MAURY USCG vessel records Sign in
← All vessels

HOS GEMSTONE

HOS GEMSTONE is a 2003 offshore supply vessel. The Coast Guard has recorded 28 inspections since 2003, most recently in August 2017, along with 7 deficiencies.

Records from 2003 to 2017. Most recent: inspection, 21 August 2017.

Built
2003
Last inspected
21 August 2017
Documentation
Valid · documentation file of 10 September 2026
Controls
None recorded without a removal date

Identity

9270995 View on MarineTraffic leaves Maury; a third-party site, nothing from it is stored here
WDB4055
621248
Flag
UNITED STATES
369279000
Maury page id
psix-621248

Inspections, by type

…with no type recorded1
Years with a record 11 calendar years (2003–2017)
The 28 inspections in the strip above, split by the kind of activity the US Coast Guard recorded. Years with a record are calendar years in which a record exists, not years in service. What Maury does not do.

This record may be incomplete: the most recent inspection recorded for this vessel was 9 years ago. Maury shows what the Coast Guard recorded, not whether the vessel has been inspected since, is still in service, or what condition it is in. Coast Guard record current through 13 September 2026, retrieved 18 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard. Records for the Offshore class in Maury's sources begin in 1978.

Documentation record

Registered dimensions (L × B × D)221.7 ft × 54.0 ft × 18.0 ft
Registered tonnagegross 1,863 / net 558
ITC dimensions (L × B × D)221.7 ft × 54.0 ft × 18.0 ft
ITC tonnagegross 1,863 / net 558
BuilderLEEVAC INDUSTRIES LLC · JENNINGS, LA, UNITED STATES · built 2003
Hull materialSteel
PropulsionDiesel Reduction
Hull shapeNot recorded
Hull configurationNot recorded
Hailing portNEW ORLEANS, LA
Trade endorsementsCoastwise, unrestricted, Registry
DocumentationValid · issued 21 July 2026 · expires 31 August 2027
Service, as the file records itOffshore Supply Vessel
Hull formpowered (Maury's inference from propulsion, hull shape, material and length, rule hf-1; not a recorded fact)
Tonnage as PSIX records it2800 - Dead Weight, Ton
1863 - Convention (Subpart B), Gross Ton
1457 - Displacement, Gross Ton
558 - Convention (Subpart B), Net Ton
Every line above is a field of the National Vessel Documentation Center's file as served by NOAA Fisheries, dated 10 September 2026, matched to this hull on its Official Number. Registered and ITC measurements are two systems and are never combined. One snapshot is held so far; documentation history begins with the next.

Radio station licence

WDB4055MMSI 369279000 · active · compulsorily equipped · granted 9 May 2023, expires 20 May 2033
FCC Universal Licensing System ship-station file of 6 September 2026, matched to this hull on its US Official Number. Status and dates are the file’s own. The licensee is not read from the file and is not shown. A lapsed licence’s MMSI is still the number the vessel transmitted under while it was valid.

A report is not offered for this hull: Its record holds only 2 of the seven kinds of material a report is built from: inspections, deficiencies, operational controls, tow-unit appearances, casualty records, dimensions and documentation. That is a statement about the record, not about the vessel. Reports.

Inspection history · 28

21 August 2017 Administrative Inspection
Administrative · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 6247617
14 May 2014 SIP Inspection/Audit · Administrative Inspection · Annual Inspection
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 4858545
20 January 2011 Drydock Extension
Administrative · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 3936350
26 March 2010 Re-Inspection
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 3703370
24 February 2010 Deficiency Check · MARPOL Annex VI Survey · Examination of Repairs · Construction Oversight
Physical examination · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 3688785
9 July 2009 Annual Inspection · MTSA/ISPS Verification
Physical examination · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 3535297
29 March 2009 Damage Survey
Physical examination · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 3443079
16 December 2008 Deficiency Check
Physical examination · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 3380672
13 July 2008 Type not recorded
No type recorded · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 3268718
25 June 2008 Hull Examination · Internal Structural Exam · Construction Oversight
Physical examination · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 3247921
29 May 2008 COI Inspection · MTSA/ISPS Verification
Physical examination · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 3211749
7 June 2007 In-Service Inspection
Physical examination · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 3059775
17 May 2007 Annual Inspection · MTSA/ISPS Verification
Physical examination · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 2952677
9 May 2006 Annual Inspection · Internal Structural Exam · Construction Oversight · Hull Examination · MTSA/ISPS Verification
Physical examination · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 2640460
9 May 2006 Administrative Inspection
Administrative · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 2644634
5 May 2006 Administrative Inspection
Administrative · Marine Safety Unit Lake Charles · USCG Heartland District (CGD-H) · Activity 2641774
17 February 2006 Administrative Inspection
Administrative · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 2587259
31 January 2006 Administrative Inspection
Administrative · Marine Safety Center (MSC) · Activity 2576506
31 January 2006 Security Plan Review - VSP
Administrative · Marine Safety Center (MSC) · Activity 2576515
21 November 2005 Deficiency Check
Physical examination · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 2538304
29 September 2005 MTSA/ISPS Verification · Re-Inspection · Ballast Water Examination
Physical examination · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 2503857
12 October 2004 Administrative Inspection
Administrative · MIDET EAST BANK DETAIL · USCG Heartland District (CGD-H) · Activity 2218812
7 July 2004 Administrative Inspection
Administrative · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 2124500
1 June 2004 MTSA/ISPS Verification
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 2086600
25 May 2004 Administrative Inspection
Administrative · MIDET EAST BANK DETAIL · USCG Heartland District (CGD-H) · Activity 2077839
20 April 2004 Security Plan Review - VSP
Administrative · Marine Safety Center (MSC) · Activity 2048406
29 December 2003 Security Plan Review - ASP
Administrative · Marine Safety Center (MSC) · Activity 1979388
5 June 2003 Initial Certification · Initial Construction-Excluding Oversight · Construction Oversight
Physical examination · MSU LAKE CHARLES · USCG Heartland District (CGD-H) · Activity 1810122

Deficiency record · 7

Engineering › Thrusters › Seal
Issued 29 March 2009 Resolved
Do not use leaking bow thruster until it is repaired
Condition: Unknown
Action required: 705 - Other - as specified
Due 29 April 2011
Resolved 23 March 2010
Electrical › Electrical Distribution System (service) › Circuit Breaker
Issued 7 July 2008 Resolved
Install 100 amp main breaker in module housing unit distribution panel per approved plans.
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 7 July 2008
Resolved 7 July 2008
Fire Fighting › Fire Hoses › Length
Issued 7 July 2008 Resolved
Install 75 foot hose on fire station #5 to provide proper coverage of housing module.
Action required: 705 - Other - as specified
Due 7 July 2008
Resolved 7 July 2008
Documentation › Safety/Response Plans/Programs › Fire Control Plans
Issued 7 July 2008 Resolved
Submit for approval an updated fire safety plan that reflects installation of housing module.
Action required: 705 - Other - as specified
Due 7 July 2008
Resolved 7 July 2008
Documentation › Safety/Response Plans/Programs › General Arrangement Plans
Issued 7 July 2008 Resolved
Submit for approval an updated Lifesaving Equipment plan that reflects installation of housing module.
Action required: 705 - Other - as specified
Due 7 July 2008
Resolved 5 September 2008
Resolution: Lifesaving Equipment plan approved this date
Fire Fighting › Fire Hoses › Condition
Issued 29 May 2008 Resolved
Replace ruptured fire hose.
Due 29 May 2008
Resolved 29 May 2008
Operations/Management › Streamlined Inspection Program › CAP Review and Revision
Issued 29 September 2005 Resolved
Annual automation equipment tests and inspections not completed.
Action required: 705 - Other - as specified
Due 24 October 2005
Resolved 8 November 2005
Resolution: Completed.

Ownership record

The Coast Guard's documentation record for this hull -- the Abstract of Title, with its owners and liens as filed -- is not in PSIX. Ask, and Maury buys it from the National Vessel Documentation Center, files it here with its date, and every reader of this page gets it.