Records from 2003 to 2021. Most recent: inspection, 19 October 2021.
A report is not offered for this hull: Its record holds only 2 of the seven kinds of material a report is built from: inspections, deficiencies, operational controls, tow-unit appearances, casualty records, dimensions and documentation. That is a statement about the record, not about the vessel. Reports.
Inspection history · 6
19 October 2021
Deficiency Check · PSC B
Physical examination · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 7335085
19 September 2019
Deficiency Check
Physical examination · U.S. COAST GUARD FORCES MICRONESIA/SECTOR GUAM · USCG Oceania District (CGD-O) · Activity 6815465
16 September 2019
Ballast Water Examination · PII Safety Exam · ISPS II Exam
Physical examination · U.S. COAST GUARD FORCES MICRONESIA/SECTOR GUAM · USCG Oceania District (CGD-O) · Activity 6809820
10 June 2008
Ballast Water Examination · Deficiency Check · PII Safety Exam · ISPS II Exam
Physical examination · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 3232226
21 July 2006
PII Safety Exam · Ballast Water Examination · ISPS II Exam
Physical examination · U.S. COAST GUARD FORCES MICRONESIA/SECTOR GUAM · USCG Oceania District (CGD-O) · Activity 2718790
26 March 2003
MARPOL Annex I Examination · Ballast Water Examination · Annual Inspection
Physical examination · MSO PORTLAND, OREGON · USCG Northwest District (CGD-NW) · Activity 1763236
02 - Structural Conditions › N/A - No Subsystem › Other (Structural condition)
Issued 19 October 2021
Resolved
After any survey of the ship under regulations 7,8,9 or 10 of this chapter has been completed, no change shall be made in the structural arrangements, machinery , equipment, etc. Covered by the survey, without the sanction of the administration. Soft patch on #3 generator raw water intake due to wasted pipe. 74SOLAS(74)I/11
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Resolved 22 October 2021
Resolution: Received and reviewed Class report attesting to repairs. Attended vessel to verify completion of repairs.
14 - Pollution Prevention › 141 - MARPOL Annex I › Oil filtering equipment
Issued 19 October 2021
Resolved
Except as specified in paragraph 3 of this regulation, any ship of 10,000 gross tonnage and above shall be fitted with oil filtering equipment complying with paragraph 7 of this regulation. Vessel's oily water separator is inoperable.
73MARPOL(2017)I/14.2
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Resolved 22 October 2021
Resolution: Received and reviewed Class report attesting to repairs. Attended vessel to witness function test of OWS.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 19 October 2021
Resolved
All exposed metal parts of electrical machines or equipment which are not intended to be "live" but are liable to become "live" under fault condition, shall be earthed, and all electrical apparatus shall be so constructed and so installed that danger of injury in ordinary handling shall not exist. Dead end wires found in engine room, one for CSC filter separator, the other starboard side, one deck above the OWS. 74SOLAS(74)II-1/27(a)(i)(1)
Condition: Improper Installation
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 22 October 2021
Resolution: Received and reviewed Class report attesting to repairs. Attended vessel to verify completion of repairs.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 19 October 2021
Resolved
MAIN AND EMERGENCY SWITCHBOARDS SHALL BE SO ARRANGED AS TO GIVE EASY ACCESS BACK AND FRONT, WITHOUT DANGER TO ATTENDENTS. EQUIPMENT STORED BEHIND SWITCHBOARDS RESTRICTING EASY ACCESS.
74SOLAS(74)II-1/27(a)(ii)
Condition: Improper Installation
Action required: 10 - Deficiency Rectified
Resolved 19 October 2021
Resolution: Corrected on the spot.
99 - Other › N/A - No Subsystem › Other (MARPOL operational)
Issued 19 October 2021
No resolution recorded
VESSEL MUST MAINTAIN A BALLAST WATER MANAGEMENT PLAN THAT HAS BEEN DEVELOPED SPECIFICALLY FOR THE VESSEL AND THAT WILL ALLOW THOSE RESPONSIBLE FOR THE PLAN'S IMPLEMENTATION TO UNDERSTAND AND FOLLOW THE VESSELS BWM STRATEGY. THE PLAN MUST INCLUDE PROCEDURES FOR COORDINATING THE SHIPBOARD BWM STRATEGY WITH U.S. COAST GUARD AUTHORITIES. VESSEL DID NOT HAVE PROCEDURES TO COORDINATE WITH THE COAST GUARD IN ITS BWM PLAN, OR PROCEDURES FOR U.S. REGULATIONS.
33CFR151.2056(G)
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
02 - Structural Conditions › N/A - No Subsystem › Other (Structural condition)
Issued 16 September 2019
Resolved
All inlets and discharges in the shell plating shall be fitted with efficient and accessible arrangements for preventing the accidental admission of water into the ship.
-OWS overboard discharge valve is not capable of fully securing, allowing for the ingress of water.
74SOLAS Ch. II-1, Regulation 14(i)(i); Code 60A/C
Action required: 60 - Rectify deficiencies prior to movement
Resolved 19 September 2019
Resolution: BV Class Report recevied clearing deficiency, see docs.
Pollution Prevention/Response › Response Equipment › Non-sparking Hand Scoops/Shovels/Buckets
Issued 10 June 2008
Resolved
SOPEP kit does not contain the required non-spark producing shovels. SOPEP kit only has metal shovels at this time.
33 CFR 155.205(b)(2). To the satisfaction of the Coast Guard
s/ [name withheld]
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Resolved 11 June 2008
Resolution: Vessel ordered new plastic shovels to replace the metal ones.
s/[name withheld]
Fire Fighting › Miscellaneous Items › Paint/Flammable Liquid Lockers
Issued 10 June 2008
Resolved
The plastic cover on the explosion proof lighting in the paint locker is brocken allowing fumes to enter light fixture which may cause ignition of fumes in paint locker.
SOLAS 74 (2004 cons.) II-I/45.10.2: To the satisfaction of the Coast Guard: s/[name withheld]
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Resolved 11 June 2008
Resolution: Crew replaced broken light fixture with the old explosion proof lighting fixture.