Records from 2016 to 2026. Most recent: inspection, 28 July 2026.
Inspection history · 27
28 July 2026
Deficiency Check
Physical examination · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 8450443
21 July 2026
Administrative Inspection · Annual Inspection
Physical examination · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 8443480
21 April 2026
Annual Inspection
Physical examination · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 8354235
7 April 2026
In-Service Inspection
Physical examination · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 8349559
4 February 2026
Internal Structural Exam · Drydock Exam
Physical examination · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 8306989
26 March 2025
COI Inspection
Physical examination · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 8099766
18 February 2025
COI Inspection
Physical examination · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 8080961
21 January 2025
Internal Structural Exam · Hull Examination
Physical examination · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 8066860
19 March 2024
Deficiency Check · Annual Inspection
Physical examination · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 7882057
26 January 2024
Drydock Exam · Internal Structural Exam
Physical examination · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 7856415
20 March 2023
Annual Inspection
Physical examination · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 7653910
16 January 2023
Hull Examination · Internal Structural Exam
Physical examination · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 7622839
17 March 2022
Annual Inspection
Physical examination · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 7421080
26 January 2022
Drydock Exam · Internal Structural Exam
Physical examination · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 7387081
8 July 2021
Annual Inspection · Deficiency Check
Physical examination · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 7249058
5 February 2021
Deficiency Check
Physical examination · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 7136385
5 January 2021
Drydock Exam · Deficiency Check
Physical examination · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 7120278
15 December 2020
Administrative Inspection
Administrative · Marine Safety Detachment Fort Macon · USCG East District (CGD-E) · Activity 7111883
20 November 2019
In-Service Inspection
Physical examination · Commandant (CG-5P-TI) · Activity 6890082
15 March 2019
Examination of Repairs
Physical examination · Commandant (CG-5P-TI) · Activity 6688699
3 January 2019
Administrative Inspection
Administrative · Marine Safety Detachment Fort Macon · USCG East District (CGD-E) · Activity 6605276
13 September 2018
In-Service Inspection · Deficiency Check · COI Inspection · Internal Structural Exam · Examination of Repairs · Drydock Exam · Administrative Inspection
Physical examination · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 6539437
29 March 2018
Deficiency Check
Physical examination · Marine Safety Detachment Fort Macon · USCG East District (CGD-E) · Activity 6381003
28 February 2018
COI Inspection · Administrative Inspection
Physical examination · Marine Safety Detachment Fort Macon · USCG East District (CGD-E) · Activity 6363029
9 May 2017
Annual Inspection
Physical examination · Marine Safety Detachment Fort Macon · USCG East District (CGD-E) · Activity 6142487
16 March 2017
Hull Examination · Examination of Repairs · Internal Structural Exam · Administrative Inspection
Physical examination · Marine Safety Detachment Nags Head · USCG East District (CGD-E) · Activity 6106221
22 March 2016
Annual Inspection
Physical examination · Marine Safety Detachment Fort Macon · USCG East District (CGD-E) · Activity 5838005
02 - Structural Conditions › N/A - No Subsystem › Electrical installations in general
Issued 21 April 2026
Resolved
Repairs or Alterations to hull, machinery, or equipment that affect the safety of the vessel must not be made without the approval of cognizant OCMI.
Vessel upgraded electrical system involving batteries, cable wiring, electrical switches, display without prior approval.
Provide scope of work, drawings, / schematics, equipment specifications to [name withheld] carriage prohibited until approval of work.
46 CFR 176.700
Condition: Invalid
Action required: 705 - Other - as specified
Resolved 27 July 2026
Resolution: MSC review complete, letter attached to this activity
07 - Fire Safety › N/A - No Subsystem › Fixed fire extinguishing installation
Issued 19 March 2024
Resolved
Provide operational fixed fire fighting system for machinery space.
Fixed fire Fighting system when activated for testing did not shut down both Main Diesel Engines. Port shut down starboard did not. Demonstrate proper operation prior to passenger carriage. 46 CFR 181.400
Condition: Placed in Improper Service
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 25 March 2024
Resolution: Port engine starter was replaced and fixed system was re tested and found satisfactory.
11 - Life Saving Appliances › N/A - No Subsystem › Distress flares
Issued 17 March 2022
Resolved
Except as otherwise provided in this section, All vesselsshall carry pyrotechnic distress signals as follows:
L/B/S Route: 3 hand held red flares and 3 hand held orange flares. Red may be substituted for orange. Provide 7 red or 1 orange flare to meet requirement.
(Old T) 46 CFR 180-35-5, 46 CFR 180-68
Condition: Invalid
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 18 May 2022
09 - Working and Living Conditions › 091 - Living Conditions › Medical Equipment
Issued 17 March 2022
Resolved
A vessel must carry either a first aid kit approved under approval series 160.041or equiviliant. Provide an approved and updated first aid kit.
46 CFR 184-170
Condition: Invalid
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 18 May 2022
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Operation of machinery
Issued 17 March 2022
Resolved
At each interval and subsequent inspection. Owner/Operator shall be prepared to conduct tests and have vessel ready for inspection of machinery, fuel, piping, operation of main propulsion machinery ahead and astern.
During inspection both shaft seals were excessively leaking. Repair/Tighten packing and collars for shaft seals.
Condition: Invalid
Action required: 10 - Deficiency Rectified
Resolved 21 March 2022
Resolution: Seals, collars and packing repaired / tightened.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 17 March 2022
Resolved
Electrical Equipment on a vessel must be installed and maintained to: (b) Protect passengers & crew, other persons and the vessel from electrical hazards including fire, caused by or originating from electricl equipment and electric shock. Waterproof exposed bilge wiring and connections and raise from above deck plates as high as possible.
46 CFR 183.200
Condition: Improper Installation
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 17 January 2023
Resolution: Wiring cleared from bilge.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 26 January 2022
Resolved
46 CFR 183.200(b)
Protect passengers, crew, other persons, and the vessel from electrical hazards, including fire, caused by or originating in electrical equipment, and electrical shock. Found electrical power strips daisy chained to electrical outlet. Remove from vessel.
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 16 March 2022
Resolution: Corrected
07 - Fire Safety › N/A - No Subsystem › Fixed fire extinguishing installation
Issued 8 July 2021
Resolved
A pre-engineered fixed gas fire extinguishing systems must automatically shut down all engines that draw intake air from within protected spaces. Fireboy 30lb FE241 in located in engine compartment was unable to shut down port side engine after three attempted tests.
46 C.F.R. 181.420
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 9 July 2021
Resolution: All fire fighting equipment was serviced on 09JUL202 ensuring proper operation of the fireboy.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Bilge pumping arrangements
Issued 8 July 2021
Resolved
On a vessel of at least 26 feet in length, a visual and audible alarm must be provided at the operating station to indicate a high water level. Marine Inspector discovered bilge high level alarm #2 located in the main cabined inoperable.
46 C.F.R 182.530
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 9 July 2021
Resolution: New high level water alarm was installed. Vessel provided video to prove that it was operational.
10 - Safety of Navigation › N/A - No Subsystem › Lights, shapes, sound-signals
Issued 8 July 2021
Resolved
A vessel at anchor shall exhibit in the fore part, an all round white light or one ball. Vessel was missing all round white light when for anchorage.
33 C.F.R 83.30
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 9 July 2021
Resolution: Vessel purchased new approved all round anchor light.
02 - Structural Conditions › N/A - No Subsystem › Beams, frames, floors-op. damage
Issued 5 January 2021
Resolved
REPAIRS OR ALTERATIONS TO THE HULL, MACHINERY, OR EQUIPMENT THAT AFFECT THE SAFETY OF THE VESSEL MUST NOT BE MADE WITHOUT THE APPROVAL OF THE COGNIZANT [name withheld] AN EMERGENCY. MULTIPLE PORTIONS OF STARBOARD SIDE WOODEN RUB RAIL FOUND ROTTED AND IN NEED OF REPLACEMENT.
46CFR176.700(a)
Action required: 50 - Rectify deficiencies w/in 30 days
Due 4 February 2021
Resolved 6 April 2021
Resolution: Rub rail repaired.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 5 January 2021
Resolved
EACH PLUG COCK IN AN INLET OR DISCHARGE PIPE MUST HAVE A MEANS, OTHER THAN A COTTER PIN, TO PREVENT ITS LOOSENING OR REMOVAL FROM THE BODY. ONE THROUGH HULL VALVE WAS EQUIPPED WITH A PLASTIC PLUG. REPLACE WITH METAL CAP.
46 CFR 179.350(g)
Action required: 50 - Rectify deficiencies w/in 30 days
Due 4 February 2021
Resolved 4 February 2021
Resolution: Received photographic evidence from vessel representative [name withheld] confirming plastic thru hull fitting cap has been replaced with bronze thru hull fitting cap.
11 - Life Saving Appliances › N/A - No Subsystem › Means of rescue
Issued 18 May 2020
Resolved
Portable watertight containers for distress flares and smoke signals shall be of a bright color, and containers shall be clearly marked in legible contrasting letters at least 12.7 millimeters (0.5 inches) high: “DISTRESS SIGNALS”. Vessel's watertight containers not appropriately marked.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 1 June 2020
Resolved 30 July 2020
Resolution: "Distress Signals" properly labeled on watertight container.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Bilge pumping arrangements
Issued 18 May 2020
Resolved
At each initial and subsequent inspection for certification of a vessel, the owner or managing operator shall be prepared to conduct operational tests of the means provided for pumping bilges. Float switch for starboard side engine room bilge pump not accessible for manual activation test.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 1 June 2020
Resolved 30 July 2020
Resolution: Float switch made accessible, test sat.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 18 May 2020
Resolved
Electrical equipment on a vessel must be installed and maintained to protect passengers, crew, other persons, and the vessel from electrical hazards, including fire, caused by or originating in electrical equipment, and electrical shock. Port side circuit breaker conductor mounting stud missing lock washer to prevent nut from backing off allowing the conductor to become loose.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 1 June 2020
Resolved 5 August 2020
Resolution: Lock washers installed.
07 - Fire Safety › N/A - No Subsystem › Ready availability of fire fighting equipment
Issued 18 May 2020
Resolved
Portable fire extinguishers must be located so that they are clearly visible and readily accessible from the space being protected. The installation and location must be to the satisfaction of the Officer in Charge, Marine Inspection. Fire extinguisher missing outside of the machinery space.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 1 June 2020
Resolved 30 July 2020
Resolution: Fire extinguisher installed.
02 - Structural Conditions › N/A - No Subsystem › Hull - corrosion
Issued 13 September 2018
Resolved
Repairs or alterations to the hull or equipment that affect the safety of the vessel must not be made without the approval of the cognizant OCMI, except during an emergency. During vessel drydock inspection Marine Inspectors found wastage in multiple locations on the keel and other locations identified on the vessel. 46 CFR 176.700
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 18 May 2020
Resolution: Conducted COI inspection. Vessel will be dry-docked annually next 3 years to inspect hull exam.
Construction/Loadline › Hull › Keel
Issued 29 March 2018
Resolved
Address keel decay & deterioration IAW the 22FEB17 letter from Calfee Engineering. The keel shows signs of decay thoughout its 50' length. Address & repair IAW best practices.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 30 April 2019
Resolved 14 December 2020
Resolution: As directed by the CID this deficiency is cleared for MISLE cleanup, vessel is out of service and a special note has been added for this activity to ensure this deficiency is reviewed prior to issuing COI.
Documentation › Logs/Records › Enhanced Survey Report File
Issued 8 March 2018
Resolved
Found vessel has failed to implement the CG approved course of action from Calfee Engineering to preserve the keel. Implement plan.
Action required: 705 - Other - as specified
Due 8 April 2018
Resolved 29 September 2020
Resolution: Deficiency cleared as part of periodic check by supervisor, found evidence of adhering to COA.
Lifesaving › Lifebuoys › Self-igniting Lights
Issued 8 March 2018
Resolved
Found the floating water light battery expired. Replace battery.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 22 March 2018
Resolved 29 March 2018
Lifesaving › Lifebuoys › Buoyant Lifeline
Issued 8 March 2018
Resolved
Found lifeline on the ring lifebuoy under sized. Replace lifeline.
Action required: 705 - Other - as specified
Due 22 March 2018
Resolved 29 March 2018
Fire Fighting › Portable CO2 Fire Extinguisher › Number
Issued 8 March 2018
Resolved
Found vessel missing a required 40-B:C portable fire extinguisher. Install extinguisher.
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 22 March 2018
Resolved 29 March 2018
Construction/Loadline › Hull › Keel
Issued 9 May 2017
Resolved
Provide repair plan addressing the keel decay as discussed in activity 6142487. Dry affected area & thoroughly ventilate compartments.
Condition: Improper/Lack of Maintenance
Due 15 June 2017
Resolved 8 March 2018
Resolution: Cleared this CG-835 requiring a repair plan and issued a new CG-835 under MISLE Activity 6363029, as discussed with MSD Fort Macon, for failure to implement the CG approved course of action from Calfee Engineering to preserve the keel.
Sail Rigging › Chainplates › Materials
Issued 9 May 2017
Resolved
Repair decayed section of wood bowsprit top.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 15 June 2017
Resolved 8 March 2018
Resolution: During COI found bowsprit had been properly repaired.
Operations/Management › Vessel Activity › Underway
Issued 25 April 2017
Resolved
Unable to conduct underway sea trials following dry dock due to weather. Conduct sea trials under sail power with a minimum wind speed of 15 knots with hard tacks.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 15 May 2017
Sail Rigging › Sails › Reinforcements and Chafe Patches
Issued 22 March 2016
Resolved
Repair chaffed sail head & provide proper chaffing gear
Due 27 June 2016
Resolved 2 June 2016
Sail Rigging › Running Rigging › Topping Lifts/Attachments
Issued 22 March 2016
Resolved
Renew broken hoops (6, 11 & uppermost) IWO main sail to mast attachments.
Condition: Damaged By Earlier Event
Due 27 June 2016
Resolved 2 June 2016