Records from 2016 to 2026. Most recent: inspection, 12 June 2026.
Inspection history · 14
12 June 2026
PSC B
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 8402716
13 April 2023
PSC B
Physical examination · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 7667572
10 April 2023
Administrative Inspection · Deficiency Check
Physical examination · Sector Jacksonville · USCG Southeast District (CGD-SE) · Activity 7665538
6 December 2021
PSC A
Physical examination · Sector Jacksonville · USCG Southeast District (CGD-SE) · Activity 7361957
13 March 2021
PSC B
Physical examination · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 7151002
29 October 2020
Type not recorded
No type recorded · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 7085089
5 September 2020
PSC B
Physical examination · U.S. COAST GUARD FORCES MICRONESIA/SECTOR GUAM · USCG Oceania District (CGD-O) · Activity 7048831
22 January 2020
PSC B · Ballast Water Examination
Physical examination · Sector Jacksonville · USCG Southeast District (CGD-SE) · Activity 6890157
2 February 2019
Administrative Inspection · Deficiency Check
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 6618989
29 January 2019
Ballast Water Examination · ISPS II Exam · PII Safety Exam
Physical examination · Sector Jacksonville · USCG Southeast District (CGD-SE) · Activity 6613976
3 May 2018
PII Safety Exam · Ballast Water Examination · ISPS II Exam
Physical examination · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 6401237
15 September 2017
In-Service Inspection
Physical examination · Sector Jacksonville · USCG Southeast District (CGD-SE) · Activity 6265740
23 January 2017
ISPS II Exam · Ballast Water Examination · PII Safety Exam
Physical examination · Sector Charleston · USCG Southeast District (CGD-SE) · Activity 6073323
19 January 2016
Deficiency Check · PII Safety Exam · Ballast Water Examination · Administrative Inspection · ISPS II Exam
Physical examination · Sector Jacksonville · USCG Southeast District (CGD-SE) · Activity 5815288
09 - Working and Living Conditions › 092 - Working Conditions › Machinery
Issued 6 December 2021
Resolved
The machinery, boilers and other pressure vessels, associated piping systems and fittings shall be of a design and construction adequate for the service for which they are intended. PPSCO's witnessed fire/GS pump and #1 main cooling pumps leaking excessively.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 6 January 2022
Resolved 10 April 2023
Resolution: Received C/E statement with pictures attesting satisfactory repairs to the pump gaskets, as well as Class NKK report attesting repairs were made.
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 6 December 2021
Resolved
Cylinders must always be secured and, when not in use, they must be stowed in a rack in an upright position. PSCO's discovered 02 oxygen cylinders outside of the oxy/acetylene locker secured to a wall with ratchet straps.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 6 January 2022
Resolved 10 April 2023
Resolution: Received bill of lading, report, and pictures attesting to removal of cylinders.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 29 January 2019
Resolved
THE CONDITION OF THE SHIP AND IT'S EQUIPMENT SHALL BE MAINTAINED TO CONFORM WITH THE PROVISIONS OF THE PRESENT REGULATIONS TO ENSURE THAT THE SHIP WILL REMAIN FIT FOR SEA. IDENTIFIED 2 TEMP. REPAIRS FOR LEAKING BELOW CRANKCASE EXPLOSION COVERS ON MDE.
Condition: Invalid
Action required: 16 - Rectify deficiencies w/in 14 days
Due 12 February 2019
Resolved 2 February 2019
Resolution: The class survey report outlined removal, cleaning, and replacement of gaskets on the #7 and #5 MDE crank case relief valves, resulting in proper seating of gaskets and closure of the identified leaks.
Electrical › Electric Generation Source (emergency) › Number of Sources
Issued 19 February 2016
Resolved
Starting arrangements for emergency generating sets shall have a second source of energy. When testing the hydraulic line parted rendering that system inoperable. 74 SOLAS(01) II-1/44.2 15ac
Condition: Design Flaw
Action required: 15 - Rectify deficiencies by next port
Due 19 February 2016
Resolved 19 February 2016
Resolution: Received a Classification report attesting to the repairs and proper operation on the secondary power supply to the emergency generator.