Records from 2003 to 2023. Most recent: inspection, 6 June 2023.
10 - Safety of Navigation › N/A - No Subsystem › Signalling lamp
Issued 8 June 2023
Resolved
A power driven vessel underway shall exhibit a stern light. Vessel's stern light was fully obstructed by vessel stowed on deck.
Condition: Placed in Improper Service
Action required: 60 - Rectify deficiencies prior to movement
Resolved 12 September 2023
Resolution: stern light moved higher up on the pilot house
05 - Radio Communications › N/A - No Subsystem › VHF radio installation
Issued 8 June 2023
Resolved
Every ship shall be provided with a VHF Radio capable of transmitting and receiving DSC... Vessel did not have a long range radio capable of DSC.
Condition: Invalid
Action required: 60 - Rectify deficiencies prior to movement
Resolved 12 September 2023
Resolution: MF Dsc capable radio installed
10 - Safety of Navigation › N/A - No Subsystem › Lights, shapes, sound-signals
Issued 8 June 2023
Resolved
A vessel of 12 meters or more... shall be provided with a whistle. Ship's whistle does not function.
Condition: Improper/Lack of Maintenance
Action required: 60 - Rectify deficiencies prior to movement
Resolved 12 September 2023
Resolution: diaphragm replaced in ships whistle.
11 - Life Saving Appliances › N/A - No Subsystem › Inflatable liferafts
Issued 8 June 2023
Resolved
The installations of all life saving appliances and arrangements must be in accordance with subchapter W. Life raft not installed in proper float free arrangement.
Condition: Improper Installation
Action required: 60 - Rectify deficiencies prior to movement
Resolved 12 September 2023
Resolution: liferaft cradle properly fixed to the deck
10 - Safety of Navigation › N/A - No Subsystem › Lights, shapes, sound-signals
Issued 8 June 2023
Resolved
A vessel at anchor shall exhibit... an all around white light. Vessel's anchor light was not functional.
Condition: Improper/Lack of Maintenance
Action required: 60 - Rectify deficiencies prior to movement
Resolved 12 September 2023
Resolution: light replaced
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 8 June 2023
Resolved
The installation of all systems of a marine engineering nature, together with details of design... shall be in accordance with the requirements of subchapter F. Vessel's STBD diesel generator had major fuel leak.
Condition: Improper/Lack of Maintenance
Action required: 60 - Rectify deficiencies prior to movement
Resolved 12 September 2023
Resolution: leak repaired
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 8 June 2023
Resolved
The installation of all systems of a marine engineering nature, together with details of design... shall be in accordance with the requirements of subchapter F. Engine is not drawing water in order to keep the system cooling.
Condition: Improper/Lack of Maintenance
Action required: 60 - Rectify deficiencies prior to movement
Resolved 12 September 2023
Resolution: sea strainers cleaned, allowing more cooling water through system
07 - Fire Safety › N/A - No Subsystem › Fire pumps and its pipes
Issued 8 June 2023
Resolved
All piping, valves and fittings shall meet the applicable requirements of subchapter F. Fireman was weathering and compromised with a hole.
Condition: Damaged By Earlier Event
Action required: 60 - Rectify deficiencies prior to movement
Resolved 12 September 2023
Resolution: fire main repaired
09 - Working and Living Conditions › 092 - Working Conditions › Anchoring devices
Issued 8 June 2023
Resolved
Vessels under 200 feet maybe equipped with either one anchor and one half length of anchor chain listed in the applicable standard. Vessel's didn't have and anchor line ready.
Condition: Placed in Improper Service
Action required: 60 - Rectify deficiencies prior to movement
Resolved 12 September 2023
Resolution: new anchor line brought onboard
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Gauges, thermometers, etc
Issued 8 June 2023
Resolved
The installation of all systems of a marine engineering nature, together with details of design... shall be in accordance with the requirements of subchapter F. Vessel's exhaust bracket crack.
Condition: Improper/Lack of Maintenance
Action required: 60 - Rectify deficiencies prior to movement
Resolved 12 September 2023
Resolution: bracket welded
01 - Certificates & Documentation › 011 - Ships Certificates › Load Lines (including Exemption)
Issued 8 June 2023
Resolved
International Load Line Certificate shall not be delivered to the ship until the officer or surveyor acting under the provisions of article 13 of the convention has certified that the marks are correctly and permanently indicated on the ships sides. Ship's load lines and plimsoll mark are not properly reflected from the certificate.
Condition: Improper Installation
Action required: 60 - Rectify deficiencies prior to movement
Resolved 12 September 2023
Resolution: load lines marked properly in accordance with ILLC
01 - Certificates & Documentation › 012 - Crew Certificates › Endorsement by flagstate
Issued 8 June 2023
Resolved
Each Administration shall ensure that the provisions of this regulation are complied with, in order to recognize, by endorsement in accordance with regulation I/2, paragraph 7, a certificate issued by or under the authority of another party. No flag state endorsements were held by any of the certificated officers.
Condition: Invalid
Action required: 60 - Rectify deficiencies prior to movement
Resolved 12 September 2023
05 - Radio Communications › N/A - No Subsystem › INMARSAT ship earth station
Issued 8 June 2023
Resolved
Every ship engaged on voyages beyond sea areas A1 and A2, but remaining within sea area A3 be provided with inmarsat earth radio.... Vessel does not have a GMDSS radio station
Condition: Improper Installation
Action required: 60 - Rectify deficiencies prior to movement
Resolved 12 September 2023
Resolution: class approved vessel to sail one time without GMDSS
Stability › Watertight Integrity › Watertight Subdivision Standard
Issued 30 October 2015
Resolved
During testing of the vessel's water-tight doors, the wheel handle to the water-tight door to/from the engine room did not operate properly, and the gasket of the water-tight door between the accommodation spaces did not pass a 'chalk test' along the door's bottom edge. All water-tight doors must work properly and gasket material be deemed satisfactory. IAW 46 CFR 179.330 & 46 CFR 176.802
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Due 30 October 2015
Resolved 31 October 2015
Resolution: Vsl repaired all doors
Electrical › Lighting (service) › Lighting Fixture
Issued 30 October 2015
Resolved
Vessel had a cracked light cover in the generator passageway. Light cover to be re-placed. IAW 46 CFR 183.210
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 30 November 2015
Resolved 20 November 2015
Resolution: Resolved to the satisfaction of the Marine Inspection.
Engineering › Bilge Water Management System › Manifold
Issued 30 October 2015
Resolved
Vessel's bilge manifold system is not properly labeled. Manifold system shall be labeled in an understandable and proper way. IAW 46 CFR 182.500
Condition: Invalid
Action required: 705 - Other - as specified
Due 30 November 2015
Resolved 20 November 2015
Resolution: Resolved to the satisfaction of the Marine Inspection.
Operations/Management › Pollution › Retention of Oily Mixture
Issued 30 October 2015
Resolved
Vessel had oily water in its bilges. All bilges shall be cleaned of oily water. IAW 46 CFR 176.830
Action required: 705 - Other - as specified
Due 30 November 2015
Resolved 30 October 2015
Resolution: Vessel crew were able to clean the oily water from the bilges prior to completion of the inspection.
Fire Fighting › Miscellaneous Items › Waste Receptacles
Issued 30 October 2015
Resolved
Vessel had some plastic trash cans onboard in the accommodation spaces. All trash cans (waste receptacles) shall be constructed of non-combustible materials. IAW 46 CFR 177.405
Action required: 705 - Other - as specified
Due 30 November 2015
Resolved 20 November 2015
Resolution: Resolved to the satisfaction of the Marine Inspection.
Fire Fighting › Means of Escape › Escape Route Signs
Issued 30 October 2015
Resolved
Vessel had some emergency exit signage that was faded and not clearly marked. All emergency exit signage shall be clearly marked. IAW 46 CFR 185.606
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 30 November 2015
Resolved 20 November 2015
Resolution: Resolved to the satisfaction of the Marine Inspection.
Accommodation/Occupational Safety › Medical/First Aid › Medicine Chest
Issued 30 October 2015
Resolved
Vessel had expired eye wash and first aid items onboard (which were in excess of required first-aid kits that were satisfactory). All expired items shall be properly disposed of and re-newed as needed. IAW 46 CFR 184.710
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 30 November 2015
Resolved 20 November 2015
Resolution: Resolved to the satisfaction of the Marine Inspection.
Electrical › Lighting (emergency) › Lighting Fixture
Issued 30 October 2015
Resolved
Vessel has an emergency light cover that is partially broken off from the bulkhead in the passageway going to the engine room. Cover must be satisfactorily reattached/fixed. IAW 46 CFR 183.220
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 30 November 2015
Resolved 20 November 2015
Resolution: Resolved to the satisfaction of the Marine Inspection.
Lifesaving › Lifefloat › Floating Electric Waterlight
Issued 30 October 2015
Resolved
The batteries for the vessel's floating waterlights (for its lifefloats and ring buoy) were past their expiration dates. All waterlight batteries shall be replaced. IAW 46 CFR 180.175
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 30 November 2015
Resolved 30 October 2015
Resolution: Vessel representative went out and purchased new batteries prior to completion of the inspection.
Lifesaving › Lifefloat › Retroreflective Material
Issued 30 October 2015
Resolved
Retro-reflective tape on two of the vessel's starboard-side stowed life floats was in poor/unsatisfactory condition. New SOLAS type retro-reflective tape shall be applied onto the life floats in question. IAW 46 CFR 180.137
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 30 November 2015
Resolved 30 October 2015
Resolution: Vessel representative went out and purchased required retro-reflective tape for application on the affected life floats, prior completion of the inspection.
Construction/Loadline › Structures › Superstructure
Issued 30 October 2015
Resolved
The cover plate for the collision bulkhead reach-rod and emergency fuel shut-off does not operate properly/is not in a satisfactory condition. The cover plate shall be made satisfactorily operable.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 30 November 2015
Resolved 20 November 2015
Resolution: Resolved to the satisfaction of the Marine Inspection.
Fire Fighting › Remote Fuel Shutoff › General
Issued 30 October 2015
Resolved
The vessel's remote (on-deck) fuel shut-offs did not have markings for direction of operation. All fuel shut-offs shall be marked with indication of direction of operation. IAW 46 CFR 185.608
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 30 November 2015
Resolved 20 November 2015
Resolution: Resolved to the satisfaction of the Marine Inspection.
Electrical › Electric Supply System (service) › Battery Installation
Issued 30 October 2015
Resolved
Vessel's battery box connectors were not all tight. All battery box connectors and wire-eye fittings shall be tightened and re-newed as needed. IAW 46 CFR 183.350
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 30 November 2015
Resolved 20 November 2015
Resolution: Resolved to the satisfaction of the Marine Inspection.
Operations/Management › Drug and Alcohol Testing › Proof of Enrollment
Issued 30 October 2015
Resolved
Vessel/Company did not have a list of employees enrolled in its drug-testing consortium. A list (from the drug-testing consortium) shall be provided, with all company vessel crewmembers enrolled listed. IAW 46 CFR 16.203
Condition: Invalid
Action required: 705 - Other - as specified
Due 30 November 2015
Resolved 20 November 2015
Resolution: Resolved to the satisfaction of the Marine Inspection.
Engineering › Freshwater System (jacketwater cooling) › Piping
Issued 30 October 2015
Resolved
Vessel had a jacket-water pipe, of its starboard generator, which was rubbing/vibrating against other parts of the machinery. Jacket-water pipe shall be properly secured to minimize rubbing/vibration. IAW 46 CFR 176.830
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 30 November 2015
Resolved 30 October 2015
Resolution: Vessel crew re-mounted the jacket-water pipe to minimize/eliminate rubbing/vibration prior to completion of the inspection.
Engineering › Engine Controls (Electric/Electronic) › Linkage
Issued 30 October 2015
Resolved
The D/C power box of the vessel's #1 port-side (outboard) engine was opened/not sealed properly. The box shall be closed and sealed in a satisfactory manner. IAW 46 CFR 176.830
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 30 November 2015
Resolved 30 October 2015
Resolution: Vessel crew closed and properly sealed the box in a satisfactory manner, prior to completion of the inspection.
Fire Fighting › Means of Escape › Escape Route Signs
Issued 10 November 2010
Resolved
Emegency exit sign was damaged port side escape hatch. Sign needs to be replaced.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 12 November 2010
Fire Fighting › Ventilation Systems › Ducts
Issued 10 November 2010
Resolved
Manual vents are not operational. Maintenance required. In addition, label all vents.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 12 November 2010
Construction/Loadline › Hull › Weld
Issued 10 November 2010
Resolved
Port side corner of rudder room has apparent punture hole. Reweld weld.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 12 November 2010
Construction/Loadline › Hull › Hull Plating
Issued 10 November 2010
Resolved
Crop and renew and place insert on starboard corner of rudder room.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 12 November 2010
Electrical › Electric Generation Source (service) › Overcurrent Device
Issued 8 October 2008
Resolved
Provide 3rd party service report indicating proper operation of overspeeds
Action required: 705 - Other - as specified
Resolved 9 October 2008
Resolution: Received report indicating proper operation
Lifesaving › Buoyant Apparatus › Float Free
Issued 8 October 2008
Resolved
Redo painter/weak link for proper deployment of lfoat free arangement
Action required: 705 - Other - as specified
Due 8 October 2008
Resolved 9 October 2008
Resolution: Fixed
Fire Fighting › Fixed CO2 Fire Extinguishing System › Servicing
Issued 8 October 2008
Resolved
Replace flexiable hoses on CO2 fire fighting system and provide report
Action required: 705 - Other - as specified
Due 8 October 2008
Resolved 9 October 2008
Resolution: Recieved report documenting replacement of hoses.
Engineering › Steering Gear System › Linkage
Issued 8 October 2008
Resolved
Readjust steering linkage to prevent the impact on steering blocks when rudder turned hard to port or starboard
Action required: 705 - Other - as specified
Due 8 October 2008
Resolved 9 October 2008
Resolution: Fixed
Lifesaving › Emergency Outfit › Lifeline and Belt/Harness
Issued 20 September 2006
Resolved
CONDUCT MONTHLY INSPECTION OF RESCUE HARNESS AND LOG SAME
Action required: 17 - Rectify deficiencies prior to departure
Due 20 October 2006
Resolved 20 September 2006
Resolution: COMPLETED.
Electrical › Electrical Distribution System (service) › Junction Box
Issued 20 September 2006
Resolved
INSTALL SWITCH COVER IN PORT SIDE LOCKER ELECTRICAL BOX.
Action required: 17 - Rectify deficiencies prior to departure
Due 20 October 2006
Resolved 20 September 2006
Resolution: COMPLETED.
Navigation › Collision/Grounding Avoidance › Danger Messages
Issued 20 September 2006
Resolved
PROVIDE AND INSTALL APPROVED BELL PRIOR TO SAILING.
Action required: 17 - Rectify deficiencies prior to departure
Due 20 October 2006
Resolved 20 October 2006
Resolution: COMPLETED
Construction/Loadline › Penetrations › Gasket
Issued 20 September 2006
Resolved
INSTALL HARD APPROVED GASKET ON MAIN DECK WATER TIGHT DOOR.
Action required: 17 - Rectify deficiencies prior to departure
Due 20 October 2006
Resolved 20 September 2006
Resolution: COMPLETED.
Construction/Loadline › Structures › Door
Issued 20 September 2006
Resolved
ADJUST WATER TIGHT DOOR DOGS AS MARKED.
Action required: 17 - Rectify deficiencies prior to departure
Due 20 October 2006
Resolved 20 September 2006
Resolution: COMPLETED.
Documentation › Manuals/Policy Documentation › Transfer Procedures
Issued 20 September 2006
Resolved
DISPLAY F/O TRANSFER PROCEDURES AT PUMP PRIOR TO THE TRANSFER OF FUEL.
Action required: 705 - Other - as specified
Due 20 October 2006
Resolved 20 September 2006
Resolution: COMPLETED
Lifesaving › Buoyant Apparatus › Lifeline
Issued 20 September 2006
Resolved
RENEW ALL U/V RESISTANT BLACK LINE ON ALL RING BOUYS AS MARKED.
Action required: 17 - Rectify deficiencies prior to departure
Due 20 October 2006
Resolved 20 September 2006
Resolution: COMPLETED.
Construction/Loadline › Hull › Side Shell
Issued 30 January 2006
Resolved
Crop and renew fractured side shell plating in way of No. 6 starboard ballast tank to the satisfaction of the attending marine inspector.
Condition: Unknown
Action required: 705 - Other - as specified
Due 1 February 2006
Resolved 31 January 2006
Resolution: Provided insert in way of sideshell and tested to the satisfaction on marine inspector.
Electrical › Lighting (emergency) › Lighting Fixture
Issued 1 November 2005
Resolved
All emergency lights are missing the required one inch 'E' labels.
Condition: Improper/Lack of Maintenance
Due 14 December 2005
Resolved 21 November 2005
Resolution: Company representative verified that all e-lights have been labeled.
Communications › Radio Communications › EPIRB
Issued 1 November 2005
Resolved
The hydro-static release for the EPIRB was out of date.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 21 November 2005
Resolution: Company rep provided a copy of a receipt for a new hydro-static release.
Documentation › Certificates/Documents
Issued 29 October 2003
Resolved
Provide ABS International Load Line Certificate. LEGACY COMPONENT DESC: International Load Line Certificate
Action required: 705 - Other - as specified
Due 31 October 2003
Resolved 31 October 2003
Resolution: Received a copy of the ABS International Load Line Certificate.
Engineering › Diesel Engine (propulsion-reduction gear)
Issued 29 October 2003
Resolved
Repair exhaust leak on #1 and #4 Main Diesel Engines as required by 46 CFR 182.430(b). LEGACY COMPONENT DESC: Piping (exhaust)
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 31 October 2003
Resolved 30 October 2003
Resolution: Witnessed a satisfactory test of the #1 and #4 Main Diesel Exhaust systems.
Construction/Loadline › Structures
Issued 29 October 2003
Resolved
Prove proper operation of port engine room exhaust fan as required by 46 CFR 182.465(a). LEGACY COMPONENT DESC: Ventilators
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 31 October 2003
Resolved 30 October 2003
Resolution: Witnessed proper operation of port engine room exhaust fan.
Electrical › Electric Generation Source (service)
Issued 29 October 2003
Resolved
Provide data plate showing the generators are designed for an ambient temperature of 50 degrees celsius or derate over current devices accordingly as required by 46 CFR 183.320(b). LEGACY COMPONENT DESC: Generator
Condition: Unknown
Action required: 705 - Other - as specified
Due 31 October 2003
Resolved 31 October 2003
Resolution: Inspected the installation of generator data plates showing that both generators were rated at 50 degrees celsius
Operations/Management › Drills/Instruction › Fire
Issued 29 October 2003
Resolved
Conduct fire drill as required by 46 CFR 185.524. LEGACY COMPONENT DESC: Fire
Action required: 701 - Prior to carriage of passengers/cargo
Due 30 November 2003
Resolved 28 January 2005
Operations/Management › Drills/Instruction › Abandon Ship
Issued 18 September 2003
Resolved
Conduct abandon ship and man overboard drills as required by 46 CFR 185.520. LEGACY COMPONENT DESC: Abandon Ship/Man Overboard Drills
Action required: 701 - Prior to carriage of passengers/cargo
Due 30 November 2003
Resolved 28 January 2005