MAURY USCG vessel records Sign in
← All vessels

CHEMBULK HONGKONG

CHEMBULK HONGKONG is a 2003 tank ship. The Coast Guard has recorded 39 inspections since 2003, most recently in June 2020, along with 20 deficiencies and 7 operational controls.

Records from 2003 to 2020. Most recent: inspection, 25 June 2020.

Built
2003
Last inspected
25 June 2020
Documentation
Not in the documentation file of 10 September 2026
Controls
None recorded without a removal date

Identity

9278650 View on MarineTraffic leaves Maury; a third-party site, nothing from it is stored here
616219
Flag
MARSHALL ISLANDS
—
Maury page id
psix-616219

Inspections, by type

…with no type recorded10
Years with a record 14 calendar years (2003–2020)
The 39 inspections in the strip above, split by the kind of activity the US Coast Guard recorded. Years with a record are calendar years in which a record exists, not years in service. What Maury does not do.

This record may be incomplete: the most recent inspection recorded for this vessel was 6 years ago. Maury shows what the Coast Guard recorded, not whether the vessel has been inspected since, is still in service, or what condition it is in. Coast Guard record current through 13 September 2026, retrieved 18 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard. Records for the Tank Ship class in Maury's sources begin in 1980.

Documentation record

Tonnage as PSIX records it40105 - Displacement, Metric Ton
32315 - Dead Weight, Metric Ton
20058 - Convention (Subpart B), Gross Ton
8489 - Convention (Subpart B), Net Ton
This hull's Official Number is not in the NVDC file dated 10 September 2026 as served by NOAA Fisheries, so no documentation record is shown. Absence from that file is a fact about the file, not about the hull.

Radio station licence

No FCC ship-station licence is recorded against this Official Number in the file of 6 September 2026. That is a fact about the licence file, not about the radio.

Inspection history · 39

25 June 2020 COC-CHEM & TVE Renew · PSC B
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 6980836
12 January 2020 Type not recorded
No type recorded · Marine Safety Unit Portland OR · USCG Northwest District (CGD-NW) · Activity 6888320
15 March 2019 COC-CHEM Renew · ISPS II Exam · Ballast Water Examination
Physical examination · Marine Safety Unit Portland OR · USCG Northwest District (CGD-NW) · Activity 6637281
12 March 2019 COE-Administrative
Administrative · Sector Columbia River · USCG Northwest District (CGD-NW) · Activity 6641403
10 March 2019 Type not recorded
No type recorded · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 6640988
26 October 2018 Administrative Inspection
Administrative · Sector Mobile · USCG Heartland District (CGD-H) · Activity 6568607
16 February 2018 ISPS III Exam · Ballast Water Examination · COC-CHEM & TVE Annual
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 6353428
2 March 2017 Deficiency Check · Administrative Inspection
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 6097603
9 February 2017 Administrative Inspection · Ballast Water Examination · COC-CHEM & TVE Renew · ISPS II Exam
Physical examination · Sector Mobile · USCG Heartland District (CGD-H) · Activity 6085263
2 March 2016 ISPS III Exam · Ballast Water Examination · COC-CHEM & TVE Annual
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 5823944
7 February 2016 Administrative Inspection
Administrative · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 5809913
30 January 2016 ISPS II Exam
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 5806514
14 December 2011 COC-CHEM Annual · ISPS II Exam · Ballast Water Examination
Physical examination · Sector Columbia River · USCG Northwest District (CGD-NW) · Activity 4202991
19 September 2011 COE-Administrative
Administrative · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 4145126
26 November 2010 Ballast Water Examination · COE-Dockside · ISPS III Exam · COC-CHEM Renew
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 3896390
15 January 2010 MARPOL Annex I Examination · MARPOL Annex II Examination · Ballast Water Examination · COC-CHEM Annual · MARPOL Annex VI Survey · ISPS II Exam
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 3661065
12 February 2009 Type not recorded
No type recorded · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 3416966
18 October 2008 Ballast Water Examination · MARPOL Annex I Examination · MARPOL Annex V Examination · PII Safety Exam · COC-CHEM Renew · ISPS II Exam
Physical examination · Resident Inspection Office St. Croix · USCG Southeast District (CGD-SE) · Activity 3346965
19 October 2007 Deficiency Check
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 3083171
27 June 2007 Ballast Water Examination · ISPS II Exam · MARPOL Annex V Examination · MARPOL Annex I Examination · MARPOL Annex II Examination · COC-CHEM Renew
Physical examination · Sector Corpus Christi · USCG Heartland District (CGD-H) · Activity 2970165
6 February 2007 Administrative Inspection
Administrative · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 2867978
10 October 2006 Ballast Water Examination · ISPS III Exam · PII Safety Exam
Physical examination · Marine Safety Unit Baton Rouge · USCG Heartland District (CGD-H) · Activity 2797158
20 September 2006 Administrative Inspection
Administrative · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 2782753
29 August 2006 Type not recorded
No type recorded · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 2763075
19 April 2006 ISPS II Exam · Ballast Water Examination · COC-CHEM Annual
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 2630987
6 January 2006 Type not recorded
No type recorded · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 2562210
6 January 2006 Type not recorded
No type recorded · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 2563265
4 January 2006 Type not recorded
No type recorded · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 2560999
22 July 2005 Deficiency Check
Physical examination · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 2435958
21 April 2005 COC-CHEM Renew
Type not classified · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 2361148
9 April 2005 Type not recorded
No type recorded · MSO WILMINGTON · USCG East District (CGD-E) · Activity 2336298
20 December 2004 ISPS III Exam
Physical examination · MSO PUGET SOUND · USCG Northwest District (CGD-NW) · Activity 2262485
18 December 2004 Type not recorded
No type recorded · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 2261716
26 August 2004 ISPS II Exam
Physical examination · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 2175515
10 May 2004 Annual Inspection
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 2058485
10 December 2003 Administrative Inspection
Administrative · MSO LOS ANGELES/LONG BEACH · USCG Southwest District (CGD-SW) · Activity 1962017
11 August 2003 Damage Survey
Physical examination · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 1882921
11 August 2003 Type not recorded
No type recorded · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 1968803
21 April 2003 Certificate of Compliance
Administrative · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1775141

Deficiency record · 20

08 - Alarms › N/A - No Subsystem › Other (alarms)
Issued 15 March 2019 Resolved
CARGO TANKS SHALL BE FITTED WITH A VISUAL AND AUDIBLE HIGH LEVEL ALARM WHICH COMPLIES WITH 15.19.1 TO 15.19.5 AND WHICH INDICATES WHEN THE LIQUID LEVEL IN THE CARGO TANK APPROACHES THE NORMAL FULL CONDITION. BOTH VISUAL AND AUDIBLE HIGH LEVEL ALARMS ARE INOPERABLE. - IBC CODE 15.19.6, 74 SOLAS (14) VII/10.1, 17AC
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Due 15 March 2019
Resolved 17 March 2019
Resolution: Received, reviewed, and accepted DNV-GL class report stating cargo tank high level alarms were satisfactorily tested in the presence of DNV-GL surveyor after replacing faulty relay in the alarm control panel in the cargo control room.
06 - Cargo Operations Including Equipment › N/A - No Subsystem › Other (cargo)
Issued 15 March 2019 Resolved
THE VENTING ARRANGEMENTS SHALL BE SO DESIGNED AND OPERATED AS TO ENSURE THAT NEITHER PRESSURE NOR VACUUM IN CARGO TANKS SHALL EXCEED DESIGN PARAMETERS. THE PRESSURE/ VACUUM VALVES INSTALLED ON CARGO TANKS 2 PORT AND 5 PORT ARE INOPERABLE. 74 SOLAS (’01) II-2/59.1.2.1, 17AC
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Due 15 March 2019
Resolved 17 March 2019
Resolution: Received, reviewed, and accepted class report stating P/V valves were satisfactorily tested with DNVGL surveyor.
15 - Safety Management Systems (ISM) › N/A - No Subsystem › Maintenance of the ship and equipment
Issued 15 March 2019 Resolved
THE COMPANY SHOULD ESTABLISH PROCEDURES TO ENSURE THAT THE SHIP IS MAINTAINED IN CONFORMITY WITH THE PROVISIONS OF THE RELEVANT RULES AND REGULATIONS AND WITH ANY ADDITIONAL REQUIREMENTS WHICH MAY BE ESTABLISHED BY THE COMPANY. OBJECTIVE EVIDENCE DURING AN EXPANDED ISM EXAM REVEALED THAT THE SHIP’S PROCEDURES, RELATED TO THE INSPECTION AND TESTING OF HIGH LEVEL ALARMS AND PRESSURE/VACUUM VALVES ARE NOT FOLLOWED AS STATED IN REGULATIONS AND ONBOARD DOCUMENTATION. THE CREW COMPLETED A VITAL SYSTEM SURVEY ON 13MAR19, INDICATING THE RESPECTIVE SYSTEMS WERE OPERATIONAL, HOWEVER THE HIGH LEVEL ALARMS AND PRESSURE/VACUUM VALVES WERE NOT WORKING AT THE TIME OF THE PORT STATE EXAM AS INDICATED ON THE VITAL SYSTEM SURVEY. IT IS RECOMMENDED THAT AN EXTERNAL THIRD PARTY AUDIT OF THE SMS BE CONDUCTED WITH REGARD TO DEFICIENCIES NO. 1 AND NO. 2. 74 SOLAS (14) IX, ISM CODE PART A 10.1, 17AC
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Due 15 March 2019
Resolved 17 March 2019
Resolution: Received, reviewed, and accepted class report from DNV-GL stating an additional audit was carried out for the scope of the PSC deficiencies no. 1 and 2. with no additional deficiencies.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 15 March 2019 Resolved
THE MACHINERY, BOILERS AND OTHER PRESSURE VESSELS, ASSOCIATED PIPING SYSTEMS AND FITTINGS SHALL BE OF DESIGN AND CONSTRUCTION ADEQUATE FOR THE SERVICE FOR WHICH THEY ARE INTENDED AND SHALL BE SO INSTALLED AND PROTECTED AS TO REDUCE TO A MINIMUM ANY DANGER TO PERSONS ON BOARD, DUE REGARD BEING PAID TO MOVING PARTS, HOT SURFACES AND OTHER HAZARDS. A CONTROL AIR LINE USED AS A SECONDARY MEANS TO STOP THE MAIN DIESEL ENGINE FUEL PUMP WAS RUPTURED AND ACTIVELY LEAKING AIR PRESSURIZED AT 7.5 BAR (100 PSI). 74 SOLAS (04) II-1/26.1, 17AC
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Due 15 March 2019
Resolved 17 March 2019
Resolution: Received, reviewed, and accepted class report from DNV-GL stating the ruptured line was replaced and verified.
06 - Cargo Operations Including Equipment › N/A - No Subsystem › Cargo transfer - Tankers
Issued 15 March 2019 Resolved
EACH VESSEL VAPOR CONNECTION FLANGE FACE MUST HAVE A PERMANENT STUD PROJECTING OUTWARD THAT HAS A 12.7 MILLIMETER (0.5 INCH) DIAMETER AND IS AT LEAST 25.4 MILLIMETERS (1 INCH) LONG. IT MUST BE LOCATED AT THE TOP OF THE FLANGE FACE, MIDWAY BETWEEN BOLT HOLES, AND IN LINE WITH THE BOLT HOLE PATTERN. THERE IS NO STUD ON THE FLANGE FACE OF THE VAPOR COLLECTION LINE ON THE PORT CARGO MAINFOLD. 46 CFR 39.2001, 17AC
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Due 15 March 2019
Resolved 17 March 2019
Resolution: Received, reviewed, and accepted class report from DNV-GL stating stud was installed.
07 - Fire Safety › N/A - No Subsystem › Division - decks, bulkheads and penetrations
Issued 15 March 2019 Resolved
“A” CLASS DIVISIONS SHALL BE SO CONTRUCTED AS TO BE CAPABLE OF PREVENTING THE PASSAGE OF SMOKE AND FLAME TO THE END OF THE ONE-HOUR STANDARD FIRE TEST. CABLE PENETRATIONS LEADING INTO THE BRIDGE, THE OFFICER LAUNDRY AND THROUGHOUT THE ENTIRE VERTICAL CABLE TRUNK WERE NOT FITTED WITH AN A RATED INSULATION MATERIAL. 74 SOLAS (01) II-2/3.3.3, 50AC
Condition: Improper Installation
Action required: 50 - Rectify deficiencies w/in 30 days
Due 15 March 2019
Resolved 17 March 2019
Resolution: Received, reviewed, and accepted class report from DNV-GL stating cable penetrations were repaired and verified.
07 - Fire Safety › N/A - No Subsystem › Maintenance of Fire protection systems
Issued 15 March 2019 Resolved
FIRE-FIGHTING SYSTEMS AND APPLIANCES SHALL BE KEPT IN GOOD WORKING ORDER AND READILY AVAILABLE FOR IMMEDIATE USE. A VALVE ON THE SUPPLY LINE FOR THE FOAM MONITOR PUMP WAS OBSERVED TO HAVE A STEADY STREAM OF WATER LEAKING WHILE THE PUMP WAS OPERATING. THE BODY OF THE VALVE HAD SIGNS OF RUNNING RUST INDICTATING THE VALVE HAS BEEN LEAKING DURING PREVIOUS PUMP OPERATIONS. 74 SOLAS (01) II-2/14.2.1.2, 10AC
Condition: Improper/Lack of Maintenance
Action required: 10 - Deficiency Rectified
Due 15 March 2019
Resolved 15 March 2019
Resolution: Further investigation found out gasket inside bonnet of the subjected valve was worn out. Gasket confirmed renewed by ship's crew and no leak found during pump operational test.
07 - Fire Safety › N/A - No Subsystem › Maintenance of Fire protection systems
Issued 15 March 2019 Resolved
FIRE-FIGHTING SYSTEMS AND APPLIANCES SHALL BE KEPT IN GOOD WORKING ORDER AND READILY AVAILABLE FOR IMMEDIATE USE. EMERGENCY FIRE PUMP WAS OBSERVED TO BE LEAKING FROM THE MECHANICAL SEAL AT A RATE EXCEEDING NORMAL OPERATIONS. 74 SOLAS (01) II-2/14.2.1.2, 10AC
Condition: Improper/Lack of Maintenance
Action required: 10 - Deficiency Rectified
Due 15 March 2019
Resolved 15 March 2019
Resolution: Crew replaced seal and emergency fire pump was tested satisfactorily.
11 - Life Saving Appliances › N/A - No Subsystem › Immersion suits
Issued 15 March 2019 Resolved
ALL LIFE-SAVING APPLICANCES SHALL COMPLY WITH APPLICABLE REQUIREMENTS OF THE CODE. AN IMMERSION SUIT SHALL BE CONSTRUCTED WITH WATERPROOF MATERIALS THAT IT WILL COVER THE WHOLE BODY WITH EXCEPTION OF THE FACE. PSCO FOUND 01 IMMERSION SUIT ZIPPER WAS BROKEN, RENDERING THE SUIT OUT OF SERVICE. 74 SOLAS (14) III/34 & LSA II/2.3.1.1.3 , 10AC
Condition: Improper/Lack of Maintenance
Action required: 10 - Deficiency Rectified
Due 15 March 2019
Resolved 15 March 2019
Resolution: Initially ship's had 35 immersion suits onboard. Required immersion suits onboard is 33 pieces. Defective immersion suit was replaced taken from the additional suits.
Pollution Prevention/Response › Prevention Equipment › Oily Mixture Discharge Fixed Piping System
Issued 17 February 2017 Resolved
2199-MARPOL I/31.1 The system shal be fitted with a recording device to provide a continuous record of the discharge in litres per nautical mile and total quantity discharged, or the oil content and rate of discharge. This record shall be indentifiable as to time and date and shall be kept for at least three years. PSCO noted that the ODME was not recording correct time and date or changing.
Condition: Invalid
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Due 17 February 2017
Resolved 2 March 2017
Resolution: Received proper class survey attesting to proper repairs and testing in presence of DNV-GL surveyor.
Deck/Cargo › Holds/Tanks › Liquid Level Gaging
Issued 17 February 2017 Resolved
2199-MARPOL II/7, IBC 17, Chem Tankers which have been surveyed & certified by states parties to the present convention in accordance with the provisions of the IBC or Chemical Bulk Code, as applicable, shall be deemed to have complied with the provisions of the said regulations & the certificate under that Code. PSCO noted that vessel is not equipped with functional closed gauging on #6S tank.
Condition: Invalid
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Due 17 February 2017
Resolved 2 March 2017
Resolution: Received proper class survey attesting to proper repairs and testing in presence of DNV-GL surveyor.
Engineering › Fuel Oil Service System › Valve
Issued 17 February 2017 Resolved
1499- 74 SOLAS (14) I/11 The condition of the ship and its equipment shall be maintained to conform with the provisions of the present regulations to ensure that the ship in all respects will remain fir to proceed to sea without danger to the ship or persons on board. PSCO noted that the recirculating valve for the #1 oil purifier is inoperable.
Condition: Invalid
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Due 17 February 2017
Resolved 2 March 2017
Resolution: Received proper class survey attesting to proper repairs and testing in presence of DNV-GL surveyor.
Deck/Cargo › Inert Gas System › IGS Blower
Issued 2 March 2016 Resolved
1899-(Tankers)The IG System shall be constructed IAW the FSS Code w/ consideration given to the blowers & piping to prevent flue gas leakages into enclosed spaces. The PSCO noticed carbon monoxide levels on their 4 gas meters were alarming and that the #2 blower impeller casing flange seal was missing one bolt. SOLAS74a II-2/5.5.3.2 FSS Code 15.2.3.1.2
Action required: 705 - Other - as specified
Due 2 March 2016
Resolved 2 March 2016
Resolution: The C/E replaced the missing bolt on the flange seal. Tested the blower and found no IG escaping from the flange. Cleared the def on the spot.
Deck/Cargo › Vapor Control Systems › Piping/Hoses
Issued 27 June 2007 Resolved
1/2 inch stud on the starboard forward and port aft vapor control manifold connections are missing.
Action required: 705 - Other - as specified
Due 27 July 2007
Resolved 19 October 2007
Resolution: Sighted pictures of both manifolds with studs installed.
Deck/Cargo › Inert Gas System › Venting System
Issued 19 April 2006 Resolved
Prove proper operation of IGS, prior to carriage of Annex I cargo's.
Condition: Unknown
Action required: 705 - Other - as specified
Resolved 23 April 2006
Resolution: Received satisfactory class report.
Pollution Prevention/Response › Prevention Equipment › Oily Water Separator (100 ppm)
Issued 19 April 2006 Resolved
Prove proper operation of ODME, prior to carriage of Annex I cargo's.
Condition: Unknown
Action required: 705 - Other - as specified
Resolved 23 April 2006
Resolution: Received satisfactory class report.
Deck/Cargo › Inert Gas System › Deck Distribution System
Issued 18 May 2005 Resolved
Prior to discharging petroleum cargoes requiring IG, provide calibration certificate for liquid filled P-V breaker.
Action required: 705 - Other - as specified
Due 22 July 2005
Resolved 22 July 2005
Resolution: Cleared by class (BV) report.
Deck/Cargo › Inert Gas System › Venting System
Issued 21 April 2005 Resolved
Prior to discharging high capacity petroleum cargoes requiring use of flue gas IG system, prove proper calibration of O2 analyzer and operation of high O2 alarm, to the satisfaction of class.
Action required: 705 - Other - as specified
Due 28 April 2005
Resolved 22 July 2005
Resolution: Cleared via class (BV) report.
Pollution Prevention/Response › Prevention Equipment › Oily Water Separator (15 ppm)
Issued 21 April 2005 Resolved
Prove proper operation oily water separator 15 ppm alarm and automatic stopping device. Test should be conducted by presenting oil into the system or by simulation with sensor. In either case, shutdown should be seen to take place immediately after 15 ppm is reached. To be completed prior to next U.S. port to satisfaction of an attending class surveyor.
Action required: 15 - Rectify deficiencies by next port
Due 28 April 2005
Resolved 22 July 2005
Resolution: Cleared by class (BV) report.
Deck/Cargo › Holds/Tanks
Issued 20 August 2003 Resolved
#3 stbd cargo tank was overpressurized during nitrogen purging, causing a buckling of external framing above the cargo tank. Transverse frame affected were, 148 thur 158. Crop an renew the effected areas. Vsl allowed to depart Houston to conduct repairs in a shipyard in Japan.
Action required: 705 - Other - as specified
Due 1 October 2003
Resolved 10 December 2003
Resolution: REPAIRED TO THE SATISFACTION OF CLASS

Ownership record

The Coast Guard's documentation record for this hull -- the Abstract of Title, with its owners and liens as filed -- is not in PSIX. Ask, and Maury buys it from the National Vessel Documentation Center, files it here with its date, and every reader of this page gets it.