MAURY USCG vessel records
← All vessels

PASCO STAR

PASCO STAR is a 2003 tank ship. The Coast Guard has recorded 27 inspections since 2016, most recently in February 2026, along with 11 deficiencies and 9 operational controls.

Records from 2016 to 2026. Most recent: inspection, 25 February 2026.

Built
2003
Last inspected
25 February 2026
Documentation
Not in the documentation file of 10 August 2026
Controls
None recorded without a removal date

Coast Guard record current through 23 August 2026, retrieved 5 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard. Records for the Tank Ship class in Maury's sources begin in 2016.

Inspection record

Last inspected 25 February 2026
…with no type recorded11
Operational controls None recorded without a removal date
Years with a record 11 calendar years (2016–2026)
Every line above is a count of records the US Coast Guard wrote, or a date it recorded. A blank resolution means none was recorded in this data; it does not establish that a deficiency is outstanding. Years with a record are calendar years in which a record exists, not years in service. What Maury does not do.

Identity

9247807
3E7049
625871
Flag
NORWAY
Maury page id
psix-625871

Documentation record

Tonnage as PSIX records it11053 - Convention (Subpart B), Net Ton
60637 - Displacement, Metric Ton
44807 - Dead Weight, Metric Ton
34970 - Regulatory (Subpart C or D), Gross Ton
11053 - Regulatory (Subpart C or D), Net Ton
34970 - Convention (Subpart B), Gross Ton
This hull's Official Number is not in the NVDC file dated 10 August 2026 as served by NOAA Fisheries, so no documentation record is shown. Absence from that file is a fact about the file, not about the hull.
Vessel history report
Every record for this hull, in one document — $299

Every recorded inspection, 2016 to 2026 for this class, in one chronology · every deficiency, with system, dates and resolution · operational controls imposed and removed · every name this hull has been recorded under · the vessels it was inspected alongside, and when · how its record compares with hulls of similar age and size, as a fact about the population and never a judgement about this vessel.

Read one first, in full: a forty-year chronology · a hull that changed operators four times · the sparse case, shown as an example, not for sale.

This report is in development and is not for sale yet. There is no date, and nothing is charged. Leave an email and we will tell you when it exists, once.

Inspection history · 27

25 February 2026 Administrative Inspection · PSC B · COC-GAS Annual
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 8316607
28 October 2025 Type not recorded
No type recorded · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 8260101
4 January 2025 COC-GAS Renew · PSC B
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 8057387
20 November 2024 PSC B · COC-GAS Annual
Physical examination · Marine Safety Unit Texas City · USCG Heartland District (CGD-H) · Activity 8033760
29 September 2024 COE-Administrative
Administrative · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 8010940
24 November 2023 COC-GAS Renew · PSC B
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 7828297
22 November 2023 Type not recorded
No type recorded · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 7828708
22 November 2023 COE-Offshore
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 7828709
10 June 2022 PSC B · COC-GAS Renew
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 7473444
8 June 2022 Type not recorded
No type recorded · Sector Delaware Bay · USCG East District (CGD-E) · Activity 7471876
15 October 2021 Type not recorded
No type recorded · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 7333787
1 June 2021 PSC B · COC-GAS Annual
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 7211667
20 January 2021 Administrative Inspection · Deficiency Check
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 7127696
23 December 2020 PSC B
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 7115452
7 July 2020 Type not recorded
No type recorded · Sector Delaware Bay · USCG East District (CGD-E) · Activity 6996447
25 May 2020 PSC A · COC-GAS Renew
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 6959789
24 May 2020 Type not recorded
No type recorded · Sector Delaware Bay · USCG East District (CGD-E) · Activity 6958706
27 January 2020 Type not recorded
No type recorded · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 6897222
12 December 2019 Type not recorded
No type recorded · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 6872716
1 October 2019 ISPS II Exam
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 6825289
31 January 2019 ISPS II Exam · Ballast Water Examination · COC-GAS Renew
Physical examination · Marine Safety Unit Texas City · USCG Heartland District (CGD-H) · Activity 6613849
21 January 2018 Type not recorded
No type recorded · Sector Northern New England · USCG Northeast District (CGD-NE) · Activity 6342364
14 January 2018 In-Service Inspection
Physical examination · Marine Safety Unit Portsmouth · USCG Northeast District (CGD-NE) · Activity 6337803
3 August 2017 Ballast Water Examination · COC-GAS Annual · ISPS II Exam
Physical examination · Marine Safety Unit Texas City · USCG Heartland District (CGD-H) · Activity 6226638
10 June 2017 Type not recorded
No type recorded · Marine Safety Unit Texas City · USCG Heartland District (CGD-H) · Activity 6171218
10 June 2017 Type not recorded
No type recorded · Marine Safety Unit Texas City · USCG Heartland District (CGD-H) · Activity 6171220
2 August 2016 Ballast Water Examination · ISPS II Exam · COC-GAS Renew
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 5956856

Deficiency record · 11

06 - Cargo Operations Including Equipment › N/A - No Subsystem › Atmosphere testing instruments
Issued 4 January 2025 Resolved
A gas carrier shall comply with the requirements of the International Gas Carrier Code. Suitable Equipment and span gas should be carried on board. PSCO observed span gas required for calibration and testing expired. 74 SOLAS (2020) VII 13.1 93 IGC Code 13.6.6
Condition: Improper/Lack of Maintenance
Action required: 10 - Deficiency Rectified
Due 4 January 2025
Resolved 4 January 2025
Resolution: Crew procurred appropriate gas and demonstrated proper calibration and testing.
12 - Dangerous Goods › N/A - No Subsystem › Fire protection cargo deck area
Issued 1 June 2021 Resolved
On ships carrying flammable or toxic products or both, a water-spray system for cooling, fire prevention and crew protection should be installed to cover: exposed cargo tank domes and any exposed parts of cargo tanks. 03 out of 03 deck water spray nozzles on the #1 cargo tank were clogged and did not sufficiently cover all exposed parts of the #1 cargo tank. 74 SOLAS (14) VII/13.1 & IGC Code (93) 11.3.1.1.
Action required: 17 - Rectify deficiencies prior to departure
Due 1 June 2021
Resolved 1 June 2021
Resolution: Corrected before the PSC team departed the vessel. (10c)
14 - Pollution Prevention › 146 - MARPOL Annex VI › Incinerator incl. operations and operating manual
Issued 1 June 2021 Resolved
02) Incinerator walls are to be protected with insulated fire bricks / refractory... There was deteriorated fire brick / refractory eposing metal incinerator shell. MARPOL VI/3.16.6.1 & MEPC .244(66).
Action required: 16 - Rectify deficiencies w/in 14 days
Due 15 June 2021
Resolved 1 June 2021
Resolution: Corrected before the PSC team departed the vessel. (10c)
11 - Life Saving Appliances › N/A - No Subsystem › Rescue boats
Issued 23 December 2020 Resolved
All life-saving appliances and arrangements shall comply with the applicable requirements of the code... All rescue boats shall comply with the requirements fo paragraphs 4.4.1 to 4.4.7.4 inclusive... There is a 3 inch diameter damaged section of the starboard hull where the rescue boat rests on the aft davit cradle. The extent of damage and watertight integrity could not be determined during the exam. - 74SOLAS (14)III/34, LSA Code 5.1.1.1 - 40AC
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Resolved 20 January 2021
Resolution: CG satisfied with 02 class surveys provided.
06 - Cargo Operations Including Equipment › N/A - No Subsystem › Other (cargo)
Issued 23 December 2020 Resolved
The changing of the set pressure under the provisions of 8.2.6 should be carried out under the supervision of the master in accordance with procedures approved by Administration and specified in the ship's operating manual... MARV auxillary setting devices were switched on the pilot valves on cargo tank dome #3, according to vessel's "set and seal" certificate from DNV-GL. Name/Data plates were missing on cargo tank #3 forward valve and cargo tank #1 aft valve. Crew did not change set pressure in accordance with vessel's change over procedures, which requires proper placement of auxillary setting devices on proper pilot valve. - IGC Code (1993) Ch. 8.2.7 - 40ac
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Resolved 20 January 2021
Resolution: CG satisfied with 02 class surveys provided.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Other (load lines)
Issued 23 December 2020 Resolved
The ring, lines and letters shall be painted in white or yellow on a dark ground... The plimsol mark and lines were not painted properly on the starboard side. - ICLL (88) I/8 - 40 ac
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Resolved 20 January 2021
Resolution: CG satisfied with 02 class surveys provided.
06 - Cargo Operations Including Equipment › N/A - No Subsystem › Cargo operation
Issued 25 May 2020 Resolved
A gas carrier shall comply with the requirements of the IGC. The changing of the pressures and setting of the alarms should be carried out under the supervision of the master and in accordance with procedures approved by administration and specified in the ships operations manual. The safety relief valve auxillaries on tank #4 were swapped and not in accordance with DNV-GL Relief valve document dated 2018-03-12. Additionally,the cargo control system was set to "at sea" mode while operating with "In harbor" settings. Ther are no procedures detailing the valve locations or to let crew know to change cargo control system settings.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 25 June 2020
Resolved 22 June 2020
Resolution: See Attached [name withheld] attesting to repairs
14 - Pollution Prevention › 141 - MARPOL Annex I › Oil filtering equipment
Issued 25 May 2020 Resolved
Oil filtering equipment shall comply with specifications recommended by the Organization. Crew used a test median for the oily water separater that is not approved by manufacture instructions. Approved solution is on board.
Action required: 10 - Deficiency Rectified
Resolved 25 May 2020
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 25 May 2020 Resolved
Before the ship leaves port and at all times during the voyage, all life saving appliances shall be in working order and ready for immediate use. Self activating light on 01 ring lifebuoy was not operational.
Action required: 10 - Deficiency Rectified
Resolved 25 May 2020
15 - Safety Management Systems (ISM) › N/A - No Subsystem › Shipboard operations
Issued 25 May 2020 Resolved
Safety Management System shall be maintained in accordance with the provisions set forth by the Code. The company shall establish procedures, plans, and instructions, including checklists as appropriate for key shipboard operations concerning the safety of the personnel, ship, and protection of the environment. The various tasks should be defined and assigned to qualified personnel. Vessel has not procedures detailing the valve locations or to let crew know to change cargo control system settings in deficiency (01). Crew did not follow the approved method of testing the oily water separator in deficiency (02). Recommend the vessel receive an external audit within 30 days.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 25 June 2020
Resolved 22 June 2020
Resolution: Audit Conducted to Satisfaction of the Class and Coast Guard.
Documentation › Logs/Records › Oil Record Book
Issued 2 August 2016 Resolved
1710 - Oil Record Book - The Oil Record Book Part I shall be completed on each occassion; on a tank to tank basis if appropriate, whenever any of the following machinery space operations takes place in the ship; bunkering of fuel or bulk lubricating oil. Vessel failed to make entry of MGO bunkering operation. C/E subsequently made correction to the Oil Record Book. MARPOL ANNEX I 17.2.5
Condition: Invalid
Action required: 705 - Other - as specified
Due 2 August 2016
Resolved 2 August 2016
Resolution: Deficiency was corrected on the spot to the satisfaction of attending PSC team.

Ownership record

The Coast Guard's documentation record for this hull -- the Abstract of Title, with its owners and liens as filed -- is not in PSIX. Ask, and Maury buys it from the National Vessel Documentation Center, files it here with its date, and every reader of this page gets it.