Records from 2016 to 2025. Most recent: inspection, 29 October 2025.
Documentation record
Registered dimensions (L × B × D)70.0 ft × 19.0 ft × 7.3 ft
Registered tonnagegross 65 / net 52
ITC dimensions (L × B × D)Not recorded
ITC tonnageNot recorded
BuilderFREEPORT SHIPBUILDING INC · FREEPORT, FL, UNITED STATES · built 2003
Hull materialAluminum
PropulsionDiesel Reduction
Hull shapeShip
Hull configurationMonohull
Hailing portPOINT O' WOODS, NY
Trade endorsementsCoastwise, unrestricted
DocumentationValid · issued 10 September 2025 · expires 30 September 2026
Service, as the file records itPassenger (Inspected)
Hull formpowered (Maury's inference from propulsion, hull shape, material and length, rule hf-1; not a recorded fact)
Tonnage as PSIX records it65 - Simplified, Gross Ton
52 - Simplified, Net Ton
Every line above is a field of the National Vessel Documentation Center's file as served by NOAA Fisheries, dated 10 August 2026, matched to this hull on its Official Number. Registered and ITC measurements are two systems and are never combined. One snapshot is held so far; documentation history begins with the next.
Inspection history · 18
29 October 2025
Annual Inspection
Physical examination · Marine Safety Unit Coram · USCG Northeast District (CGD-NE) · Activity 8259915
23 October 2024
Administrative Inspection · Drydock Exam · Internal Structural Exam
Physical examination · Marine Safety Unit Coram · USCG Northeast District (CGD-NE) · Activity 8022124
16 October 2024
Annual Inspection · Administrative Inspection
Physical examination · Marine Safety Unit Coram · USCG Northeast District (CGD-NE) · Activity 8019034
2 August 2023
COI Inspection · Administrative Inspection · Internal Structural Exam
Physical examination · Marine Safety Unit Coram · USCG Northeast District (CGD-NE) · Activity 7756779
7 July 2023
Administrative Inspection
Administrative · Marine Safety Unit Coram · USCG Northeast District (CGD-NE) · Activity 7736126
2 November 2022
Annual Inspection · Administrative Inspection · Drydock Exam · DAPI Audit · Internal Structural Exam
Physical examination · Marine Safety Unit Coram · USCG Northeast District (CGD-NE) · Activity 7587243
26 January 2022
Deficiency Check
Physical examination · Marine Safety Unit Coram · USCG Northeast District (CGD-NE) · Activity 7382936
3 November 2021
Internal Structural Exam · Annual Inspection
Physical examination · Marine Safety Unit Coram · USCG Northeast District (CGD-NE) · Activity 7330963
10 November 2020
Drydock Exam · Internal Structural Exam
Physical examination · Marine Safety Unit Coram · USCG Northeast District (CGD-NE) · Activity 7093339
4 November 2020
Deficiency Check · Annual Inspection
Physical examination · Marine Safety Unit Coram · USCG Northeast District (CGD-NE) · Activity 7092062
23 October 2019
Annual Inspection
Physical examination · Marine Safety Unit Coram · USCG Northeast District (CGD-NE) · Activity 6840461
6 November 2018
Hull Examination · Internal Structural Exam
Physical examination · Marine Safety Unit Coram · USCG Northeast District (CGD-NE) · Activity 6553911
31 July 2018
Internal Structural Exam · COI Inspection
Physical examination · Marine Safety Unit Coram · USCG Northeast District (CGD-NE) · Activity 6448209
4 April 2018
Deficiency Check
Physical examination · Marine Safety Unit Coram · USCG Northeast District (CGD-NE) · Activity 6380367
31 October 2017
Annual Inspection
Physical examination · Marine Safety Unit Coram · USCG Northeast District (CGD-NE) · Activity 6233287
18 November 2016
Internal Structural Exam · Hull Examination
Physical examination · Marine Safety Unit Coram · USCG Northeast District (CGD-NE) · Activity 6045163
8 November 2016
Annual Inspection
Physical examination · Marine Safety Unit Coram · USCG Northeast District (CGD-NE) · Activity 6036901
3 March 2016
Administrative Inspection
Administrative · Marine Safety Unit Coram · USCG Northeast District (CGD-NE) · Activity 5826165
05 - Radio Communications › N/A - No Subsystem › Other (radio communication)
Issued 2 November 2022
Resolved
Vessel must provide a FCC Bridge to Bridge Radio Telephony Certificate for its Radio installation IAW 47 CFR 80 prior to commencing passenger operations in the Spring of 2023.
Condition: Placed in Improper Service
Action required: 705 - Other - as specified
Resolved 25 July 2023
Resolution: Vessel had the Bridge to Bridge inspection completed 1 May 23.
02 - Structural Conditions › N/A - No Subsystem › Other (Structural condition)
Issued 3 November 2021
Resolved
Repair crack on F/O tank prior to operations with passengers for hire.
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Resolved 28 January 2022
Resolution: MI attended vessel and witnessed satisfactory repair to tank.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Gauges, thermometers, etc
Issued 23 October 2019
Resolved
Vessel does not have means of determining fuel level on board.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 4 December 2019
Resolved 11 November 2020
Resolution: Verrified fuel guage was operational during underway inspection.
04 - Emergency Systems › N/A - No Subsystem › Man Overboard Drill (MOB)
Issued 23 October 2019
Resolved
Emergency instructions stated to launch rescue boat during MOB drill. Vessel is not fitted with a rescue boat and is able to recover a person in the water from the platform itself. 46 CFR 185.510(b)
Action required: 60 - Rectify deficiencies prior to movement
Due 4 December 2019
Resolved 4 November 2020
Resolution: Verified emergency instructions were updated to reflect vessel compliment.
10 - Safety of Navigation › N/A - No Subsystem › Nautical publications
Issued 23 October 2019
Resolved
Navigation publications on board were from 2007. 46 CFR 184.420
Action required: 50 - Rectify deficiencies w/in 30 days
Due 4 December 2019
Resolved 4 November 2020
Resolution: Publications on board are annual print outs of applicable operating areas.
Operations/Management › Drills/Instruction › Man Overboard Recovery
Issued 31 October 2017
Resolved
Complete emergency drills prior to operating with passengers, (weather during inspection precluded conducting drills safely)
Condition: Invalid
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 4 April 2018
Resolution: MI attended vessel and witnessed satisfactory emergency drills.
Communications › Radio Communications › VHF Radiotelephone
Issued 31 October 2017
Resolved
Install DSN radio system
Condition: Placed in Improper Service
Due 1 April 2018
Resolved 4 April 2018
Resolution: MI attended vessel and witnessed satisfactory installation and operation of new radio with MMSI..
Operations/Management › Drug and Alcohol Testing › Proof of Enrollment
Issued 8 November 2016
Resolved
Missing proof of enrollement
Action required: 705 - Other - as specified
Due 22 November 2016
Resolved 4 April 2018
Resolution: Witnessed satisfactory proff of enrollement
Unknown
Issued 8 November 2016
Resolved
Vessel does not have a waste management plan.
Action required: 705 - Other - as specified
Due 22 November 2016
Resolved 8 November 2016
Resolution: Vessel added waste management plan to log book.
Operations/Management › Drills/Instruction › Not Conducted
Issued 8 November 2016
Resolved
Vessel is not conducting the full suite of drills every 3 months.
Action required: 705 - Other - as specified
Due 8 November 2016
Resolved 8 November 2016
Resolution: Vessel understand requirements to run 3 types of drills every 3 months.