NORDIC BULKER 2 is a 2002 freight ship. The Coast Guard has recorded 10 inspections since 2003, most recently in August 2020, along with 14 deficiencies — 2 with no resolution recorded — and 2 operational controls.

Records from 2003 to 2020. Most recent: operational control imposed, 12 August 2020.

Built
2002
Last inspected
12 August 2020
Documentation
Not in the documentation file of 10 September 2026
Controls
None recorded without a removal date

Identity

9278973 View on MarineTraffic leaves Maury; a third-party site, nothing from it is stored here
611681
Flag
PANAMA
—
Maury page id
psix-611681

Inspections, by type

…with no type recorded3
…past their stated due date1
Years with a record 6 calendar years (2003–2020)
The 10 inspections in the strip above, split by the kind of activity the US Coast Guard recorded. Years with a record are calendar years in which a record exists, not years in service. What Maury does not do.

This record may be incomplete: the most recent inspection recorded for this vessel was 6 years ago. Maury shows what the Coast Guard recorded, not whether the vessel has been inspected since, is still in service, or what condition it is in. Coast Guard record current through 13 September 2026, retrieved 18 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard. Records for the Bulk Carrier class in Maury's sources begin in 1981.

Documentation record

Tonnage as PSIX records it16966 - Convention (Subpart B), Gross Ton
10498 - Convention (Subpart B), Net Ton
34589 - Displacement, Ton
28458 - Dead Weight, Ton
This hull's Official Number is not in the NVDC file dated 10 September 2026 as served by NOAA Fisheries, so no documentation record is shown. Absence from that file is a fact about the file, not about the hull.

Radio station licence

No FCC ship-station licence is recorded against this Official Number in the file of 6 September 2026. That is a fact about the licence file, not about the radio.

Inspection history · 10

12 August 2020 PSC B · Deficiency Check
Physical examination · Marine Safety Unit Portland OR · USCG Northwest District (CGD-NW) · Activity 7024687
6 February 2012 Deficiency Check
Physical examination · Sector San Juan · USCG Southeast District (CGD-SE) · Activity 4239237
12 September 2011 NPV Safety Exam · ISPS II Exam · Ballast Water Examination
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 4139247
10 September 2011 Type not recorded
No type recorded · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 4193122
27 February 2011 ISPS II Exam · PII Safety Exam · Ballast Water Examination
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 3953809
10 September 2008 Ballast Water Examination · PII Safety Exam · ISPS II Exam
Physical examination · Sector Southeast Alaska · USCG Arctic District (CGD-A) · Activity 3321869
26 November 2004 ISPS II Exam
Physical examination · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 2248304
25 November 2004 Type not recorded
No type recorded · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 2248578
21 March 2003 Type not recorded
No type recorded · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1760625
19 March 2003 Passenger/Freight Vessel Examination
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1761101

Deficiency record · 14

15 - Safety Management Systems (ISM) › N/A - No Subsystem › Reports of non-conf., accidents & hazardous occur.
Issued 12 August 2020 Resolved
THE COMPANY SHOULD ENSURE THAT INSPECTIONS ARE HELD AT APPROPRIATE INTERVALS; ANY NON-CONFORMITY IS REPORTED, WITH ITS POSSIBLE CAUSE, IF KNOWN; APPROPRIATE CORRECTIVE ACTION IS TAKEN; AND RECORDS OF THESE ACTIVITIES ARE MAINTAINED. A REVIEW OF THE VESSEL'S SAFETY MANAGEMENT SYSTEM DURING AN EXPANDED EXAM REVEALED THE VESSEL FAILED TO CONDUCT OR DOCUMENT REQUIRED CRITICAL EQUIPMENT AND SYSTEMS STATUS TESTING AT THE APPROPRIATE INTERVALS AS STATED ON FORM E35. ADDITIONALLY, LONG STANDING NONCONFORMITIES IDENTIFIED THROUGHOUT THE ENGINE ROOM WERE NOT REPORTED TO THE COMPANY AS STATED IN CHAPTER 9 OF THE VESSEL'S SMS. RECOMMEND EXTERNAL SMS AUDIT. 74SOLAS(14) IX/3, ISM CODE 10.2, 30ABC
Action required: 30 - Ship detained
Resolved 14 August 2020
Resolution: Vessel had ISM audit conducted. See attached document for additional information.
07 - Fire Safety › N/A - No Subsystem › Oil accumulation in engine room
Issued 12 August 2020 Resolved
THE CONDITION OF THE SHIP AND ITS EQUIPMENT SHALL BE MAINTAINED TO CONFORM WITH THE PROVISIONS OF THE PRESENT REGULATIONS TO ENSURE THAT THE SHIP IN ALL RESPECTS WILL REMAIN FIT TO PROCEED TO SEA WITHOUT DANGER TO THE SHIP OR PERSONS ON BOARD. PSCO'S IDENTIFIED EXCESSIVE OIL ACCUMULATION AND OIL SOAKED RAGS THROUGHOUT THE ENGINE ROOM TO INCLUDE: BETWEEN AND BELOW THE DIESEL OIL AND HFO SETTLING TANKS FROM AN UNKNOWN OIL SPILL, PURIFIER FLATS, UNDER ALL THREE GENERATORS, AT THE FUEL OIL TRANSFER PUMP, AND UNDER BOTH AIR COMPRESSORS CREATING A SIGNIFICANT FIRE HAZARD. 74 SOLAS (14) I/11, 30 ABC
Action required: 30 - Ship detained
Resolved 14 August 2020
Resolution: All oil acculumation and oil soaked rags were cleaned from engine room. Verified through folow up exam and class/flag report.
07 - Fire Safety › N/A - No Subsystem › Oil accumulation in engine room
Issued 12 August 2020 Resolved
IN A SHIP IN WHICH OIL FUEL IS USED, THE ARRANGEMENTS FOR THE STORAGE, DISTRIBUTION AND UTILIZATION OF THE OIL FUEL SHALL BE SUCH AS TO ENSURE THE SAFETY OF THE SHIP AND PERSONS ON BOARD. PSCO'S IDENTIFIED AN ACTIVE FUEL OIL LEAK ON THE NO.2 GENERATOR FUEL OIL LEAK ALARM RESERVOIR CREATING A FIRE HAZARD AND BRINGING THE OPERABILITY OF THE ALARM INTO QUESTION. THE RESERVOIR WOULD FAIL TO FILL AND SET OFF THE ALARM IN AN EMERGENCY DUE TO THE LEAK. 74SOLAS(01)II-2/15, 30ABC
Action required: 30 - Ship detained
Resolved 14 August 2020
Resolution: Crew dismantled reservoir and thoroughly cleaned it including clogged overflow drain tubing. Sensor was reassembled and tested with satisfactory results. Verified during follow up exam and class/flag report.
09 - Working and Living Conditions › 092 - Working Conditions › Other (mooring)
Issued 12 August 2020 Resolved
PHYSICAL CONDITION AND PROPER STORAGE OF MOORING LINES AND ROPES TO ENSURE THAT THEY ARE FREE OF DAMAGE AND DEFECTS AND ARE NOT EXPOSED TO CONDITIONS WHICH COULD LEAD TO THEIR DETERIORATION AND EVENTUAL FAILURE. PSCO'S OBSERVED A SPLICE IN AFT MOORING LINE, LEADING TO QUESTIONABLE INTEGRITY OF LINE. ILO-147/PWSA, 46USC70002, 60C
Action required: 60 - Rectify deficiencies prior to movement
Resolved 13 August 2020
Resolution: Received and reviewed photos and facility attestation that the compromised mooring line was replaced.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 12 August 2020 Resolved
THE MACHINERY, BOILERS AND OTHER PRESSURE VESSELS, ASSOCIATED PIPING SYSTEMS AND FITTINGS SHALL BE OF A DESIGN AND CONSTRUCTION ADEQUATE FOR THE SERVICE FOR WHICH THEY ARE INTENDED AND SHALL BE SO INSTALLED AND PROTECTED AS TO REDUCE TO A MINIMUM ANY DANGER TO PERSONS ON BOARD, DUE REGARD BEING PAID TO MOVING PARTS, HOT SURFACES AND OTHER HAZARDS. PSCO'S IDENTIFIED ACTIVE JACKET WATER LEAKS ON MAIN ENGINE CYLINDERS #2 AND #3. 74SOLAS(04)II-1/26.1, 17AC
Action required: 17 - Rectify deficiencies prior to departure
Resolved 14 August 2020
Resolution: Crew tightened upper connecting cooling ring to the cylinder head. Condition of class was given to have the connecting rings renewed at a later date. Verified during follow up examination and class report.
04 - Emergency Systems › N/A - No Subsystem › Emergency source of power - Emergency generator
Issued 12 August 2020 Resolved
AFTER ANY SURVEY OF THE SHIP UNDER REGULATIONS 7, 8, 9 OR 10 HAS BEEN COMPLETED, NO CHANGE SHALL BE MADE IN THE STRUCTURAL ARRANGEMENTS, MACHINERY, EQUIPMENT AND OTHER ITEMS COVERED IN THE SURVEY, WITHOUT THE SANCTION OF THE ADMINISTRATION. PSCO'S IDENTIFIED SPLICED ELECTRIC CABLE ON #2 BATTERY BANK AND LOOSE CABLE CONNECTION ON BATTERY BANK #1 FOR EMERGENCY GENERATOR. 74SOLAS(14) I/11B, 17AC
Action required: 17 - Rectify deficiencies prior to departure
Resolved 14 August 2020
Resolution: Spliced serial connecting cable was replaced with new cable. All connections were greased and tightened. Verified during follow up examination and class report.
14 - Pollution Prevention › 146 - MARPOL Annex VI › Incinerator incl. operations and operating manual
Issued 12 August 2020 Resolved
THE CONDITION OF THE SHIP AND ITS EQUIPMENT SHALL BE MAINTAINED TO CONFORM WITH THE PROVISIONS OF THE PRESENT REGULATIONS TO ENSURE THAT THE SHIP IN ALL RESPECTS WILL REMAIN FIT TO PROCEED TO SEA WITHOUT DANGER TO THE SHIP OR PERSONS ON BOARD. PSCO'S IDENTIFIED SEVERAL ELECTRICAL SPLICES IN VICINITY OF THE BURNER ASSEMBLY OF THE INCINCERATOR. ADDITIONALLY, THE INCINERATOR DOORS HAD MISSING INSULATION AND WARPED/WASTED SEALS. 74SOLAS(14) I/11A, 17AC
Action required: 17 - Rectify deficiencies prior to departure
Resolved 14 August 2020
Resolution: Exposed cables were properly stowed in junction boxes. Doors refractory were repaired and missing insulation and sealing arrangements were refurbished. Verified during follow up exam and class report.
09 - Working and Living Conditions › 092 - Working Conditions › Other (accident prevention)
Issued 12 August 2020 Resolved
THE PROVISION OF SAFE MEANS OF ACCESS TO AND THROUGHOUT THE SHIP, AND THE SATISFACTORY PHYSICAL CONDITION OF LADDERS, DECKS, BULWARKS, FENCING, HANDRAILS, ETC. PSCO'S IDENTIFIED SEVERED SUPPORT BEAMS FOR A WALKWAY AND STAIRS IN THE VICINITY OF THE MAIN ENGINE. ADDITIONALLY, SEVERAL DECKPLATE COVERS WERE NOT IN PLACE ON THE LOWEST ENGINE ROOM DECK AND A DECKPLATE NEAR THE MAIN ENGINE LOCAL CONTROLS WAS WASTED WITH SHARP METAL EDGES PROTRUDING UPWARDS. ILO-147/PWSA 46 USC 70002, 17AC
Action required: 17 - Rectify deficiencies prior to departure
Resolved 14 August 2020
Resolution: Supporting structure for main engine port side walkway was disconnected, properly aligned, and properly welded. Verified during follow up exam and class report.
99 - Other › N/A - No Subsystem › Other (SOLAS operational)
Issued 12 August 2020 No resolution recorded
THE CONDITION OF THE SHIP AND ITS EQUIPMENT SHALL BE MAINTAINED TO CONFORM WITH THE PROVISIONS OF THE PRESENT REGULATIONS TO ENSURE THAT THE SHIP IN ALL RESPECTS WILL REMAIN FIT TO PROCEED TO SEA WITHOUT DANGER TO THE SHIP OR PERSONS ON BOARD. PSCO'S IDENTIFIED NUMEROUS PINHOLE LEAKS IN SEWAGE PIPING AROUND THE MARINE SANITATION DEVICE. 74SOLAS(14) I/11A, 50AC
Action required: 50 - Rectify deficiencies w/in 30 days
Due 11 September 2020 — due date passed with no resolution recorded
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 12 August 2020 Resolved
THE CONDITION OF THE SHIP AND ITS EQUIPMENT SHALL BE MAINTAINED TO CONFORM WITH THE PROVISIONS OF THE PRESENT REGULATIONS TO ENSURE THAT THE SHIP IN ALL RESPECTS WILL REMAIN FIT TO PROCEED TO SEA WITHOUT DANGER TO THE SHIP OR PERSONS ON BOARD. PSCO'S IDENTIFIED ACTIVE LEAK FROM CASCADE TANK FLANGE IN THE VICINITY OF INSPECTION PORT. 74SOLAS(14) I/11A, 50AC
Action required: 50 - Rectify deficiencies w/in 30 days
Due 11 September 2020
Resolved 17 August 2020
Resolution: New gasket was installed with new bolts. No leaking observed during follow up exam. See class Report.
02 - Structural Conditions › N/A - No Subsystem › Loading/Ballast condition
Issued 12 August 2020 No resolution recorded
FOLLOWING INSTALLATION, THE MASTER, OWNER, OPERATOR, AGENT OR PERSON IN CHARGE OF THE VESSEL MUST PROPERLY MAINTAIN THE BALLAST WATER MANAGEMENT SYSTEM IN ACCORDANCE WITH ALL MANUFACTURER SPECIFICATIONS. VESSEL'S BALLAST WATER MANAGEMENT SYSTEM WAS FOUND TO BE INOPERABLE. 33CFR151.2025A1, 40AC
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Lifesaving › Lifebuoys › Stowage
Issued 12 September 2011 Resolved
0650- Lifebuoys- PSCO discovered lifebuoys on both bridge wings were forced into the quick release brackets to prevent quick release, and the bracket hinges were seized to prevent the quick release from falling when release bar was pulled- SOLAS 74 III/7.1.3a
Action required: 705 - Other - as specified
Due 19 September 2011
Resolved 6 February 2012
Resolution: Corrected to the satisfaction of the attending USCG Port State Control Officer.
Documentation › Certificates/Documents › Engine IAPP Certificate
Issued 12 September 2011 Resolved
2199- Other (Marpol related operational)- Vessel showed EIAPP for diesel engines issued by the Classification Society for previous operator, NKK, but could not provide NOx Technical Files for any engine onboard- MARPOL 2006 Cons. Ed. VI/13 Nox Tech Code 2.3.5
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Resolved 6 February 2012
Resolution: Corrected to the satisfaction of the attending USCG Port State Control Officer.
Operations/Management › EPA Vessel General Permit (VGP) › 4.1.1.1-Documentation Routine Vessel Inspection
Issued 12 September 2011 Resolved
9900- Other (Not Clearly Hazardous)- Every vsl with a VGP is required to conduct inspections IAW the VGP. Every vessel over 300 GT with a VGP must file a NOI to follow the VGP. Vessel has VGP onboard, but has not conducted required inspections and has not filed a NOI. - 40CFR122.2.
Action required: 705 - Other - as specified
Due 12 September 2011
Resolved 12 September 2011
Resolution: The above VGP deficiencies are considered corrected as the vessels master was advised of Environmental Protection Agency''s VGP requirements, and has taken administrative action to address the deficiencies

Ownership record

The Coast Guard's documentation record for this hull -- the Abstract of Title, with its owners and liens as filed -- is not in PSIX. Ask, and Maury buys it from the National Vessel Documentation Center, files it here with its date, and every reader of this page gets it.