Inspection history · 43
19 April 2019
Administrative Inspection
Administrative · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 6666203
15 February 2019
Explosive Handling Operation-Commercial
Physical examination · Marine Safety Unit Texas City · USCG Heartland District (CGD-H) · Activity 6628357
9 February 2019
Ballast Water Examination · ISPS II Exam · PII Safety Exam
Physical examination · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 6621483
17 January 2019
Administrative Inspection
Administrative · Sector North Carolina · USCG East District (CGD-E) · Activity 6621552
3 January 2019
Explosive Handling Operation-Military
Physical examination · Sector North Carolina · USCG East District (CGD-E) · Activity 6584349
30 December 2018
Type not recorded
No type recorded · Activities Europe · Activity 6604647
26 November 2018
Deficiency Check
Physical examination · Activities Europe · Activity 6586391
15 November 2018
Damage Survey
Physical examination · Activities Europe · Activity 6581140
14 November 2018
Type not recorded
No type recorded · Activities Europe · Activity 6584059
22 October 2018
Administrative Inspection
Administrative · Sector North Carolina · USCG East District (CGD-E) · Activity 6566022
9 October 2018
Administrative Inspection
Administrative · Activities Europe · Activity 6557330
29 August 2018
Administrative Inspection
Administrative · Navigation Center · Activity 6526488
24 August 2018
Administrative Inspection
Administrative · Activities Europe · Activity 6521326
18 August 2018
Type not recorded
No type recorded · Activities Europe · Activity 6527075
13 August 2018
Type not recorded
No type recorded · Sector North Carolina · USCG East District (CGD-E) · Activity 6498589
10 August 2018
Deficiency Check
Physical examination · Sector North Carolina · USCG East District (CGD-E) · Activity 6506780
8 August 2018
Administrative Inspection
Administrative · Sector North Carolina · USCG East District (CGD-E) · Activity 6504367
8 July 2018
Deficiency Check
Physical examination · Marine Safety Unit Portland OR · USCG Northwest District (CGD-NW) · Activity 6474245
2 July 2018
MSP Periodic Oversight · MTSA/ISPS Verification · Deficiency Check · In-Service Inspection · Administrative Inspection
Physical examination · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 6459933
28 June 2018
Type not recorded
No type recorded · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 6458767
12 May 2018
Damage Survey
Physical examination · Activities Far East · USCG Oceania District (CGD-O) · Activity 6413710
7 April 2018
Administrative Inspection
Administrative · Marine Inspections Unit Singapore · USCG Oceania District (CGD-O) · Activity 6390834
14 February 2018
Administrative Inspection
Administrative · Marine Inspections Unit Singapore · USCG Oceania District (CGD-O) · Activity 6372182
6 February 2018
Administrative Inspection
Administrative · Activities Far East · USCG Oceania District (CGD-O) · Activity 6350049
5 February 2018
Type not recorded
No type recorded · Activities Far East · USCG Oceania District (CGD-O) · Activity 6685303
4 February 2018
Type not recorded
No type recorded · Activities Far East · USCG Oceania District (CGD-O) · Activity 6385525
11 October 2017
Type not recorded
No type recorded · Marine Inspections Unit Singapore · USCG Oceania District (CGD-O) · Activity 6285256
10 October 2017
MARPOL Annex I Examination
Physical examination · Marine Inspections Unit Singapore · USCG Oceania District (CGD-O) · Activity 6284461
4 October 2017
MSP COI Oversight · ISM SMC Audit · MSP Select Additional Oversight – Risk Assessment · Administrative Inspection · Hull Examination · COI Inspection · Drydock Exam
Physical examination · Marine Inspections Unit Singapore · USCG Oceania District (CGD-O) · Activity 6280796
12 September 2017
COI Inspection · Ballast Water Examination · Administrative Inspection
Physical examination · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 6262668
23 August 2017
Administrative Inspection · Deficiency Check · Damage Survey · ISM Oversight · ISM SMC Audit · Examination of Repairs
Physical examination · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 6251391
10 August 2017
Type not recorded
No type recorded · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 6249884
1 August 2017
Type not recorded
No type recorded · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 6227253
26 July 2017
Type not recorded
No type recorded · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 6221667
25 July 2017
Examination of Repairs · MSP COI Oversight · COI Inspection · MTSA/ISPS Verification · Administrative Inspection
Physical examination · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 6219053
11 July 2017
Type not recorded
No type recorded · Activities Far East · USCG Oceania District (CGD-O) · Activity 6318225
28 June 2017
Type not recorded
No type recorded · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 6226769
28 June 2017
Type not recorded
No type recorded · Marine Safety Detachment Santa Barbara · USCG Southwest District (CGD-SW) · Activity 6265355
23 April 2017
Type not recorded
No type recorded · Activities Far East · USCG Oceania District (CGD-O) · Activity 6133440
7 January 2017
Type not recorded
No type recorded · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 6086051
1 July 2016
MARPOL Annex V Examination · Administrative Inspection · Annual Inspection · MARPOL Annex I Examination · MARPOL Annex VI Survey · MTSA Verification
Physical examination · Marine Inspections Unit Singapore · USCG Oceania District (CGD-O) · Activity 5925539
28 March 2016
Type not recorded
No type recorded · Sector Virginia · USCG East District (CGD-E) · Activity 5840549
23 March 2016
Administrative Inspection
Administrative · Sector Virginia · USCG East District (CGD-E) · Activity 5838950
11 - Life Saving Appliances › N/A - No Subsystem › Lifeboat inventory
Issued 26 November 2018
Resolved
A food ration consisting of not less than 10,000kj for each person the life raft is permitted to accommodate. These rations shall be palatable, edible throughout the marked life. The Rations shall be packed in permanently sealed metal containers or vacuum packed in a flexible packaging material. Vacuum seal for numerous food rations is broken and air has leaked into the food.
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Due 14 December 2018
Resolved 14 December 2018
Resolution: Recieved photos of new food ratiions.
11 - Life Saving Appliances › N/A - No Subsystem › Rigid liferafts
Issued 26 November 2018
Resolved
An inflatable liferaft must be serviced at a facility specifically approved by commandant for the particular brand, no later than the month and year on its services sticker affixed under 46CFR160.151-57(n). Last Servicing of the 6 man liferaft, starboard liferaft and spare liferaft for embarked security personnel was October 2017.
46CFR199.99(g)3, 74SOLAS(14)III/20.8.1
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Due 24 December 2018
Resolved 14 December 2018
Resolution: Recieved copies of the liferaft certificates.
07 - Fire Safety › N/A - No Subsystem › Fixed fire extinguishing installation
Issued 26 November 2018
Resolved
Operational readiness, systems, and appliances shall be maintained ready for use. One of the cargo hold fixed CO2 bottles was found disconnected from the main discharge manifold. Ship's crew tightened while the MI's were on board.
SOLAS II-2/14.1.1
Condition: Placed in Improper Service
Action required: 10 - Deficiency Rectified
Due 1 December 2018
Resolved 1 December 2018
Resolution: Ships force corrected.
11 - Life Saving Appliances › N/A - No Subsystem › Lifeboats
Issued 26 November 2018
Resolved
Before the ship leaves port and at all times during the voyage, all lifesaving appliances, shall be in working order and ready for immediate use. Attending USCG inspectors noted that the bracket holding the keel cooler onto the lifeboat was broken.
SOLAS III/20.2
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Due 24 December 2018
Resolved 3 December 2018
14 - Pollution Prevention › 141 - MARPOL Annex I › Control of discharge
Issued 26 November 2018
Resolved
Each transfer pipe system used for the transfer of oil or liquid hazardous material to or from a vessel with the capacity of 250 barrels or more must not leak under a static liquid pressure of 1.5 times the max allowable working pressure on an annual basis. Vessel has not tested the bunker lines in over 16 months. Prior to bunkering operations in the U.S. complete a hydrostatic test and provide evidence of the same. 33CFR156.170
Action required: 703 - Prior to bunkering operations
Due 24 December 2018
Resolved 24 December 2018
Resolution: Recieved confirmation of testing onboard the vessel/
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Auxiliary engine
Issued 26 November 2018
Resolved
Vessel has a cracked block on the inboard Generator causing a small jacket water leak, it was previously documented by Sector San Fransisco on an 835, however that activity was closed as this was turned over to DNV-GL as a condition of class , however the due date was 2JAN19. For tracking purposes I've dated this due for 1FEB18 as no USCG unit is currently tracking the repairs.
Condition: Design Flaw
Action required: 705 - Other - as specified
Due 1 February 2019
Resolved 17 January 2019
Resolution: Cleared due to vsl reflag to MI
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 21 November 2018
Resolved
The condition of the ship and its equipment shall be maintained to conform with the provisions of the present regualtions to ensure that the ship will remain fit to proceed to sea without danger to the ship or persons on board. The main diesel engine #5 cylinder has a crack in the cylinder head and is overheating, rendering the main engine inoperable. Dead ship tow is authorized from Casablanca, Morocco to Rota, Spain, where repairs to the #5 cylinder head main engine shall be completed prior to departure. Submit RO repair report for satisfactory vessel operation to the USCG for review.
Action required: 17 - Rectify deficiencies prior to departure
Due 28 November 2018
Resolved 24 December 2018
Resolution: Recieved DNV GL survey following sea trials, the engine has been repaird with OEM rep and conducted operational tests.
10 - Safety of Navigation › N/A - No Subsystem › Long-range identification and tracking system (LRIT)
Issued 29 August 2018
Resolved
Vessel has failed to report via LRIT per 33 CFR 169.230.
Condition: Invalid
Action required: 50 - Rectify deficiencies w/in 30 days
Due 18 December 2018
Resolved 18 December 2018
Resolution: Verified LRIT was broadcasting to NAVCEN Via phone call, discussed with [name withheld] and was approved to clear this deficiency.
02 - Structural Conditions › N/A - No Subsystem › Steering gear
Issued 15 August 2018
Resolved
The ship shall remain fit to proceed to sea in all respects without danger to the ship or persons on board. During operational testing as part of witnessing PSTPs, the slowdown manual override test failed to operate as designed and pitch did not return to previous set point.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 30 October 2018
Resolved 17 January 2019
Resolution: Cleared due to vsl reflag to MI
08 - Alarms › N/A - No Subsystem › Engineers' alarm
Issued 15 August 2018
Resolved
The ship shall remain fit to proceed to sea in all respects without danger to the ship or persons on board. During operational testing as part of witnessing PSTPs, standing alarms were found on engineers panels in berthing and mess deck althgouh no active alarms were indicated in ECR. Ensure all engineer alarm panels throughout vsl are functioning as designed.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 30 October 2018
Resolved 17 January 2019
Resolution: Cleared due to vsl reflag to MI
15 - Safety Management Systems (ISM) › N/A - No Subsystem › Shipboard operations
Issued 15 August 2018
Resolved
The company and ship shall comply with requirements of the ISM Code. During operational testing as part of witnessing PSTPs, Section 1.0 Fire Alarm System, repeatedly mentions manual pull stations for fire alarm. Pull stations are not listed in SMS and are not being routinely tested.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 30 October 2018
Resolved 17 January 2019
Resolution: Cleared due to vsl reflag to MI
07 - Fire Safety › N/A - No Subsystem › Remote Means of control (opening,pumps,ventilation,etc.) Machinery spaces
Issued 15 August 2018
Resolved
Fire protection systems and fire fighting systems and appliances shall be maintained ready for use. During operational testing as part of witnessing PSTPs, the air conditioning unit in ECR failed to stop when "D07SL04" was pushed (2.4f)
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 30 October 2018
Resolved 17 January 2019
Resolution: Cleared due to vsl reflag to MI
07 - Fire Safety › N/A - No Subsystem › Remote Means of control (opening,pumps,ventilation,etc.) Machinery spaces
Issued 15 August 2018
Resolved
Fire protection system and fire fighting system and appliances shall be maintained ready for use. During operational testing as part of witnessing PSTPs, Emergency fuel valves #4355, #4357, and #4803 failed to close during emergency fuel valve shutdown test.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 30 October 2018
Resolved 17 January 2019
Resolution: Cleared due to vsl reflag to MI
07 - Fire Safety › N/A - No Subsystem › Remote Means of control (opening,pumps,ventilation,etc.) Machinery spaces
Issued 15 August 2018
Resolved
Fire protection system and fire fighting system and appliances shall be maintained ready for use. Manual pull for thermal oil expansion tank fuel shut off valve failed to operate and shall be included in ship's SMS for testing.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 30 October 2018
Resolved 17 January 2019
Resolution: Cleared due to vsl reflag to MI
02 - Structural Conditions › N/A - No Subsystem › Ballast, fuel and other tanks
Issued 15 August 2018
Resolved
The ship shall remain fit to proceed to sea in all respects without danger to the ship or persons on board. During operational testing as part of witnessing PSTPs, low level alarm on the diesel oil day tanks (fwd/aft) #1 and #2 failed to alarm due to faulty floats.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 30 October 2018
Resolved 17 January 2019
Resolution: Cleared due to vsl reflag to MI
04 - Emergency Systems › N/A - No Subsystem › Means of communication between safety centre and other control stations
Issued 15 August 2018
Resolved
An emergency means of communication must provide common talking means of two way voice communications and calling among navigation bridge and emergency control stations. During operational testing as part of witnessing PSTPs, it was determined that the vessel does not have headsets for vsl's sound powered telephone system. Provide headsets for steering gear station and CPP station (section 9.0)
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 30 October 2018
Resolved 17 January 2019
Resolution: Cleared due to vsl reflag to MI
02 - Structural Conditions › N/A - No Subsystem › Steering gear
Issued 14 August 2018
Resolved
the Ship shall remain fit to proceed to sea in all respoects without danger to the crew or the ship. During operational testing as part of witnessing PSTPs, the manual (back up) pitch setting "ahead" and "astern" buttons failed to operate.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 30 October 2018
Resolved 17 January 2019
Resolution: Cleared due to vsl reflag to MI
07 - Fire Safety › N/A - No Subsystem › Fire detection and alarm system
Issued 10 August 2018
Resolved
Fire protection systems and fire-fighting systems and appliances shall be maintained ready for use. During operational testing of Flame Detectors as part of witnessing PSTPs, 03 of 03 flame detectors were non-operational.
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Resolved 15 August 2018
Resolution: Vsl installed new flame detectors and operationally tested iaw PSTPs 1.3 in presence of MI
07 - Fire Safety › N/A - No Subsystem › Fire detection and alarm system
Issued 10 August 2018
Resolved
Fire protection systems and fire-fighting systems and appliances shall be maintained ready for use. During operational testing as part of witnessing PSTPs, Loop 7 of the fire detection system has been removed from operation.
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Resolved 15 August 2018
Resolution: Vsl reconnected Loop 7 and disconnected dryer in laundry room, operationally tested, all sat.
07 - Fire Safety › N/A - No Subsystem › Fire fighting equipment and appliances
Issued 10 August 2018
Resolved
Fire protection systems and fire-fighting systems and appliances shall be maintained ready for use. Portable fire extinguishers not properly service with 33 (approx half requiried) have not had required hydrostatic testing.
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Resolved 15 August 2018
Resolution: Vsl found proper servicing report indicating all but 03 need hydrostatic testing. Replaced with like foreign extinguishers while being serviced.
07 - Fire Safety › N/A - No Subsystem › Fire control plan
Issued 10 August 2018
Resolved
Fire Control Plans shall be kept up to date. Update Fire Control Plan to reflect size, type, and location of portable fire extinguishers on board.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 30 October 2018
Resolved 17 January 2019
Resolution: Cleared due to vsl reflag to MI
07 - Fire Safety › N/A - No Subsystem › Jacketed high pressure lines and oil leakage alarm
Issued 10 August 2018
Resolved
Fire protection systems and fire-fighting systems and appliances shall be maintained ready for use. During operational testing as part of witnessing PSTPs, the fuel injector leakage alarm on the M/E is inoperable.
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Due 16 August 2018
Resolved 15 August 2018
Resolution: Crew calibrated and replaced sensor. Demonstrated proper operation iaw PSTP 4.17.
08 - Alarms › N/A - No Subsystem › Other (alarms)
Issued 10 August 2018
Resolved
The ship shall remain fit to proceed to sea in all respects without danger to the ship or persons on board. During operational testing as part of witnessing PSTPs, Hydraulic Lock alarm on #1 steering pump has bad module rendering it inoperable.
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Due 30 October 2018
Resolved 17 January 2019
Resolution: Cleared due to vsl reflag to MI
08 - Alarms › N/A - No Subsystem › Engineers' alarm
Issued 10 August 2018
Resolved
The ship shall remain fit to proceed to sea in all respects without danger to the ship or persons on board. During operational testing as part of witnessing PSTPs,the 3/E alarm panel dies not alarm aftr 3 minute interval iaw PSTP 6.4.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 30 October 2018
Resolved 17 January 2019
Resolution: Cleared due to vsl reflag to MI
02 - Structural Conditions › N/A - No Subsystem › Steering gear
Issued 2 July 2018
Resolved
Repair zip-tied emergency steering solenoid on #2 steering pump within 30 days (74 SOLAS 14 Consolidated I/11).
Action required: 50 - Rectify deficiencies w/in 30 days
Due 2 August 2018
Resolved 3 July 2018
Resolution: Witnessed satisfactory replacement and installation of solenoid.
09 - Working and Living Conditions › 092 - Working Conditions › Guards - fencing around dangerous machinery parts
Issued 2 July 2018
Resolved
Provide guard for rotating machinery on A/C compressor fan belt accessible to crew in steering compartment within 30 days (74 SOLAS 14 Consolidated I/11).
Action required: 50 - Rectify deficiencies w/in 30 days
Due 2 August 2018
Resolved 3 July 2018
Resolution: Crew installed guard.
10 - Safety of Navigation › N/A - No Subsystem › Establishment of working language onboard
Issued 2 July 2018
Resolved
Engine Order Telegraph (EOT) listed orders are not in the language of the crew. Label EOT orders in English.
SOLAS Cons(2004)Ch.II-1/26.10
Action required: 50 - Rectify deficiencies w/in 30 days
Due 2 August 2018
Resolved 3 July 2018
Resolution: Crew replaced labels on EOT in English.
07 - Fire Safety › N/A - No Subsystem › Fire pumps and its pipes
Issued 2 July 2018
Resolved
Fire protection systems and fire-fighting systems and appliances shall be maintained ready for use. Fire main serving port bridge wing fire hydrant found corroded in vicinity of turn at deck and failed when hammer tested, producing a hole of approximately 1 inch. Repair wastage as original, and visually inspect and pressure test entire system to the satisfaction of class and the USCG. SOLAS Cons(2014) Ch.II-2/14.1.1
Condition: Improper/Lack of Maintenance
Action required: 30 - Ship detained
Due 4 July 2018
Resolved 4 July 2018
Resolution: Verified replacement of wasted portion of fire main. Conducted visual inspection of entire fire main under pressure.
07 - Fire Safety › N/A - No Subsystem › Maintenance of Fire protection systems
Issued 2 July 2018
Resolved
Maintenance testing and inspections shall be carried out based on the guidelines developed by the Organization and in a manner having due regard to ensuring the reliability of fire-fighting systems and appliances. Fixed CO2 cylinder protecting the EDG space found corroded at base. Replace with approved cylinder IAW manufactures instructions to the satisfaction of the attending marine inspector or class surveyor. SOLAS Cons(2014) Ch.II-2/14.2.2.2
Condition: Improper/Lack of Maintenance
Action required: 30 - Ship detained
Due 4 July 2018
Resolved 4 July 2018
Resolution: Verified installation of new CO2 cylinder.
07 - Fire Safety › N/A - No Subsystem › Fixed fire extinguishing installation
Issued 2 July 2018
Resolved
Crew members shall be trained to be familiar with the arrangements of the ship as well as the location and operation of any fire-fighting systems and appliances that they may be called upon to use. Operating instructions for the EGD fixed CO2 system found to be inaccurate. Provide accurate instructions for operation and ensure all crew are trained in their use.
SOLAS Cons(2014) Ch.II-2/15.2.2.1
Action required: 17 - Rectify deficiencies prior to departure
Due 4 July 2018
Resolved 4 July 2018
Resolution: Verified proper instructions for EDG CO2 discharge in place.
11 - Life Saving Appliances › N/A - No Subsystem › Rescue boats
Issued 2 July 2018
Resolved
Before the ship leaves port and at all times during the voyage, all life-saving appliances shall be in working order and ready for immediate use. Rescue boat fixed means of bailing required by FSA code 5.1.1.10 found deteriorated and inoperable. The vessels bow light was also found inoperable. Repair both items and prove proper operation to the attending marine inspector or class surveyor. SOLAS Cons(2014)Ch.III/20.2
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Due 4 July 2018
Resolved 4 July 2018
Resolution: Verified installation of new bow light and bailing system with operational test of both.
07 - Fire Safety › N/A - No Subsystem › Fire pumps and its pipes
Issued 2 July 2018
Resolved
Fire-fighting systems and appliances shall be kept in good working order and readily available for immediate use. Fire main cross-over valves throughout the fire main system found with heavily corroded handles with wasted locking springs. Provide replacement handles to the satisfaction of the attending marine inspector or class surveyor.
SOLAS Cons(2014) Ch.II-2/14.2.1.2
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 4 July 2018
Resolved 4 July 2018
Resolution: Verified replacement of all wasted handles and associated parts.
07 - Fire Safety › N/A - No Subsystem › Personal equipment for fire safety
Issued 2 July 2018
Resolved
A minimum of two two-way portable radiotelephones apparatus for each fire party for fire-fighter’s communication shall be carried on board. Those two-way radiotelephone apparatus shall be of an explosion-proof type or intrinsically safe. Required radiotelephones were not aboard. Provide required radiotelephones at the two emergency gears lockers and prove proper operation to the attending marine inspector or class surveyor.
SOLAS Cons.(2014)Ch.II-2/10.10.4
Action required: 17 - Rectify deficiencies prior to departure
Due 4 July 2018
Resolved 4 July 2018
Resolution: Verified proper amount of portable communications available with satisfactory operational test.
07 - Fire Safety › N/A - No Subsystem › Personal equipment for fire safety
Issued 2 July 2018
Resolved
The fire-fighter’s outfits or sets of personal equipment shall be kept ready for use in an easily accessible location that is permanently and clearly marked and, where more than one fire-fighter’s outfit or more than one set of personal equipment is carried, they shall be stored in widely separated locations. Vessel found with all fire-fighting outfits stored in the same location. Vessel shall separate the required fire-fighting outfits into both of the onboard emergency gear lockers to the satisfaction of the attending marine inspector or class surveyor.
SOLAS Cons.(2014)Ch.II-2/10.3.1
Action required: 17 - Rectify deficiencies prior to departure
Due 4 July 2018
Resolved 4 July 2018
Resolution: Verified sufficient number of fire fighting outfits stored in separate lockers.
09 - Working and Living Conditions › 092 - Working Conditions › Ropes and wires
Issued 2 July 2018
Resolved
8. Bits, rollers, and leads found corroded and heavily scaled which is causing damage to the mooring lines. Remove scale, smooth bitts, rollers, and leads. Vessel to install chafing gear on mooring lines until corrected to the satisfaction of class. SOLAS(2014)Ch.1/11(a)
Condition: Improper/Lack of Maintenance
Action required: 15 - Rectify deficiencies by next port
Due 4 July 2018
Resolved 4 July 2018
Resolution: Crew installed chaffing gear on mooring lines.
15 - Safety Management Systems (ISM) › N/A - No Subsystem › Maintenance of the ship and equipment
Issued 2 July 2018
Resolved
Vessel found with multiple discrepancies related to fire
fighting systems and appliances. Vessel shall undergo
an external audit of the SMS.
SOLAS Cons(2014) Ch. IX/5
Action required: 15 - Rectify deficiencies by next port
Due 7 July 2018
Resolved 8 July 2018
Resolution: External audit completed by ABS [name withheld], [name withheld]. Seven (07) corrective action requests (CARs) /observations issued; no major non-conformities. ABS issued short-term Safety Management Certificate (SMC) valid 08Jul2018-08Oct2018.
Navigation › Collision/Grounding Avoidance › Radar
Issued 6 February 2018
Resolved
Vessel's port radar stopped rotating. The brushes were fried on the antenna motor and the unit will not rotate.
Condition: Damaged By Earlier Event
Action required: 17 - Rectify deficiencies prior to departure
Resolved 9 February 2018
Resolution: uploaded Technician report into MISLE. All Sat.
Electrical › Electric Generation Source (service) › Generator
Issued 6 February 2018
Resolved
#1 SSDG overheated and shutdown. Crew found plastic bags in the strainer and believe prevented cooling water into the #1 SSDG. This caused the SSDG temperatures to shoot up high overheating it and causing a shutdown. Vessel lost power for 15 min.
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Resolved 9 February 2018
Resolution: C/E cleaned out the strainers and the #1 SSDG is operating normally.
Navigation › Collision/Grounding Avoidance › Danger Messages
Issued 6 February 2018
Resolved
NAVTEX fuse was blown. Fuse changed out and unit energized. Unit started and tested all day but vessel is not receiving messages.
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Resolved 9 February 2018
Resolution: Uploaded technician report into MISLE. All Sat.
Engineering › Reduction Gearing/Clutches › Shaft
Issued 18 December 2017
Resolved
1. Complete vibration analysis alignment per DNV-GL outstanding condition of class, provide completed 3rd party report and take the appropriate action for repairs if recommended. Reference DNV-GL NCR for details and complete to satisfaction of MIDET Singapore, Sector HONO and local OCMI.
Action required: 705 - Other - as specified
Due 31 May 2018
Resolved 9 April 2018
Resolution: Crowley and DNV GL eng provided reports detailing other methods for ensuring reduction gear is operating satisfactorily.
Communications › Alarms/Indicators › Lube Oil Level Alarm
Issued 18 December 2017
Resolved
2. Update PSTS regarding incorrect set points, procedures and missing steering test requirement and submit to Coast Guard, Marine Safety Center for approval. Complete to satisfaction of MIDET Singapore, Sector Hono, and the local OCMI.
Action required: 705 - Other - as specified
Due 2 October 2018
Resolved 17 January 2019
Resolution: Cleared due to vsl reflag to [name withheld] date extended from 18Feb2018 to 02Oct2018 per MISLE Activity #6459933. SNC attempted to clear, unable to complete on 15Aug18 due to multiple issues (Act # 6506780).
Documentation › Safety Management System › Conformity Maintenance Procedures
Issued 4 December 2017
Resolved
The safety management system shall be maintained in accordance with the provisions of the International Safety Management Code. Over 180 items were marked as substandard during the recent dry dock inspection. The Flag Administration has identified numerous areas of non-conformity including but not limited to:
A) Failure to report to nearest USCG OCMI when temporary repairs were made to a hole in the hull.
B) Inadequate training for crew members authorized to use the oily water separator
C) Inadequate training for correct logging of Oil Record Book Entries.
D) Unauthorized alterations in engine room piping including bypass pipes between sludge tank and Dirty Oil Tank and incorrect safety relief valves.
E) Substandard sanitation and accommodation for galley sinks and drains, leaking ceiling in food stores, and sewage smell throughout accommodations for months
F) Substandard vessel maintenance of deck equipment, ventilation ducts, fire fighting dampers, many of the discrepancies were not properly identified or addressed
G) Vessel Security Plan Control-copies of VSP were used as scrap pages in engine room
An external SMS audit is required prior to departure from Singapore. Based on the number and scope of the non-conformities detected, we do not believe the SMS has been properly implemented. The scope of the audit is to determine the prevalence of non-implementation of the SMS.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 9 December 2017
Resolution: USCG attended SMS audit with ABS
Fire Fighting › Ventilation Systems › Ducts
Issued 2 November 2017
Resolved
Wasted ventilation duct improperly repaired, non-approved sheet metal used instead of A-0 or equivalent. Complete insert as per original design and agreement. Complete repair to the satisfaction of the attending Marine Inspector.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 29 November 2017
Resolution: Duct repaired properly.
Engineering › Pressure Vessel › Relief Valve
Issued 2 November 2017
Resolved
Safety relief valves on the air receivers exceed the working pressure as rated on the bottles (data plate). Install relief valves that relieve at or below MAWP to the satisfaction of the attending Marine Inspector.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 29 November 2017
Resolution: Data plates added and relief valves set at MAWP added.
Fire Fighting › Combustible Materials › Insulation
Issued 2 November 2017
Resolved
Oil soaked lagging identified in the engine room exhaust trunks poses fire and safety hazards. Replace oil soaked lagging IWO of the exhaust trunks and complete to satisfaction of the attending Marine Inspector.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 29 November 2017
Resolution: Lagging replaced
Fire Fighting › Ventilation Systems › Ventilation Fire Dampers
Issued 2 November 2017
Resolved
Engine room fire damper wasted at the butterfly stem. Complete repair to the satisfaction of the attending Marine Inspector.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 29 November 2017
Resolution: Repair completed
Electrical › Lighting (service) › Lighting Fixture
Issued 2 November 2017
Resolved
Replace all damaged and broken light fixtures. Complete repair to satisfaction of the attending Marine Inspector.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 15 December 2017
Resolution: Over 50 light fixtures were repaired/replaced.
Engineering › Fuel Oil Service System › Flange
Issued 2 November 2017
Resolved
Complete repair to the lube oil flange at the boiler. Complete repair to satisfaction of the attending Marine Inspector.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 17 November 2017
Resolution: Flange repaired. Inspector witnessed.
Fire Fighting › Combustible Materials › Insulation
Issued 2 November 2017
Resolved
Replace damaged lagging in the engine room exhaust; make repair to satisfaction of the attending Marine Inspector.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 29 November 2017
Resolution: Lagging replaced
Fire Fighting › Ventilation Systems › Ducts
Issued 2 November 2017
Resolved
Crop and renew wasted E-generator ventilation supply trunk. Make damper available for inspection and complete repair to satisfaction of the attending Marine Inspector. Doublers are not allowed in repair.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 29 November 2017
Resolution: Repairs completed
Pollution Prevention/Response › Prevention Equipment › Sewage System Piping
Issued 2 November 2017
Resolved
Sewage smell permeates accommodation space. Identify cause and eliminate smell.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 15 November 2017
Resolution: Valve and pressure gauge were added to system.
Construction/Loadline › Hull › Side Shell
Issued 2 November 2017
Resolved
Make repairs to STBD and PORT side shell to the satisfaction of the attending Marine Inspector. Provide repair plans, and make available at fit up, back gouging, and final NDT.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 15 November 2017
Resolution: Repairs completed
Deck/Cargo › Holds/Tanks › Bulkhead
Issued 2 November 2017
Resolved
Conduct UTM of remaining areas in Cargo Hold #1 to the satisfaction of the attending Marine Inspector.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 3 November 2017
Resolution: UTM Report Received. Steel thickness within allowance.
Fire Fighting › Structural - A Class Divisions › Main Galleys
Issued 2 November 2017
Resolved
Clean galley floor drain.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 13 November 2017
Resolution: Galley floor drain chemically cleaned
Fire Fighting › Fixed Pressure Water-Spraying Fire Extinguishing System › Pump
Issued 2 November 2017
Resolved
Conduct test of newly installed water cooling system to the satisfaction of the attending Marine Inspector.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 29 November 2017
Resolution: Witnessed initial testing. Class witnessed final testing after one nozzel was adjusted.
Engineering › Steering Gear System › Rudder
Issued 2 November 2017
Resolved
Conduct Sea Trials to include testing of the rudder and steering gear system to the satisfaction of the attending Marine Inspector.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 11 December 2017
Resolution: Vessel conducted 03 sea trials. Steering gear passed class inspection and testing on 11DEC17
Accommodation/Occupational Safety › Occupational Safety › Deck Rail
Issued 2 November 2017
Resolved
Folding stanchions and respective brackets at rescue boat are wasted. Repair or renew to original to the satisfaction of the attending Marine Inspector.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 13 November 2017
Resolution: Stanchions fabricated and work.
Fire Fighting › Combustible Materials › Insulation
Issued 2 November 2017
Resolved
Insulation in dry stores of galley is saturated. Remove affected areas and make area available to the satisfaction of the attending Marine Inspector.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 13 November 2017
Resolution: Panels removed, insulation on pipes properly installed
Fire Fighting › Combustible Materials › Insulation
Issued 2 November 2017
Resolved
Insulation in dry stores of galley is saturated. Replace insulation with approved materials IAW structural fire protection requirements to the satisfaction of the attending Marine Inspector.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 17 November 2017
Resolution: Insulation and Panels replaced with approved material.
Fire Fighting › Structural - A Class Divisions › Workshops
Issued 2 November 2017
Resolved
Wire run through engine room workshop missing fire retardant packing. Add approved packing to the satisfaction of the attending Marine Inspector.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 13 November 2017
Resolution: Fire caulk added to wire run.
Lifesaving › Rescue Boat › Propulsion Engine
Issued 2 November 2017
Resolved
Rescue boat engine stalled multiple times during testing. Retest to the satisfaction of the attending marine inspector.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 6 November 2017
Resolution: Spaark pulg was replaced. Tested rescue boat with USCG present, all sat.
Engineering › Reduction Gearing/Clutches › Bearing
Issued 16 October 2017
Resolved
Conduct root cause analysis of the failure of the reduction gear. Provide report to USCG MIDET Singapore.
Action required: 705 - Other - as specified
Resolved 23 November 2017
Resolution: Report Received with mitigating/preventative actions for future
Engineering › Reduction Gearing/Clutches › Bearing
Issued 12 September 2017
Resolved
Complete maintenance/repairs & tests listed in Sector Honolulu Dry Dock Worklist issued on 13SEP2017. Items must be completed prior to issuance of new COI after completion of 2017 Dry Dock in Singapore.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 31 October 2017
Resolved 15 December 2017
Resolution: Work list items cleared or rescinded. See narrative
Engineering › Fuel Oil Storage/Transfer System › Piping
Issued 12 September 2017
Resolved
Submit plans to DNV-GL to install pressure relief valve in fuel oil bunker line. Relief valve is needed to protect the bunker line from overpressure as required by 74 SOLAS 2001, Chap II-2, Reg 15.2.7
Action required: 705 - Other - as specified
Due 31 October 2017
Resolved 8 November 2017
Resolution: 835 void. Vessel Requested Reconsideration, NVIC 10-99 does not require the relief valve. See activity 6280796 for more information.
Engineering › Fuel Oil Storage/Transfer System › Piping
Issued 12 September 2017
Resolved
Install pressure relief valve in fuel oil bunker line. Relief valve is needed to protect the bunker line from overpressure as required by 74 SOLAS 2001, Chap II-2, Reg 15.2.7
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 31 October 2017
Resolved 8 November 2017
Resolution: 835 void. Vessel Requested Reconsideration, NVIC 10-99 does not require the relief valve. See activity 6280796 for more information.
Documentation › Manuals/Policy Documentation › Transfer Procedures
Issued 12 September 2017
Resolved
Review & add necessary items to the vessel's fuel oil transfer procedures. Procedure contents must be in accordance with 33 CFR 155.750. Item must be completed prior to issuance of new COI at completion of 2017 dry dock in Singapore
Condition: Invalid
Action required: 705 - Other - as specified
Due 31 October 2017
Resolved 6 November 2017
Resolution: Vessel corrected and updated Fuel Oil Transfer Procedures
Communications › Alarms/Indicators › Lube Oil Level Alarm
Issued 12 September 2017
Resolved
Update Periodic Safety Test Procedures. Steps for test 5.9 & 5.10 must include steps & equip needed to test the high temp sensors. Also, add procedures to test the high temp alarms for the thrust bearing & reduction gear oil temperature. Submit updates to MSC for approval. Item must be completed prior to issuance of new COI. May be extended pending review/approval.
Condition: Invalid
Action required: 705 - Other - as specified
Due 31 October 2017
Resolved 18 December 2017
Resolution: Requirement for updates to PSTP included with new 835 issued by MIDET Singapore 18DEC17. See MISLE 6280796
Communications › Alarms/Indicators › Lube Oil Level Alarm
Issued 12 September 2017
Resolved
Submit plans to DNV-GL to add high temperature alarms & automatic load reduction on high temperature, for the reduction gear input shaft and PTO shaft bearings. Items are required to be monitored/alarmed to meet 74 SOLAS 2001, Chap II-2, Reg 52, Reg 53.4.1 & 53.4.3 as failure of these bearings led to the loss of the reduction gear on 09-10 Aug 2017.
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 31 October 2017
Resolved 30 November 2017
Resolution: 835 void after request for reconsideration from company was approved and other mitigating/preventative actions taken by company see MISLE activity 6280796.
Communications › Alarms/Indicators › Lube Oil Level Alarm
Issued 12 September 2017
Resolved
Install high temperature alarm & load reduction for high temperature of the reduction gear input shaft & PTO bearings. Timeline dependent upon plan approval from DNV-GL. Once installed, add procedures to the vessel's Periodic Safety Test procedures to test the alarms and auto load reduction feature; submit additions to the PSTP to MSC for approval.
Action required: 705 - Other - as specified
Due 31 October 2017
Resolved 5 December 2017
Resolution: 835 void after request for reconsideration from company was approved and other mitigating/preventative actions taken by company see MISLE activity 6280796.
Engineering › Diesel Engine (propulsion-reduction gear) › Bearing
Issued 23 August 2017
Resolved
Vessel probibited from departing any port within Sector Honolulu COTP Zone until proper operation of the vessels propulsion approved by CG MI.
Action required: 705 - Other - as specified
Due 23 August 2017
Resolved 12 September 2017
Resolution: A sea trial with 70% CPP pitch and ship normal electric load on the shaft generator at sea was carried out for approx. 1 hr and confirmed the reduction gear operates in the normal condition.
Deck/Cargo › Holds/Tanks › Hatch Cover
Issued 29 July 2017
Resolved
Vessel restricted from lifting cargo hatches until permanent repairs are completed during August 2017 drydock. IAW NVIC 01-13 CH 1
Due 30 August 2017
Resolved 28 November 2017
Resolution: Cargo hatch covers repaired, hose test successfully witnessed by class.
Engineering › Engine Controls (Electric/Electronic) › Software
Issued 25 July 2017
Resolved
Provide documentation that vessels automation installation meets the minimum requirements of 46CFR61.50-30 in addition to all requirements required by DNVGL for EO notation.
Due 30 August 2017
Resolved 5 December 2017
Resolution: 835 is void as vessel meets reqirements of MSP NVIC 01-13 CH1 to operate PUMS.
Documentation › Certificates/Documents › Certificate of Inspection
Issued 25 July 2017
Resolved
Vessel conducted commercial operations with an expired Certificate of Inspection. Vessel departed Singapore on June 29, 2017 headed for Japan to load cargo. The vessel departed Japan on July 10, 2017, bound for Concord, CA. The vessel arrived in Concord, CA on July 24, 2017 and the COI expired on June 30, 2017.
Action required: 705 - Other - as specified
Due 25 July 2017
Resolved 5 December 2017
Resolution: Deficiency added to enable the vessel inspection activity to be successfully referred for enforcement. Deficiency cleared.
Fire Fighting › Structural - A Class Divisions › Doors
Issued 8 July 2016
Resolved
A CLASS DOOR ADJACENT TO BOSN STATEROOM DOES NOT FULLY SELF CLOSE
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 8 August 2016
Resolved 4 August 2016
Resolution: Class has assumed responsibility under MSP Select program.
Documentation › Safety/Response Plans/Programs › Fire Control Plans
Issued 8 July 2016
Resolved
A-0 mini door between panty/galley as well as galley CO2 system not on fire plan
Condition: Placed in Improper Service
Action required: 705 - Other - as specified
Due 8 August 2016
Resolved 4 August 2016
Resolution: Class has assumed responsibility under MSP Select program.
Lifesaving › Rescue Boat › Propulsion Casing/Protection
Issued 8 July 2016
Resolved
Cort nozzle prop protection damgaged during use, needs repair/replace
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Due 8 August 2016
Resolved 4 August 2016
Resolution: Class has assumed responsibility under MSP Select program.
Lifesaving › Launching Appliances › Davit
Issued 8 July 2016
Resolved
Not mechanical stop or cut out for slewing davit into life rafts and free-fall davit.
Condition: Design Flaw
Action required: 705 - Other - as specified
Due 8 August 2016
Resolved 4 August 2016
Resolution: Class has assumed responsibility under MSP Select program.
Pollution Prevention/Response › Prevention Equipment › Oily Residue (sludge/slop) Tank
Issued 8 July 2016
Resolved
Temp/leaky Soft patches found on sludge piping running from steering space into sludge tank.
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Due 8 August 2016
Resolved 4 August 2016
Resolution: Class has assumed responsibility under MSP Select program.
Lifesaving › Launching Appliances › Falls
Issued 8 July 2016
Resolved
two fish hooks found in hockled davit wire.
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Due 8 August 2016
Resolved 4 August 2016
Resolution: Class has assumed responsibility under MSP Select program.
Stability › Watertight Integrity › Weathertight Enclosure
Issued 1 July 2016
Resolved
Hatch to Bosn Locker doesn't seal properly, "super foam" used to make weather tight. Nees to be adjusted and/or repaired
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Due 8 August 2016
Resolved 4 August 2016
Resolution: Class has assumed responsibility under MSP Select program.