Records from 2005 to 2026. Most recent: inspection, 13 January 2026.
Documentation record
Registered dimensions (L × B × D)74.0 ft × 20.2 ft × 9.5 ft
Registered tonnagegross 95 / net 76
ITC dimensions (L × B × D)Not recorded
ITC tonnageNot recorded
Builderbuilder not recorded · SYRACUSE, NY, UNITED STATES · built 1934
Hull materialSteel
PropulsionDiesel Reduction
Hull shapeShip
Hull configurationMonohull
Hailing portALBANY, NY
Trade endorsementsCoastwise, unrestricted
DocumentationValid · issued 5 February 2026 · expires 28 February 2027
Service, as the file records itTowing Vessel
Hull formpowered (Maury's inference from propulsion, hull shape, material and length, rule hf-1; not a recorded fact)
Tonnage as PSIX records it95 - Simplified, Gross Ton
76 - Simplified, Net Ton
Every line above is a field of the National Vessel Documentation Center's file as served by NOAA Fisheries, dated 10 September 2026, matched to this hull on its Official Number. Registered and ITC measurements are two systems and are never combined. One snapshot is held so far; documentation history begins with the next.
Inspection history · 10
13 January 2026
Vessel Attendance · Administrative Inspection
Physical examination · Marine Safety Unit Thousand Islands · USCG Great Lakes District (CGD-GL) · Activity 8296398
14 August 2025
Administrative Inspection
Administrative · Sector Eastern Great Lakes · USCG Great Lakes District (CGD-GL) · Activity 8209916
14 December 2023
Damage Survey · Annual Inspection · Administrative Inspection
Physical examination · Sector Eastern Great Lakes · USCG Great Lakes District (CGD-GL) · Activity 7840189
28 February 2023
In-Service Inspection · Damage Survey
Physical examination · Sector Eastern Great Lakes · USCG Great Lakes District (CGD-GL) · Activity 7643431
8 February 2023
Deficiency Check
Physical examination · Sector Eastern Great Lakes · USCG Great Lakes District (CGD-GL) · Activity 7633958
4 October 2022
COI Inspection · Administrative Inspection
Physical examination · Sector Eastern Great Lakes · USCG Great Lakes District (CGD-GL) · Activity 7562664
23 June 2022
Administrative Inspection
Administrative · Sector Eastern Great Lakes · USCG Great Lakes District (CGD-GL) · Activity 7484827
13 August 2021
Administrative Inspection
Administrative · Sector Eastern Great Lakes · USCG Great Lakes District (CGD-GL) · Activity 7285710
23 June 2015
Type not recorded
No type recorded · Sector Eastern Great Lakes · USCG Great Lakes District (CGD-GL) · Activity 5163234
13 June 2005
Type not recorded
No type recorded · MSO BUFFALO · USCG Great Lakes District (CGD-GL) · Activity 2389235
02 - Structural Conditions › N/A - No Subsystem › Hull damage impairing seaworthiness
Issued 14 December 2023
Resolved
Wasted and holed sections of port side hull required repaired. Including 12" x 12" inset.
Action required: 701 - Prior to carriage of passengers/cargo
Due 8 May 2026
Resolved 6 May 2026
Resolution: Inset repaired using in kind metal.
04 - Emergency Systems › N/A - No Subsystem › Fire drills
Issued 14 December 2023
No resolution recorded
Drills and underway operational inspections were not completed. Complete remaining annual inspection items.
Action required: 701 - Prior to carriage of passengers/cargo
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Bilge pumping arrangements
Issued 4 October 2022
Resolved
Bilge Pump did not have installed check/foot valve to prevent back flooding, as the upstream valve was maintained open to maintain fire pump readiness on the same sea chest. Add a check valve to ensure proper operation.
Condition: Improper Installation
Action required: 50 - Rectify deficiencies w/in 30 days
Due 4 November 2022
Resolved 14 December 2023
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 4 October 2022
No resolution recorded
Electrical lines on the stern deck to a capstan were exposed and present an electrical hazard. Remove or terminate wires to ensure safety of the vessel and crew.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 4 November 2022 — due date passed with no resolution recorded
10 - Safety of Navigation › N/A - No Subsystem › Lights, shapes, sound-signals
Issued 4 October 2022
No resolution recorded
Each towing vessel must be equipped with navigation lights, shapes, and sound signals in accordance with the International Regulations for Prevention of Collisions at Sea (COLREGS) or 33 CFR part 84 as appropriate to its area of operation. Ensure light configurations meet the requirements for Intensity, Vertical position, and Horizontal sectors
Action required: 50 - Rectify deficiencies w/in 30 days
Due 4 November 2022 — due date passed with no resolution recorded
11 - Life Saving Appliances › N/A - No Subsystem › Inflatable liferafts
Issued 4 October 2022
Resolved
Each towing vessel must carry the survival craft specified in Table 141.305 of this section, as appropriate for the towing vessel, in an aggregate capacity to accommodate the total number of individuals on-board. Ensure vessel is supplied with a life raft of the approved type and ensure capacity meets regulations.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 4 November 2022
Resolved 8 February 2023
Resolution: Vessel Rep supplied the vessel with an addequate sized life raft.
11 - Life Saving Appliances › N/A - No Subsystem › Lifejackets incl. provision and disposition
Issued 4 October 2022
Resolved
Vessel was not equipped with an adequate amount of approved type life jackets to meet the requirements of the regulation. Ensure the vessel is equipped with enough approved PFD's to compliment the maximum persons on board stated on the COI.
Condition: Improper Installation
Action required: 10 - Deficiency Rectified
Due 4 November 2022
Resolved 8 February 2023
Resolution: Vessel rep supplied the vessel with an adequate amount of approved PFD's.
01 - Certificates & Documentation › 011 - Ships Certificates › Other (certificates)
Issued 13 August 2021
Resolved
All owners and operators of an existing towing vessel must have a valid COI prior to the specified phase-in period. This vessel is one of the vessels that has not obtained a valid COI. The vessel shall be made available for a Coast Guard COI inspection within 90 days. If an inspection is not completed prior to this date, the action for this deficiency shall be changed to a 60 (Rectify deficiencies prior to movement) and the vessel may no long be permitted to operate.
46 CFR §136.202(a)
Condition: Placed in Improper Service
Action required: 705 - Other - as specified
Due 11 November 2021
Resolved 23 June 2022
Resolution: Resolved per Sector Buffalo phase in letter dated 25MAR2022