← All vessels

MORITZ

MORITZ is a 2003 passenger vessel (inspected). The Coast Guard has recorded 34 inspections since 2003, most recently in September 2025, along with 34 deficiencies.

Records from 2003 to 2025. Most recent: inspection, 8 September 2025.

Built
2003
Last inspected
8 September 2025
Documentation
Not in the documentation file of 10 September 2026
Controls
None recorded without a removal date

Identity

627168
Flag
UNITED STATES
—
Maury page id
psix-627168

Inspections, by type

Years with a record 20 calendar years (2003–2025)
The 34 inspections in the strip above, split by the kind of activity the US Coast Guard recorded. Years with a record are calendar years in which a record exists, not years in service. What Maury does not do.

Coast Guard record current through 13 September 2026, retrieved 18 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard. Records for the Passenger Ship class in Maury's sources begin in 1977.

Documentation record

Tonnage as PSIX records it53 - Dead Weight, Ton
27 - Displacement, Gross Ton
53 - Regulatory (Subpart C or D), Gross Ton
This hull's Official Number is not in the NVDC file dated 10 September 2026 as served by NOAA Fisheries, so no documentation record is shown. Absence from that file is a fact about the file, not about the hull.

Radio station licence

No FCC ship-station licence is recorded against this Official Number in the file of 6 September 2026. That is a fact about the licence file, not about the radio.

A report is not offered for this hull: Its record holds only 2 of the seven kinds of material a report is built from: inspections, deficiencies, operational controls, tow-unit appearances, casualty records, dimensions and documentation. That is a statement about the record, not about the vessel. Reports.

Inspection history · 34

8 September 2025 Deficiency Check · Drydock Exam · Internal Structural Exam
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 8229213
23 June 2025 Internal Structural Exam · Annual Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 8160442
26 June 2024 Annual Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 7941906
23 August 2023 Internal Structural Exam · Deficiency Check · Drydock Exam
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 7769079
26 June 2023 COI Inspection · Deficiency Check
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 7723929
5 December 2022 Deficiency Check · Annual Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 7604162
30 November 2022 Administrative Inspection
Administrative · Sector New York · USCG Northeast District (CGD-NE) · Activity 7601945
16 August 2021 Drydock Exam · Deficiency Check · Internal Structural Exam
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 7288068
2 June 2021 Administrative Inspection
Administrative · Sector New York · USCG Northeast District (CGD-NE) · Activity 7213549
1 July 2020 Annual Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 6992978
10 September 2019 Annual Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 6808134
19 August 2019 Drydock Exam · Internal Structural Exam
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 6787834
29 July 2019 Administrative Inspection · Deficiency Check
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 6766697
22 April 2019 Administrative Inspection · Drydock Extension
Administrative · Sector New York · USCG Northeast District (CGD-NE) · Activity 6667956
6 November 2018 Administrative Inspection
Administrative · Navigation Center · Activity 6575311
2 July 2018 COI Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 6463818
10 January 2018 Administrative Inspection
Administrative · Navigation Center · Activity 6335348
28 August 2017 MTSA Verification · Annual Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 6253640
30 March 2017 Deficiency Check · Examination of Repairs · Administrative Inspection · Drydock Exam
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 6114694
15 June 2016 Annual Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 5908002
18 June 2014 Annual Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 4894064
4 May 2012 Annual Inspection · Deficiency Check
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 4304078
8 December 2011 Administrative Inspection
Administrative · Sector New York · USCG Northeast District (CGD-NE) · Activity 4204467
23 February 2009 Hull Examination · Internal Structural Exam
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 3422495
28 May 2008 COI Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 3219179
31 May 2007 MARPOL Annex V Examination · Annual Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 2952458
23 February 2007 Internal Structural Exam · Hull Examination
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 2876754
25 May 2006 MARPOL Annex V Examination · Annual Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 2658921
14 June 2005 Annual Inspection · MARPOL Annex V Examination
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 2389923
22 February 2005 Hull Examination · Internal Structural Exam
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 2296743
13 September 2004 MARPOL Annex V Examination · Annual Inspection
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 2194885
12 July 2004 Damage Survey
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 2133263
11 December 2003 Deficiency Check · COI Inspection · MARPOL Annex V Examination
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1962224
30 May 2003 COI Inspection · Construction Oversight
Physical examination · MSO PUGET SOUND · USCG Northwest District (CGD-NW) · Activity 1863360

Deficiency record · 34

09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 29 June 2023 Resolved
Each vessel that relies on electricity to power the following loads must be arranged so that the loads can be energized from two sources of electricity: (i) The vital systems listed in § 182.710 of this chapter;Vessel's STBD Gen Set does not operate as designed due to a faulty injector, must repair and prove proper operation to the Coast Guard Marine Inspector. (CGMI)
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 21 July 2023
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 26 June 2023 Resolved
Propulsion machinery must be suitable in type and design for propulsion requirements of the hull in which it is installed and capable of operating at constant marine load under such requirements without exceeding its designed limitations; vessel's STBD MDE just had work completed but during MOB drill the engine would not operate over 1315 RPM, must repair to original condition as designed.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 19 July 2023
09 - Working and Living Conditions › 092 - Working Conditions › Other (accident prevention)
Issued 26 June 2023 Resolved
A vessel must carry either a first-aid kit that meets the requirements in 46 CFR 199.175(b)(10) or a kit with equivalent contents and instructions. For equivalent kits, the contents must be stowed in a suitable, watertight container that is marked “First-Aid Kit”.
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 19 July 2023
10 - Safety of Navigation › N/A - No Subsystem › Charts
Issued 26 June 2023 Resolved
As appropriate for the intended voyage, a vessel must carry adequate and up-to-date: (1) Charts of large enough scale to make safe navigation possible; (2) U.S. Coast Pilot or similar publication; (3) Coast Guard Light List; (4) Tide tables; and (5) Current tables, or a river current publication issued by the U.S. Army Corps of Engineers or a river authority. (b) Extracts from the publications listed above for the areas to be transited may be provided instead of the complete publication, all were not current. (2012&2013)
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 19 July 2023
03 - Water/Weathertight Conditions › N/A - No Subsystem › Covers (hatchway-, portable-, tarpaulins, etc.)
Issued 26 June 2023 Resolved
Each hatch cover must— (1) Have securing devices; and (2) Be attached to the hatch frame or coaming by hinges, captive chains, or to other devices to prevent its loss. All hatches did not have securing device.
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 19 July 2023
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 26 June 2023 Resolved
Each ring life buoy with a floating waterlight must have a lanyard of at least 910 millimeters (3 feet) in length, but not more than 1,830 millimeters (6 feet), securing the waterlight around the body of the ring life buoy.Vessel's Upper Stbd ring buoy waterlight line was wasted and must be replaced.
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 19 July 2023
03 - Water/Weathertight Conditions › N/A - No Subsystem › Machinery space openings
Issued 26 June 2023 Resolved
The number of penetrations in a watertight bulkhead must be minimized. A penetration in a watertight bulkhead must be as high and as far inboard in the bulkhead as practicable, and made watertight. Vessel P&S tank spaces have new wires run though old cable penetrations and the fire block is missing, must replace to make water and fire tight.
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 19 July 2023
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 26 June 2023 Resolved
Electrical equipment and installations must be suitable for the roll, pitch, and vibration of the vessel underway; stbd steering void junction box to the RAI is hanging and must be re-secured.
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 19 July 2023
04 - Emergency Systems › N/A - No Subsystem › Man Overboard Drill (MOB)
Issued 26 June 2023 Resolved
At each initial and subsequent inspection for certification, the marine inspector may require that an abandon ship or man overboard drill be held under simulated emergency conditions specified by the inspector; vessel must conduct MOB drill with CGMI using only 2 crew members as on the COI. The CGMI feels this will not be possible in all working conditions as observed during recent inspection using 3 crew members.
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 26 June 2024
Resolution: Cleared for cause. Will evaluate the finding on the 2nd Annual Inspection.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Manholes/flush scuttles
Issued 5 December 2022 Resolved
All hatches exposed to the weather must be watertight. The gasket material for all flush scuttles are compressed / hard and not able to seal properly.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 5 January 2023
Resolved 23 August 2023
Resolution: Replaced gaskets on flush scuttles.
10 - Safety of Navigation › N/A - No Subsystem › Automatic Identification System (AIS)
Issued 6 November 2018 Resolved
Vsl is broadcasting invalid IMO # and Vsl is not broadcasting static draft information
Condition: Invalid
Action required: 705 - Other - as specified
Resolved 27 August 2019
Resolution: Submitted documentation proving AIS working properly.
02 - Structural Conditions › N/A - No Subsystem › Ballast, fuel and other tanks
Issued 2 July 2018 Resolved
Shutoff valves, installed so as to close against the fuel flow, must be manually operable. Following the vessels ship yard maintenance period, the fuel shutoff valves were improperly re-installed and do not allow for full closing of shutoff valve. Properly repair and prove proper operation of identified fuel shutoff valves.
Condition: Damaged By Earlier Event
Action required: 16 - Rectify deficiencies w/in 14 days
Due 17 July 2018
Resolved 13 July 2018
07 - Fire Safety › N/A - No Subsystem › Fixed fire extinguishing installation
Issued 2 July 2018 Resolved
A pre-engineered fixed gas fire extinguishing system must automatically shut down all power ventilation systems and all engines that draw intake air from within the protected space. The starboard generator failed to shut down during inspection of automatic shut downs. Properly repair and prove proper operation of shut down.
Condition: Damaged By Earlier Event
Action required: 50 - Rectify deficiencies w/in 30 days
Due 2 August 2018
Resolved 13 July 2018
07 - Fire Safety › N/A - No Subsystem › Fixed fire extinguishing installation
Issued 2 July 2018 Resolved
A gas actuated valve or device must be capable of manual override at the valve or device. The manual override for the vessels port main engine displayed an intermittent connection. Properly repair electrical connection for override system and prove proper operation.
Condition: Damaged By Earlier Event
Action required: 50 - Rectify deficiencies w/in 30 days
Due 2 August 2018
Resolved 13 July 2018
Engineering › Steering Gear System › Power Unit
Issued 4 May 2012 Resolved
JR1- Prove proper operation of starboard steering system. Prior to vessel getting underway.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 8 May 2012
Resolution: Witnessed steering test; all sat.
Fire Fighting › Remote Fuel Shutoff › General
Issued 4 May 2012 Resolved
JR02-Replace Emergency Fuel shut off cable port side. Prior to getting underway.
Action required: 17 - Rectify deficiencies prior to departure
Due 8 May 2012
Resolved 8 May 2012
Resolution: new shut off''s installed.
Accommodation/Occupational Safety › Sleeping Accommodations › Berth
Issued 4 May 2012 Resolved
Provide modular smoke detector in passenger berthing space. Prior to overnight voyage.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 8 May 2012
Resolution: Smoke detector installed.
Documentation › Certificates/Documents › Stability Letter
Issued 8 December 2011 Resolved
Owner/Operator failed to submit stability certification compliance by 01DEC11. Issued CG-835 reducing maximum persons allowed to 6/30 based on the assumed average weight per person of 185 pounds and in accordance with 46 CFR 178.320 amended by FR vol. 75, No. 239, USCG-2007-0030. Reduction will remain in effect until Owner/Operator submits stability certification compliance to Coast Guard.
Action required: 705 - Other - as specified
Resolved 31 May 2012
Resolution: New stability letter was issued by MSC.
Lifesaving › Inflatable Liferafts › Hydrostatic Release Unit
Issued 28 May 2008 Resolved
Replace hydrostatic releases for both life rafts.
Action required: 705 - Other - as specified
Due 31 May 2008
Resolved 28 May 2008
Communications › Radio Communications › EPIRB
Issued 28 May 2008 Resolved
Replace expired EPIRB battery.
Action required: 705 - Other - as specified
Resolved 28 May 2008
Communications › Radio Communications › EPIRB
Issued 28 May 2008 Resolved
Replace expired hydrostatic release for EPIRB.
Action required: 705 - Other - as specified
Resolved 28 May 2008
Engineering › Fuel Oil Service System › Valve, Control
Issued 25 May 2006 Resolved
Port engine fuel shut-off cable is broken. Repair shut-off cable prior to carrying passengers.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 26 May 2006
Resolution: Shut-off cable re-located to area on deck above fuel shut-off valve above lazarette.
Lifesaving › Lifefloat › Markings
Issued 25 May 2006 Resolved
Stenciling on life floats for person capacity is faded. Re-stencil lettering.
Action required: 705 - Other - as specified
Due 8 June 2006
Resolved 26 May 2006
Resolution: Stenciling re-marked on life floats.
Lifesaving › Lifebuoys › Markings (ship name/port)
Issued 25 May 2006 Resolved
Retro-reflective tape on ring buoys and life floats are worn. Re-mark buoys and life floats as required.
Action required: 705 - Other - as specified
Due 8 June 2006
Resolved 26 May 2006
Resolution: Retro-reflective tape replace as required.
Electrical › Electrical Distribution System (service) › Cable
Issued 14 June 2005 Resolved
Remove or terminate cables in stbd midship void. Cables are from old cathodic protection system. If terminated, must be terminated in junction boxes.
Due 14 July 2005
Resolved 23 June 2005
Resolution: Unterminated cables were removed.
Construction/Loadline › Hull › Hull Plating
Issued 20 July 2004 Resolved
C\R damaged hull plates (in 6 areas) & die pen test
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 20 August 2004
Resolution: All 6 areas C\R & die pen tested.
Construction/Loadline › Hull › Hull Plating
Issued 20 July 2004 Resolved
Repair\ replace\ remove active cathodic protection system.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 20 August 2004
Resolution: System removed and replaced with zincs.
Construction/Loadline › Hull › Hull Plating
Issued 20 July 2004 Resolved
Grind out minor pitting throughout hull & clean, clad weld.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 20 August 2004
Resolution: Minor pitting grinded out, cleaned, and clad welded.
Construction/Loadline › Hull › Hull Plating
Issued 20 July 2004 Resolved
Replace isolation IWO fwd foil & hull.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 20 August 2004
Resolution: Replaced to satisfaction of ACOE.
Lifesaving › Buoyant Apparatus
Issued 11 December 2003 Resolved
Stencil capacity on all life floats. LEGACY COMPONENT DESC: Capacity
Condition: Unknown
Action required: 705 - Other - as specified
Due 15 December 2003
Resolved 19 December 2003
Lifesaving › Lifebuoys
Issued 11 December 2003 Resolved
Make repairs to life ring buoy waterlight. LEGACY COMPONENT DESC: Self-igniting Lights
Condition: Unknown
Action required: 705 - Other - as specified
Due 19 December 2003
Resolved 19 December 2003
Lifesaving › Launching Appliances
Issued 11 December 2003 Resolved
[name withheld] hydro release with proper expiration date. LEGACY COMPONENT DESC: EPIRB Hydro Release
Condition: Placed in Improper Service
Action required: 705 - Other - as specified
Due 19 December 2003
Resolved 19 December 2003
Fire Fighting
Issued 11 December 2003 Resolved
Provide 3 2.5 gallon fire buckets with lanyard and "FIRE BUCKET" stenciled on them. LEGACY COMPONENT DESC: Fire Buckets
Condition: Unknown
Action required: 705 - Other - as specified
Due 19 December 2003
Resolved 19 December 2003
Operations/Management › Drills/Instruction
Issued 11 December 2003 Resolved
Conduct satisfactory Fire and MOB drills to the satisfaction of attending Marine Inspector. LEGACY COMPONENT DESC: Fire/MOB Drills
Condition: Unknown
Action required: 705 - Other - as specified
Due 19 December 2003
Resolved 19 December 2003

Ownership record

The Coast Guard's documentation record for this hull -- the Abstract of Title, with its owners and liens as filed -- is not in PSIX. Ask, and Maury buys it from the National Vessel Documentation Center, files it here with its date, and every reader of this page gets it.