Records from 2016 to 2026. Most recent: inspection, 21 May 2026.
Documentation record
Registered dimensions (L × B × D)28.2 ft × 9.7 ft × 3.8 ft
Registered tonnagegross 6 / net 5
ITC dimensions (L × B × D)Not recorded
ITC tonnageNot recorded
BuilderKARL'S WELDING · ASOTIN, WA, UNITED STATES · built 2003
Hull materialAluminum
PropulsionJet Drive
Hull shapeShip
Hull configurationMonohull
Hailing portASOTIN, WA
Trade endorsementsCoastwise, unrestricted
DocumentationValid · issued 2 December 2025 · expires 31 January 2027
Service, as the file records itPassenger (Inspected)
Hull formpowered (Maury's inference from propulsion, hull shape, material and length, rule hf-1; not a recorded fact)
Tonnage as PSIX records it5 - Simplified, Net Ton
6 - Simplified, Gross Ton
Every line above is a field of the National Vessel Documentation Center's file as served by NOAA Fisheries, dated 10 August 2026, matched to this hull on its Official Number. Registered and ITC measurements are two systems and are never combined. One snapshot is held so far; documentation history begins with the next.
Inspection history · 14
21 May 2026
Annual Inspection
Physical examination · Sector Columbia River · USCG Northwest District (CGD-NW) · Activity 8394975
24 March 2025
Annual Inspection
Physical examination · Sector Columbia River · USCG Northwest District (CGD-NW) · Activity 8099036
8 July 2024
Deficiency Check
Physical examination · Sector Columbia River · USCG Northwest District (CGD-NW) · Activity 7952982
23 April 2024
Deficiency Check · Annual Inspection
Physical examination · Sector Columbia River · USCG Northwest District (CGD-NW) · Activity 7903974
11 April 2023
Annual Inspection
Physical examination · Sector Columbia River · USCG Northwest District (CGD-NW) · Activity 7666904
22 April 2022
Hull Examination · COI Inspection
Physical examination · Marine Safety Unit Portland OR · USCG Northwest District (CGD-NW) · Activity 7447030
16 March 2021
Annual Inspection
Physical examination · Marine Safety Unit Portland OR · USCG Northwest District (CGD-NW) · Activity 7153574
8 September 2020
Deficiency Check
Physical examination · Marine Safety Unit Portland OR · USCG Northwest District (CGD-NW) · Activity 7053213
17 March 2020
Annual Inspection
Physical examination · Marine Safety Unit Portland OR · USCG Northwest District (CGD-NW) · Activity 6926247
18 June 2019
Deficiency Check
Physical examination · Marine Safety Unit Portland OR · USCG Northwest District (CGD-NW) · Activity 6719566
21 March 2019
Annual Inspection
Physical examination · Marine Safety Unit Portland OR · USCG Northwest District (CGD-NW) · Activity 6643410
2 January 2018
Deficiency Check · COI Inspection · Hull Examination
Physical examination · Marine Safety Unit Portland OR · USCG Northwest District (CGD-NW) · Activity 6332709
10 April 2017
Annual Inspection
Physical examination · Marine Safety Unit Portland OR · USCG Northwest District (CGD-NW) · Activity 6121174
20 April 2016
Annual Inspection
Physical examination · Marine Safety Unit Portland OR · USCG Northwest District (CGD-NW) · Activity 5851508
07 - Fire Safety › N/A - No Subsystem › Fixed fire extinguishing installation
Issued 23 April 2024
Resolved
A vessel on which a pre-engineered fixed gas fire extinguishing system is installed must have the following equipment at the operating station: A light to indicate discharge; An audible alarm that sounds upon discharge; and A means to reset devices used to automatically shut down ventilation systems and engines as required by paragraph (a)(3) of this section. The vessel's installed Xintex-Fireboy, did not have the required equipment at the operating station, and had no way to test the functionality of the pre-engineered fire system. Operator is to install required equpment and provide proof of functionality to marine inspector.
Action required: 701 - Prior to carriage of passengers/cargo
Due 31 May 2024
Resolved 8 July 2024
Resolution: Rcvd video of operator conducting sat test of system.
08 - Alarms › N/A - No Subsystem › Fire alarm
Issued 23 April 2024
Resolved
A flammable vapor detection system must provide a visual and audible alarm at the operating station. Flammable vapor sensor failed to function properly and sound or display alarm at the operating station during marine inspector testing. Operator is to repair or replace flammable vapor detection system so that it alarms properly.
Action required: 701 - Prior to carriage of passengers/cargo
Due 31 May 2024
Resolved 6 May 2024
Resolution: Rcvd video of owner conducting a test on fume detector, all sat.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Bilge pumping arrangements
Issued 23 April 2024
Resolved
At each initial and subsequent inspection for certification of a vessel, the owner or managing operator shall be prepared to conduct tests and have the vessel ready for inspections of machinery, fuel, and piping systems, including Operational test of the means provided for pumping bilges; and Test of machinery alarms including bilge high level alarms. During inspection, bilge pump failed to function in automatic mode from the float switch. Operator is to repair or replace so that bilge pump operates in auto mode.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 31 May 2024
Resolved 6 May 2024
Resolution: Rcvd email with video of bilge pump working in auto, all sat.
07 - Fire Safety › N/A - No Subsystem › Fire fighting equipment and appliances
Issued 17 March 2020
Resolved
Place into service one (01) 2-A portable fire extinguisher.
Condition: Improper Installation
Action required: 50 - Rectify deficiencies w/in 30 days
Due 17 April 2020
Resolved 8 September 2020
Resolution: Via Text, Owner indicated that a 3rd fire extinguisher was mounted under the starboard seat. Support with a picture. Def Cleared.
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 21 March 2019
Resolved
Place into service a ring buoy light, lanyard and detachable clip in accordance with 46CFR180.70, prior to operating at night.
Action required: 705 - Other - as specified
Due 21 April 2019
Resolved 18 June 2019
Resolution: Email received attesting to installation of approved float light.
Engineering › Fuel Oil Service System › Valve
Issued 10 January 2018
Resolved
Repair and/or replace fuel oil emergency cut-off valves so that they will fully close via the remote operating t-handle/pull cable.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 10 February 2018
Resolved 2 February 2018
Resolution: Vessel owner replaced the quarter-turn valves with new (brass) ones.
Engineering › Bilge Water Management System › Not Operational
Issued 10 January 2018
Resolved
Repair or replace inoperable float switch/alarm in the bilge area forward of the machinery space.
Action required: 705 - Other - as specified
Due 10 February 2018
Resolved 2 February 2018
Resolution: Vessel owner installed a new float switch.
Navigation › Collision/Grounding Avoidance › Navigation Lights
Issued 10 January 2018
Resolved
Repair or replace inoperable running light (starboard).
Action required: 705 - Other - as specified
Due 10 February 2018
Resolved 2 February 2018
Resolution: Vessel owner replaced burnt-out light bulb in the starboard running light.
Lifesaving › Lifebuoys › Serviceable
Issued 10 January 2018
Resolved
Replace damaged life-ring buoy.
Action required: 705 - Other - as specified
Due 10 February 2018
Resolved 2 February 2018
Resolution: Owner replaced life-ring buoy.