Professional
The full record for this vessel
Behind this panel: 2 inspections, each with its date, unit and type; 6 deficiencies with the resolution recorded against each; operational controls, none recorded without a removal date; no tow-unit appearances recorded; no other recorded names; no NVDC documentation record for this Official Number. Every line is a record the Coast
Guard wrote; the counts above are the same counts as in the summary, and they are free.
Professional is $39 a month or $299 a year,
or $19.99 a month locked for life at the founding rate, for the first 200 subscribers. It unlocks
every detail section on every vessel page, fleet watch tied to your account, and ownership records
on request. Already a subscriber? Sign in.
Maury does not score, rate or grade vessels, at any price.
Electrical › Electric Supply System (service) › Cable
Issued 3 April 2016
Resolved
0950-Electrical Equipment General. Wiring within the hazardous zone on the cargo deck near the Cargo Pump shut down, stuffing tubes for the ESD on the Catwalk and the tank level indicator for No.1 Cargo tank are deteriated. Cargo pump shut down pannel has a non intrinsically safe shore connection being utlized. Awaiting Classificaiton verification prior to vessel discharging cargo.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 3 April 2016
Resolved 4 April 2016
Resolution: Received, reviewed and accepted class report from ABS stating all electrical fittings have been repaired to the satisfaction of class.
Engineering › Fuel Oil Service System › Heater
Issued 3 April 2016
Resolved
1499-Other-Vessel is carrying Heavy Fuel Oil but unable to heat and use it due to malfunctioning steam heater-50a-SOLAS 97 I-11
Action required: 705 - Other - as specified
Due 3 May 2016
Resolved 17 May 2016
Resolution: PSC NOLA received a technician report from International Marine Automation satisfying the requirement.
Engineering › Fuel Oil Service System › Gauge
Issued 3 April 2016
Resolved
1499-Other-PSCO obsv an MGO flow meter with exposed wiring taped to a plastic water bottle-50a-SOLAS 97 I-11
Action required: 705 - Other - as specified
Due 3 May 2016
Resolved 3 April 2016
Resolution: Received, reviewed and accepted class report from ABS stating the crew repaired the flow meter and tested satisfactorily.
Accommodation/Occupational Safety › Potable Water System › General
Issued 3 April 2016
Resolved
0999-Other-PSCO obsv crew unable to activate decontamination shower and eye wash station on deck due to supply valve being closed. Crew opened valve and verified operation-10c-SOLAS (97) VII/13.1 IGC/14.4.3
Action required: 705 - Other - as specified
Due 3 April 2016
Resolved 3 April 2016
Resolution: Crew opened valve and verified operation prior to departure of examination team.
Deck/Cargo › Ballast › Piping
Issued 3 April 2016
Resolved
0940-Ballast Tanks-PSCO obsv the #2 Port BWT sounding pipe was missing its cap and crew was using a wooden plug to seal. Crew installed a proper fitting with cap prior to departure of examination team-10c-SOLAS (97) I-11
Action required: 705 - Other - as specified
Due 3 April 2016
Resolved 3 April 2016
Resolution: Crew installed a proper fitting with cap prior to departure of examination team
Engineering › Fuel Oil Service System › Piping
Issued 3 April 2016
Resolved
0750-Fire Prevention-PSCO obsv 5 double jacketed fuel lines on MDE loose. Crew tightened prior to departure of examination team-10c-SOLAS 97 II-2/2.7
Action required: 705 - Other - as specified
Due 3 April 2016
Resolved 3 April 2016
Resolution: Crew tightened prior to departure of examination team