Records from 2003 to 2008. Most recent: inspection, 1 December 2008.
A report is not offered for this hull: Its record holds only 2 of the seven kinds of material a report is built from: inspections, deficiencies, operational controls, tow-unit appearances, casualty records, dimensions and documentation. That is a statement about the record, not about the vessel. Reports.
Inspection history · 12
1 December 2008
SIP Inspection/Audit · Administrative Inspection
Administrative · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 3371844
27 November 2008
COI Inspection · Administrative Inspection · MTSA/ISPS Verification · MARPOL Annex I Examination
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 3373998
25 August 2008
Examination of Repairs · Hull Examination · Internal Structural Exam
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 3308402
25 March 2008
SIP Inspection/Audit · Administrative Inspection
Administrative · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 3186960
3 April 2007
Annual Inspection · Examination of Repairs · Administrative Inspection · Construction Oversight
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 2900547
30 March 2006
Administrative Inspection · Re-Inspection
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 2612496
6 April 2005
Administrative Inspection · Re-Inspection
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 2327904
29 March 2005
Administrative Inspection
Administrative · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 2322587
25 August 2004
MTSA/ISPS Verification
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 2175904
20 February 2004
Administrative Inspection
Administrative · MSO Mobile · USCG Heartland District (CGD-H) · Activity 2009975
29 December 2003
Security Plan Review - VSP
Administrative · Marine Safety Center (MSC) · Activity 1971398
26 August 2003
Internal Structural Exam · MARPOL Annex I Examination · Initial Certification · Initial Construction-Excluding Oversight · Hull Examination
Physical examination · MSO Mobile · USCG Heartland District (CGD-H) · Activity 1888109
Lifesaving › Rescue Boat Equipment › Instructions (engine start/operation)
Issued 12 December 2008
Resolved
Prove proper repairs to the rescue boat steering gear.
Action required: 705 - Other - as specified
Due 16 December 2008
Resolved 14 December 2008
Electrical › Electric Generation Source (emergency) › Switch
Issued 9 December 2008
Resolved
Prove proper operation of emergency generator automatic load transfer.
Action required: 705 - Other - as specified
Due 23 December 2008
Resolved 17 December 2008
Operations/Management › Drills/Instruction › Launching/Recovery of Survival Craft
Issued 9 December 2008
Resolved
Provide instruction label's in English and language of crew for all fire fighting and safety equipment.
Action required: 705 - Other - as specified
Due 9 January 2009
Resolved 27 January 2009
Operations/Management › Vessel Safety Management › Plans for Shipboard Operations
Issued 9 December 2008
Resolved
Update new address of the company operator on the Continuous Synopsis Record (CSR).
Action required: 705 - Other - as specified
Due 9 January 2009
Resolved 3 January 2009
Pollution Prevention/Response › Prevention Equipment › Oily Water Separator (15 ppm)
Issued 9 December 2008
Resolved
Prove proper operation of the oily water seperator.
Action required: 705 - Other - as specified
Due 23 December 2008
Resolved 17 December 2008
Pollution Prevention/Response › Prevention Equipment › Sewage System Valve
Issued 27 November 2008
Resolved
Conduct maintenance on the sewage discharge valve and prove proper operation.
Action required: 705 - Other - as specified
Due 9 January 2009
Resolved 3 January 2009
Stability › Intact Stability (when using lifting gear) › General
Issued 3 April 2007
Resolved
Provide stability booklet amendment and ABS approval letter/stamp for new stability.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 3 April 2007
Operations/Management › Vessel Safety Management › Maintenance of Ship/Equipment
Issued 3 April 2007
Resolved
Provide complete documentation for automation test procedures annual tests.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 3 April 2007
Accommodation/Occupational Safety › Other Accommodation Spaces › Open Deck Space
Issued 3 April 2007
Resolved
Lab on main deck does not have proper SOLAS approval. Vsl is applying through 10-82 for approval.
Due 23 August 2007
Resolved 25 March 2008
Resolution: Received approval letter from MSC approving the portable quarters under SOLAS.
Deck/Cargo › Cargo Transfer/Lightering (liquid) › Piping
Issued 3 April 2007
Resolved
Provide [name withheld]/ MI info about changes made after approval of plans to liquid mud and brine piping. Systems are not exact to plans, further info needed(change in pipe size/location/type/penetrations) to determine if re-submittal is neccessary.
Due 23 August 2007
Resolved 3 April 2007