/ISPS Verification · Hull Examination · COI Inspection
Physical examination · Marine Safety Unit Belfast · USCG Northeast District (CGD-NE) · Activity 7144456
26 August 2020
Administrative Inspection
Administrative · Marine Safety Unit Belfast · USCG Northeast District (CGD-NE) · Activity 7042994
23 June 2020
Exemption
Administrative · Commandant (CG-CVC) · Activity 7029867
17 March 2020
Hull Examination · COI Inspection
Physical examination · Marine Safety Unit Belfast · USCG Northeast District (CGD-NE) · Activity 6928064
27 February 2020
Administrative Inspection
Administrative · Marine Safety Unit Belfast · USCG Northeast District (CGD-NE) · Activity 6916820
30 September 2019
In-Service Inspection
Physical examination · Marine Safety Unit Belfast · USCG Northeast District (CGD-NE) · Activity 6821561
20 March 2019
MTSA/ISPS Verification · Deficiency Check · Hull Examination · DAPI Audit · COI Inspection · ISM SMC Audit
Physical examination · Marine Safety Unit Belfast · USCG Northeast District (CGD-NE) · Activity 6646073
26 October 2018
Plan Review "T" Boat · Examination of Repairs · Administrative Inspection
Physical examination · Marine Safety Unit Belfast · USCG Northeast District (CGD-NE) · Activity 6575892
30 March 2018
Deficiency Check
Physical examination · Marine Safety Unit Belfast · USCG Northeast District (CGD-NE) · Activity 6382000
1 March 2018
COI Inspection · MTSA/ISPS Verification · DAPI Audit · ISM SMC Audit · Internal Structural Exam · Hull Examination · Deficiency Check
Physical examination · Marine Safety Unit Belfast · USCG Northeast District (CGD-NE) · Activity 6364074
17 June 2017
In-Service Inspection
Physical examination · Sector Boston · USCG Northeast District (CGD-NE) · Activity 6180186
3 April 2017
Examination of Repairs · Deficiency Check · COI Inspection · MTSA/ISPS Verification · Hull Examination · Internal Structural Exam · DAPI Audit
Physical examination · Marine Safety Unit Belfast · USCG Northeast District (CGD-NE) · Activity 6116797
2 August 2016
Type not recorded
No type recorded · Marine Safety Unit Belfast · USCG Northeast District (CGD-NE) · Activity 5962240
29 January 2016
Examination of Repairs · Hull Examination
Physical examination · Marine Safety Unit Belfast · USCG Northeast District (CGD-NE) · Activity 5806209
29 January 2016
Deficiency Check · COI Inspection · MTSA/ISPS Verification
Physical examination · Marine Safety Unit Belfast · USCG Northeast District (CGD-NE) · Activity 5806215
03 - Water/Weathertight Conditions › N/A - No Subsystem › Doors
Issued 24 May 2023
Resolved
Prove operation of WTD status indicator light.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 7 June 2023
Resolved 20 June 2023
Resolution: Test sat.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Railing, gangway, walkway and means for safe passage
Issued 9 July 2022
Resolved
Repair / replace handrails damaged in allision.
Action required: 701 - Prior to carriage of passengers/cargo
Due 9 July 2022
Resolved 10 July 2022
Resolution: Repairs made and installation of hand rails complete.
07 - Fire Safety › N/A - No Subsystem › Fixed fire extinguishing installation
Issued 26 May 2021
Resolved
Prove that powered ventilation shuts down when fixed firefighting system in the engine room is activated.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 26 June 2021
Resolved 1 June 2021
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 21 October 2019
Resolved
Provide an MSC approval letter for the DVTP, FMEA as required by CVC policy letter 17-07, dated 19OCT17.
Condition: Improper Installation
Action required: 17 - Rectify deficiencies prior to departure
Due 1 May 2020
Resolved 15 June 2020
07 - Fire Safety › N/A - No Subsystem › Fixed fire extinguishing installation
Issued 28 May 2019
Resolved
Provide labeling of remote pull handle and instructions for the fixed Fireboy system.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 28 June 2019
Resolved 29 May 2019
Resolution: Corrected
07 - Fire Safety › N/A - No Subsystem › Fire pumps and its pipes
Issued 28 May 2019
Resolved
Provide a pressure gauge on the discharge side of the pump.
Condition: Improper Installation
Action required: 50 - Rectify deficiencies w/in 30 days
Due 28 June 2019
Resolved 29 May 2019
Resolution: Corrected
08 - Alarms › N/A - No Subsystem › Machinery controls alarm
Issued 28 May 2019
Resolved
Provide testing of the new engine's alarms for low oil pressue and high jacket water temperature.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 29 May 2019
Resolution: Completed
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 28 May 2019
Resolved
Provide testing of new engine's DVTP as submitted.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 28 June 2019
Resolved 29 May 2019
Resolution: Corrected
Communications › Alarms/Indicators › Bilge Alarm
Issued 22 May 2018
Resolved
Repair the midship bilge high water alarm indicator
Action required: 50 - Rectify deficiencies w/in 30 days
Due 22 June 2018
Resolved 4 June 2018
Resolution: Corrected
Sail Rigging › Sails › Correct Sail Area of Record
Issued 22 May 2018
Resolved
Provide the approved sail plan onboard vsl.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 22 June 2018
Resolved 4 June 2018
Resolution: Onboard vsl.
Sail Rigging › Running Rigging › Topping Lifts/Attachments
Issued 22 May 2018
Resolved
Provide a rigging & maintenance inspection per NVIC 2-16.
Action required: 705 - Other - as specified
Due 22 August 2018
Resolved 4 June 2018
Resolution: Done
Operations/Management › Vessel Safety Management › Documentation Maintenance/Control
Issued 22 May 2018
Resolved
Provide a SMS approval letter.
Action required: 702 - Prior to embarking on international voyage
Resolved 4 June 2018
Resolution: SMS approved based on MVI#10-90 from USCG HQ & endrosement on COI.
Engineering › Fuel Oil Storage/Transfer System › Vent Pipe
Issued 24 May 2017
Resolved
Renew the flame screen on fuel vent pipe.
Action required: 705 - Other - as specified
Due 24 June 2017
Resolved 30 May 2017
Resolution: corrected
Lifesaving › Lifebuoys › Serviceable
Issued 24 May 2017
Resolved
Clean the soot off of the ring buoys and renew the solas reflective tape as needed.
Action required: 705 - Other - as specified
Due 24 June 2017
Resolved 30 May 2017
Resolution: corrected
Communications › Visual Communication › Signalling Lamp
Issued 24 May 2017
Resolved
Provide a solas approved daylight signal lamp prior to international voyage.
Action required: 705 - Other - as specified
Resolved 30 March 2018
Resolution: Alternative arrangement was accepted as meeting the SOLAS requirement.
Lifesaving › Rescue Boat Equipment › Radar Reflector
Issued 24 May 2017
Resolved
Provide a radar reflector prior to an international voyage.
Action required: 705 - Other - as specified
Resolved 30 May 2017
Resolution: Radar reflector provided.
Communications › Alarms/Indicators › Fire Alarm
Issued 24 May 2017
Resolved
Repair or replace the Fireboy discharge alarm annunicator on the helm.
Action required: 705 - Other - as specified
Due 10 July 2017
Resolved 10 July 2017
Resolution: Cleared def; new fireboy annuciator was installed.
Fire Fighting › Fixed Gas Fire Extinguishing System › Quantity of Gas
Issued 3 April 2017
Resolved
Service Fireboy for the engine room fixed fire extinquishing system.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 25 May 2017
Resolution: New Fireboy bottle.
Construction/Loadline › Hull › Side Shell
Issued 3 April 2017
Resolved
Replace a wooden plug, port side, amidships that was loose.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 6 April 2017
Resolution: Completed.
Communications › Alarms/Indicators › Fire Alarm
Issued 24 May 2016
Resolved
Replace audible alarm on the pre-engineered fixed fire-firefighting discharge module.
Action required: 705 - Other - as specified
Due 1 June 2016
Resolved 26 May 2016
Resolution: Alarm cleaned and audible, test sat.
Communications › Radio Communications › EPIRB
Issued 24 May 2016
Resolved
Replace exipred battery on EPIRB. Vessel is restricted to three miles from shore until EPIRB is operable.
Action required: 705 - Other - as specified
Due 24 June 2016
Resolved 26 May 2016
Resolution: New battery installed in EPIRB, test sat.