Inspection history · 50
20 November 2023
Administrative Inspection · Exemption
Administrative · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 7827493
12 July 2018
Administrative Inspection
Administrative · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 6481557
7 November 2017
MARPOL Annex I Examination · MTSA/ISPS Verification · COI Inspection · DAPI Audit
Physical examination · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 6299140
4 October 2017
Administrative Inspection
Administrative · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 6281044
28 September 2016
MARPOL Annex I Examination · Annual Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 6007846
11 September 2015
Internal Structural Exam · Deficiency Check · Examination of Repairs · Periodic Inspection · MARPOL Annex I Examination · MTSA Verification
Physical examination · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 5725875
30 October 2014
Annual Inspection · MTSA Verification
Physical examination · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 5014528
22 September 2014
Deficiency Check · Examination of Repairs
Physical examination · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 4987181
28 December 2013
Type not recorded
No type recorded · Marine Safety Unit Victoria · USCG Heartland District (CGD-H) · Activity 4775221
9 December 2013
MARPOL Annex I Examination · Deficiency Check · MTSA Verification · MARPOL Annex VI Survey · Annual Inspection
Physical examination · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 4764540
13 June 2013
Deficiency Check
Physical examination · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 4619267
25 September 2012
Drydock Exam · Internal Structural Exam · COI Inspection · Cargo Tank Internal · Deficiency Check
Physical examination · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 4449844
23 January 2012
Administrative Inspection
Administrative · Sector New York · USCG Northeast District (CGD-NE) · Activity 4229690
5 October 2011
MTSA Verification · MARPOL Annex I Examination · Annual Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 4161351
3 November 2010
Internal Structural Exam · MTSA Verification · MARPOL Annex V Examination · MARPOL Annex I Examination · Periodic Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 3883827
7 June 2010
Type not recorded
No type recorded · Sector Virginia · USCG East District (CGD-E) · Activity 3762004
13 May 2010
Type not recorded
No type recorded · Sector Virginia · USCG East District (CGD-E) · Activity 3737861
16 April 2010
Examination of Repairs · Damage Survey
Physical examination · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 3718442
16 April 2010
Type not recorded
No type recorded · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 3721494
2 April 2010
Type not recorded
No type recorded · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 3711006
11 January 2010
Annual Inspection · MTSA Verification · MARPOL Annex V Examination · MARPOL Annex I Examination
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 3660778
16 September 2009
Type not recorded
No type recorded · Marine Safety Unit Coram · USCG Northeast District (CGD-NE) · Activity 3596607
22 December 2008
Type not recorded
No type recorded · Sector New York · USCG Northeast District (CGD-NE) · Activity 3390733
25 November 2008
MARPOL Annex V Examination · MARPOL Annex I Examination · Annual Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 3369012
28 May 2008
Type not recorded
No type recorded · Marine Safety Unit Coram · USCG Northeast District (CGD-NE) · Activity 3220504
6 February 2008
Type not recorded
No type recorded · Marine Safety Unit Coram · USCG Northeast District (CGD-NE) · Activity 3144081
27 December 2007
Damage Survey
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 3121359
26 December 2007
Type not recorded
No type recorded · Sector New York · USCG Northeast District (CGD-NE) · Activity 3132169
27 November 2007
Type not recorded
No type recorded · Marine Safety Unit Coram · USCG Northeast District (CGD-NE) · Activity 3105171
19 November 2007
Type not recorded
No type recorded · Marine Safety Unit Coram · USCG Northeast District (CGD-NE) · Activity 3101182
10 October 2007
MARPOL Annex V Examination · MARPOL Annex I Examination · Internal Structural Exam · Hull Examination · COI Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 3078562
24 June 2007
Type not recorded
No type recorded · Sector New York · USCG Northeast District (CGD-NE) · Activity 3005704
28 March 2007
Type not recorded
No type recorded · Marine Safety Unit New Bedford · USCG Northeast District (CGD-NE) · Activity 2896584
25 January 2007
MARPOL Annex V Examination · Annual Inspection · MARPOL Annex I Examination
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 2861627
14 October 2006
Type not recorded
No type recorded · Marine Safety Unit Coram · USCG Northeast District (CGD-NE) · Activity 2807263
31 May 2006
Type not recorded
No type recorded · Sector New York · USCG Northeast District (CGD-NE) · Activity 2683267
7 December 2005
MARPOL Annex I Examination · Annual Inspection · MARPOL Annex V Examination
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 2547408
31 March 2005
Type not recorded
No type recorded · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 2323549
17 March 2005
Internal Structural Exam · Damage Survey
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 2312963
15 March 2005
Damage Survey
Physical examination · MSO PROVIDENCE · USCG Northeast District (CGD-NE) · Activity 2310475
14 March 2005
Type not recorded
No type recorded · MSO PROVIDENCE · USCG Northeast District (CGD-NE) · Activity 2310507
11 January 2005
Annual Inspection · MTSA Verification · MARPOL Annex V Examination · MARPOL Annex I Examination
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 2272520
26 October 2004
Security Plan Amendment Review - VSP
Administrative · Marine Safety Center (MSC) · Activity 2228540
15 October 2004
Type not recorded
No type recorded · MSFO CAPE COD · USCG Northeast District (CGD-NE) · Activity 2221648
17 February 2004
Security Plan Review - VSP
Administrative · Marine Safety Center (MSC) · Activity 2016352
11 February 2004
Annual Inspection · MARPOL Annex I Examination
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 2002762
12 December 2003
Security Plan Review - ASP
Administrative · Marine Safety Center (MSC) · Activity 1980791
9 June 2003
Type not recorded
No type recorded · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 1813693
9 March 2003
Damage Survey
Physical examination · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 1755196
4 November 2002
Cargo Tank Internal · Hull Examination · Construction Oversight · Initial Certification · Initial Construction-Excluding Oversight · Internal Structural Exam
Physical examination · MSO Mobile · USCG Heartland District (CGD-H) · Activity 1700715
Deck/Cargo › Cargo Transfer/Lightering (liquid) › Piping
Issued 7 November 2017
No resolution recorded
Vessel's cargo pipeline was not currently hydro tested conduct hyrdo test of pipeline.
Condition: Invalid
Action required: 701 - Prior to carriage of passengers/cargo
Deck/Cargo › Cargo Transfer/Lightering (liquid) › Cargo Pump
Issued 7 November 2017
No resolution recorded
Vessel cargo pump relief valves and pressure gauges were not currently tested. Conduct annual test of relief valves and gauges.
Action required: 701 - Prior to carriage of passengers/cargo
Lifesaving › Inflatable Liferafts › Servicing
Issued 7 November 2017
No resolution recorded
Vessel's inflatable liferaft past due for servicing.
Condition: Invalid
Action required: 701 - Prior to carriage of passengers/cargo
Lifesaving › Lifebuoys › Markings (ship name/port)
Issued 7 November 2017
No resolution recorded
Remark life ring in vicinity of bow with vessel's name.
Action required: 701 - Prior to carriage of passengers/cargo
Deck/Cargo › Vapor Control Systems › Liquid Overfill Protection
Issued 7 November 2017
No resolution recorded
Vessel's tank overfill alarm not properly marked. Properly mark vessel's overfill alarm.
Condition: Placed in Improper Service
Action required: 701 - Prior to carriage of passengers/cargo
Operations/Management › Drills/Instruction › Not Conducted
Issued 7 November 2017
No resolution recorded
Provide documentation of pollution response drills and exercises.
Action required: 701 - Prior to carriage of passengers/cargo
Engineering › Compressed Air System (start air) › Valve
Issued 7 November 2017
No resolution recorded
Vessel's air receiver valve was seized. Ensure proper operation of valve.
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Communications › Radio Communications › EPIRB
Issued 7 November 2017
No resolution recorded
Vessel's EPIRB hydrostatic release was expired. Provide non-expired hydro release for EPIRB.
Action required: 701 - Prior to carriage of passengers/cargo
Electrical › Electrical Distribution System (service) › Conductor
Issued 7 November 2017
No resolution recorded
Generator switchboard missing panel and has exposed wires/ Properly dead end or remove wiring.
Condition: Placed in Improper Service
Action required: 701 - Prior to carriage of passengers/cargo
Electrical › Electric Supply System (service) › Battery Installation
Issued 7 November 2017
No resolution recorded
Properly stow/store batteries in generator compartment.
Condition: Placed in Improper Service
Action required: 701 - Prior to carriage of passengers/cargo
Deck/Cargo › Cargo Heating › General
Issued 7 November 2017
No resolution recorded
Provide proper operation and conduct fireside examination of vessel's thermal fluid heater prior to operation of thermal fluid heater.
Condition: Invalid
Action required: 701 - Prior to carriage of passengers/cargo
Deck/Cargo › Mooring/Anchoring › Anchoring Arrangement
Issued 7 November 2017
No resolution recorded
Prove proper operation of the vessel's anchor system prior to operation.
Condition: Invalid
Action required: 701 - Prior to carriage of passengers/cargo
Deck/Cargo › Vapor Control Systems › Vessel Vapor Overpressure/Vacuum Protection
Issued 28 September 2016
Resolved
Several of the barges cargo tank pressure vacuum valves were not operating properly and seized closed. Prove proper operation prior to cargo ops.
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Due 28 September 2016
Resolved 29 September 2016
Resolution: Received, reviewed, and accepted third party report stating that all pressure vacuum valves onboard were tested and operated satisfactory.
Deck/Cargo › Vapor Control Systems › Piping/Hoses
Issued 28 September 2016
Resolved
vessel had expired vapor tightness test. Provide proof of vapor tightness prior to using vcs system with cargo that require use of this system.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 28 September 2016
Resolved 29 September 2016
Resolution: Received, reviewed, and accepted proper documentation from company by the attending marine inspector, satisfying the requirement.
Operations/Management › Vessel Safety Management › Maintenance of Ship/Equipment
Issued 28 September 2016
Resolved
Vessel had no inspection records for pilot ladders. Provide proper inspections and documentation prior to using the port and starboard side pilot ladders.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 28 September 2016
Resolved 29 September 2016
Resolution: Received, reviewed, and accepted vessels inspection records that records inspections.
Deck/Cargo › Vapor Control Systems › Vessel Vapor Overpressure/Vacuum Protection
Issued 28 September 2016
Resolved
Several flame screens on drains for the pressure vacuum valves were found clogged. Replace or clean screens to the satisfaction of the attending marine inspector.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 6 October 2016
Resolved 29 September 2016
Resolution: Received, reviewed, and accepted proper documentation from company by the attending marine inspector, satisfying the requirement.
Engineering › Fuel Oil Storage/Transfer System › Hose
Issued 28 September 2016
Resolved
#3 cargo engine fuel oil supply hose was cracked and chaffed. Replace the supply hose inkind.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 29 October 2016
Resolved 29 September 2016
Resolution: Received, reviewed, and accepted proper documentation from company by the attending marine inspector, satisfying the requirement.
Deck/Cargo › Cargo Transfer/Lightering (liquid) › Emergency Shut-down
Issued 28 September 2016
Resolved
The #3 cargo emergency shut down was inperative when tested.
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Due 28 September 2016
Resolved 28 September 2016
Resolution: Crew made adjustments to the #3 emergency shut down, tested to the satisfaction of the attending marine inspector.
Construction/Loadline › Structures › Superstructure
Issued 28 September 2016
Resolved
The foward and aft flammable paint lockers both had holes and was missing sealing surface on lids. Make both vapor tight for the fixed fire-fighting.
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 13 October 2016
Resolved 29 September 2016
Resolution: Received, reviewed, and accepted proper documentation from company by the attending marine inspector, satisfying the requirement.
Deck/Cargo › Cargo Transfer/Lightering (liquid) › Transfer Hose
Issued 28 September 2016
Resolved
Remove/replace vapor transfer hose on deck both end connections were unservicable.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 28 September 2016
Resolved 29 September 2016
Resolution: Received, reviewed, and accepted proper documentation from company by the attending marine inspector, satisfying the requirement.
Operations/Management › Equipment Service/Testing › EPIRB
Issued 29 October 2015
Resolved
Provide approved and up to date hydrostatic release for EPIRB. 46CFR199.510
Action required: 705 - Other - as specified
Due 5 November 2015
Resolved 4 November 2015
Resolution: Replaced expired HRU with a new one. Expires Oct. 2017.
Engineering › Fuel Oil Service System › Valve
Issued 29 October 2015
Resolved
Properly label emergency fuel shut-off valve with 2" lettering. 46CFR35.30
Action required: 705 - Other - as specified
Due 5 November 2015
Resolved 4 November 2015
Resolution: Fuel shut off valves labeled properly.
Electrical › Lighting (emergency) › Battery Operated Lantern
Issued 29 October 2015
Resolved
Repair inoperative emergency light on forward part of main house. 46CFR112.43
Action required: 705 - Other - as specified
Resolved 29 October 2015
Resolution: Repaired light.
Deck/Cargo › Holds/Tanks › Tank Level Monitoring Device
Issued 7 October 2015
Resolved
#6 Stbd cargo overflow visual alarm is inoperative. Repair light to the satisfaction of the CG Marine Inspector. 46CFR39.20-7(d)(2)
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 29 October 2015
Resolution: Visual alarm operable.
Deck/Cargo › Vapor Control Systems › Piping/Hoses
Issued 7 October 2015
Resolved
New vapor piping system install not complete. Complete install of all piping on vapor system. 46CFR39.20-1(a)(1)
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 29 October 2015
Resolution: Vapor control system modifications complete. Satisfactory air test on piping witnessed by ABS.
Accommodation/Occupational Safety › Occupational Safety › Tripping/Falling Hazard
Issued 7 October 2015
Resolved
Properly stow paint on vessel or remove it from barge. 46CFR32.85-1
Action required: 17 - Rectify deficiencies prior to departure
Resolved 29 October 2015
Resolution: All paint stowed or removed.
Accommodation/Occupational Safety › Occupational Safety › Welding/Hot Work
Issued 7 October 2015
Resolved
Properly stow welding machines or remove from barge. 46CFR31.10-17(a)(3)
Action required: 17 - Rectify deficiencies prior to departure
Resolved 29 October 2015
Resolution: Welding machines removed from barge.
Lifesaving › Lifebuoys › Stowage
Issued 7 October 2015
Resolved
Properly stow all lifesaving gear. 46CFR199
Action required: 17 - Rectify deficiencies prior to departure
Resolved 29 October 2015
Resolution: All lifesaviing gear stowed properly.
Deck/Cargo › Cargo Transfer/Lightering (liquid) › Cargo Pump
Issued 7 October 2015
Resolved
#3 cargo pump not onboard. Install pump and test IAW ABS standards. 46CFR35.35-70
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 29 October 2015
Resolution: Cargo pump installed.
Engineering › Generator (propulsion/auxiliary-electric) › Interlock Circuitry
Issued 7 October 2015
Resolved
Make #1 & #2 generators ready for operation and testing. 46CFR111.12-1(b)(c)
Action required: 17 - Rectify deficiencies prior to departure
Resolved 29 October 2015
Resolution: Generators operational and tests SAT.
Engineering › Compressed Air System (control) › Valve
Issued 7 October 2015
Resolved
Make air receiver relief valve ready for testing. 46CFR61.10-5(i)
Action required: 17 - Rectify deficiencies prior to departure
Resolved 29 October 2015
Resolution: Relief valve test SAT.
Deck/Cargo › Ballast › Piping
Issued 11 September 2015
Resolved
Properly repair wasted sounding tube pipe, located at the top of ballast tank # 6 port.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 11 September 2015
Resolved 30 September 2015
Deck/Cargo › Ballast › Segregated Ballast Tank
Issued 11 September 2015
Resolved
Properly repair crack on knife edge of # 6 ballast tank water-tight hatch.
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Due 11 September 2015
Resolved 30 September 2015
Deck/Cargo › Ballast › Valves
Issued 11 September 2015
Resolved
Properly repair reach rod bracket, for #3 port ballast valve.
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Due 11 September 2015
Resolved 30 September 2015
Construction/Loadline › Hull › Hull Plating
Issued 11 September 2015
Resolved
Crop out and renew tripped side shell longitudinal and shell plate, located in # 1 port ballast tank.
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Due 11 September 2015
Resolved 30 September 2015
Engineering › Diesel Engine (auxiliary) › Overspeed Device
Issued 9 December 2013
Resolved
VESSEL MUST CONDUCT A 115% OVERSPEED SHUTDOWN ON GENERATORS #1 AND #3 AS PER 46 CFR 111.12-(1)(B)
Condition: Improper/Lack of Maintenance
Due 10 January 2014
Resolved 12 December 2013
Resolution: WITNESSED SATISFACTORY TEST OF 115% OVERSPEED SHUTDOWNS ON GENERATORS #1 AND #3.
Deck/Cargo › Vapor Control Systems › Piping/Hoses
Issued 21 June 2013
Resolved
Demonstrate proper marking of vapor control system line. 46 CFR 39.20-1(d)
Due 5 July 2013
Resolved 17 July 2013
Resolution: E-mailed picture of properly marked vapor control system line.
Electrical › Electrical Distribution System (service) › Panelboard
Issued 21 June 2013
Resolved
Revise outdated circuit breaker directories. 46 CFR 11.40-11
Due 5 July 2013
Resolved 17 July 2013
Resolution: E-mailed picture of revised circuit breaker directory.
Engineering › Diesel Engine (auxiliary) › Piping (exhaust)
Issued 21 June 2013
Resolved
Fix exhaust stop flappers on top of pump houses. 46 CFR 58.10-5(d)
Due 5 July 2013
Resolved 17 July 2013
Resolution: E-mailed picture of exhaust flapper.
Electrical › Electrical Distribution System (service) › Ground Indicator
Issued 21 June 2013
Resolved
Identify and rectify cause of ground fault in generator room. 46 CFR 111.05-21
Due 5 July 2013
Resolved 19 July 2013
Resolution: Received e-mail with technician''s report and pictures.
Engineering › Freshwater System (jacketwater cooling) › Sensor
Issued 21 June 2013
Resolved
Replace inoperable jacket water temperature gauges. 46 CFR 31.10-15
Due 5 July 2013
Resolved 17 July 2013
Resolution: E-mailed picture of jacket water temperature gauge.
Fire Fighting › Means of Escape › Escape Route Signs
Issued 21 June 2013
Resolved
Properly label topside of both emergency exits/escapes from accommodations. 46 CFR 32.02-1
Due 5 July 2013
Resolved 17 July 2013
Resolution: E-mailed pictures of labeled emergency escapes.
Deck/Cargo › Cargo Transfer/Lightering (liquid) › Piping
Issued 21 June 2013
Resolved
Repair valve indicator pin. 46 CFR 56.20-9(a)
Due 5 July 2013
Resolved 17 July 2013
Resolution: E-mailed picture of repaired valve indicator pin.
Communications › Visual Communication › Red Warning Signal
Issued 1 November 2012
Resolved
Demonstrate high and high high level alarms to the satisfaction of the attending marine inspector. 46 CFR 39.20-9
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 2 November 2012
Resolution: Demonstrated alarms working correctly.
Documentation › Manuals/Policy Documentation › Procedures and Arrangements Manual (NLS)
Issued 1 November 2012
Resolved
Prior to the carriage of NAPTHA on an international route, if the NAPTHA is of petroleum steam cracked aeromatic variety, provide PNA Manual. 46 CFR153.490(a)(2) Prior to carriage of specified product.
Due 30 November 2012
Resolved 5 March 2013
Resolution: Called MSC to disscuss removal of NAPTHA from CAA. MSC did not recieve request from vsl to remove NAPTHA, but lining out cargoes on CAA acceptable with OCMI approval. For the complete removal of NAPTHA from the CAA, vsl has to submit request through MSC.
Deck/Cargo › Vapor Control Systems › Piping/Hoses
Issued 1 November 2012
Resolved
Complete plan review process for VCS Modifications and addition of Bergen System. 46 CFR 31.01-5 To the satisfaction of MSC.
Due 30 November 2012
Resolved 13 June 2013
Resolution: Approval letter from MSC is in MISLE.
Navigation › Collision/Grounding Avoidance › Navigation Lights
Issued 1 November 2012
Resolved
Demonstrate operation of starboard aft end nav light. 33 CFR 81
Due 8 November 2012
Resolved 2 November 2012
Resolution: Demonstrated working nav light.
Lifesaving › Lifebuoys › Buoyant Lifeline
Issued 1 November 2012
Resolved
Replace grab line on midships life ring. 46 CFR 199.70
Due 30 November 2012
Resolved 2 November 2012
Resolution: Replaced grab line.
Lifesaving › Line-Throwing Appliances › Projectiles
Issued 1 November 2012
Resolved
Provide four line throwing apparatuses prior to operating as a manned barge.
Due 30 November 2012
Resolved 2 November 2012
Resolution: Provided four line throwing appuratuses.
Lifesaving › Inflatable Liferafts › Servicing
Issued 1 November 2012
Resolved
Demonstrate servicing and installation of 6 person liferaft. 46 CFR 160.051 Prior to operating as a manned barge.
Due 1 November 2012
Resolved 2 November 2012
Resolution: Provided servicing certificate and inspected proper installation.
Construction/Loadline › Hull › Side Shell
Issued 16 April 2010
Resolved
835 issued to vessel - Provide to [name withheld], a repair proposal addressing permanent repairs to be made to the structural support and shell plating to starboard #1 ballast tank. Above requirement to be completed prior to loading cargo and to the satisfaction of the attending Coast Guard Inspector. Class to attest to proper repair iaw ABS LL Certificate.
Condition: Damaged By Earlier Event
Action required: 17 - Rectify deficiencies prior to departure
Resolved 21 April 2010
Resolution: Satisfactory repair was completed and tested. 835 requirment clear. Vessel cleared to sail.
Accommodation/Occupational Safety › Occupational Safety › Receptacle Outlet
Issued 17 March 2005
Resolved
Remove unauthorized heat strips and extension cords from under houses. (2nd notice).
Condition: Placed in Improper Service
Action required: 705 - Other - as specified
Resolved 7 April 2005
Accommodation/Occupational Safety › Occupational Safety › Rubbish/Waste Materials
Issued 17 March 2005
Resolved
Remove gasoline from paint locker.
Condition: Placed in Improper Service
Action required: 705 - Other - as specified
Resolved 7 April 2005
Construction/Loadline › Hull › Hull Plating
Issued 15 March 2005
Resolved
Prior to conducting cargo operations, complete permanent repairs in the forward rake space, STBD side IWO the hawse pipe, aft to the bulkhead. The barge is allowed a one time transit to COTP zone NYC to complete these repairs. The repairs are to be completed to the satisfaction of the attending marine inspector.
Condition: Damaged By Earlier Event
Action required: 701 - Prior to carriage of passengers/cargo
Due 15 March 2005
Resolved 15 March 2005
Construction/Loadline › Hull › Hull Plating
Issued 15 March 2005
Resolved
Proceed to Jamestown anchorage to undergo a damage survey by a USCG Marine Inspector. Make ready T/B PENN 120 for internal structure exam IWO damaged area.
Condition: Damaged By Earlier Event
Due 15 March 2005
Resolved 15 March 2005
Resolution: Conducted ISE
Electrical › Electrical Distribution System (service) › Cable
Issued 11 January 2005
Resolved
Strip heaters used to heat pipe under house were energized by numerous extention cords in a dangerous manner.
Condition: Placed in Improper Service
Due 25 January 2005
Resolved 11 January 2005
Resolution: Extention cords were removed and plans to hard wire the strips are being formulated.
Electrical › Electrical Distribution System (service) › Outlet Box
Issued 11 January 2005
Resolved
Outlet Box caugt fire as a result of being overloaded by extention cords used to energize the underhouse pipe strip heaters.
Condition: Damaged By Earlier Event
Due 25 January 2005
Resolved 11 January 2005
Resolution: Outlet box replaced
Electrical › Lighting (service) › Lighting Fixture
Issued 11 January 2005
Resolved
Florescent bulbs blown in cargo pump house.
Condition: Unknown
Due 25 January 2005
Resolved 11 January 2005
Resolution: Bulbs replaced
Deck/Cargo › Cargo Transfer/Lightering (liquid) › Cargo Pump
Issued 11 January 2005
Resolved
There was evidence of a leak on the cargo pump exhaust.
Condition: Unknown
Due 25 January 2005
Resolved 11 January 2005
Resolution: Upon further investigation the evidence of the leak was determined to be old and no existing leak was present.
Lifesaving › Inflatable Liferafts › Hydrostatic Release Unit
Issued 11 January 2005
Resolved
Life raft weak link was arranged improperly
Condition: Placed in Improper Service
Due 11 January 2005
Resolved 11 January 2005
Resolution: Vessel crew rearranged liferaft connection to work as designed.
Construction/Loadline › Hull › Hull Plating
Issued 9 March 2003
Resolved
Prior to vessel departure, a wriiten dive report must be submitted to thi office for review.
Condition: Damaged By Earlier Event
Due 10 April 2003
Resolved 9 March 2003