Records from 2003 to 2018. Most recent: inspection, 25 May 2018.
Inspection history · 39
25 May 2018
Administrative Inspection · COI Inspection
Physical examination · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 6420539
4 April 2017
Annual Inspection
Physical examination · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 6117195
15 August 2016
Examination of Repairs · Damage Survey
Physical examination · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 5974101
29 February 2016
Internal Structural Exam · Deficiency Check · Periodic Inspection
Physical examination · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 5821804
17 September 2015
Examination of Repairs
Physical examination · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 5725498
19 March 2015
Annual Inspection · MTSA Verification
Physical examination · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 5089636
14 December 2014
Type not recorded
No type recorded · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 5039937
25 July 2014
Administrative Inspection
Administrative · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 4933536
10 July 2014
Annual Inspection · Internal Structural Exam
Physical examination · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 4909837
10 June 2014
Internal Structural Exam
Physical examination · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 4884896
1 May 2014
Internal Structural Exam
Physical examination · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 4848530
18 March 2014
Administrative Inspection · Examination of Repairs · Internal Structural Exam · Deficiency Check · Damage Survey
Physical examination · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 4818668
7 March 2014
Damage Survey
Physical examination · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 4812159
10 October 2012
Deficiency Check
Physical examination · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 4461318
5 October 2012
Type not recorded
No type recorded · Sector Southeast Alaska · USCG Arctic District (CGD-A) · Activity 4458089
13 September 2012
Damage Survey
Physical examination · Sector Southeast Alaska · USCG Arctic District (CGD-A) · Activity 4440967
12 September 2012
Type not recorded
No type recorded · Sector Southeast Alaska · USCG Arctic District (CGD-A) · Activity 4439515
19 April 2012
Annual Inspection · MARPOL Annex I Examination · MTSA Verification
Physical examination · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 4388318
25 January 2012
Type not recorded
No type recorded · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 4231812
21 December 2010
Type not recorded
No type recorded · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 3917973
18 December 2010
Damage Survey
Physical examination · Sector Columbia River · USCG Northwest District (CGD-NW) · Activity 3913671
29 April 2010
Annual Inspection
Physical examination · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 3723232
18 March 2009
Annual Inspection
Physical examination · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 3436368
2 March 2009
Type not recorded
No type recorded · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 3432175
9 January 2009
In-Service Inspection
Physical examination · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 3391525
15 July 2008
Type not recorded
No type recorded · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 3268720
12 July 2008
Type not recorded
No type recorded · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 3274733
12 May 2008
COI Inspection · Cargo Tank Internal · Drydock Exam · Internal Structural Exam
Physical examination · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 3204940
8 October 2007
Type not recorded
No type recorded · Sector Portland · USCG Northwest District (CGD-NW) · Activity 3076422
23 May 2007
MARPOL Annex I Examination · Annual Inspection
Physical examination · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 2936677
27 October 2006
Type not recorded
No type recorded · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 2849631
30 May 2006
Annual Inspection · Internal Structural Exam
Physical examination · Sector Portland · USCG Northwest District (CGD-NW) · Activity 2658780
22 June 2005
Periodic Inspection · MTSA Verification
Physical examination · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 2399510
9 June 2005
Type not recorded
No type recorded · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 2439263
2 August 2004
Annual Inspection
Physical examination · MSO PUGET SOUND · USCG Northwest District (CGD-NW) · Activity 2153516
19 July 2004
MTSA Verification
Physical examination · MSO PUGET SOUND · USCG Northwest District (CGD-NW) · Activity 2138550
23 January 2004
Type not recorded
No type recorded · MSO PORTLAND, OREGON · USCG Northwest District (CGD-NW) · Activity 1994179
3 December 2003
Security Plan Review - ASP
Administrative · Marine Safety Center (MSC) · Activity 1958301
8 May 2003
Hull Examination · Internal Structural Exam · MARPOL Annex I Examination · MARPOL Annex II Examination · COI Inspection · Construction Oversight
Physical examination · MSO PROVIDENCE · USCG Northeast District (CGD-NE) · Activity 1789157
Deck/Cargo › Cargo Transfer/Lightering (liquid) › Loading Arms
Issued 14 April 2016
Resolved
Cargo transfer hoses are past due for hydro testing. Prove hydro testing of cargo hoses prior to use.
Action required: 705 - Other - as specified
Due 29 April 2016
Resolved 29 April 2016
Deck/Cargo › Holds/Tanks › Tank Level Monitoring Device
Issued 14 April 2016
Resolved
#5P COT overfill alarm is inop. Prove operation of alarm.
Action required: 705 - Other - as specified
Due 29 April 2016
Resolved 29 April 2016
Deck/Cargo › Cargo Stowage › General
Issued 14 April 2016
Resolved
Fracturing of cargo tanks IWO Fr.s has resulted in multiple inserts to cargo tanks. Conduct non-destructive testing to determine the presence of subsurface defects in cargo tanks that have not inserted to include Fr.s 7P/S, 8P, 9P, 10P/S, 11P, 13P, 40S, 41P/S, 42S, 44S, 45P/S. Testing shall be conducted by a 3rd party and results submitted to Coast Guard and attending ABS surveyor for review.
Due 29 April 2016
Resolved 29 April 2016
Resolution: All remaining Fr.s were inserted IWO COT's.
Construction/Loadline › Structures › Transverse Bulkhead
Issued 29 February 2016
Resolved
Fwd void - C&R damaged bracket IWO SL2(stbd) and aft bulkhead.
Due 29 April 2016
Resolved 9 March 2016
Construction/Loadline › Hull › Girder
Issued 29 February 2016
Resolved
Void No. 1 Stbd - C&R deep transverse web from SL1 to SL4.
Due 29 April 2016
Resolved 9 March 2016
Construction/Loadline › Hull › Stringer
Issued 29 February 2016
Resolved
Void No. 1 Stbd - C@R BL's 1&3 from fwd blk aft 36" and renew brackets. BL's 2&4 from fwd blk aft 48" and renew brackets.
Due 29 April 2016
Resolved 18 March 2016
Construction/Loadline › Hull › Stringer
Issued 29 February 2016
Resolved
Void No. 1 Port - C@R BL's 1&3 from fwd blk aft 36" and renew brackets. BL's 2&4 from fwd blk aft 48" and renew brackets.
Due 29 April 2016
Resolved 18 March 2016
Construction/Loadline › Hull › Hull Plating
Issued 18 March 2014
Resolved
Provide repair proposal for Coast Guard review, then conduct repairs once approved.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 30 March 2014
Resolution: Repairs satisfactory.
Construction/Loadline › Hull › Transverse Frame
Issued 18 March 2014
Resolved
After every Ocean Transit, an inspection shall be conducted in all voids to examine the cargo tank shells. Inspect each frame joint on the out-board sides of the cargo tank knuckles for signs of cracking and leaks. This inspection shall be documented and submitted to Sector San [name withheld] Inspections via e-mail to: [email withheld]
Condition: Design Flaw
Due 2 May 2014
Resolved 9 May 2014
Resolution: Company has failed to comply with requirement. Issued more restrictive 835.
Construction/Loadline › Hull › Transverse Frame
Issued 18 March 2014
Resolved
Provide a structural analysis to determine the cause of frequent cracking in the outboard sides of the cargo tank knuckle plating. Analysis shall address all cargo tank fractures noted during dry-dock of 2013 and all that were found in March of 2014. Causative factors for all cracks should be identified.
Condition: Design Flaw
Due 2 May 2014
Resolved 9 May 2014
Resolution: Company has failed to comply with requirement. Issued more restrictive 835.
Construction/Loadline › Hull › Transverse Frame
Issued 18 March 2014
Resolved
Provide a proposed corrective action plan to prevent future cracking.
Condition: Design Flaw
Due 2 May 2014
Resolved 9 May 2014
Resolution: Company has failed to comply with requirement. Issued more restrictive 835.
Construction/Loadline › Hull › Transverse Frame
Issued 18 March 2014
Resolved
At least once every 90 days, an inspection shall be scheduled with the cognizant OCMI. A Marine Inspector will conduct internal structural exams of all voids to inspect the cargo tank shells. Each frame joint on the outboard sides of the cargo tank knuckles will be inspected carefully for signs of cracking and leaks. Exams shall be conducted until structural repairs have been approved & completed
Condition: Design Flaw
Action required: 705 - Other - as specified
Resolved 15 March 2016
Construction/Loadline › Hull › Transverse Frame
Issued 18 March 2014
Resolved
Provide a structural analysis to determine the cause of frequent cracking in the outboard sides of the cargo tank knuckle plating. Analysis shall address all cargo tank fractures noted during dry-dock of 2013 and all that were found in March of 2014. Causative factors for all cracks should be identified.
Condition: Improper/Lack of Maintenance
Due 30 July 2014
Resolved 22 July 2014
Resolution: Structural analysis has been submitted to ABS for review under NVIC 10-82.
Construction/Loadline › Hull › Transverse Frame
Issued 18 March 2014
Resolved
Provide a repair proposal to prevent future cracking of cargo tank structures.
Condition: Design Flaw
Due 30 July 2014
Resolved 22 July 2014
Resolution: Repair proposal has been submitted.
Deck/Cargo › Cargo Stowage › General
Issued 18 March 2014
Resolved
Offload all cargo, clean area adjacent to identified crack in cargo hold #3 and certify spaces safe for hot work.
Condition: Design Flaw
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 25 May 2015
Deck/Cargo › Holds/Tanks › Cargo Tank Arrangement/Size
Issued 18 March 2014
Resolved
Provide repair proposal for identified crack and affect repairs in accordance with USCG approved repair proposal to the satisfaction of the attending marine inspector.
Condition: Design Flaw
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 25 May 2015
Construction/Loadline › Structures › Longitudinal Bulkhead
Issued 18 March 2014
Resolved
Make void 1 available for internal exam at the vessel's next port call to San Francisco Bay (after 01 September 15) for the purpose of monitoring the fractured bottom longitudinal frames at bulkhead 6 and the outboard longitudinal to web frame weld fractures.
Action required: 705 - Other - as specified
Resolved 1 November 2015
Deck/Cargo › Holds/Tanks › Cargo Tank Arrangement/Size
Issued 7 March 2014
Resolved
Conduct survey and adequate repairs in accordance with all applicable ABS rules in the #3 and #5 double bottom voids.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 14 May 2014
Resolution: Received report from Elliot Bay which can be viewed in documents section of VCP.
Construction/Loadline › Structures › Superstructure
Issued 13 September 2012
Resolved
Crop and renew fractured bulkhead in way of #1 P tank forward above the main deck near centerline.
Action required: 705 - Other - as specified
Due 13 October 2012
Resolved 11 October 2012
Resolution: Fractured bulkhead renewed with weld procedure attached to activity 4461318.
Construction/Loadline › Hull › Stiffener
Issued 13 September 2012
Resolved
Renew wasted/fractured welds for stiffener brackets fwd of #1 S and #1 P tank bulkheads on/above the main deck.
Action required: 705 - Other - as specified
Due 13 October 2012
Resolved 10 October 2012
Resolution: Attended renewed welds for stiffener brackets forward of #1 S and #1 P tanks.
Construction/Loadline › Hull › Stiffener
Issued 13 September 2012
Resolved
Vessel must conduct repairs after offloading all cargo. A marine chemist must certify tanks safe for hot work. No cargo may be loaded until repairs are made.
Action required: 701 - Prior to carriage of passengers/cargo
Due 13 October 2012
Resolved 11 October 2012
Resolution: Repairs complete and vacuum box testing satisfactory.
Construction/Loadline › Hull › Longitudinal Frame
Issued 18 December 2010
Resolved
Submit plan for approval, to repair the following tripped/fractured internal structures: Bottom longs and bulkhead brackets in fwd rake; bottom longs in port side #1 double bottom void; 2nd sideshell long from bottom and bulkhead bracket in #1 port wing void. See activity narrative and/or on board handwritten CG 835 for specific locations.
Due 18 February 2011
Resolved 3 February 2011
Deck/Cargo › Vapor Control Systems › Piping/Hoses
Issued 28 May 2008
Resolved
Vapor control lines need to be labeled with red yellow red markings with black VAPOR lettering over yellow section.
Condition: Design Flaw
Due 2 June 2008
Resolved 28 May 2008
Construction/Loadline › Structures › Door
Issued 28 May 2008
Resolved
Gasket on generator ventilation door needs to be replaced.
Condition: Improper/Lack of Maintenance
Due 30 May 2008
Resolved 28 May 2008
Navigation › Collision/Grounding Avoidance › Navigation Lights
Issued 28 May 2008
Resolved
Port side red navigation light and yellow pushing ahead light need to be repaired and operable.
Due 30 May 2008
Resolved 28 May 2008
Electrical › Lighting (emergency) › Lighting Fixture
Issued 28 May 2008
Resolved
Blue loss of power light needs to be repaired.
Due 30 May 2008
Resolved 28 May 2008
Pollution Prevention/Response › Prevention Equipment › Overfill Devices
Issued 28 May 2008
Resolved
Overfill alarm does not have a seperate distinctive audible sound.
Due 30 May 2008
Resolved 28 May 2008
Deck/Cargo › Cargo Transfer/Lightering (liquid) › Piping
Issued 28 May 2008
Resolved
Transfer piping needs to be hydrostatically tested and stamped.
Condition: Improper/Lack of Maintenance
Due 30 May 2008
Resolved 28 May 2008
Construction/Loadline › Hull › Bracket
Issued 12 May 2008
Resolved
Repair 3 tripped and corroded brackets in starboart bow rake.
Condition: Damaged By Earlier Event
Due 30 May 2008
Resolved 16 May 2008
Documentation › Manuals/Policy Documentation › Transfer Procedures
Issued 23 May 2007
Resolved
Provide copy of updated Below Deck Piping Diagram in the Oil Transfer Procedures.
Due 23 May 2007
Resolved 23 May 2007
Resolution: Corrected on the spot.