Documentation record
Registered dimensions (L × B × D)219.0 ft × 56.0 ft × 18.5 ft
Registered tonnagegross 1,739 / net 570
ITC dimensions (L × B × D)219.0 ft × 56.0 ft × 18.5 ft
ITC tonnagegross 1,739 / net 570
BuilderEASTERN SHIPBUILDING GROUP INC. · PANAMA CITY, FL, UNITED STATES · built 2003
Hull materialSteel
PropulsionDiesel Reduction
Hull shapeUNSPECIFIED
Hull configurationUNSPECIFIED
Hailing portGALLIANO, LA
Endorsements, as the file codes themcw_un, reg
DocumentationValid · issued 5 September 2025 · expires 31 October 2026
Service, as the file records itOffshore Supply Vessel
Hull formpowered (Maury's inference from propulsion, hull shape, material and length, rule hf-1; not a recorded fact)
Tonnage as PSIX records it2774 - Dead Weight, Gross Ton
1739 - Convention (Subpart B), Gross Ton
570 - Convention (Subpart B), Net Ton
Every line above is a field of the National Vessel Documentation Center's file as served by NOAA Fisheries, dated 10 August 2026, matched to this hull on its Official Number. Registered and ITC measurements are two systems and are never combined. One snapshot is held so far; documentation history begins with the next.
Inspection history · 24
23 March 2026
Administrative Inspection · Cargo Tank Internal · Internal Structural Exam · Drydock Exam · Examination of Repairs
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 8318508
16 September 2025
Administrative Inspection
Administrative · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 8240668
20 August 2025
MTSA/ISPS Verification · MARPOL Annex I Examination · Periodic Inspection · MARPOL Annex VI Survey
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 8180241
17 October 2024
Annual Inspection
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 8020266
26 September 2024
Administrative Inspection
Administrative · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 8009930
14 June 2024
Damage Survey
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 7934779
13 June 2024
Type not recorded
No type recorded · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 8003349
11 May 2024
Administrative Inspection
Administrative · Sector Mobile · USCG Heartland District (CGD-H) · Activity 7910447
19 September 2023
MTSA/ISPS Verification · MARPOL Annex I Examination · COI Inspection · Administrative Inspection · MARPOL Annex VI Survey
Physical examination · Sector Mobile · USCG Heartland District (CGD-H) · Activity 7794657
31 January 2023
Hull Examination · Administrative Inspection · Internal Structural Exam · Drydock Exam
Physical examination · Sector Mobile · USCG Heartland District (CGD-H) · Activity 7632880
6 November 2022
Damage Survey
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 7590031
6 November 2022
Type not recorded
No type recorded · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 7590670
20 May 2022
Administrative Inspection · Annual Inspection
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 7454421
11 May 2021
Periodic Inspection
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 7194794
22 February 2021
Hull Examination · Internal Structural Exam · Drydock Exam · Cargo Tank Internal · Administrative Inspection
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 7144484
13 May 2020
Annual Inspection · Administrative Inspection
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 6952456
25 June 2019
MTSA/ISPS Verification · Annual Inspection · Administrative Inspection · MARPOL Annex I Examination · MARPOL Annex VI Survey
Physical examination · Sector Mobile · USCG Heartland District (CGD-H) · Activity 6726287
21 February 2018
MTSA/ISPS Verification · COI Inspection · Administrative Inspection
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 6358316
29 January 2018
Administrative Inspection · Cargo Tank Internal · Hull Examination · Internal Structural Exam · Examination of Repairs
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 6345817
3 November 2017
In-Service Inspection · Administrative Inspection
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 6307653
3 August 2017
Annual Inspection · Administrative Inspection
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 6230046
27 July 2016
Administrative Inspection · Periodic Inspection
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 5955052
5 April 2016
Administrative Inspection
Administrative · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 5876303
10 February 2016
Cargo Tank Internal · Administrative Inspection · Internal Structural Exam · Hull Examination
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 5830971
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 20 August 2025
Resolved
The machinery, associated piping systems, and fittings shall be of a design and construction adequate for the service for which they are intended and shall be so installed and protected as to reduce to a minimum any danger to persons on board, due regard being paid to moving parts, hot surfaces and other hazards.
Various items on the propulsion and generator prime movers must be rectified:
#2 Bow Thruster - Machinery control mounting hardware
Stern Thruster - Repair/replace control panel and gauges
Repair exhaust leak
Install drip tray under fuel filters
Reinstall cover on start solenoid
Splash tape - Install splash tape around the high pressure fuel piping unions on bow thrusters, stern thruster, and all three ship service diesel generator prime movers
Action required: 50 - Rectify deficiencies w/in 30 days
Due 20 September 2025
Resolved 19 September 2025
Resolution: Vessel rep provided photographic evidence and a LA Cat tech report, MI accepted as satisfactory to clear the requirement.
04 - Emergency Systems › N/A - No Subsystem › Water level indicator
Issued 17 October 2024
Resolved
Visible and audible alarms must be installed at the pilothouse to indicate high bilge level. Machinery room and steering gear room bilge alarms inop.
46 CFR 130.460(a)(4)
Action required: 17 - Rectify deficiencies prior to departure
Due 17 October 2024
Resolved 21 October 2024
Resolution: The high bilge level alarms for the machinery room and steering gear room were made operational. Verified function at operating station.
08 - Alarms › N/A - No Subsystem › Closing water-tight doors alarm
Issued 17 October 2024
Resolved
Class – 1 door may be installed at any place if the vessel’s pilothouse contains a visual indicator showing whether the hatch is open or closed. Stbd side deck escape hatch indicator is inop.
46 CFR 174.210(c)(3)
Action required: 17 - Rectify deficiencies prior to departure
Due 17 October 2024
Resolved 21 October 2024
Resolution: The starboard side deck escape hatch indicator was troubleshot and repaired. It’s operation was made satisfactory.
06 - Cargo Operations Including Equipment › N/A - No Subsystem › Other (cargo)
Issued 17 October 2024
Resolved
No OSV may carry flammable or combustible liquid cargoes in bulk without approval.
Methanol requires a cargo tank pressure relief valve setting to be a minimum of .02 MPa (2.9 psi). The pressure relief valve setting was at 1.0 psi on the port & starboard methanol tanks.
A ring buoy with light that was not intrinsically safe appeared to be within a hazardous zone of the methanol transfer area. Vessel did not have a hazardous zone diagram to confirm.
Address items prior to the carriage of methanol.
- 46 CFR 125.110 / CG-ENG Policy Letter
No. 03-12, CH-1 / IBC Code 15.12.4
Action required: 705 - Other - as specified
Due 17 October 2024
Resolved 23 December 2024
Resolution: The methanol tank P/V setting was changed to 2.9 psi, the non-intrinsic ring buoy light was replaced with one that is intrinsically safe, and the open style vents were updated within transfer procedures (attached) to be closed with carriage of methanol.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Cargo & other hatchways
Issued 17 October 2024
Resolved
Each watertight door and hatch must comply with the requirements of 46 CFR 174. Each hatch exposed to the weather must be watertight. The vessel’s port & starboard side engine room escape hatches were showing light after and were not watertight. Crew made adjustments and go them water tight on the spot.
- 46 CFR 131.893 // 46 CFR 174.220
Action required: 10 - Deficiency Rectified
Due 17 October 2024
Resolved 17 October 2024
Resolution: Crew made adjustments to the port and starboard hatches and got them water tight prior to the end of the inspection.
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 17 October 2024
Resolved
Nothing in this part shall limit the inspector from making such inspection as deemed necessary to assure the safety and seaworthiness of a vessel. A hydraulic line for the port side steering gear had broken support brackets. The brackets were renewed on the spot.
- 46 CFR 126.100
Action required: 10 - Deficiency Rectified
Due 17 October 2024
Resolved 17 October 2024
Resolution: The brackets were renewed at the conclusion of the inspection.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 26 September 2024
Resolved
(a) When any vessel is drydocked, examination must be made of the propeller, stern bushing, sea connection, and fastenings if deemed necessary by the marine inspector. Vsl reported vibration in port mde shaft.
Condition: Invalid
Action required: 16 - Rectify deficiencies w/in 14 days
Due 10 October 2024
Resolved 7 October 2024
Resolution: Cleared by class, report uploaded into documents folder.
09 - Working and Living Conditions › 092 - Working Conditions › Machinery
Issued 20 May 2022
Resolved
External high-pressure fuel delivery lines shall be double jacketed and provided with an alarm. No. 1 SSDG was in alarm for fuel line leak. Fuel was leaking from SSDG.
SOLAS 14 II-2/4.2.2.5.2
Action required: 16 - Rectify deficiencies w/in 14 days
Due 3 June 2022
Resolved 24 May 2022
Resolution: Fuel lines replaced by third party tech.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 20 May 2022
Resolved
Inspection and tests of main propulsion machinery shall ensure it is in satisfactory working condition. Stbd MDE would not start.
Action required: 10 - Deficiency Rectified
Resolved 20 May 2022
Resolution: Starter part replaced, MDE started.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 20 May 2022
Resolved
Electrical equipment must be installed to protect from electrical hazards. Open electrical junction box in fwd thruster room and hanging red alarm light in dry bulk tank space.
Action required: 10 - Deficiency Rectified
Resolved 20 May 2022
Resolution: Junction box cover installed, alarm light installed.
07 - Fire Safety › N/A - No Subsystem › Fire fighting equipment and appliances
Issued 20 May 2022
Resolved
Portable fire extinguishers which have een discharged shall be immediately replaced. #22 extinguisher in engine room, gage indicates in the red.
SOLAS 14 II-2/14.2.1.2.1.2
Action required: 10 - Deficiency Rectified
Resolved 20 May 2022
Resolution: Fire extinguisher replaced.
07 - Fire Safety › N/A - No Subsystem › International shore-connection
Issued 20 May 2022
Resolved
Ships of 500 GT and up shall be provided with an international shore connection. Connection on the vsl is not configured properly.
SOLAS 14 II-2/10.2.1.7
Action required: 702 - Prior to embarking on international voyage
Resolved 24 May 2022
Resolution: Connection modified to accept international shore connection.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Gauges, thermometers, etc
Issued 11 May 2021
Resolved
Where pressure-indicating gauges are used, they shall be chosen to be compatible with the pressure to be indicated. In no case shall the upper range of the gauge be less than 1.2 times nor more than 2 times the pressure at which the relieving device is set to function; relief device was set at 200 psi but pressure vessel only had a 160 psi gauge.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 25 May 2021
Resolved 12 May 2021
Resolution: Reattended the vessel and confirmed that a 300 psi gauge was installed on the pressure vessel.
11 - Life Saving Appliances › N/A - No Subsystem › Operational readiness of lifesaving appliances
Issued 11 May 2021
Resolved
Each life buoy shall, if it is intended to operate the quick-release arrangement provided for the self-activated smoke signals and self-igniting lights, have a mass of not less than 4 kg; 02 deck buoys were used in lieu of bridge buoys for the smoke floats on the port and starboard side of the bridge. 74 SOLAS (14) III/7.1.3, LSA Code 2.1.1.7.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 12 May 2021
Resolution: Reattended the vessel and confirmed that bridge buoys of the appropriate weight were installed onboard.
11 - Life Saving Appliances › N/A - No Subsystem › Operational readiness of lifesaving appliances
Issued 11 May 2021
Resolved
Each item of survival equipment with an expiration date must be replaced during the annual inspection and repair if this date has passed; smoke floats were expired.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 12 May 2021
Resolution: Reattended the vessel and confirmed that there were new smoke floats installed.
11 - Life Saving Appliances › N/A - No Subsystem › Operational readiness of lifesaving appliances
Issued 11 May 2021
Resolved
Each item of survival equipment with an expiration date must be replaced during the annual inspection and repair if this date has passed; Waterlight for ring buoy on the port side bridgewing was expired.
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 12 May 2021
Resolution: Reattended the vessel and confirmed that waterlight with new battery was installed.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 11 May 2021
Resolved
Each connection to a conductor or a terminal part of a conductor must be made within an enclosure; #3 main
propulsion engine had 02 exposed wire nuts.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 25 May 2021
Resolved 12 May 2021
Resolution: Reattended the vessel and confirmed that wire nuts were properly enclosed.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 11 May 2021
Resolved
Each cable and wire must be supported so as to avoid chafing or other damage; electrical cable for rescue boat davit control panel was not supported and laying on the deck.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 25 May 2021
Resolved 12 May 2021
Resolution: Reattended the vessel and confirmed that electrical cable was properly secured and no longer laying on the deck.
08 - Alarms › N/A - No Subsystem › General alarm
Issued 13 May 2020
Resolved
General alarm must be audible in spaces where persons may be maintaining, repairing, or operating equipment, such as machinery spaces, bow thruster rooms, under deck passageways in cargo areas, and steering gear rooms. General alarm could not be heard in tank farm or machinery spaces.
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 27 May 2020
Resolution: Vessel submitted work invoice from EMT Electronics, Inc showing GA repair.