Records from 2003 to 2019. Most recent: inspection, 22 August 2019.
A report is not offered for this hull: Its record holds only 2 of the seven kinds of material a report is built from: inspections, deficiencies, operational controls, tow-unit appearances, casualty records, dimensions and documentation. That is a statement about the record, not about the vessel. Reports.
Inspection history · 34
22 August 2019
Administrative Inspection
Administrative · Sector Upper Mississippi River · USCG Heartland District (CGD-H) · Activity 6830066
19 August 2019
Administrative Inspection
Administrative · Sector Upper Mississippi River · USCG Heartland District (CGD-H) · Activity 6788086
8 February 2019
Administrative Inspection
Administrative · Sector Upper Mississippi River · USCG Heartland District (CGD-H) · Activity 6622668
22 August 2018
Administrative Inspection
Administrative · Sector Upper Mississippi River · USCG Heartland District (CGD-H) · Activity 6519678
3 May 2018
Administrative Inspection · COI Inspection · DAPI Audit
Physical examination · Sector Upper Mississippi River · USCG Heartland District (CGD-H) · Activity 6404982
25 January 2017
Administrative Inspection
Administrative · Sector Delaware Bay · USCG East District (CGD-E) · Activity 6077146
18 July 2016
Administrative Inspection · Examination of Repairs
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 5944728
17 March 2016
Administrative Inspection
Administrative · Sector Delaware Bay · USCG East District (CGD-E) · Activity 5843262
10 March 2016
In-Service Inspection
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 5830675
25 February 2016
Administrative Inspection · Annual Inspection
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 5821369
18 September 2015
In-Service Inspection
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 5732903
17 June 2014
In-Service Inspection
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 4913762
23 May 2014
Administrative Inspection
Administrative · Sector Delaware Bay · USCG East District (CGD-E) · Activity 4866288
17 January 2012
Annual Inspection · DAPI Audit
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 4228313
8 December 2011
Examination of Repairs
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 4206279
18 February 2011
Annual Inspection
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 3948249
3 March 2010
Deficiency Check
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 3688974
2 February 2010
Annual Inspection
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 3674006
14 July 2009
Examination of Repairs
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 3534038
9 April 2009
Damage Survey
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 3449136
8 April 2009
Type not recorded
No type recorded · Sector Delaware Bay · USCG East District (CGD-E) · Activity 3449140
18 February 2009
Hull Examination · COI Inspection
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 3419505
11 December 2008
Examination of Repairs
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 3378351
30 August 2008
In-Service Inspection
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 3312892
11 January 2008
Drydock Exam · Examination of Repairs · Annual Inspection
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 3128761
18 June 2007
Annual Inspection
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 2966348
20 March 2006
Annual Inspection
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 2605588
18 July 2005
Damage Survey
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 2430844
16 July 2005
Type not recorded
No type recorded · Sector Delaware Bay · USCG East District (CGD-E) · Activity 2434449
1 April 2005
Annual Inspection
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 2367250
18 March 2004
Construction Oversight · COI Inspection
Physical examination · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 2040823
3 February 2004
Initial Certification
Physical examination · MSO ST LOUIS · USCG Heartland District (CGD-H) · Activity 1988370
2 April 2003
Construction Oversight
Physical examination · MSO ST LOUIS · USCG Heartland District (CGD-H) · Activity 1762021
12 February 2003
Construction Oversight
Physical examination · MSO ST LOUIS · USCG Heartland District (CGD-H) · Activity 1740665
01 - Certificates & Documentation › 011 - Ships Certificates › Certificate of Inspection (COI)
Issued 19 February 2019
No resolution recorded
Demonstrate compliance with new Conditions of Operation listed on amended COI.
Action required: 17 - Rectify deficiencies prior to departure
Engineering › Fuel Oil Service System › Gauge
Issued 23 May 2018
Resolved
During the operational test of the vessel it was discovered that the fuel gauge was inoperable.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 23 June 2018
Resolved 14 August 2018
Resolution: Received email verification that the fuel gauge has been fixed and is now operable.
Electrical › Lighting (service) › Lighting Branch Circuit
Issued 23 May 2018
Resolved
During shoreside inspection it was discovered that the vessels dome lights were inoperable.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 23 June 2018
Resolved 14 August 2018
Resolution: Received email verification that the dome light circuit has been repaired and they are now operable.
Documentation › Logs/Records › Logbook/Record (unofficial)
Issued 23 May 2018
No resolution recorded
In accordance with agreement between RTD and SUMR, during COI inspections RTD will provide a list of applicable plans for the vessel and a certified weight ticket. The documents were not provided.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 23 June 2018 — due date passed with no resolution recorded
Navigation › Collision/Grounding Avoidance › Navigation Lights
Issued 23 May 2018
Resolved
During the shoreside inspection, it was discovered that the vessel's stern light was inoperable. This deficiency was corrected on scene.
Condition: Improper/Lack of Maintenance
Action required: 10 - Deficiency Rectified
Resolved 23 May 2018
Resolution: This deficiency was corrected on scene.
Operations/Management › Lifesaving › Op Readiness/Maintenance/Inspection
Issued 23 May 2018
Resolved
During shoreside inspection, emergency egress side curtains wiring was damaged during operational test. This deficiency was corrected on scene.
Condition: Damaged By Earlier Event
Action required: 10 - Deficiency Rectified
Resolved 23 May 2018
Resolution: This deficiency was corrected on scene.
Operations/Management › Drills/Instruction › Not Conducted
Issued 20 January 2012
Resolved
Conduct drills.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 29 February 2012
Resolution: Witnessed sat drills.
Operations/Management › Drills/Instruction › Not Conducted
Issued 18 February 2011
Resolved
Conduct Drills
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 6 April 2011
Resolution: Sat drills conducted.
Construction/Loadline › Hull › Hull Plating
Issued 18 February 2011
Resolved
Provide access for inspection of bulwarks.
Action required: 705 - Other - as specified
Due 16 March 2011
Resolved 9 March 2011
Resolution: Holes drilled for access w/ inspection scope.
Engineering › Pressure Vessel › Marking and Stamping
Issued 18 February 2011
Resolved
Prove compliance w/46 CFR 54.01-5(c)(3) for pressure vessel.
Action required: 705 - Other - as specified
Due 16 September 2011
Resolved 30 August 2011
Resolution: Received letter E1-1102506 from MSC.
Engineering › Fuel Oil Storage/Transfer System › Tank
Issued 18 February 2011
Resolved
Prove fuel tank meets 46 CFR 182.440(a)(1) note 5.
Action required: 705 - Other - as specified
Due 16 March 2011
Resolved 6 April 2011
Resolution: Fuel tank accecpted by [name withheld] 1-01.
Engineering › Freshwater System (jacketwater cooling) › Piping
Issued 18 February 2011
Resolved
Prove compliance with 46 CFR 182.422(c) regarding keel cooler instalation
Action required: 705 - Other - as specified
Due 16 March 2011
Resolved 6 April 2011
Resolution: Reviewed sat plans.
Engineering › Freshwater System (intermediary cooling) › Hose
Issued 18 February 2011
Resolved
Prove transmission keel cooler hoses meet 46 CFR 182.720(e)
Action required: 705 - Other - as specified
Due 16 March 2011
Resolved 6 April 2011
Resolution: Determined hoses were in fact J-1942 listed.
Engineering › Fuel Oil Service System › Suction Strainer
Issued 18 February 2011
Resolved
Prove compliance with 46 CFR 182.455(b)(6) regarding drip pans.
Action required: 705 - Other - as specified
Due 16 March 2011
Resolved 24 October 2011
Resolution: Drip pans fabricated & installed.
Engineering › Shafting/Propeller Arrangements › Propeller (fixed pitch)
Issued 18 February 2011
Resolved
Prove compliance with 46 CFR 182.200(a) regarding engine transmission and propeller
Action required: 705 - Other - as specified
Due 16 March 2011
Resolved 1 August 2011
Resolution: Reconsideration granted IAW Sec Del Bay [name withheld] dated 1 Aug 11.
Electrical › Electrical Distribution System (service) › Switch
Issued 18 February 2011
Resolved
Prove compliance with 46 CFR 182.460(e) for ignition interlock.
Action required: 705 - Other - as specified
Due 16 March 2011
Resolved 6 April 2011
Resolution: Approved plans provided.
Accommodation/Occupational Safety › Ventilation › General
Issued 18 February 2011
Resolved
Prove compliance with 46 CFR 182.460(j) regarding ventilation dampers.
Action required: 705 - Other - as specified
Due 16 March 2011
Resolved 6 April 2011
Resolution: Approved plans provided.
Construction/Loadline › Structures › Door
Issued 18 February 2011
Resolved
Mark windshield IAW 46 CFR 177.500(n)(3)
Action required: 705 - Other - as specified
Due 16 March 2011
Resolved 6 April 2011
Resolution: OCMI determined windshield acceptable as is.
Engineering › Freshwater System (jacketwater cooling) › Hose
Issued 18 February 2011
Resolved
Prove compliance with 46 CFR 182.720 for jacket water keel cooler hose.
Action required: 705 - Other - as specified
Due 16 March 2011
Resolved 6 April 2011
Resolution: Keel cooler hose determined to be SAE J-1942 listed.
Communications › Alarms/Indicators › Fire Alarm
Issued 18 February 2011
Resolved
Mount forward vapor detector sending unit.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 18 February 2011
Resolution: mounted sat
Engineering › Gasoline Engine (propulsion) › Fan, Cooling (4 cycle)
Issued 18 February 2011
Resolved
Replace lower air dam IWO mufflers.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 18 February 2011
Resolution: inspected sat
Accommodation/Occupational Safety › Ventilation › General
Issued 18 February 2011
Resolved
Replace vent hose for space heaters.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 22 February 2011
Resolution: inspected sat
Operations/Management › Drug and Alcohol Testing › Proof of Enrollment
Issued 18 February 2011
Resolved
Prove compliance with 46 CFR Part 16.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 15 April 2011
Resolution: Deficiencies discovered during DAPI audit resolved to the satisfaction of teh D5 DAPI.
Documentation › Certificates/Documents › Certificate of Inspection
Issued 18 February 2011
Resolved
Prove owner name/address discrepancy between boat registration and COI.
Action required: 705 - Other - as specified
Due 16 March 2011
Resolved 14 April 2011
Resolution: Witnessed satisfactory state registration.
Navigation › Piloting/Steering › Coast Guard Light List
Issued 18 February 2011
Resolved
Provide 2011 Light List
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 18 February 2011
Resolution: 2010 provided, all sat
Communications › Alarms/Indicators › Bilge Alarm
Issued 18 February 2011
Resolved
Prove/Repair STBD aft bilge alarm.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 22 February 2011
Resolution: repaired & tested sat
Accommodation/Occupational Safety › Ventilation › General
Issued 18 February 2011
Resolved
Prove free flow of bilge blower.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 18 February 2011
Resolution: re-tested sat
Operations/Management › Drills/Instruction › Not Conducted
Issued 18 February 2011
Resolved
Conduct Drills
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 22 February 2011
Resolution: Duplicate entry, administratively cleared.
Engineering › Bilge Water Management System › Pump
Issued 18 February 2011
Resolved
Prove propper adjustment of higgins pump and steering chains.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 18 February 2011
Resolution: inspected sat
Engineering › Steering Gear System › Chain
Issued 9 April 2009
Resolved
Provide missing link for steering chain.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 16 April 2009
Resolution: New link installed.
Engineering › Freshwater System (jacketwater cooling) › Hose
Issued 9 April 2009
Resolved
Provide chafe protection for keel cooler hoses.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 16 April 2009
Resolution: Witnessed installation of chafe protection.
Electrical › Electrical Distribution System (service) › Cable
Issued 9 April 2009
Resolved
Properly secure battery cable IWO steering box.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 16 April 2009
Resolution: Witnessed cable properly secured.
Engineering › Steering Gear System › Chain
Issued 9 April 2009
Resolved
Provide steering chain tension specifications and actual tension.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 16 April 2009
Resolution: Witnessed specs and actual tension.
Engineering › Steering Gear System › Chain
Issued 9 April 2009
Resolved
Provide steering chain actual alignment specification and actual alignment.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 16 April 2009
Resolution: Witnessed specs and actual.
Engineering › Steering Gear System › Chain
Issued 9 April 2009
Resolved
Provide written verification of inspection of steering chain & results of all Philadelphia Ride the Ducks (vessels)
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 16 April 2009
Resolution: Witnessed inspection list.
Engineering › Steering Gear System › Chain
Issued 9 April 2009
Resolved
Provide written procedures for routine inspection of steering chain.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 16 April 2009
Resolution: Wittnessed procedures.
Operations/Management › Drug and Alcohol Testing › Recordkeeping
Issued 18 February 2009
Resolved
Prove compliance w/ 46 CFR Part 16.
Action required: 705 - Other - as specified
Due 18 March 2009
Resolved 4 March 2009
Resolution: Witnessed proper documentation.
Engineering › Steering Gear System › Rudder
Issued 18 February 2009
Resolved
Repair leak in rudder packing.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 4 March 2009
Resolution: Witnessed satisfactory operation.
Construction/Loadline › Penetrations › Gasket
Issued 18 February 2009
Resolved
Repair leaking steering box
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 4 March 2009
Resolution: Witnessed leak free steering box.
Accommodation/Occupational Safety › Medical/First Aid › Medicine Chest
Issued 18 February 2009
Resolved
Prove first aid kit complies with 46 CFR 184.710.
Action required: 705 - Other - as specified
Due 18 March 2009
Resolved 4 March 2009
Resolution: Witnessed new first aid kit.
Operations/Management › Drills/Instruction › Not Conducted
Issued 18 February 2009
Resolved
Conduct Drills
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 5 March 2009
Resolution: Witnessed sat drills.
Engineering › Freshwater System (jacketwater cooling) › Piping
Issued 18 February 2009
Resolved
Prove repair of coolant leak IWO radiator filler neck.
Action required: 705 - Other - as specified
Due 18 March 2009
Resolved 12 March 2009
Resolution: Witnessed leak free expansion tank.
Construction/Loadline › Penetrations › Weld
Issued 11 January 2008
Resolved
Prove satisfactory stern tube repair.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 13 March 2008
Resolution: Witnessed satisfactory air test.
Construction/Loadline › Penetrations › Pipe Flange
Issued 18 June 2007
Resolved
Install missing bolt and tighten other bolt on shaft boot bracket.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 29 July 2007
Resolution: Bolt hole repaired and bolts installed/tightened.
Construction/Loadline › Hull › Bottom Plating
Issued 18 June 2007
Resolved
Provide repair proposal for leaking shaft log
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 29 June 2007
Resolution: Satisfactory repairs completed.
Engineering › Reduction Gearing/Clutches › Shaft
Issued 18 July 2005
Resolved
All 4 prop engager bolts found broken.
Condition: Design Flaw
Action required: 705 - Other - as specified
Resolved 21 July 2005
Resolution: Installed newly designed welded hub prop engagers.
Documentation › Markings/Placards › Oil Discharge Placard
Issued 1 April 2005
Resolved
Provide marpol, oil discharge and emergency broadcast placard as needed.
Due 1 May 2005
Resolved 20 April 2005
Resolution: Provided placards.
Deck/Cargo › Mooring/Anchoring › Anchor
Issued 1 April 2005
Resolved
Provide proper way to discharge anchor.
Due 1 May 2005
Resolved 20 April 2005
Resolution: Provided way.
Electrical › Electrical Distribution System (service) › Cable
Issued 1 April 2005
Resolved
Properly secure wiring in way of dash.
Due 1 May 2005
Resolved 20 April 2005
Resolution: Wiring secured.
Accommodation/Occupational Safety › Medical/First Aid › Medicine Chest
Issued 18 March 2004
Resolved
Provide blanket for man overboard.
Due 24 April 2004
Resolved 19 April 2004
Resolution: Provided blanket.
Construction/Loadline › Structures
Issued 18 March 2004
Resolved
Provide pulls for floor boards.
Condition: Design Flaw
Due 24 April 2004
Resolved 19 April 2004
Resolution: Provide pulls.
Accommodation/Occupational Safety › Occupational Safety
Issued 18 March 2004
Resolved
Provide latches for jump seat.
Condition: Design Flaw
Due 24 April 2004
Resolved 19 April 2004
Resolution: Provide latches.
Engineering › Fuel Oil Storage/Transfer System › Hose
Issued 18 March 2004
Resolved
Stow fuel line a safe distance from the shaft.
Condition: Improper Installation
Due 24 April 2004
Resolved 19 April 2004
Resolution: Stowed fuel line.
Engineering › Freshwater System (jacketwater cooling)
Issued 18 March 2004
Resolved
Fix brackets on keel cooler.
Condition: Design Flaw
Due 24 April 2004
Resolved 19 April 2004
Resolution: Brackets fixed.
Lifesaving › Lifejacket/PFD (Type I)
Issued 3 February 2004
Resolved
Properly label all life jackets and life rings with vessel name. LEGACY COMPONENT DESC: Marking
Condition: Placed in Improper Service
Action required: 701 - Prior to carriage of passengers/cargo
Due 5 February 2004
Resolved 26 March 2004